MINUTES OF PROJECT REVIEW MEETING HELD ON

Similar documents
L&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL)

Article 13, clause no of the Concession Agreement states that:

NATIONAL HIGHWAYS AUTHORITY OF INDIA

DETAIL OF THE PROJECT

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

SmartCity (Kochi) Infrastructure Private Limited SEZ

SmartCity (Kochi) Infrastructure Private Limited SEZ

SECTION DESCRPTIONS PAGE NOS.

P3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E.

Dufferin Jog Elimination Project

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS.

Development of Road Infrastructure in India

BUILD. Update CONSTRUCTION. In this issue: FEATURED PROJECT: KENT AVENUE ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEBRUARY 2019

SECTION DESCRPTIONS PAGE NOS.

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016

KANNUR INTERNATIONAL AIRPORT LIMITED (KIAL) Status Report as on 5 May Total land planned for the project acres

N25 New Ross Bypass PPP Project

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

IRONTON-RUSSELL BRIDGE REPLACEMENT

ADDENDUM 2 APPENDIX D STANDARD DRAWINGS

Energy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B

5.7 Local road upgrades

INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA. CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI

Deterioration Factors at Girder Ends

DATA BOOK IV : COST ESTIMATE

EIA for Development of New Civil Enclave at Air Force Base. Annexure 2

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation

Dublin Airport Update Presented by Pat Molloy

Ohio Department of Transportation Construction Update

Approved Training Organisation Manual

CYNGOR CYMUNED DINAS POWYS COMMUNITY COUNCIL

AIRLINE ALLIED SERVICES LIMITED (A wholly owned subsidiary of AIL)

Topic on A Technical and Project Review of the 10 Airport Core Projects and their Influence on Current Developments

MINUTES OF THE STANTON DREW PARISH COUNCIL MEETING HELD IN THE PARISH HALL ON THURSDAY 3 RD NOVEMBER 2016 AT 7.30 PM

Honorable Minister for Industries inspection at CMRL Metro Stations from AG-DMS to Washermanpet

Monitorable Targets & Milestones for INFRASTRUCTURE SECTOR : Planning Commission, Government of India

National Conference on

NATIONAL HIGHWAYS AUTHORITY OF INDIA

Alternatives Study of Alignment

HENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September Chock Lane Traffic Calming scheme Monitoring Report

Annex 5: Technical Terms and Conditions for Lot IV: Committee of the Regions

City of Sydney (COS) Bridges - an Overview & Current Asset Management Practices

Pattullo Bridge Replacement Project

Dilmunia Development Fund I L.P. Enhancing Life, Restoring Balance. January 1st 2014 to June 30th 2014

1. The purpose of this report is to seek the Works, Traffic and Environment Committee s recommendation for:

Terminal Reconstruction and Addition at the M.R. Štefánik Airport in Bratislava

Road Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H

Recommendation: THAT the Council of the Township of Centre Wellington award the following two tenders:

How do you get two buses to pass safely on something

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM

REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT

Phoenix Sky Harbor transit guideway bridge

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT

Report. Recommendation: Mayor and Councillors. To: District Engineer and Roading Manager. From: Date: 11 th April 2012

Central Power Research Institute Civil Engineering Division. Monthly Vigilance Report for the month of JULY 2014

Creating Connections in Niagara Region

ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation. December 28, Prepared by.

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

Historic England (Designation) Consultation Report 14 December 2017

EDERPT East Dulwich Estate Regeneration Project Team MINUTES Albrighton Centre 7-9pm TUESDAY SEPTEMBER

Hospital Link Project Project Update September 2015

D L R C C T R A F F I C N E W S

ICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015

North West London Hospitals NHS Trust

Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges

FDOT Treasure Coast Traffic Impact Report

Whakapirau and Kaipara District Council Working in Partnership

FDOT Treasure Coast Traffic Report through

EAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008

QUEENSLAND RECREATIONAL BOATING COUNCIL INC (QRBC) Report of Meeting

THE CHARTERED INSTITUTION OF HIGHWAYS & TRANSPORTATION. The A19 Trunk Road

Inside Government Conference Case Study: Norwich Northern Distributor Road

Environment, Development and Transport Committee

The rezoning application is recommended for consideration of approval.

History of the Denten Bridge

SmartCity (Kochi) Infrastructure Private Limited Special Economic Zone. 14 th (5/2015 series) APPROVAL COMMITTEE MEETING DATE : AGENDA

Mason Street Bike/Pedestrian Trail Project

Bangalore zonal Office 15, Police Station Road Basavangudi, BENGALURU Ph /221

Personnel views of Barrie Old one of Peter Lind site engineers Renfrew Bypass (M8) (February 2018).

