INFRASTRUCTURE DEVELOPMENT IN THE NORTH-EAST

Similar documents
REGIONAL POLICY DIALOGUE ON STRENGTHENING TRANSPORT CONNECTIVITY IN SOUTHERN ASIA

Northeast India (officially called North Eastern Region, NER) is the

Accelerated Road Development Programme (SARDP-NE) and Border Highways under Border Area Development Programme (BADP) in Arunachal Pradesh

BY NHIDCL. 25 t h MAY, 2018

Ministry of Development of North Eastern Region

Adequate infrastructure facilities are a pre requisite for industrial development. The infrastructure facilities available in Assam are as follows:

Helicopter Connectivity in North East

Outline. (1) JICA and India. (2) Infrastructure Development. (3) Cross-Border Connectivity

Travelling in Northeast India

APPROACH TO XI th FIVE YEAR PLAN IN RESPECT OF COMMUNICATION SECTOR UNDER PWD ARUNACHAL PRADESH

Development of Road Infrastructure in India

Strengthening Transport Connectivity between CLMV-T and India: Opportunities and Challenges

LIST OF RETAINED PROJECTS FROM PRIORITY LIST OF to PENDING FOR SANCTION FOR FUNDING UNDER NLCPR INDICATING IT S LATEST STATUS.

TENTATIVE ITINERARY NEFIT TRADE DELEGATION TO ATTEND INVEST MYANMAR SUMMIT 2019

Road Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H

Strengthening Transport Connectivity through Road Corridors in Bangladesh

CENTRALLY SPONSORED SCHEMES

esupersavernortheast Scheme Terms and Conditions

esupersavereconomy Scheme Terms and Conditions

THE REPUBLIC OF THE UNION OF MYANMAR

Monitorable Targets & Milestones for INFRASTRUCTURE SECTOR : Planning Commission, Government of India

Daily Current Affairs Capsule 19 th January 2019

2 AGATTI Airports Authority of India, Agatti Airport Controller

Welcome HAI Delegates

Assistance to States for Developing Export Infrastructure and Allied Activities (ASIDE) Scheme of Ministry of Commerce & Industry, State Cell

INTERNATIONAL PASSENGERS

CITY PAIR WISE DOMESTIC PASSENGER TRAFFIC STATISTICS FOR THE MONTH OF AUGUST, 2015

Status of Integrated Transport in Bangladesh. Presented by Md. Ehsan-E-Elahi Joint Secretary Road Transport & Highways Division

MINISTRY OF SHIPPING

PPP Days 2010 PPPs Lessons from the Last 18 Months

Sagarmala Development Company (SDC)

CITY PAIR WISE DOMESTIC PASSENGER TRAFFIC STATISTICS FOR THE MONTH OF SEPTEMBER, 2017 (Provisional )

Largest hydropower potential in India. Railways as a new means of transport. Orchid paradise. Carpet making. Largest state in Northeast

HLTC (Economy Class) DLTC (Executiv e Class)

Airindia Domestic Fares (Apex & Instant Purchase Fares) TABLE IV LTC Fares updated as on TABLE IV- LTC Fares

SITREP NO-110/ hours 32-20/2007-NDM-I Ministry of Home Affairs (Disaster Management Division) Dated, 18 TH September, 2007

India - State-wise Wastelands Distribution (Percentage to total geographical area)

CITY PAIR WISE DOMESTIC PASSENGER TRAFFIC STATISTICS FOR THE MONTH OF JAN, 2017

Table-1.1 SEASONS, SOWING & HARVESTING PERIOD AND PRODUCTION. Five year Average Production ( to Harvesting Period.

Network Size and Growth

Nostalgic Tourism and Make in India with Special Reference to North-East India.

MEMORANDUM OF UNDERSTANDING

CITY PAIR WISE DOMESTIC PASSENGER TRAFFIC STATISTICS FOR THE MONTH OF MARCH, 2017

Public Private Partnership (PPP) in Airport Infrastructure

PHD Aviation Summit: Indian Civil Aviation Benefit Beyond Borders. February 18 th, Presented To:

TRANSPORT CANADA S NATIONAL TRADE CORRIDORS FUND. PNWER November 2018

Which current trends are your best friends?

