TERMS OF REFERENCE. Review of Aviation Weather Requirements. Lourdes-de-Blanc-Sablon, Québec

Similar documents
Review of Air Traffic Services Montreal International Mirabel (CYMX) TERMS OF REFERENCE. Review of Air Traffic Services

Terms of Reference - Review LOC/DME at CYGV, CYRJ, CYHR TERMS OF REFERENCE

Terms of Reference CYR301 Airspace Modification TERMS OF REFERENCE. Airspace Modification CYR301. Camp Dundurn, SK

TERMS OF REFERENCE FREDERICTON AIRSPACE REVIEW

Terms of Reference. Airspace and Communications Requirements in the South Oil Sands Area, Northern Alberta

Section 1. Performance of International Flights

1.0 BACKGROUND NEW VETERANS CHARTER EVALUATION OBJECTIVES STUDY APPROACH EVALUATION LIMITATIONS... 7

MANAGING THE CHANGES AS A STATE CASE STUDY UAE Airspace Restructuring Project

AERODROME SAFETY COORDINATION

2 THE MASTER PLAN 23

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

DETAILS AND PRINCIPLES REGARDING PROPOSED REVISED SERVICE CHARGES OCTOBER 1, 2000

AERONAUTICAL INFORMATION CIRCULAR 33/17

AERONAUTICAL STUDY REVIEW OF AIR TRAFFIC SERVICE REQUIREMENTS AT SUDBURY, ONTARIO

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

The NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

Air Operator Certification

NATA 2018 AGM & CONFERENCE

PBN and airspace concept

Tel.: +1 (514) ext Ref.: SWG 21/1-09/94 16 December 2009

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen

THE NATIONAL ACADEMIES PRESS

Aeronautical Studies (Safety Risk Assessment)

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

ACI World Safety Seminar Beijing November 2008 AN OVERVIEW OF ICAO SAFETY PROGRAMMES

INTERNAL AUDIT REPORT

IMPORTANT ANNOUNCEMENT THURSDAY, 31 MAY 2007 COMMUNICATION REGARDING STANDARDIZED PRIVATE PILOT LICENCE (PPL)

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

NANAIMO AIRPORT LAND USE AND DEVELOPMENT PRINCIPLES

Ref.: A2/76.1.CONF IND/16/14 14 June 2016

The mandate and composition of the Committee were changed following:

AERONAUTICAL INFORMATION CIRCULAR Belgium and Luxembourg

ICAO Regional Safety Management Symposium Interaction between SMS & SSP. Geoff Want Director of Safety & Security. October 2017

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

A Master Plan is one of the most important documents that can be prepared by an Airport.

2.2 Air Navigation Deficiencies ICAO CAR/SAM AIR NAVIGATION DEFICIENCIES DATABASE SIP. (Presented by the Secretariat) SUMMARY

Forecast of Aviation Activity

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT

GENERAL ADVISORY CIRCULAR

Safety Management System Coordinator. Position Number Community Division/Region Yellowknife Air, Marine and Safety/HQ

Applewood Heights Community Open House

TORONTO TRANSIT COMMISSION REPORT NO.

TWELFTH AIR NAVIGATION CONFERENCE

The framework of the ICAO EUR Regional Expert Safety Team (IE REST)

Communication and consultation protocol

Doncaster Local Plan. Housing and Economic Land Availability Assessment (HELAA) July 2017 Update Employment Sites

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project

ICAO CAPSCA. Asia Pacific. Manila, April 22-25, CAPSCA Manila

When replying please quote: Ref.: NT-NE57 E.OSG - NACC May 2018

COMMISSION IMPLEMENTING REGULATION (EU)

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION TANZANIA CIVIL AVIATION AUTHORITY VACANT POSITIONS

The Strategic Commercial and Procurement Manager

Recommended Performance Measures

IRELAND SAFETY REGULATION DIVISION

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

ICAO Cyber Summit & Exhibition CLOSING REMARKS. 10 April 2017

Terms of Reference: Introduction

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

Draft airspace design guidance consultation

AN INTRODUCTION TO PANS-AERODROMES (Doc 9981)

SRC POSITION PAPER. Edition March 2011 Released Issue

University of Connecticut Division of Student Affairs Unit Review. What is Unit Review? Purpose. Guiding Principles of Unit Review

TWELFTH AIR NAVIGATION CONFERENCE

Office of Aviation Safety Analytical Services

Airport Safety Management Systems: Integrating Planning Into the Process

The completion date will be for Pilots and for Controllers instead of

Accept, Sir/Madam, the assurances of my highest consideration.

Steps towards development of Aeronautical Data Catalogue in Ukraine

Considerations for Facility Consolidation

COMPREHENSIVE REGIONAL IMPLEMENTATION PLAN FOR AVIATION SAFETY IN AFRICA (AFI PLAN) NINETEENTH AFI PLAN STEERING COMMITTEE MEETING

Real-time Simulations to Evaluate the RPAS Integration in Shared Airspace

Summary of Public Submissions Received on

Pre-Submission Consultant Briefing January 12, 2016

Content. Definitions and Abbreviations 5 General definitions Abbreviations Consultation Details 10 Comments arising from the NPRM...

MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS.

