TRAFFIC DEVELOPMENT POLICY 2018

Similar documents
Traffic Development Policy

TRAFFIC DEVELOPMENT POLICY 2018

Traffic Development Policy IATA SEASONS 2015/2016

Abruzzo Airport. Commercial Policy Development Routes

Catania Airport Commercial Aviation Policy October 2018

Interactive x-via web analyses and simulation tool.

INVEST WITH US! Discover vibrant cities with MEININGER Hotels. Europe

SEA GROUP POLICY FOR THE DEVELOPMENT OF TRAFFIC AT MALPENSA AIRPORT. Strategic targets of SEA Group

ACI EUROPE POSITION PAPER. Airport Slot Allocation

-1- Company Presentation Flughafen Wien AG Results 2007

Passenger Flows Zurich Airport. July to November 2011

Incentive Discounts Programme for Traffic Development at Sofia Airport 2018

Hello 2017 Business Class Promotional Fares

SKP OHD SKP OHD SKOPJE ALEXANDER THE GREAT AIRPORT OHRID ST. PAUL THE APOSTLE AIRPORT

Brussels Airport Airline Issues & Route Development Breakout session 18 June

BUS TBS BATUMI AIRPORT TIBLISI AIRPORT TBS BUS

Intra-European Seat Capacity. January February March April May June July August September October November December. Intra-European Sectors Flown

Results for the First Nine Months of 2007

Airport Slot Allocations In The EU: Current Regulation and Perspectives.

IATA EUR Airline PBN implementation requirements - March State Airport TMA/Runways Specifics. Austria VIE PRNAV SIDs/STARs

ACL Company Profile. Aviation, Optimised.

ACL Company Profile. Aviation, Optimised.

Incentive Programme 2018

ACI EUROPE POSITION. A level playing field for European airports the need for revised guidelines on State Aid

Growing through Alliances and Consolidation

Leveraging the New Partnership. 19 December 2011

Infrastructure constraints in Europe

Incentive Programme 2017

MISUSE OF SLOTS ENFORCEMENT CODE ANNUAL REPORT 2014/15

The Future of Aviation in Northern Europe

AviAlliance The Airport Management Company

Airports Council International, Geneva, Switzerland Airports Council International, European Region, Brussels

INCENTIVE PROGRAM

Airport Slot Capacity: you only get what you give

Recommendations on Consultation and Transparency

Airline network optimization. Lufthansa Consulting s approach

Role of Aviation Sector in Latvia Development of Riga International Airport

KEFLAVÍK AIRPORT FROM A STROLL THROUGH CENTRAL PARK TO A SEAT ON THE LONDON EYE FACTS AND FIGURES 2017

Emirates Airline (EK) Student Fare to UK, Ireland, Europe ~Ticketing must be issued on or before 30Apr19 (One-way) Low Season

Grow Transfer Incentive Scheme

ALITALIA GROUP: RESULTS FOR QUARTER THREE 2012

Incentive Programme 2019

Media Release ETIHAD AIRWAYS ANNOUNCES STEP-CHANGE IN BUSINESS STRATEGY WITH THE LAUNCH OF ETIHAD REGIONAL

ANA Traffic Growth Incentives Programme Terms and Conditions

Competition from the Gulf and Turkey

Company Presentation Flughafen Wien AG

Schedule Compression by Fair Allocation Methods

State of the Aviation Industry

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

Thomas Cook (option 3 or 4) 2

PALANGA AIRPORT INCENTIVE SCHEME

RE: PROPOSED MAXIMUM LEVELS OF AIRPORT CHARGES DRAFT DETERMINATION /COMMISSION PAPER CP6/2001

Aviation fuelling at its best

MICE Facilities.

0/12M 45kgs. Valid on ALL EK Operating Flights Destinations. Routing (s) From HKG via DXB to. Baggage Validity Allowance

Intra-African Air Services Liberalization

The Commission invited respondents to comment on the The assumptions, conclusions, analysis and factual basis of the SH & E report.