TABLE IV- LTC Fares. DLTC (Executive Class) HLTC (Economy Class) S No SECTOR & V.V

¾Ö ÖÖÖÖ¼ÜÖ Ö ÖÖÊ ÔÜ ÒÜÃ Ü / VISAKHAPATNAM PORT TRUST {ÉÊ Ú{ÉJÉ / CIRCULAR NO. 338

PRE FEASIBILITY REPORT TABLE OF CONTENTS

WATER QUALITY INDEX OF RIVER WATER AT DIFFERENT LOCATIONS IN THE STATE OF ASSAM UNDER NWMP FOR JULY-2017

Corridor of growth. Corridor Description and Rating NEW GURGAON. Areas Included:

ASSAM THE LAND OF RED RIVERS AND BLUE HILLS

WATER QUALITY INDEX OF RIVER WATER AT DIFFERENT LOCATIONS IN THE STATE OF ASSAM UNDER NWMP FOR AUGUST-2017

Afghanistan. Supply, Installation, Rehabilitation, Construction Testing and Commissioning of Gardez To Khost Road in Afghanistan, Funded by USAID

Global Sustainable Tourism Criteria Perspective Bangladesh. Akhtaruz Zaman Khan kabir CEO

URBANIZATION IN THE HILL DISTRICTS OF ASSAM

Aero Expo 2016 Civil Aviation Convention & Exhibition Enhancing Regional & Remote Connectivity. November 18 th, 2016.

CITIZEN S CHARTER OF ASSAM URBAN WATER SUPPLY AND SEWERAGE BOARD, GUWAHATI-6.

ROAD DEVELOPMENT IN INDIA 2015

List of RCS Airports and routes Started under UDAN-1 & 2 20 Aug 2018

11 th Annual Conference Road Development in India Telangana State Initiatives

ARUNACHAL PRADESH LAND OF THE RISING SUN

SOUTHWEST MONSOON-2008: DAILY FLOOD SITUATION REPORT

ASSAM THE LAND OF RED RIVERS AND BLUE HILLS

Message from Chairman, Committee on Trade with ASEAN countries

ASSAM THE LAND OF RED RIVERS AND BLUE HILLS

SOUTHWEST MONSOON-2008: DAILY FLOOD SITUATION REPORT

Rural Tourism of North East India: Prospects and Challenges

Indian Aviation Industry

The winning states in each of the three award categories were as follows:

Investment Opportunities DMIC UP Region

COIMBATORE AREA RAPID TRANSPORT- CART

POLICY AND PROCEDURE MANUAL. 4. General Guidelines 3. Table of Contents. 1. Objective Scope Policy Annexure. 5.1.

Asian Highway. A vision for the Future. Country Presentation: Bangladesh. 6 th Working Group Meeting on Asian Highway Seoul, Korea

Current Affairs MCQs 12 March 2018

Notice of invitation of Counter proposals dated

Joy & Secrets of. Tribal Frontier. FEB/Mar Highlights of the trip. Destinations. An Adventure with Sudhakar Selwyn

Prashant Mavani, is an expert in current affairs analysis and holds a MSc in Management from University of Surrey (U.K.).

L&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL)

16. COMMITTEE SECTION (T&T)

AIRPORTS AUTHORITY OF INDIA. Press Release

Reference List for Cathodic Protection of LPG Mounded Bullets using AnodeFlex

Exploring the Unexplored India: An Opportunity in Tourism Industry (With Special Reference to Eastern States in India)

the total length of railway lines in the country and the length out of that electrified in terms of kilometre and percentage, State-wise;

Japan India Cooperation on Railway Sector

Civil Aviation. LTI The Trusted Training Institute for Competitive Exams (

Tribal. Joy & Secrets of. Frontier. Mar Highlights of the trip. Destinations. An Adventure with Sudhakar Selwyn

Airports NOVEMBER For updated information, please visit

LAND VALUE CAPTURE FOR RAILWAY STATION DEVELOPMENT. Changing perception of Railways

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1

Planned Procurement Opportunities Report. January 2019

RAILWAY RECRUITMENT BOARD (RRB) EXAM - QUESTION PAPER SOLVED

Agenda Item 6-ATM Coordination - Airspace restructuring COLLABORATIVE AIRSPACE DESIGN AND MANAGEMENT. (Presented by Airports Authority of India)

GMR Infrastructure Limited, Q1-FY 11 Performance Highlights. Financial Highlights for Q (Rs. Cr.)

