FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

Similar documents
FY Transportation Improvement Program Basic Project List (in Thousands)

FY Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded

Changes in TIP projects Draft vs. Final Draft

±158 INDUSTRIAL ACRES

±34 ACRES - LAKE AVENUE

Springettsbury Township. Road Improvement Projects

±2.47 ACRES AT THE VILLAGE AT MERIDIAN EXCLUSIVE LISTING MERIDIAN, ADA COUNTY, IDAHO

FDOT Treasure Coast Traffic Impact Report

Stormwater Interpretive Signage

State Route 8 Corridor. Northern Summit County s Path to Success

Listing Summary. Land Listings. December Land with Trophy Bass Pond on Private Duck Hunting Preserve. Private Access. 20 Minutes from Caldwell.

Listing Summary. Land Listings. April Land with Trophy Bass Pond on Private Duck Hunting Preserve. Private Access. 20 Minutes from Caldwell.

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

FDOT Treasure Coast Traffic Report through

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

November 21, 2012 Barbara Kelleher, (954)

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

Progress Report for Projects of Regional Significance

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

FY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

Wichita Falls MPO - MTP Project List 1 of 6

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

Major Projects Overview

MoDOT Southwest District

Progress Report for Projects of Regional Significance

APPENDIX H Transportation Projects Considered for Cumulative Impact Analysis

2018 Service Changes Ada County

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number

Guide to. Road Construction Projects

All closures this week happen at night, including full closures of Mesa and I-10

FDOT Treasure Coast Traffic Impact Report

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

Additional Economic Development Strategy submissions- Klickitat County

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

Transportation TRANSPORTATION PROJECTS

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

October 31, 2014 Chuck McGinness, (954)

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

2009 Regional Solicitation Selected Projects*

I-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps.

2 Construction Program

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects

Palm Beach County Traffic Report July 13 through July 20, 2012

GOODALE TRAIL PROPERTY

May 16, 2014 Chuck McGinness, (954) BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014

D I S C O V E R how our skilled workforce, thriving business climate and enviable lifestyle can go to work for you.

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2017)

City of Grand Island Tuesday, December 12, 2017 Council Session

Hancock. Hancock. Hancock County Population 54,558. Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles HCP 1 81 HCP 2 34

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

Chapter 6 Existing and Proposed Transportation Facilities

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

El Dorado County / Tahoe Roadwork Schedule Sunday through Saturday September 9 September 15, 2012

5.1 Traffic and Transportation

THE RICHMOND REGION Transportation Priority Projects

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

Project ID Project Description Date Sum of Obligation. Grand Total $7,942,419.19

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

Hospital Link Project Project Update Winter 2018

TAYLOR 40 MERIDIAN ROAD & AMITY MERIDIAN, IDAHO

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

STREET CONSTRUCTION PROGRAM SUMMARY CALENDAR YEAR 2018 / 2019 FISCAL YEAR Street From To Construction Type Cost Estimate

NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

Culpeper District. Albemarle County Monthly Report December 2011

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

1.0 Purpose and Organization of the Community Impact Assessment Addendum

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required.

FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69

Airport Planning Area

Current Corridor Characteristics

Construction Update. Local Officials Briefing March 2016

FY Transportation Improvement Program Funding Summary: Local Match for Federal Funds

Capital Improvement Program Fiscal Year

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

Creating Connections in Niagara Region

GO 10 is planning to switch I 10 Eastbound traffic lanes after Sunland Park. The switch is set for Sunday, April 2. Details continue to develop.