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

AIRSPACE CHANGE COMMUNITY ENGAGEMENT REPORT

Contents. Part 172 Amendments. Subpart A General Purpose... 5 CONSULTATION DETAILS Air Traffic Service Organisations Certification

Transport Canada Civil Aviation Transformation (TCCAT) Initiative

2.1 TITLE: VMC PARKS MASTER PLAN AND IMPLEMENTATION STRATEGY PROJECT UPDATE

AERONAUTICAL INFORMATION CIRCULAR 11/16

FLIGHT PATH FOR THE FUTURE OF MOBILITY

ASSEMBLY 39TH SESSION

AEROTHAI Air Traffic Management Network Management Centre IATA ICAO Cross Border ATFM Workshop

(Also known as the Den-Ice Agreements Program) Evaluation & Advisory Services. Transport Canada

Responsible Aerodrome development?

The support of an European ANSP

UK Implementation of PBN

Billy Bishop Toronto City Airport Terminal Upgrade Project

USE OF REMOTELY PILOTED AIRCRAFT AND MODEL AIRCRAFT IN AVIATION

Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development

PLUME RISE ASSESSMENTS

Civil Aviation Directive

Transcription:

TERMS OF REFERENCE Review of Aviation Weather Requirements Lourdes-de-Blanc-Sablon, Québec NAV CANADA Level of Service 77 Metcalfe Street Ottawa, Ontario K1P 5L6 October 2018 The information and diagrams contained in this Terms of Reference are for illustrative purposes only and are not to be used for navigation.

TABLE OF CONTENTS 1.0 Purpose... 2 2.0 Scope of the study... 2 3.0 Background... 2 4.0 Methodology... 2 5.0 Safety Management Plan... 3 6.0 Human Resources... 3 7.0 Work Management Plan... 3 8.0 Finance Resources... 4 9.0 Materiality of the changes... 4 10.0 Consultation... 4 11.0 Authority... 4 1

1.0 Purpose The purpose of this Terms of Reference (TOR) document is to initiate an aeronautical study to review the weather requirements for the Lourdes-de-Blanc-Sablon, Québec airport. 2.0 Scope of the study The aeronautical study will determine if the NAV CANADA Automated Weather Observation System (AWOS) will be an acceptable alternative to the current Contract Weather Office (CWO) as the means of providing aviation weather observations at the Lourdes-de-Blanc- Sablon airport (CYBX). 3.0 Background A 24-hour per day aviation weather observation program (METAR/SPECI) is currently conducted by a CWO. The observations also support a 24-hour aerodrome forecast (TAF). 4.0 Methodology An aeronautical study assesses and analyzes information gathered through data collection and customer/stakeholder consultation. The aeronautical study team will: Confirm stakeholder requirements for aviation weather services at the Lourdes-de-Blanc- Sablon airport; Analyze the concerns and issues raised by the stakeholders; Develop possible solutions and/or options; Conduct a HIRA as required; Present recommendations to senior management for approval; Coordinate with the appropriate managers who would be involved with the technical and operational implementation of the proposed service change; and Coordinate with Transport Canada. The study team will ensure that consultation with customers and affected or interested stakeholders is sufficient prior to making any recommendations to senior management. A business case will be developed to validate the recommendations. The Study team will conduct the risk analysis and may call upon stakeholders to contribute to the assessment of some risk scenarios. 2

5.0 Safety Management Plan The manager responsible for implementing any decisions resulting from this aeronautical study will prepare a project safety management plan. The plan will include mitigation and monitoring actions that are required to implement the change in service. 6.0 Human Resources The team will be multi-disciplined with representation as required from key technical, operational and support areas. Where significant resources are required, this will be negotiated between the respective managers. Team Leader: Manager, Level of Service & Aeronautical Studies Other Team Members: Manager, Level of Service & Aeronautical Studies Manager, Aviation Weather Services Analyst, Navigation and Airspace 7.0 Work Management Plan TOR approval: November 2018 When conducting an Aeronautical Study, the following will be undertaken: 1. Develop Communication and Consultation Plan Winter 2018/2019 2. Study commencement Winter 2018/2019 3. Consultation Month - Winter 2019 4. Assess consultation input Winter 2019 5. Conduct HIRA Winter 2019 6. Finalize Aeronautical Study Report Winter 2019 7. Management Approvals Winter 2019 8. Circulate to Transport Canada for safety oversight review Winter 2019 Following Transport Canada review 9. Coordinate implemention plan and dates with appropriate departments TBD 10. Prepare AIM Submission TBD 11. Prepare and publish AIC TBD 12. Prepare and publish Notice TBD 13. Implement TBD 14. Monitoring Post implementation Reviews (conducted at post 90 days and 1 year) 3

8.0 Finance Resources Each responsibility manager is accountable for any travel and related expenses of the study team including the management of overtime. Service design changes may generate an engineering support requirement. These requirements will be identified as the study progresses and an Opportunity Proposal (OP) generated to initiate project planning for implementing the engineering related recommendations from the study. 9.0 Materiality of the changes There is the potential that some of the service delivery options may represent a material change. If this is the case formal notifications as per the Civil Air Navigation Services Commercialization Act will apply. 10.0 Consultation An appropriate communications plan incorporating a full consultation plan will be prepared. Aviation organizations representing airport, general aviation, business aviation and others as appropriate will be consulted during the Aeronautical Study. A complete list of customers and stakeholders consulted will be attached to the aeronautical study. 11.0 Authority Executive Vice President Service Delivery 4