Railway Recruitment Board (RRB) Exam - Question Paper Solved

TO BE INTRODUCED IN LOK SABHA. Bill No. 93 of 2006

DETAIL NOTE ON PROJECT

PAWAN HANS HELICOPTERS LTD. Bank Payments To Suppliers

DaHar Danube Inland Harbour Development

Transcription:

INFRASTRUCTURE DEVELOPMENT IN THE NORTH-EAST INTERNATIONAL CONFERENCE ON CROSS-BORDER CONNECTIVITY NEW DELHI, MAY 12, 2014 Dr. Manoj Singh, Adviser (Transport) PLANNING COMMISSION, GOVERNMENT OF INDIA NEW DELHI

EXISTING RAIL NETWORK IN THE NORTH EAST State Broad Gauge Meter Gauge Total (Km) Arunachal Pradesh - 1.26 1.26 Assam 1,443.03 990.96 2,433.99 Tripura - 151.40 151.40 Nagaland 11.13 1.72 12.85 Manipur - 1.35 1.35 Mizoram - 1.50 1.50 Meghalaya - - - Sikkim - - - Total 1,454.16 1,148.19 2,602.35

MASTER PLAN FOR THE DEVELOPMENT OF RAIL INFRASTRUCTURE IN THE NORTHEAST REGION

RAILWAYS : ON-GOING PROJECTS IN NORTH EAST (2013-14) New Line Gauge Conversion Doubling Total Projects in progress (Nos.) 14 4 2 20 Of which, National Projects (Nos.) 8 2-10 Throw forward (Rs. Crore) as on 1.4.2013 Of which, National Projects (Rs. Crore) 21,689 2,071 2,044 16,354 1,586-25,806 ($4.3 b) 17,940 ($3 b) Length of ongoing works (Km) 965 1,510 44.92 2,520 5

INVESTMENT IN N.E REGION OVER LAST 10 YEARS (NEW LINES, GAUGE CONVERSION & DOUBLING) Total Rs 15,629 Crs(Last 10yrs) (Including works in progress) 4000 3392 3500 Rs in Crore 3000 2500 2000 1500 1000 500 295 542 845 979 1403 1765 1913 2130 2365 0 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14

ACHIEVEMENTS Year New Line Gauge Conversion Doubling 2007-08 20 107-2008-09 113 170-2009-10-110 - 2010-11 58 110 31 2011-12 148 409-2012-13 61.50 206.18-2013-14 2.0 154 -

RECENT PROGRESS OF RAILWAY PROJECTS North Bank GC Project Rangiya-Rangapara North Dekargaon (Tezpur) (186 km) completed & operationalized on 4 th January 2014. Rangapara (N) North Lakhimpur (172 km) Target Completion: Mar. 2014. Completed on March 31 st, 201.4 North Lakhimpur-Murkongselek (154 km) TDC: Dec. 2014. Engine Rolling Completed New Broad gauge line of Harmuti-Naharlagun (21.75 km): first connectivity to Arunachal Pradesh. TDC: March. 2014. Completed on 4 th April, 2014 Train services started on April 7 th, 2014. New Broad gauge line of Dudhnoi-Mendipathar (19.75 km): first connectivity to Meghalaya (10 km) TDC: March. 2014. Likely by mid May, 2014. 8

TARGETS OF NATIONAL RAILWAY PROJECTS Name of Project TDC Rangiya-Murkongselek with linked fingers (520 km) (Assam) Dec. 14 Lumding-Silchar, incl. Branch (GC) lines & MMs (421 km) (Assam, Manipur, Mizoram, Tripura) Mar. 15/ June. 16 Tetelia-Byrnihat (21.50 km) (Meghalaya) Jiribam- Tupul -Imphal (111km) (Manipur) Mar.15 Mar. 16/Mar.18 Kumarghat Agartala (109 km) (Tripura) June. 16 Agartala - Sabroom (112 km) (Tripura) Bogibeel Bridge with linking lines (73 km) (Assam) Bhairabi-Sairang (51.38 km) (Mizoram) Sivok-Rangpo (44.39 km) (Sikkim) Dimapur-Zubza (Kohima) (88 km) (Nagaland) Byrnihat-Shillong (108.40 km) (Meghalaya) June.16 Dec.16 Not fixed Not fixed Not fixed Not fixed 9

