Procurement Plan. 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] N/A

Similar documents
Large Scale Irrigation Modernization Project Procurement Plan

Procurement Plan. I. General

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement

PROCUREMENT PLAN (Textual Part)

Procurement Plan National PPFD

PROCUREMENT PLAN. Period covered by this Procurement Plan: September 25, 2017 September 28, Preamble

Procurement Plan for P (PFS)

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

(Updated version, November 12, 2010)

Code Denomination Type. 1.A KB/RRP/C/1/A High visibility vests for schools G. 1.B KB/RRP/C/1/B High visibility vests for Police Service G

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

BF-YOUTH EMPLOYMENT & SKILLS DEVELOPMENT (P130735)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

ESPACE DES ONG / NGO SPACE 39 e session de la Conférence générale / 39 th session of the General Conference

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Capital Estimates. Budget de capital

Présentation officielle du budget de 2016 le 25 janvier Official Presentation of the 2016 Budget January 25 th, 2016

Capital Estimates. Budget de capital

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612)

(i) Adopted or adapted airworthiness and environmental standards;

Guidance for Usage of Issue Papers

Certification Specifications and Acceptable Means of Compliance for Aircraft Noise CS-36

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

INVITATION FOR EXPRESSION OF INTEREST

Republic of Kosova Ministry of Economy and Finance. CAPACITY BUILDING CONFERENCE ON PUBLIC PRIVATE PARTNERSHIP (PPPs)

Musique Cordiale, Association Fr

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017.

OPS General Rules for Operations Manuals

Draft Planning Controls Planning Scheme Amendment GC81

RIJEKA GATEWAY PROJECT CROATIA. M. Audigé Program Team Leader ECSIE

SARI NPA M-02-G. SARI Part M Issue 2 dated 31 July 2017 includes inconsistency with other SARI Parts, incorrect references and omissions.

SEARCH AND RESCUE (SAR) ORGANIZATION IN CAMEROON

BOARD OF AIRPORT COMMISSIONERS

Request for Proposal for Hiring of Ground Support Equipments for All Airports of Pakistan

APPENDIX 1 BACKGROUND AND OVERVIEW OF THE GS/OAS TRAVEL

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198)

Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program - Phase II (P083325)

CARICOM FRAMEWORK ON PUBLIC PROCUREMENT

Current Status of Airport PPP Projects

Contract ID No WBC/RRC- M4/ WBC/RRC- R101/ WBC/RRC- M5PS/ WBC/RRC- M5SB/ WBC/RRC- M5SB/ WBC/RRC- M5SL/

CRD NPA 05/ / Theisen Andre-Cargolux Airlines S.A. (No paragraph affected). Header on pages 2, 3, 5, 6 and 7. Text changed.

International Ship and Port Facility Security Code (ISPS) Maritime Transportation Security Act (MTSA)

PRINCIPLES FOR DETERMINING THE COSTS OF AERONAUTICAL METEOROLOGICAL SERVICE FOR EN-ROUTE AND TERMINAL AIR NAVIGATION, UNITED REPUBLIC OF TANZANIA

Women by area: Urban F Women by area: Rural F

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

REVISION OF REG. 1371/2007 ON RAIL PASSENGERS RIGHTS AND OBLIGATIONS: THE POSITION OF PUBLIC TRANSPORT OPERATORS AND ORGANISING AUTHORITIES

Réseau électrique métropolitain (REM)

Generic OpSpec A332 - DRAFT

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data

15 IMPLEMENTATION OF PRIORITY PROJECTS

The Haitian Government and its Partners. Establishing an Industrial Park in the Northern Region To be Operational as of 2012!

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

How french institutions promote and frame the energy action of local authorities?

ATS OPERATIONAL SUPERVISION AND MANAGEMENT

Licensing Sub-Committee 18 July 2018

ARM - AIR CREW ANNEX III. CONDITIONS for the ACCEPTANCE of LICENCES. ISSUED by or on BEHALF of THIRD COUNTRIES. ARM - AIR CREW Annex III GDCA of RA

? 0-? WA", ilp. Y ON 1Z Cond 1 0 AIRPORT COMMISSIONERS BOARD REPORT TO THE Los Angeles World Airports 0*1-

TENDER NO: KCAA/038/ EXPRESION OF INTEREST (EOI)

Ref: New Tariff for the Water and sewerage Company Inc. (WASCO) Page 1 of 9

SUMMARY AUDIT REPORT OF THE DIRECTORATE OF CIVIL AVIATION OF BURKINA FASO

The type rating of test pilots having flown the aircraft for its development and certification needs to be addressed as a special case.