Short-Haul Operations Route Support Scheme (RSS)

Grow Transfer Incentive Scheme ( GTIS ) ( the Scheme )

Regulating Air Transport: Department for Transport consultation on proposals to update the regulatory framework for aviation

Country (A - C) Local Number Toll-Free Premium Rates

Decision Strategic Plan Commission Paper 5/ th May 2017

Press release. For immediate release 10 September European airport passenger traffic up 8.3% in July

THE BRUSSELS AIRPORT COMPANY

EASYJET INTERIM MANAGEMENT STATEMENT FOR THE QUARTER ENDED 31 DECEMBER 2010

SLOTS AND BUSINESS AVIATION - THE LEGAL POSITION

European Economic and Social Committee Public Hearing New developments in air transport Brussels, 12 April 2012 State aid and the aviation sector

Unlocking Business Aviation s Potential in Switzerland

Company Presentation Flughafen Wien AG. March 26,

Summary How air passengers and aviation businesses would be affected if the UK leaves the EU in March 2019 with no deal.

irport atchment rea atabase

BREXIT & AVIATION. Market Interdependence and Economic value

EASYJET INTERIM MANAGEMENT STATEMENT FOR THE QUARTER ENDED 30 JUNE 2013

Q3 FY 14 IMS Analyst & Investor presentation. 3 months to 30 June 2014

ANA Traffic Growth Incentives Program Terms and Conditions

CLUJ AVRAM IANCU INTERNATIONAL AIRPORT R.A

The Changing Trends in the International Airline Industry. Dr John Frankie O Connell First Annual Tourism Policy Workshop Dromoland, 2010

Country (A - C) Local Number Toll-Free Premium Rates

GATWICK AIRPORT LGW WINTER 2014/15 (W14) Start of season

Half Year Traffic Highlights

GATWICK AIRPORT JOINS VINCI AIRPORTS December 2018

Phase 1 opening July 2009 Phase 2 opening Summer 2010 ARAD ROMANIA

Report on Air Passenger Rights Complaints for the period 1 st January to 30 th June th December 2011

Global Seat Capacity July. May. June. Global Sectors Flown July. May. June %

Surface Access Congestion

October 8th, 2014 Montego Bay, Jamaica. Presentation for: ICAO Regional Air Transport Conference The Impact of Taxation on Air Transport s Development

Global Office Real Estate Review colliers.com

Exploring City Pathways

Our commitment to you. Business Powered

ATC Global 2014 航空运输业的可持续发展. The Sustainable Development of the Air Transport Industry. Robin Deransy

SUSTAINABLE DEVELOPMENT PLAN 2015

Given the challenges, airlines would far prefer to have ample capacity and no slot constraints.

Traffic at smaller airports up 11% in November

European passenger traffic up 7.5% in 2004

Palermo Airport The Commercial Policy for Passenger Traffic development

Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport

Airport Access The challenge for Business Aviation in the 21st century. Vlad Olteanu, Policy Manager

Airline Marketing Brussels Airport Léon Verhallen, Head of Airline Business Development

Market Research & Air Service Development in Africa: A Strategic Approach

Dublin Route Support Scheme ( RSS ) Long-Haul Operations (the Scheme )

Transcription:

TRAFFIC DEVELOPMENT POLICY 2018 1. FOREWORD, TARGET AND GENERAL PRINCIPLES 1.1 SAGAT S.p.A. is responsible for the management of Torino Airport The large majority of its shareholders (87%) and all of its activities are self financed with no access to public funding. 1.2 In 2017 Torino Airport transported 4,17 million passengers and handled 47.855 movements. 1.3 Torino Airport s activities are exposed to a sizeable competition from nearby airports of Milano Malpensa and Bergamo Orio al Serio and the Airport has been experiencing a severe leakage of passengers from its catchment area in favour of those airports. 1.4 SAGAT therefore needs to enhance its network of destinations and increase its connectivity in order to recover the most of the passenger traffic leaked to nearby airports, thus allocating more efficiently its capacity. 1.5 In order to do so, SAGAT has conceived a Traffic Development Policy (TDP), aimed at increasing the attractiveness of Torino Airport towards air carriers by offering them market development incentives (MDI). The Guidelines of Torino Airport TDP are hereafter exposed. 1.6 The access to market development incentives is granted in a transparent, fair and non discriminatory manner. 2. TERMS OF APPLICATION 2.1 MDI are provided to air carriers willing to commit to develop and increase their activities on Torino Airport, fulfilling the conditions of one of the cases of market development listed in paragraph 4 of this TDP. 2.2 MDI consist of an economic compensation to be awarded to airlines as a consideration for incremental traffic. As an example, MDI may consist of: an amount to be multiplied by the number of eligible passengers transported by the carrier (parameters of eligibility may vary case by case); or one off lump sums to be paid in advance to compensate start up costs born by the air carrier; or lump sums to be paid to the air carrier when it reaches thresholds of passengers transported; or a combination of the above or other forms of economic compensation. 2.3 The amount of the MDI may vary according to the strategic relevance of the connection, the number of weekly frequencies, the type of aircraft used, the 1