INDO-MYANMAR RAIL CONNECTIVITY

RAIL PROJECTS IN MANIPUR

RAIL MAP OF MYANMAR

Myanmar: India s Land Bridge to ASEAN

BROAD PROJECT PARAMETERS OF INDO-MYANMAR RAIL CONNECTIVITY Imphal Moreh 111 Kms Rs. 5500 Crores ($ 1 b) Moreh Kalay 130 Kms Rs. 3000 Crores ($ 0.5 b) Possibility of funding by JICA, ADB, and other Multi-lateral Agencies;

Road Development in the North East Two Major Projects Going On Presently East West Corridor (Silchar in Assam to Porbandar in Gujarat) Completed length is 500 km (81%) Likely completion date : Dec. 2014 Special Accelerated Road Development Project in the North East (SARDP-NE) Phase A 4,099 km (Project cost Rs.21,000 crore) Phase B 3,723 km (Only DPR approved) Arunachal Package (MoRTH, Arunachal PWD and BRO) 2,319 km (Rs.11,919 crore) Total Investment : Rs 40,000 crores ($ 7 b) 15

Item Progress of Phase A and Arunachal Package Total Length Target Work Sanctioned/ Awarded Roads Completed Phase A 4,099 2,505 1,214 Arunachal Package 2,319 1,341 (58%) 113 (5%) Total 6,418 3,846 (60%) 1,327 (21%) Targeted/Expected Date for Completion June, 2015/March2017 June, 2016/March2018 Upgrade National Highways connecting state capitals to 2/4 lane Connect 88 District Headquarters of NER by at least 2 lane roads Improve connectivity to neighbouring countries/border areas (In Kms) 16

International Road Gateways Moreh to Guwahati Moreh Imphal : NH 39-120 km 2 lane road 3 hrs Imphal Jiribam Silchar : NH 53-240 km 2 lane : 8 hrs Silchar Guwahati : East West Corridor 325 km 6 hrs Total : 700 kms : 17 hrs

Roads covered for improvement in Arunachal Pradesh under SARDP-NE Daporijo Koloriang Aalong GORGING PONGO MIGGING LUNGTE Yingkiong BISHING JIDO SINGA SAKRAM POINT Anini Roing Tezu To Srirampur Tawang TASHIGAONG LUMLA Bomdila Being improved to 2 lane by BRO under China Study Group(CSG) 229 Seppa NECHIPU BALIPARA Yupia ITANAGAR SILGHAT Ziro HOLONGI ZORAM Potin TAHILA 229 GOHPUR TATO RUPAI MAHADEVPUR TINSUKIA 52B JAIRAMPUR NAMCHIK AKAJAN DIBRUGARH Lalpul NORTH PANGSU PASS LAKHIMPUR 153 BIMLAPUR Hoj SIBSAGAR 52B 52B BANDER DEWA KANUBARI NUMALIGARH BILE PAKA Pasighat MARIYUNG PANGIN 229 BAME JONAI Khonsa BOMJIR 52 37 Ext SADIA DHOLA Koronu Paya LEGEND :- CHOWKHAM 52 Changlang A. Roads under Arunachal Package 1. Trans Arunachal Highway(NH-229, 52 & 52B) 2. Roads connecting remaining 5 DHQs 3. Road stretches proposed on Annuity basis Hawai Baihata Charali GUWAHATI NAGAON TO SILCHAR ROUTE OF 4 LANE CONNECTIVITY OF ITANAGAR WITH EAST WEST CORRIDOR AT NAGAON B. Roads under Phase A Other National Highways East West Corridor DISTRICT HEADQUARTER TOWN