Transcription:

FY2016-2020 Regional Transportation Improvement Program Basic Project List () All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell 13055 2018 $1,367 10th Avenue ITS and Overlay, Caldwell 13905 PD $1,312 21st Avenue, Chicago Street to Cleveland Boulevard, Caldwell 13052 2016 $2,381 Academy Road Railroad Crossing, Greenleaf 19461 2018 $106 ACHD Overlays, Arterials and Collectors - FY2014 12050 2016 $0 Bicycle Parking, Main Street Station, VRT 19803 2016 $53 Bogus Basin Road Safety, Maintenance, and Trailhead Improvements 19783 2018 $5,378 Bridge Rehabilitation, FY2019 19442 2019 $3,795 Bridge Repair, FY2020 19345 2020 $2,545 Bridge Repairs, FY2018 19064 2018 $2,330 Capital Maintenance, ACHD - FY2015 12363 2015 ($1,440) Capital Maintenance, ACHD - FY2016 13907 2016 $470 Capital Maintenance, ACHD - FY2017 13479 2017 $6,275 Capital Maintenance, ACHD - FY2019 13903 2019 $5,490 Capital Maintenance, ACHD - FY2020 18728 2020 $6,341 Capital Maintenance, ACHD - FY2021 18701 PD $6,341 Capital Maintenance, ACHD - FY2022 19465 PD $6,341 Capital Maintenance, Alternative Transportation Set-Aside, Boise - FY2019 18847 2019 $1,160 Capital Maintenance, Alternative Transportation Set-Aside, Boise - FY2020 19057 2020 $1,160 Capital Maintenance, Alternative Transportation Set-Aside, Boise - FY2021 18905 PD $1,160 Capital Maintenance, Alternative Transportation Set-Aside, Boise - FY2022 19763 PD $1,160 Capital Maintenance, Local, Boise Area - FY2019 20091 2019 $320 Capital Maintenance, Phase 2, Boise Area - FY2019 20003 2019 $2,383 Capital Maintenance, VRT, Boise - FY2016 13511 2016 $1,477 Capital Maintenance, VRT, Boise - FY2017 13902 2017 $104 Capital Maintenance, VRT, Boise - FY2018 13482 2018 $50 Capital Maintenance, VRT, Nampa - 2020 13906 2020 $153 Centennial Way Roundabout, Caldwell 13484 PD $2,424 Cherry Lane, Linder Road to Meridian Road, Lighting Improvements, ACHD 18717 2017 $440 Cole Road, I-84 to Franklin Road, Boise RD207-16 2019 $4,842 Cole Road, West Spectrum Street to South Century Way, Medians, ACHD 19685 2017 $247 Colorado and Holly Signal and Pedestrian Improvements, Nampa 13486 2020 $774 Eagle Road, Amity Road to Victory Road, Meridian RD207-33 PD $3,350 Farmway Road and Extension 44 Road Rehabilitation, Canyon County 13054 2018 $2,905 Federal Aid Overlay Arterials and Collectors FY2013 11581 2015 ($78) Five Mile Road, Franklin Road to Fairview Avenue, ACHD 11582 2014 $550 Franklin Road and Cloverdale Road Intersection 08698 2015 $0 Franklin Road, Black Cat Road to Ten Mile Road, Meridian 12368 2016 $6,898 Franklin Road, Black Cat Road to Ten Mile Road, Meridian 12368 2017 $61 Franklin Road, Touchmark Way to Five Mile Road 12062 2016 $0 Friends Road Railroad Crossing, Greenleaf 19417 2017 $85 Greenhurst Road Signals, Nampa 13959 2016 $339 Page 1 of 6