expected total traffic volume, the expected non-aviation revenues connected to the flight. 2.4 MDI are predetermined in their amount and predefined in time and their payment is made ex post, once SAGAT has verified that all commitments have been fulfilled by the air carrier. 2.5 MDI will be paid on the basis of a written contract signed by both parties. SAGAT reserves the right to extend the duration of an MDI contract. 2.6 The payment of MDI is normally subject to: operation of a minimum number of flights on the eligible routes during the term of the contract; punctual and regular payments of current regulated charges. 3. ACCESS TO AN MDI CONTRACT 3.1 Air carriers interested in developing new operations on Torino Airport and wishing to access to an MDI Program, can submit an application by e-mail to SAGAT s Commercial Aviation Department (aviationbusiness@sagat.trn.it). 3.2 The application must specify all possible details concerning: a) the air carrier, its fleet, its network and its bases of operation; b) the destinations the air carrier is willing to operate; c) the expected schedule (period of operations, number of weekly frequencies, aircrafts used). 3.3 SAGAT reserves the right to ask the air carrier to provide further information or to conduct autonomous investigations in order to assess the reliability and financial solidity of the applicant air carrier. 3.4 In case the outcome of the assessment of the air carrier s reliability and financial solidity is positive, SAGAT will enter into a negotiation with the applicant air carrier to define the contents of an MDI Contract provided that SAGAT will have the right, at its own discretion, to decide whether or not to subscribe the contract. 3.5 In case more than one air carrier has submitted an application for the same destination and has been assessed to be reliable and financially solid, SAGAT reserves the right to conduct parallel negotiations, provided that SAGAT will have the right, at its own discretion, to select one or more air carriers for the subscription of MDI Contracts. 4. CASES OF MARKET DEVELOPMENT 4.1 NEW SCHEDULED ROUTES a) Commitment of the air carrier: operate at least one weekly scheduled rotation on a route not being served by the same carrier or by another carrier with direct scheduled flights or on a route for which the incumbent carrier has announced the cancellation of its operations. 2

a) MDI: an economic compensation as per 2.2 - the amount of the MDI may vary according to the strategic relevance of the connection, the number of weekly frequencies, the type of aircraft used, the expected total traffic volume, the expected non-aviation revenues connected to the flight. b) Duration of the MDI contract: up to 5 (five) years. SAGAT reserves the right to extend the duration. c) Other conditions: the Carrier may be asked to commit to operations for a minimum period of time (eg. 12 months, 1 traffic season, etc.). d) Priority destinations: chart n. 1 below lists some destinations considered to be a priority for the development of Torino Airport. The applicant air carrier may, in any case, propose other destinations; SAGAT will assess the potential of the proposed route both in terms of potential passengers traffic and in terms of profitability and decide to add it to the Areas Destinations Countries IATA Codes Africa Tunis Tunisia TUN Middle East Tel Aviv Israel TLV Abu Dhabi UAE AUH Dubai UAE DXB Europe Düsseldorf Germany DUS Hamburg Germany HAM Prague Czech Republic PRG Budapest Hungary BUD Dublin Ireland DUB Glasgow Ireland GLA Warsaw Poland WAW Geneva Switzerland GVA London Heathrow UK LHR Bristol UK BRS Birmingham UK BHX Manchester UK MAN Belgrade Serbia BEG Oslo Norway OSL Vienna Austria VIE Moscow Russia SVO VKO St. Petersburg Russia LED Italy Trieste TRS Comiso CIY Ancona AOI 3