Airports in NE State Operational Non- Operational Assam 6 3 IAF, 3 AAI Arunachal Pradesh Pakyong Bagdogra Sikkim West Bengal 2-5 Manipur 1 - Meghalaya 1 1 Mizoram 1 1 Nagaland 1 - Tripura 1 3 Sikkim - - West Bengal 1* - Total 11+1 12 Rupsi Tura Agartala Guwahati Shillong Meghalaya Kailashahar Kamalpur Khowai Tripura Shella Tezpur Assam Silchar Lengpui Ziro Dimapur Mizoram Turial Daparizo Dibrugargh North Lakhimpur (Lilabari) Jorhat Imphal Manipur * Bagdogra Airport, although in Eastern Region, is included as it is the gateway to North-East including Sikkim State Arunachal Pradesh Itanagar Along Pasighat Nagaland Chiethu/ Kohima LEGEND Tezu Operational (11+1) Non-Operational (12) Greenfield (3) 19

mmm 20

31 DHUBRI JOGIGHOPA SHISHUMARA DAIKHAWA CHILMARI I N D I A 31 31C 51 37 DISPUR PANDU P SHILLONG 40 M E G H A L A Y A TEJPUR A S S A M 37 SILGHAT P INDO BANGLADESH 36 PROTOCOL ROUTES 53 KOHIMA NAGALAND HULIAN 6 2 HALDIA P 41 34 B A N G L A D E S H GODAGARI SIRAJGANJ RAJSHAHI KOLKATA P 35 NAMKHANA BAGHABARI P KHULNA CHALNA P BAHADURABAD ARICHA P MONGLA ANGTIHARA DHAKA BARISAL BHAIRAB BAZAR NARAYANGANJ P KAUKHALI Bay of Bengal ZAKIGANJ SYLHET BHANGA KARIMGANJ MARKULI FENCHUGANJ SHERPUR AJMIRIGANJ AKHAURA CHANDPUR ASHUGANJ 44 TRIPURA AGARTALA 54 AIZWAL LAKHIPUR P MIZORAM 53 MANIPUR IMPHAL N Legend Declared National waterway Proposed National waterway Protocol route Road Rail NH 51 Protocol route distances Kolkata Silghat..... 1720 Km Kolkata - Karimganj...1318 Km Silghat- Karimganj 1410 Km Dhulian-Rajshahi...78 21 21 Km Myanmar (Burma)

Proposed National Waterway (No 6) River Barak Bhanga Badarpur Silchar Stretch Km Bhanga - Lakhipur 121 Length 121 km Development cost -Rs 123.3 Cr (at 2012 prices) Status: Declaration in process Bill likely to be introduced in Budget session 2013 2 2

Airports Development (2012-17) - I Development of Airports at Pakyong New TDC: Dec. 2014. Need resolution of land acquisition for AAI Colony, shifting of 16 local residences and approach road from Pakyong to Gangtok Itanagar State Govt. to provide land acquisition (1,037 acres), Rehabilitation, Compound Wall, Approach Road, Electricity/Water supply. PIL challenging site before Guwahati High Court Cheithu Alternative site needs to be selected by State Government Modernize selected Airports by AAI Guwahati Construction of 3 hangars for A-321. TDC Sep. 2014 Dibrugarh Runway extension (32 acres land acquisition) Jorhat - Apron extension completed (30 Nov. 2013). New Terminal Building planned Shillong Upgradation at Barapani taken up. 32 acres defence land required. Work stopped (August 2012) due to local agitation Imphal : Notified international airport (14 Nov. 2013) with connectivity to South/East Asian countries. Extension of Apron & Boundary Wall Work going on Agartala New Terminal building in planning stage 23

Airports Development - II Airports in Arunachal Pradesh & Meghalaya (Non-operational) Operationalize Along, Daparizo, Passighat, Tezu, Ziro (Arunachal Pradesh) Daparijo (Arunachal Pradesh to sort out Land Acquisition Issues) Greenfield Airport in Tawang (Arunachal Pradesh) to be finalized after NOC from MoD Tura (Meghalaya) land acquisition issues. Average no. of departures per week from NE Airports increased sharply. 2001 2011 2012 226 581 497 Larger and more regular air connectivity to NER, specifically within the region necessary. Guwahati being developed as a regional hub (Sept. 2014). Will help improve connectivity Intra-regional network in NE is weak and needs to be developed. NEC has invited bids (with VGF support) with little success so far Need to approve recommendations of Committee under Member (NE), PC on issues relating to air connectivity by Alliance Air. Shillong-Kolkata services resumed since 10 Jul. 2013, may be discontinued again by Alliance Air 24