[Type text] AIRPORT MASTER PLAN UPDATE EMAS PROJECT WRAPPING UP A TEMPORARY HOME FOR A BBJ

MONTHLY O & M INSPECTION REPORT DECEMBER

Message from the Managing Director... r...


THIS IS 2015: THE BANKS PROJECT YEAR IN REVIEW

Building the transportation network we need for the future in Niagara Region

Meeting August 5, 2013

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

1) SUB: ENVIRONMENT AWARENESS & STRESS MANAGEMENT RETREAT (12 th 14 th AUGUST, 2016)

ASX Announcement. Appointment of Preferred Contractor for CHPP Construction at Colton Mine

D L R C C T R A F F I C N E W S

The Covered Bridge of Pepperell

Minutes of the Annual Meeting of the Parish Council held in Torpenhow Village Hall on Wednesday 10 th May, 2017 at 7.15 pm

Road Network Assessment 20 February 2005

Swallow House, 10 Swallow Street, Birmingham, B1 1BD

SHREE SHYAM Bus Services Pvt. Ltd. Head Office : F-692, Raghubir Nagar, New Delhi COMPANY PROFILE

Progress Report for Projects of Regional Significance

Transcription:

MINUTES OF PROJECT REVIEW MEETING HELD ON 4 th July 2016 1

The project review meeting started at 2.30 pm on 4 th July 2016 at the H.O of with the Managing Director of Shri A P M Mohammed Hanish IAS in chair. List of Participants are given below. Sl No Name Designation Mob. No Email id 1 Shri. APM Mohammed Hanish IAS Managing Director, 9746333100 rbdckltd@gmail.com 2 Sri.Raveendran.J General Manager, 9447134955 rbdckltd@gmail.com 3 Shri.M T Thankachan AGM, RBDCK 9447134952 rbdckltd@gmail.com 4 Shri.KK.Adbulla AGM, RBDCK 9446088778 rbdckltd@gmail.com kutty 5 Shri.AA Abdul DGM, RBDCK 9446411445 rbdckltd@gmail.com Salam 6 Shri.Alex.T.J DGM, RBDCK 9446488772 rbdckltd@gmail.com 7 Shri.Somasundaran PM(KRIP), 9447708293 9496553900 ersomasundaranp@yah oo.com 8 Shri.Hareendran Liaison Officer, 9496553700 rbdckltd@gmail.com 9 Smt. Ambily.N Manager, 9496554200 rbdckltd@gmail.com RBDCK ltd 10 Shri. Sanal Sunny Manager, 9446088779 rbdckltd@gmail.com 11 Shri. Mohammed Manager, 9446088779 rbdckltd@gmail.com Uvais 12 Shri. Midhun Joseph Manager, 9446431333 rbdckltd@gmail.com 13 Shri. Sarath. S. Kumar Manager, 9496554100 rbdckltd@gmail.com 14 Smt. Tia.M.E Graduate Apprentice, rbdckltd@gmail.com 15 Shri.Amal Raj Graduate Apprentice, rbdckltd@gmail.com 2

16 Shri.Pramod.G Sr. Consultant, M/s Kitco Ltd. 17 Smt. Bhama Benoy Sr. Consultant, M/sKitco Ltd. 18 Shri. Santhosh G Sr. Consultant, M/sKitco Ltd. 19 Shri.George Thambi Consultant, M/s KITCO LTD 20 Shri.Arun Thomas Project Engineer, M/s Kitco 21 Shri.Saji.V.Cheriyan MD, CVCC Ltd 22 Sreekumar M V Vice President, RDS Project Ltd 23 Ranga Goundan Site in Charge RDS Project Ltd 24 Shri. Antony Shyam Planning Engineer 25 Shri. Rony Sibi Jacob Project director, Skilled 26 Smt. Shobha Sunil Director Skilled 27 Shri. S.K.Salam Conconstruction Co-ordinator, RSDCPL 28 M.Jolly Mathew Vice President, Seguro Inkel Consortium LLP 29 Shri. K.H.Subhash GM, Seguro Inkel Consortium LLP 9447185819 kitcopramod@gmail.co m 984702425 bhamabenoy@gmail.co m 9447384217 santhoshg@kitco.in 9995884056 georgethambi84@gmail.com 821982746 arunthomas@kitco.in 9388085305 planningengbill@rdspro ject.in 9567868010 SkilledConstructioncom pany@yahoo.com 9447157877 9447574044 3