CHINCHERO INTERNATIONAL AIRPORT CUSCO -PERU. December 2013

Regular Board Meeting August 4, 2015

BRAZIL FEDERAL ROADS GIF Advisory Council Meeting. April 18, 2018

REPORT 2014/065 INTERNAL AUDIT DIVISION. Audit of air operations in the United. Nations Assistance Mission in Afghanistan

Newcastle Transport Program Newcastle Light Rail Determination Report

a p 0.4 f Ai RPORT COMMISSIONERS Meeting Date: \ Sk 0 /1ci / 1/1'/V BOARD..ii REPORT TO THE -...r "V:4'

No UNITED ARAB REPUBLIC and SUDAN Agreement (with annexes) for the full utilization of the Nile waters. Signed at Cairo, on 8 November 1959

EDTO SARPS FROM ANNEX 6 PART 1

AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) IMPLEMENTATION IN INDONESIA

Comment response document for Airbus A380 D 04 Crew Rest Compartment

ORD ORDRE DU JOUR AGENDA. Approval of minutes of the regular sitting of February and the special sitting of February

Example 5 «Breizh-bocage» program

Notice regarding expected tender

CAISSE NATIONALE DES CAISSES D EPARGNE ET DE PREVOYANCE

CONFERENCE ON THE ECONOMICS OF AIRPORTS AND AIR NAVIGATION SERVICES

REPUBLIC OF LATVIA. State Joint-stock Company Latvijas Gaisa Satiksme Aeronautical Information Service Riga Int. Airport, LV-1053, Latvia

The European Commission's Proposal to Amend EU Regulation 261/2004. by Arpad Szakal

9 me Atelier du Club Display. Bienvenue

CHINCHERO INTERNATIONAL AIRPORT CUSCO -PERU. February 2014

This working. Action by the - AIS/MAP. TF/6 Report Report changes as. monopoly 1.3. The establishment SUMMARY REFERENCES.

REPORT 2014/113 INTERNAL AUDIT DIVISION

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

FRAMEWORK TRACK ACCESS AGREEMENT FOR PASSENGER SERVICES. Dated August Between HS1 LIMITED. and EUROSTAR (U.K.) LIMITED

Guidelines for Evaluation of Quality Control for Manufacturing

CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs.

European Aviation Safety Agency

Contract (Description)

PLAN OF ACTION ON TOURISM ( )

Invitation to tender for the provision of PR support services for Visit Belfast

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA

Platform for growth & opportunities 19 > 21 NOVEMBER 2015 BRAZZAVILLE INTERNATIONAL FORUM FOR INVESTMENTS IN CONGO

AIRPORT CHARGES REGULATION

Republika e Kosovës Republika Kosova-Republic of Kosovo Qeveria - Vlada - Government New Kosovo Project

Staff Instruction. SI (O) Standard Operations Specifications

The Nation Municipality Municipalité de La Nation. Budget 2007 Presented on May 7th Présenté le 7 mai

A structuring public transport project for Cape Town Inner City

Progress Report on the Gautrain Rapid Rail Link Portfolio Committee on Transport

Transcription:

I. General Plan 1. Bank s approval Date of the procurement Plan [Original: February 11, 2010]: Revision of Updated Plan, February 2017 2. Date of General Notice: 3. Period covered by this procurement plan: 18 months after effectiveness II. Goods and Works and non-consulting services. 1. Review Threshold: Decisions subject to Review by the Bank as stated in Appendix 1 to the Guidelines for : Method Review Threshold Comments 1. ICB and LIB (Goods) Above 500,000 All 2. NCB (Goods) Above 100,000 First contract 3. ICB (Works) Above 15 million All 4. NCB (Works) Above 5 million All 5. (Non- Services) Below 100,000 First contract [Add other methods if necessary] 2.. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. 4. Reference to (if any) Project Operational/ Manual: Project Manual for World Bank Loan Project P106975 08/25/2014 issued by PEEDU 5. Any Other Special Arrangements: [including advance procurement and retroactive financing, if applicable] N/A 6. the Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. No. Description Estimated Cost Packages Domest ic Review by Bank ( / ) Comments