I-84B, Canyon Street to Grant Avenue, Nampa 13931 2017 $3,820 I-84, Bridge Deck Life Extension FY2017 13945 2017 $1,414 I-84 Bridge Repairs, FY2018 19010 2018 $530 I-84, Eisenman Interchange to Indian Creek Bridge Eastbound 12352 2016 ($374) I-84, Eisenman Interchange to Indian Creek Bridge Westbound 12353 2016 ($62) I-84, Farmers Sebree Canal (near Parma Exit) to Franklin Road, Caldwell 19696 2020 $730 I-84, Five Mile Road to Orchard Road, Boise 19289 2020 $2,800 I-84, Garrity Road Eastbound On-Ramp, Nampa 13934 2016 $803 I-84, Karcher Interchange Modification, Nampa 19814 2017 $2,690 I-84, Karcher Interchange Modification Study, Nampa NEW 2016 $9 I-84, Karcher Interchange to Franklin Boulevard Interchange, Nampa 19451 2019 $7,015 I-84, Mason Creek Culvert Replacement, Nampa 19933 2019 $2,720 I-84, Meridian Road Interchange, Meridian 10939 2016 $9 I-84 Pavement Striping FY2014 12342 2016 ($61) I-84, Pavement Striping - FY2015 and FY2016 12343 2015 $309 I-84, Pavement Striping - FY2017 13464 2017 $622 I-84, Pavement Striping - FY2018 13939 2018 $345 I-84, Pavement Striping - FY2019 18818 2019 $345 I-84, Ramp Pavement Improvements - FY2016 13936 2016 $1,257 I-84, Sand Hollow Interchange, Canyon County 19047 2017 $5,550 I-84, SH-44 to Sand Hollow Interchange, Canyon County 19602 2019 $4,175 I-84, Sign Structures at US 20/26 and I-84B/Centennial Way, Caldwell 18830 2019 $1,064 I-84, US 20/26 (Franklin Road) in Caldwell to Karcher Road in Nampa 19589 2018 $12,227 Intersection North Linder Road and SH-44 (State Street), Ada County 13059 2016 ($430) Intersection of Star Road and Franklin Road 09989 2016 ($247) ITS, Northside Boulevard Signal Upgrades, Nampa 18702 2017 $291 ITS, Port of Entry License Plate Readers, Ada County NEW 2017 $500 ITS, SH-55 (Eagle Road) Adaptive Signals, Ada County 18833 2018 $450 Linder Road and Deer Flat Road Intersection, Kuna 13492 2020 $3,103 Linder Road, Franklin Road to Pine Avenue, Meridian RD213-16 PD $3,026 Meridian Maintenance Yard Replacement Facilities (GARVEE) 19772 2017 $1,910 Middleton Road and Ustick Road Roundabout, Caldwell 13487 PD $1,071 Middleton Road Pavement Rehabilitation, Canyon County 12377 2016 ($123) Old Highway 30, Plymouth Street Bridge, Caldwell 13494 PD $8,839 Overland Road and Vista Avenue Lighting, ACHD 19387 2017 $149 Pathway, Dry Creek Trail and Underpass, Eagle 13916 2016 $302 Pathway, Garden City to Americana Boulevard, Boise 13514 2016 $56 Pathway, Mill Creek Elementary, Middleton 18838 2017 $316 Pathway, Rail with Trail, Meridian 13918 2018 $575 Peckham Road, US-95 to Notus Road, Canyon County 13964 2020 $2,202 Pedestrian Improvements, Avenue E, 4th Street to Main Street, Kuna ORN20239 2017 $1,050 Pedestrian Improvements, College of Western Idaho, Nampa 18718 2016 $0 Pedestrian Improvements, Lake Lowell Pathway, Nampa 19065 2017 $267 Pedestrian Improvements, Middleton Heights Elementary, Middleton 18954 2016 $281 Pedestrian Improvements, Near Nampa High, Nampa 18977 2016 $786 Page 2 of 6