Roads East West Corridor (NHAI) Completed length is 500 km (81%) Likely completion date : Dec. 2014 Critical issues: Land availability. Likely to be resolved by State Govt. Guwahati Nalbari (14 km) (Assam) Maibong Harangajao (16 km) (Assam) Clearance for extraction of Mines & Minerals (State Govts.) SARDP-NE (MoRTH, State PWDs, BRO) Phase A 4,099 km (Project cost Rs.21,000 crore) Phase B 3,723 km (Only DPR approved) Arunachal Package (MoRTH, Arunachal PWD and BRO) 2,319 km (Rs.11,919 crore) 25

Item Progress of Phase A and Arunachal Package Total Length Target Work Sanctioned/ Awarded Roads Completed Phase A 4,099 2,505 1,214 Arunachal Package 2,319 1,341 (58%) 113 (5%) Total 6,418 3,846 (60%) 1,327 (21%) Targeted/Expected Date for Completion June, 2015/March2017 June, 2016/March2018 Work Sanctioned and Awarded Likely to be 5800 Km (84%) by March 2015. Steps taken to strengthen project execution: ADG (1), CE (3) at Guwahati, Agartala & Itanagar posted. Tripura PWD Engineers (7) seconded to Ministry for NH-44 work at Agartala PIU (2) at Guwahati, PIU (2) at Itanagar and PIU (1) at Agartala PIU (1) at Imphal to look after work of NH-53 & construction of 2 bridges Barak and Makru Non-strategic roads off-loaded from BRO (In Kms) 26

Agency-wise Re-Distribution of Road Lengths under SARDP-NE & Arunachal Package Agency Original Modified Phase 'A' Ar. Ar. Total Phase 'A' Package Package Total BRO 1247 812 2059 578 558 1136 PWD 52 633 685 52 887 939 Ar. Pradesh Assam 745 98 843 984 98 1082 Manipur - - - 58-58 Meghalaya 609-609 609-609 Mizoram 299-299 299-299 Nagaland 342-342 342-342 Sikkim 207-207 304-304 Tripura 0 - - 130-130 NHAI 394-394 539-539 MoRTH 204 776 980 204 776 980 Total 4099 2319 6418 4099 2319 6418 27

Road Sector Issues Need for special focus on: Work on connecting Sikkim (NH-31A, Sivok-Gangtok-Nathula by BRO) has progressed at a slow pace. New TDC March 2016 Work on NH-44 has been stalled for quite some time. Need for fast pace after the re-distribution & being taken up by State PWD Work on NH-53 (Jiribam-Imphal) critical. Needs early completion Silchar Bridge being replaced with support from M/o DONER. Need for early completion of project Dhola Sadiya Bridge (river Brahmaputra) targeted for completion in 2015. Work going on well Road to Vijaynagar from Miao needs early sanction Construction of Bridge over Feni river (Tripura) connecting Bangladesh taken up with MEA support. Work should start early Replacement of all semi-permanent timber bridges in the region. Special focus and be funded by State Govts., along with Central assistance under SPA over next 3 years. A special scheme needs to be launched to complete this 29

Airports in NE State Operational Non- Operational Assam 6 3 IAF, 3 AAI Arunachal Pradesh Pakyong Bagdogra Sikkim West Bengal 2-5 Manipur 1 - Meghalaya 1 1 Mizoram 1 1 Nagaland 1 - Tripura 1 3 Sikkim - - West Bengal 1* - Total 11+1 12 Rupsi Tura Agartala Guwahati Shillong Meghalaya Kailashahar Kamalpur Khowai Tripura Shella Tezpur Assam Silchar Lengpui Ziro Dimapur Mizoram Turial Daparizo Dibrugargh North Lakhimpur (Lilabari) Jorhat Imphal Manipur * Bagdogra Airport, although in Eastern Region, is included as it is the gateway to North-East including Sikkim State Arunachal Pradesh Itanagar Along Pasighat Nagaland Chiethu/ Kohima LEGEND Tezu Operational (11+1) Non-Operational (12) Greenfield (3) 30