(Works) (Goods) the NCB (Works) the NCB (Goods) (Non- Services) million Prefere nce (yes/no) 65 11 No 4.7 1 No III. of s 1. Review Threshold: decisions subject to Review by Bank as stated in Appendix 1 to the Guidelines and Employment of s: Method Review Threshold Comments 1. Competitive Methods (Firms) Above 100,000 2. Single Source (Firms) All 3. Individual Above 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Guidelines. 3. Any Other Special Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Assignment number of contracts that will be let under QCBS Estimated Cost million Packages Review by Bank ( / ) 2.4 3 Comments

number of contracts that will be let under other methods 0. 3 3 CQS

Page 1 PROCUREMENT PLAN Congo, Republic of : Rep. of Congo - Water, Electricity & Urban Development SIL (LEN) General Information Country: Congo, Republic of Banks Approval Date of the Original Plan: 2017-07-27 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-05-28 Project ID: P106975 GPN Date: Project Name: Rep. of Congo - Water, Electricity & Urban Development SIL (LEN) Loan / Credit No:, IDA / 55410, IDA / 47010 Executing Agency(ies): CG-Water, Electricity and Urban Developement WORKS GOODS CG-PEEDU-001-F-AOI-17 / Fournitures 50 postes et lignes - Fournitures et construction de 50 postes de transformation électriques MT/BT et lignes MT associées du réseau électrique à BZV et PNR (2 lots) Request for Bids Open - International 0.00 Canceled 2017-10-19 2018-03-13 2017-10-24 2017-12-05 2018-01-04 2018-02-08 2019-02-08 CG-PEEDU-007-F-AOI / Réhabilitation 40 postes- Fournitures réhabilitation de 40 postes et lignes MT/BT Bzv et Pnr Request for Bids Open - International 11,187,608.93 Signed 2017-02-09 2017-02-14 2017-03-28 2017-08-10 2018-01-31 2017-12-29 2017-12-13 2018-11-24 CG-PEEDU-22-F-AON / Acquisition d'un véhicule laboratoire et de deux valises de détection des défauts pour la société nationale d'électricité (SNE) Request for Bids Open - National 2018-04-26 2018-05-01 2018-06-12 2018-07-12 2018-08-16 2019-02-12 CG-PEEDU-23-F-AON / Acquisition des équipements médicaux des centres de santé intégrés (Indzouli à Brazzaville, Siafoumou et Saint Joseph à Pointe-Noire) IDA / 47010 Urban Infrastructure and Services Request for Bids Open - National 2018-05-07 2018-05-12 2018-06-23 2018-07-23 2018-08-27 2019-02-23 CG-PEEDU-026-F-AOI / FOURNITURE ET TRAVAUX DE CONSTRUCTION DE 20 NOUVEAUX POSTES DE TRANSFORMATION ÉLECTRIQUE MT/BT ET LIGNES A BRAZZAVILLE Request for Bids Open - International 2018-05-15 2018-05-20 2018-07-01 2018-07-31 2018-09-04 2019-09-04 NON CONSULTING SERVICES CONSULTING FIRMS Contract Type Combined Evaluation Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Terms of Reference Report and Draft Signed Contract Contract Completion Notice Request for Proposals as Proposals / Minutes Proposal Negotiated Contract CG-PEEDU-004-C-QC-17 / NIES 7 feeders Bzv - Réalisation d'une notice d'impact environnemental et social (NIES) pour la construction de 7 feeders à Brazzaville Review 2016-02-23 2016-03-15 2016-04-28 2016-05-28 2017-08-03 2017-11-01 CG-PEEDU-003 BIS-C-SFQC / postes - Firme pour contrôle et supervision des fournitures et travaux de construction de 16 feeders souterrains et Réhabilitation de 40 postes et lignes MT-BT à BZV et PNR Open - International 916,100.24 Signed 2015-04-11 2015-11-26 2016-07-26 2017-05-03 2017-05-25 2017-06-19 2017-11-11 2017-07-19 2017-07-19 2018-12-11 CG-PEEDU-008 BIS-C-QC / Enquête Satisfaction SNE - Enquête de satisfaction de base de la clientèle SNE 2017-05-04 2017-05-17 2017-07-17 2017-08-28 2017-09-06 2017-09-08 2017-09-08 2017-12-07 CG-PEEDU-29275-CS-CQS / Réalisation d'une notice d'impact environnemental et social (NIES) pour la construction de 7 feeders à Brazzaville Urban Infrastructure and Services Open - International 204,477.74 Signed 2017-02-23 2017-03-16 2017-04-29 2017-05-29 2017-11-11 2017-07-03 2017-04-07 2017-12-30