Pedestrian Improvements, Near Skyview High, Nampa 19069 2016 $63 Pedestrian Improvements, South Midland Boulevard, Nampa 14344 2017 $181 Pedestrian Improvements, Stoddard Pathway/Greenhurst Road, Nampa 18867 2016 $265 Planning, Communities in Motion Update, COMPASS 13047 2016 $307 Planning, COMPASS CPA1 PD $1,811 Planning, Congestion Management Study, COMPASS 18998 PD $75 Planning, Freight and Goods Movement Study Update, COMPASS 18948 2017 $300 Planning, High Capacity Corridor Alternatives Analysis 13046 PD $1,000 Planning, Metropolitan Planning Funds, COMPASS CPA2 2020 $6,879 Planning, Transit, VRT, Boise 18677 2020 $2,577 Planning, Transit, VRT, Nampa 18805 2020 $1,055 Planning, Transportation Operations, Mgmt., and ITS Plan Update 18694 2019 $250 Planning, Travel Survey and Transit On-Board Data Collection 13048 2015 ($192) Pollard Lane Realignment (GARVEE) 19771 2017 $356 Railroad Crossing, South Black Cat Road, Ada County 20014 2018 $425 Rideshare, ACHD CPA3 PD $1,375 Rideshare, Commuteride Replacement Vans, ACHD 18700 2016 $322 Rideshare, Commuteride Replacement Vans, ACHD 19042 2016 $568 Riverside Road and Lake Shore Drive, Rehabilitation, Canyon County 14362 2017 $4,531 SH-16 and Beacon Light Road Intersection Improvements, Ada County 18872 2017 $1,450 SH-16, Junction SH-44 in Ada County to Emmett 13467 2016 $773 SH-16, Phyllis Canal and South Phase 12917 2016 $0 SH-16, SH-44 (State Street) to US 20/26 (Chinden Boulevard) River Crossing 11236 2016 $0 SH-19, Oregon State Line to Homedale, Seal Coat, Canyon and Owyhee 19856 2020 $1,285 SH-19, Oregon State Line to Homedale, Seal Coat, Canyon and Owyhee 19856 SH-19, Roedel Avenue Railroad Crossing, Caldwell 19627 2018 $388 SH-19, Simplot Gate 6 to Blaine Street, Caldwell 13937 2016 $2,022 SH-44, ADA Ramp Improvements, Middleton 19008 2016 $43 SH-44, Canyon Canal Bridge, Middleton 18950 2019 $2,340 SH-44, Corridor Study, I-84 in Canyon County to Eagle Road 07827 2017 $341 SH-44, I-84 near Caldwell to Junction SH-55 North in Eagle, Seal Coat 19709 2019 $2,100 SH-44, Junction I-84 to Plummer Road in Star, Canyon County 13463 2016 $8,726 SH-44, State Street to SH-55 North, Pavement Preservation, Eagle 13923 2016 $2,957 SH-45 (12th Avenue), 10th Street South to 12th Street South, Nampa 19600 2017 $291 SH-45 (12th Avenue), Sherman Avenue to Dewey Avenue, Nampa 19396 2017 $291 SH-45, Deer Flat Road to I-84B (2nd Street), Seal Coat, Nampa 20225 2017 $1,400 SH-45, Snake River Bridge, Walters Ferry 13389 2017 $6,080 SH-55 and Farmway Road Intersection, Canyon County 18841 2017 $3,395 SH-55, City of Marsing to Caldwell Boulevard, Seal Coat, Canyon County 20267 2018 $970 SH-55 (Eagle Road) and SH-44 (State Street), CFI Intersection, Eagle 19572 PD $650 SH 55 (Eagle Road), Fairview Avenue to SH 44 12044 2016 ($483) SH-55 (Eagle Road), I-84 to SH-44 Micro Seals, Ada County 13466 2017 $2,211 SH-55 (Eagle Road), Meridian Towne Center, Meridian 13349 2016 $9,310 SH-55, Intersection Karcher Road and Middleton Road, Nampa 12046 2016 $0 SH-55 (Karcher Rd.) and Hoskins, Pride, and Riverside, Canyon County 18779 2019 $1,605 Page 3 of 6