Airports Development (2012-17) - I Development of Airports at Pakyong New TDC: Dec. 2014. Need resolution of land acquisition for AAI Colony, shifting of 16 local residences and approach road from Pakyong to Gangtok Itanagar State Govt. to provide land acquisition (1,037 acres), Rehabilitation, Compound Wall, Approach Road, Electricity/Water supply. PIL challenging site before Guwahati High Court Cheithu Alternative site needs to be selected by State Government Modernize selected Airports by AAI Guwahati Construction of 3 hangars for A-321. TDC Sep. 2014 Dibrugarh Runway extension (32 acres land acquisition) Jorhat - Apron extension completed (30 Nov. 2013). New Terminal Building planned Shillong Upgradation at Barapani taken up. 32 acres defence land required. Work stopped (August 2012) due to local agitation Imphal : Notified international airport (14 Nov. 2013) with connectivity to South/East Asian countries. Extension of Apron & Boundary Wall Work going on Agartala New Terminal building in planning stage 31

Airports Development - II Airports in Arunachal Pradesh & Meghalaya (Non-operational) Operationalize Along, Daparizo, Passighat, Tezu, Ziro (Arunachal Pradesh) Daparijo (Arunachal Pradesh to sort out Land Acquisition Issues) Greenfield Airport in Tawang (Arunachal Pradesh) to be finalized after NOC from MoD Tura (Meghalaya) land acquisition issues. Average no. of departures per week from NE Airports increased sharply. 2001 2011 2012 226 581 497 Larger and more regular air connectivity to NER, specifically within the region necessary. Guwahati being developed as a regional hub (Sept. 2014). Will help improve connectivity Intra-regional network in NE is weak and needs to be developed. NEC has invited bids (with VGF support) with little success so far Need to approve recommendations of Committee under Member (NE), PC on issues relating to air connectivity by Alliance Air. Shillong-Kolkata services resumed since 10 Jul. 2013, may be discontinued again by Alliance Air 32

Inland Water Transport in the NE Region 891 Km National Waterway-2 on River Brahmaputra along with Indo-Bangladesh Protocol Route provides safe, cheap and eco friendly route for carriage of commodities Navigability of 2.0-2.5 meter depth along with navigation aids and ten floating terminals maintained by IWAI 16 Floating terminals for passengers funded by MoS will be commissioned by March 2014. 4 already operational Inland Water Port at Pandu developed with high level and low level jetties, two warehouses, Railway siding and open storage: Land for Connecting Road needs resolution with NFR/Govt. of Assam IWAI is developing: Ro-Ro facility at Dhubri and Hatsingimari (opposite bank of Brahmaputra) to reduce travel time of vehicles between Meghalaya and Dhubri in Assam which now have to go over Jogighopa bridge covering a distance of 220 km Vessel repair facility at Pandu (Guwahati). Assam Govt. to expedite transfer of land 33

I N D I A Aizwal I N D I A B A N G L A D E S H Lawngtlai Myeikwa (IM Border) Kaletwa Myanmar Bay of Bengal Paletwa Kolkata Sittwe 539 km Sea Sittwe Paletwa 158 km IWT Paletwa Kaletwa 67 km Road Kaletwa Myeikwa (IM Border) Myeikw a (IM Border) Lawngtl ai 62 km Road 100 km Road Lawngtlai Aizwal 334 km Road Kolkata Aizwal 1260 km Kyauktaw Sittwe 34

North East has special requirements of transport because of topographical challenges (hilly, landslides ) Transport Infrastructure benefits in NE States. It is provides neighbouring countries. Area: 0.26 million sq land and 46 million population. Partition: Distanced the NE Region to the rest of India by connecting countries to the narrow 27 km wide. 96 % of the boundary of region frame international burdens. Challenges for NE Region: Complete the progress of infrastructure in NE Region; Create institutional & functional mechanisms to sustain and maintain the infrastructure. Well Policy region for free movements of govt./service and from NE region to the international neighbour. 35

Agency-wise Re-Distribution of Road Lengths under SARDP-NE & Arunachal Package Agency Original Modified Phase 'A' Ar. Ar. Total Phase 'A' Package Package Total BRO 1247 812 2059 578 558 1136 PWD 52 633 685 52 887 939 Ar. Pradesh Assam 745 98 843 984 98 1082 Manipur - - - 58-58 Meghalaya 609-609 609-609 Mizoram 299-299 299-299 Nagaland 342-342 342-342 Sikkim 207-207 304-304 Tripura 0 - - 130-130 NHAI 394-394 539-539 MoRTH 204 776 980 204 776 980 Total 4099 2319 6418 4099 2319 6418 36