Page 2 CG-PEEDU-003-C-SFQC-17 / postes - Firme pour contrôle et supervision des fournitures et travaux de construction de 16 feeders souterrains et Réhabilitation de 40 postes et lignes MT-BT à BZV et PNR Open - International 0.00 Canceled 2017-07-26 2017-08-16 2017-09-29 2017-10-27 2017-05-03 2017-11-26 2017-12-31 2018-02-04 2019-02-04 CG-PEEDU-008-C-QC / Enquête Satisfaction SNE - Enquête de satisfaction de base de la clientèle SNE Open - International 0.00 Canceled 2017-05-04 2017-07-12 2017-09-04 2017-10-04 2017-11-09 2018-05-08 CG-PEEDU-003-BIS-C-SFQC / postes-supervision et Contrôle des fournitures et construction de 16 feeders etvréhabilitation de 40 postes et lignes MB/BT à BZV et PNR Open - International 0.00 Canceled 2015-12-17 2016-01-16 2016-08-13 2016-12-11 2017-06-07 2017-07-12 2017-08-16 2018-08-16 CG-PEEDU-002-C-SFQC-17 / supervision 50 postes et lignes - Contrôle et supervision des travaux de 50 postes de transformation électriques MT/BT et lignes MT associées du réseau électrique à BZV et PNR Open - International 0.00 Canceled 2017-10-27 2018-01-11 2017-11-17 2018-01-31 2017-12-31 2018-03-29 2018-01-28 2018-02-27 2018-04-03 2018-05-08 2019-06-07 CG-PEEDU-016-C-QC-18 / Notice d'impact environnemental et social (NIES) pour la construction de neuf feeders souterrains 20 kv à Pointe Noire Open - International 0.00 Canceled 2014-12-31 2015-12-31 2016-12-23 2017-02-15 2017-04-07 2017-10-04 CG-PEEDU-004-C-SFQC / Assistance comptable SNDE - Urban Water Supply Assistance technique financière et comptable auprès de la SNDE Open - International 0.00 Canceled 2017-08-15 2017-09-05 2017-10-19 2017-11-16 2017-12-16 2018-01-20 2018-02-24 2019-02-24 CG-PEEDU-005-C-SMC / Patrimoine SNDE - Audit du patrimoine de la SNDE Urban Water Supply Least Cost Open - International 0.00 Canceled 2017-04-21 2017-09-12 2017-08-22 2017-10-05 2017-11-02 2017-12-02 2018-01-06 2018-02-10 2018-08-09 CG-PEEDU-006-C-SMC / Patrimoine SNE-Audit du patrimoine de la SNE Least Cost Open - International 0.00 Canceled 2017-04-21 2017-09-14 2017-08-22 2017-10-05 2017-11-02 2017-12-02 2018-01-06 2018-02-10 2018-08-09 CG-PEEDU-20-CS-SFQC / Inventaire physique des immobilisations et présentation Urban Water Supply d'une situation bilancielle auditée et corrigée de la SNDE au 31 décembre 2017 2018-03-28 2018-04-16 2018-04-18 2018-04-24 2018-06-01 2018-06-29 2018-07-29 2018-09-02 2018-10-07 2019-10-07 CG-PEEDU-21-CS-SFQC / Inventaire physique des immobilisations et présentation d'une situation bilancielle auditée et corrigée de la SNE au 31 décembre 2017 2018-03-28 2018-04-05 2018-04-18 2018-04-12 2018-06-01 2018-06-29 2018-07-29 2018-09-02 2018-10-07 2019-10-07 CG-PEEDU-24-CS-SFQC / Elaboration du fichier des Urban Water Supply abonnés de la société nationale de distribution d'eau (SNDE) Review 2018-05-10 2018-05-31 2018-07-14 2018-08-11 2018-09-10 2018-10-15 2018-11-19 2019-11-19 CG-PEEDU-027-C-SFQC / CONTRÔLE ET SUPERVISION DES FOURNITURES ET TRAVAUX DE CONSTRUCTION DE 20 NOUVEAUX POSTES DE TRANSFORMATION ÉLECTRIQUE MT/BT ET LIGNES A BRAZZAVILLE Open - International 2018-05-15 2018-06-05 2018-07-19 2018-08-16 2018-09-15 2018-10-20 2018-11-24 2019-12-24 INDIVIDUAL CONSULTANTS