SH-55 (Karcher Road) and Indiana Avenue Intersection, Caldwell 13475 2016 $2,284 SH-55 (Karcher Road) and Indiana Avenue Intersection, Caldwell 13475 2017 $50 SH-55 (Karcher Road) and Lake Avenue Intersection, Canyon County 12383 2017 $3,645 SH-55 (Karcher Road) and Midway Road Intersection, Nampa 13025 2017 $4,565 SH-55 (Karcher Road) and Nampa/Caldwell Blvd. Intersection, Nampa 13033 2016 $1,240 SH-55, Overhead Message Sign to Avimor, Ada County 18787 2016 $1,205 SH-55, Pride Lane in Canyon County to Middleton Road in Nampa 19414 2016 $30 SH-55, Pride Lane in Canyon County to Middleton Road in Nampa 19414 2020 $4,392 SH-55, Snake River Bridge, Marsing 13387 2017 $7,749 South Cemetery Road, SH-44 to Willow Creek, Middleton 12048 2018 $2,947 SR2S, VRT, Ada County - FY2016, FY2017, and FY2018, Phase 1 13909 2016 $443 SR2S, VRT, Ada County - FY2016, FY2017, and FY2018, Phase 2 13910 2017 $12 SR2S, VRT, Ada County - FY2019 & FY2020 13912 2019 $316 State Street and Collister Drive Intersection, Boise 13481 2018 $9,060 Storm Water Design Guide, ACHD 13819 2016 ($2) Studies and Special Projects Set-Aside - FY2020 19712 2020 $214 Studies and Special Projects Set-Aside - FY2021 19303 PD $232 Studies and Special Projects Set-Aside - FY2022 19571 PD $232 Swan Falls Road Shoulder Widening, Kuna - FY2012 13518 2016 ($46) Transit 5310 Elderly and Disabled District 3 19464 2016 $200 Transit 5339 Bus and Bus Facility 19663 2016 $280 Transit - Accessible Vehicles, Vehicle Sharing Pool, Nampa 19079 2017 $79 Transit - Acquisition of Service, Boise 19691 2016 $381 Transit - Acquisition of Service Canyon County, Nampa 18790 2015 $61 Transit - Acquisition of Service Eagle and Meridian, Boise 12802 2016 $261 Transit - Acquisition of Service, Kuna and Star 18855 2016 $39 Transit - Acquisition of Service, Nampa 19576 2016 $281 Transit - Acquisition of Service, Nampa 18739 2020 $1,321 Transit - Acquisition of Service Set-Aside, Boise 19145 2020 $1,296 Transit - Associated Capital Enhancements, Boise 18788 2020 $2,256 Transit - Associated Capital Enhancements, Nampa 18781 2020 $700 Transit - Associated Capital Enhancements, Nampa - FY2014 12778 2016 $144 Transit - Associated Capital Improvements, Boise 19081 2020 $565 Transit - Associated Capital Improvements, Nampa 18911 2020 $1,150 Transit - Associated Capital Improvements, Nampa - FY2013 12760 2016 $891 Transit - Beyond Demand Response, Nampa Area 20043 2017 $1,216 Transit - Boise State University Maintenance Facility - FY2008 11350 2016 $108 Transit - Boise State University Replacement Shuttles, Boise 13224 2016 $332 Transit - Boise State University Replacement Shuttles, Boise - FY2015 13223 2016 $83 Transit - Bus Stop Enhancement, VRT, Middleton 19716 2016 $20 Transit - Capital Enhancements, Boise - FY2013 12754 2016 $40 Transit - Capital Lease or Purchase and Maintenance, Boise 13779 2017 $405 Transit - Capital Lease or Purchase and Maintenance, Boise 19122 2020 $2,095 Transit - Capital Lease or Purchase and Maintenance, Boise - FY2013 13827 2016 $324 Transit - Capital Lease or Purchase and Maintenance, Boise - FY2014 14221 2016 $193 Page 4 of 6