4.2 IMPROVEMENT OF THE PERFORMANCE ON AN EXISTING SCHEDULED ROUTE 4.2.1 IMPROVEMENT DUE TO A NEW ENTRANT a) Commitment of the air carrier: a new Carrier commits to operating at least one weekly scheduled rotation on a route already served by another carrier. b) MDI: an economic compensation as per 2.2 - the amount of the MDI may vary according to the strategic relevance of the connection, the number of weekly frequencies, the type of aircraft used, the expected total traffic volume, the expected non-aviation revenues connected to the flight. c) Duration of the MDI contract: up to 5 (five) years. SAGAT reserves the right to extend the duration. d) Other conditions: the Carrier may be asked to commit to operations for a minimum period of time (eg. 12 months, 1 traffic season, etc.). 4.2.2 IMPROVEMENT DUE TO INCREASE OF NUMBER OF FREQUENCIES OR INCREASE OF CAPACITY a) Commitment of the air carrier: an air carrier already operating scheduled flight on a route commits (i) to operating at least one additional weekly scheduled rotation on the same route as compared with the same IATA season of the previous year OR (ii) to increase the amount of seats offered on the same route as compared with the same IATA season of the previous year by at least 30% as a consequence of aircraft change. b) MDI: an economic compensation as per 2.2 - the amount of the MDI may vary according to the strategic relevance of the connection, the number of weekly frequencies, the type of aircraft used, the expected total traffic volume, the expected non-aviation revenues connected to the flight. c) Duration of the MDI contract: up to 5 (five) years. SAGAT reserves the right to extend the duration. d) Other conditions: the Carrier may be asked to commit to the increase of frequencies or capacity for a minimum period of time (eg. 12 months, 1 traffic season, etc.). 4.3 HIGH PASSENGER VOLUMES a) Commitment of the air carrier: an air carrier, either new or already operating on the airport, commits to developing on Torino Airport, in a 4

short lapse of time, a network of destinations (either with or without based aircrafts) able to determine a significant and swift increase of passenger volume and to maximise the use of Torino Airport infrastructure the air carrier also commits to furtherly increasing that network in the following years according to a development scheme included in the contract. b) MDI: a tailored MDI scheme will be negotiated which may include a combination of economic compensation as per 2.2 and operational support. c) Duration of the MDI contract: up to 10 (ten) years. SAGAT reserves the right to extend the duration. d) Other conditions: the payment of the MDI can depend on the achievement by the air carrier of predetermined traffic thresholds in each year/season of contract. 4.4 KEY DESTINATIONS A. DETROIT Based on the estimates and projections of traffic potential and on the feedbacks received by users of the airport and by corporate based in the catchment area, SAGAT considers that a direct connection Torino Detroit would be a perfect eminent addition to its network. A great deal of direct business passenger traffic would be guaranteed by the presence both in Torino and in Detroit of relevant corporate in the automotive sector, mainly FCA group which is established both in Torino and in Detroit. Besides Detroit serves as one of the main hubs for Skyteam Alliance and Delta Airlines in the Midwestern United States and could provide passengers from Torino with several connecting flights to most destinations in North and Central America. For air carriers willing to commit to operating regular scheduled rotations on the Torino Detroit route SAGAT is available to tailor an ad hoc MDI scheme which may include a combination of economic compensation as per 2.2 and operational support. B. LONDON CITY London City Airport is still considered as the most efficient gateway to London for those travelling for business purposes. Its congestion problems and the severe shortage of available slots turned it into a prestigious and elite airport that would perfectly fit in the network of destinations of Torino Airport, given its consistent share of business traffic. For air carriers willing to commit to operating regular scheduled rotations on the London City route SAGAT is available to tailor an ad 5

hoc MDI scheme which may include a combination of economic compensation as per 2.2 and operational support. For further information or clarifications, please contact SAGAT s Commercial Aviation Department. e-mail: aviationbusiness@sagat.trn.it phone (Maria Cristina Dematteis): 0039-011-5676244. Caselle, 14 th September 2018. 6