Meeting with M/s Kitco Recommendation and submission of the final bills of the ROB Kumaranallore is still pending from M/s Kitco. M/s Kitco informed that they will send the bill within a weeks time The measurement books of final bill for ROB at Mooledam is submitted to RBDCK on 04.07.2016. Certain close out documents are not yet submitted. All the required equipment for the lab are mobilised to Station kadavu site, it should be arranged in a proper way and lab fully established. MD RBDCK directed M/s Kitco to make a power point presentation on 16.07.2016 at 11.00AM to discuss about the draft DPR on Angamali byepass. Necessary modification shall be made in the DPR mentioning the Lease period of operation, toll collection after reducing the land value provided in the draft DPR. They were requested to prepare DPR in two phases, first from Karayamparambu to Angamali Railway station and 2 nd from Angamali Railway station to CIAL Airport Junction. Informed Kitco to carry out the Boundary stone planting for land acquisition at Palarivattom site urgently and police protection would be arranged by RBDCK. M/s Kitco informed that Boundary stone was laid for the Pavangad ROB project and for the Karamana ROB, arrangements are made for the laying of boundary stone. GM, RBDCK instructed to lay down the boundary stones of standard size of 15x15x90cm fixed in concrete, to be painted neatly, and RBDCK should be engraved clearly. M/s Kitco was instructed to submit hard copies of monthly progress report promptly and weekly report in time by e-mail. Decided to send letters to the contractor to submit the Monthly Progress report as per the contract agreement. 4

1. FLYOVER AT PALARIVATTOM IN NH 66 (OLD NH 47) BYPASS Contractor: M/s RDS Project Ltd. 1.1 Status of Work as on June 30 th 2016 Pile 86/86 Pile cap 20/20 Pier 20/20 Pier cap 20/20 Girder casting 122/122 Girder Launching 122/122 Deck slab 19/19 Diaphragm walls 19/19 span 1.2. Progress of Monthly Target for June 30 th 2016 Sl No. Item Target for June 16 Executed June 16 No. Location 1 Diaphragm wall 2 spans 2 spans 2 Deck slab 2 spans 2 spans 3 Crash barrier 200 m 165m 4 Center Median 220 m 135m 5 Formation of 100% Work is in progress approach road- Edappally side 6 GSB & WMMbothside 100% Vytila side WMM work completed 7 Strip seal expansion 100% 50% completed joint 8 Continuous joint 100% 50% to completed 9 DBM & BC- Both 100% Not started sides 10 Painting 100% Work commenced 11 Side drain 50% Not done 12 Handrails 100% Not done 13 Electrification 50% 30% completed 5

1.3 Target for July 2016 Sl No. Item Target for July 16 No. 100% 1 Formation of approach road- Edappally side 2 GSB & WMM- bothside 100% 3 Strip seal expansion joint 100% 4 Continuous joint 100% 5 DBM & BC- Both sides 100% 6 Painting 100% 7 Handrails 100% 8 Electrification 100% 9 Road signage works 100% 10 Center median 100% 11 Crash Barrier 100% Location 1.4 Matters of Concern MD, RBDCK instructed to complete all major works by 31 st of July 2016 6

2. ROB AT ANGADIPURAM Note Contractor: M/s Cherian Varkey Construction Company Pvt. Ltd. 1. Staircase works started. The contractor informed that they will complete all the works in a month time. 2. GM, RBDCK instructed the contractor to carry out shoulder filling on either side of the approach road. 7

3. AIRPORT- SEAPORT ROAD PHASE II (SECTION B) - MAHILALAYAM JN. TO CHOWARA INCLUDING TWO BRIDGES ACROSS PERIYAR Contractor: M/s Cherian Varkey Construction Company Pvt. Ltd. 3.1.a Status of Work as on June 30 th 2016 for Main Bridge Pile Pile cap 13/13 Pier 13/13 Pier 56/56 cap Girder 48/48 Girder 48/48 Deck 12/12 Dirt casting Launching slab wall 13/13 2/2 3.1.b Status of Work as on June 30 th 2016 for Minor Bridge Pile 13/17 Pile cap 4/5 Pier 4/5 Pier cap Girder 12/16 Deck 3/4 Handrails 3/4 casting slab 4/5 3.3Matters of Concern 1.Work hindered for the minor bridge due to land acquisition issue. MD, RBDCK informed that the LA issue would be resolved soon.. 8

4. ROB AT KUNHIPPALLI Contractor: M/s Skilled Constructions. 4.1 Status of Work as on June 30 th 2016 Pile 60/60 Pile cap 16/16 Pier 16/16 Pier cap Girder 16/16 Deck 16/16 casting slab 16/16 4.2 Progress of Monthly Target for June 30 th 2016 SI.NO Item description Target for June 2016 Executed June 2016 No Location 1 Approach road 100% On Monthal Not done side 2 Service road 100% On Monthal side Not done 4.3 Target for July 2016 Sl No. Item Target for July 2016 No. Location 1 Approach road 100% On Monthal side 2 Service road 100% On Monthal side 4.4 Matters of Concern 1. The works are at stand still due to non-availability of land for approach road at NH side. 2. RBDCK directed the contractor to complete the approach road works and service roads on Monthal side. Contractor informed that they had started filling work but not progressed due to problem in getting earth. 9