Road Sector Issues Need for special focus on: Work on connecting Sikkim (NH-31A, Sivok-Gangtok-Nathula by BRO) has progressed at a slow pace. New TDC March 2016 Work on NH-44 has been stalled for quite some time. Need for fast pace after the re-distribution & being taken up by State PWD Work on NH-53 (Jiribam-Imphal) critical. Needs early completion Silchar Bridge being replaced with support from M/o DONER. Need for early completion of project Dhola Sadiya Bridge (river Brahmaputra) targeted for completion in 2015. Work going on well Road to Vijaynagar from Miao needs early sanction Construction of Bridge over Feni river (Tripura) connecting Bangladesh taken up with MEA support. Work should start early Replacement of all semi-permanent timber bridges in the region. Special focus and be funded by State Govts., along with Central assistance under SPA over next 3 years. A special scheme needs to be launched to complete this 37

Roads East West Corridor (NHAI) Completed length is 500 km (81%) Likely completion date : Dec. 2014 Critical issues: Land availability. Likely to be resolved by State Govt. Guwahati Nalbari (14 km) (Assam) Maibong Harangajao (16 km) (Assam) Clearance for extraction of Mines & Minerals (State Govts.) SARDP-NE (MoRTH, State PWDs, BRO) Phase A 4,099 km (Project cost Rs.21,000 crore) Phase B 3,723 km (Only DPR approved) Arunachal Package (MoRTH, Arunachal PWD and BRO) 2,319 km (Rs.11,919 crore) 38

Item Progress of Phase A and Arunachal Package Total Length Target Work Sanctioned/ Awarded Roads Completed Phase A 4,099 2,505 1,214 Arunachal Package 2,319 1,341 (58%) 113 (5%) Total 6,418 3,846 (60%) 1,327 (21%) Targeted/Expected Date for Completion June, 2015/March2017 June, 2016/March2018 Work Sanctioned and Awarded Likely to be 5800 Km (84%) by March 2015. Steps taken to strengthen project execution: ADG (1), CE (3) at Guwahati, Agartala & Itanagar posted. Tripura PWD Engineers (7) seconded to Ministry for NH-44 work at Agartala PIU (2) at Guwahati, PIU (2) at Itanagar and PIU (1) at Agartala PIU (1) at Imphal to look after work of NH-53 & construction of 2 bridges Barak and Makru Non-strategic roads off-loaded from BRO (In Kms) 39

Agency-wise Re-Distribution of Road Lengths under SARDP-NE & Arunachal Package Agency Original Modified Phase 'A' Ar. Ar. Total Phase 'A' Package Package Total BRO 1247 812 2059 578 558 1136 PWD 52 633 685 52 887 939 Ar. Pradesh Assam 745 98 843 984 98 1082 Manipur - - - 58-58 Meghalaya 609-609 609-609 Mizoram 299-299 299-299 Nagaland 342-342 342-342 Sikkim 207-207 304-304 Tripura 0 - - 130-130 NHAI 394-394 539-539 MoRTH 204 776 980 204 776 980 Total 4099 2319 6418 4099 2319 6418 40

Road Sector Issues Need for special focus on: Work on connecting Sikkim (NH-31A, Sivok-Gangtok-Nathula by BRO) has progressed at a slow pace. New TDC March 2016 Work on NH-44 has been stalled for quite some time. Need for fast pace after the re-distribution & being taken up by State PWD Work on NH-53 (Jiribam-Imphal) critical. Needs early completion Silchar Bridge being replaced with support from M/o DONER. Need for early completion of project Dhola Sadiya Bridge (river Brahmaputra) targeted for completion in 2015. Work going on well Road to Vijaynagar from Miao needs early sanction Construction of Bridge over Feni river (Tripura) connecting Bangladesh taken up with MEA support. Work should start early Replacement of all semi-permanent timber bridges in the region. Special focus and be funded by State Govts., along with Central assistance under SPA over next 3 years. A special scheme needs to be launched to complete this 41

Thank you