Transit - Capital Lease or Purchase and Maintenance, Nampa 18929 2020 $1,238 Transit - Capital Lease or Purchase and Maintenance, Nampa - FY2013 13831 2016 $27 Transit - Capital Lease or Purchase and Maintenance, Nampa - FY2014 12779 2016 $21 Transit - Capital Maintenance, VRT, Boise - FY2014 13480 2016 $1,064 Transit - Capital Maintenance, VRT, Boise - FY2015 13510 2016 $600 Transit - Capital, Safety and Security, Boise 19131 2020 $264 Transit - Capital, Safety and Security, Nampa 18685 2020 $180 Transit - Capital Vehicle Purchase, VRT, Nampa - FY2015 12364 2016 $970 Transit - College of Western Idaho Entrance and Roundabout, VRT, Nampa 19609 2016 $779 Transit - Commuteride Replacement Vans, ACHD 19375 2016 $128 Transit - Demand Response, Nampa 18989 2016 $183 Transit - Demand Response, Nampa 19398 2016 $320 Transit - Demand Response, Nampa - FY2013 13832 2016 $194 Transit - Demand Response Operations, Boise 18785 2020 $2,886 Transit - Demand Response Operations, Nampa 18762 2020 $225 Transit - Fixed Line Operations, Nampa 18786 2020 $6,150 Transit - Mobility Management Coordinated Marketing, VRT 19504 2016 $70 Transit - Mobility Management Implementation, Boise 18854 2020 $3,738 Transit - Mobility Management Implementation, Nampa 18842 2020 $1,288 Transit - Mobility Operations, Boise 19041 2020 $3,520 Transit - Mobility Operations, Nampa 19023 2020 $1,370 Transit - Park and Ride, VRT, Middleton 19297 2016 $1,010 Transit - Preventive Maintenance, Boise 19137 2020 $11,272 Transit - Preventive Maintenance, Nampa 18914 2020 $1,558 Transit - Purchase of Service Admin. and Implementation, Boise - FY2014 14245 2016 $286 Transit Rideshare Platform, VRT/ACHD 19173 2016 $60 Transit Rural Area Formula Program 19380 2016 $3,886 Transit - South Nampa Multimodal Connectivity, Nampa 19590 2016 $520 Transit, Southwest Bus and Bus Facility - FY2015 19147 2016 $310 Transit -Technology Implementation, VRT - FY2013 13830 2016 $100 Transit - Technology, VRT, Boise 18884 2020 $584 Transit - Technology, VRT, Nampa 19573 2016 $400 Transit - University District Multimodal Connectivity, Nampa 19235 2016 $358 Transit - Valley Regional Transit Technology, Boise - FY2014 13226 2016 $150 Transit - Vehicle Maintenance, Kuna Senior Center, Boise 18920 2016 $5 Transit - Vehicle Replacement, Kuna Senior Center 19160 2016 $60 US 20/26 and Farmway Road Intersection, Canyon County 18852 2018 $1,045 US 20/26 and Franklin Road Intersection, Canyon County 19111 2019 $1,100 US 20/26, Borchers Lane in Caldwell to Locust Grove Road in Meridian 19412 2020 $4,105 US 20/26, Branstetter Street to Junction I-184, Garden City 13928 2016 $2,386 US 20/26, Broadway Bridge, Boise 11588 2015 $100 US 20/26, Broadway Bridge, Christ Chapel Mitigation, Boise 19181 2016 $32 US 20/26, Corridor Study, Caldwell to Boise 07826 2017 $102 US 20/26 Intersection Improvements, Canyon County 19415 2020 $755 US 20/26, Locust Grove Road to Cloverdale Road, Ada County 13927 2016 $602 Page 5 of 6

US 20/26, Locust Grove Road to SH-55 (Eagle Road) 19944 PD $7,475 US 20/26, Myrtle, Front, Broadway Resurfacing, Boise 19727 2019 $3,746 US 20/26, Parma Junction to I-84, Seal Coat, Canyon County 19332 2018 $830 US 20/26, Phyllis Canal, Bridge Rehabilitation, near Meridian 20227 PD $3,070 US 20/26, Smeed Parkway to Middleton Road, Caldwell 13921 PD $411 US-95 Bridge Replacement at US 20/26 UPRR Overpass, Canyon County 12886 2016 $6,561 US-95, US-30, US-20, Seal Coats 19254 2020 $1,429 US-95, Wilder to Parma, Seal Coat, Canyon County 19407 2017 $623 Ustick Road, Linder Road to Meridian Road, Meridian RD202-35 2018 $3,080 Ustick Road, Meridian Road to Locust Grove Road, Meridian RD202-37 2017 $2,500 Page 6 of 6