5. ROB AT EROOR Contractor: M/s Skilled Constructions. 5.1 Status of Work as on June 30 th 2016 Pile 38/38 Pile cap 10/10 Pier 10/10 Pier cap Void 9/10 slab 10/10 5.2 Status of Work as on June 30 th 2016 SI.NO Item Target for June 2016 Executed June 2016 Description No Location No Location 1 RE wall 100% To complete Not done 2 Kerb 100% To complete 87% Completed 3 Handrails 100% To complete 65% completed 4 Service road 50% On Thripunithura side (depending on the rain) Upto 70% of GSB completed 5.3 Target for July 2016 SI.NO Item Description Target for July 2016 No Location 1 RE wall 100% To complete in Thripunithura side 2 Kerb 100% To complete in Palarivattom side 3 Handrails 100% To complete space left for light post 4 Service road 100% On Thripunithura side (depending on the rain) 5 Drainage 100% At Thripunithura side 6 Existing culverts 100% To be cleared. 10

5.4 Matters of Concern The following critical activities are agreed to be completed on the dates noted below 1. Cleaning of Deck slab to be completed (Before fixing kerbs ) on 11.07.2016 2. Preparation for expansion joint 11.07.2016 6 Limited Use ROB at Thirunettur Contractor- Skilled Construction Company 6.1 Status of Work as on June 30 th 2016 SI.NO Item Target for June 2016 Executed June 2016 Description No Location No Location 1 Pile cap 4 Nos PCC levelling course laying is progressing at site 6.2 Target for July 2016 Sl No. Item Target for July 2016 No. Location 1 Pile cap 4 Nos Eastern side 6.3 Matters of Concern 1. Contractor informed that RA Bill 01 for an amount of Rs.50,96,447/- is Pending and requested to release the same. 11

7. Airport- Seaport Road- Phase II- Section A Contractor- RSDCPL, Erode 7.1 Progress of Monthly Target for June 30 th 2016 SI.NO Item Description Target for June 2016 Executed June 2016 No Location No Location 1 Plain concrete / reinforced concrete for sub-structure/super structure etc.m25 100 m3 100m3 compelted 7.2 Target for July 2016 Sl No. Item Target for July 2016 No. Location 1 Plain concrete / 50 m3 reinforced concrete for sub-structure/super structure etc.m25 2 Plain concrete / 20 m3 reinforced concrete for sub-structure/super structure etc.m15 3 RR masonry 60 m3 7.3 Matters of Concern M/s RSDCPL was instructed to speed up the construction of culverts, side drain etc. The contractor informed that if HMT land is made available, they can do the work in the area. RBDCK informed that processes are going on to transfer the land by District Collector. 12

8. Angamali Byepass Road MD RBDCK directed M/s Kitco to make a power point presentation on 16.07.2016 at 11.00AM to discuss about the draft DPR on Angamali byepass. Necessary modification shall be made in the DPR mentioning the Lease period of operation, toll collection after reducing the land value provided in the draft DPR. They were requested to prepare DPR in two phases, first from Karayamparambu to Angamali Railway station and 2 nd from Angamali Railway station to CIAL Airport Junction 9. RIVER BRIDGE AT STATION KADAVU Contractor- Seguro Inkel Consortium LLP, Cochin 9.1 Progress of Monthly Target for June 30 th 2016 SI.NO Item Target for June 2016 Executed June 2016 Description No Location No Location 1 Pier cap 1 Nos 1 No 2 Piling 7 Nos 4 Nos 3 Pier 1 Nos 1 No 4 Pile cap 1 Nos Not done 5 Load test 1 Nos A2 Not done 9.2 Target for July 2016 Sl No. Item Target for July 2016 No. Location 1 Piling 12 Nos 2 Pile cap 1 Nos A 2 3 Load test 1 Nos A2 13

9.3 Matters of Concern Following critical activities are agreed to be completed on the dates noted by respective parties Sl No 1 2 3 4 5 Tasks Design and Method of construction of N truss to support casting of girders over bearings will be submitted by the contractor on The above to be reviewed and approved by M/s Kitco on N truss erection and allied works will be started by the contractor on Pile load test will be done on M/s Kitco will provide Engineers decision on whether the girder cast on P8-P9 can be used at the center position on Status 07.07.2016 11.07.2016 20.07.2016 15.07.2016 11.07.2016 The meeting concluded at 4.30 PM. Managing Director, M/s RBDCK LTD 14