Governor s Mobility Plan. Corridors, Segments and Projects. Allied Junction Corridor 10/12/89

Similar documents
FY TRANSPORTATION IMPROVEMENT PROGRAM. Authority Projects FY

V. DATA COLLECTION PROGRAM

Office Units Available

OFFICE SUITES AVAILABLE

OFFICE SUITES AVAILABLE

OFFICE SUITES AVAILABLE

PRIME HOTEL GROUND LEASE SITE AVAILABLE TO BUILD 172 Rooms Focused Service Hotel

THE RESTAURANT OPPORTUNITIES AT

NJ TRANSIT ANNOUNCES ALTERNATE SERVICE PLAN FOR POSSIBLE RAIL STOPPAGE

8. Community Facilities

elizabeth center RETAIL LEASING OPPORTUNITIES AVAILABLE elizabeth, nj off exit 13a of the new jersey turnpike FAMECO

A New Trans-Hudson Passenger Rail Tunnel

Mission Statement. Spur 601 Project Highlights

SITUATION REPORT # 11 NEW JERSEY STATE EMERGENCY OPERATIONS CENTER October 31, 2012, 8:00 a.m.

elizabeth center RETAIL LEASING OPPORTUNITIES AVAILABLE elizabeth, nj off exit 13a of the new jersey turnpike

DOT 0200 HR ROAD CLOSURE REPORT

LG ELECTRONICS U.S.A., INC., AIR-CONDITIONING ACADEMY VISITORS INFORMATION

3. Project Alternatives

FHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date

Avenue L. General Pulaski Skyway De lancey Street I- 95 I- 95. Nn p. Wilson Av enue (0.23) FROM TPK EAST. US Route (1.93) RAMP FROM DELANCEY WILSON

NEW JERSEY DEPARTMENT OF TRANSPORTATION BUREAU OF RAIL SERVICES FISCAL YEAR 2010 STATE RAIL PLAN APPLICATIONS ELIGIBLE FOR FUNDING

Passaic Morris Sussex. Burlington Camden. Cumberland Gloucester

Getting to The Juilliard School

Update on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan

Directions. Directions to Fidelity Investment Locations

Directions to Local Offices. Call for directions to any office NJ-LAW

Spadina Avenue which would include two new underground stations located at Yonge Street and at University Avenue.

Directions. IBM Recovery Center One Evertrust Plaza Jersey City, NJ From World Trade Center site (Downtown New York City):

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS

College Avenue Campus Mettler, Stonier, and Tinsley Residence Halls General Instructions: Note: From New Jersey Turnpike (North or South) NOTE:

NEW JERSEY DEPARTMENT OF TRANSPORTATION

Northern Branch Corridor DEIS December Appendix H: Historic Properties and Resources

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

NJ STATE POLICE 2019 DWI Detection and SFST Course Officers not scheduled will not be trained

Claremont Project Background and Update Community Meeting September 11, 2017

Rail Average Weekday Station Passenger Boardings Fiscal Year 2010

The Transportation Corridor Overlay District

CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES

National Association of University Women (NAUW) Northeast Sectional Conference Trenton Branch, Conference Host

Oak Creek Assembly of God FOR YOUR SAFETY

NJ GLOUCESTER B(N/S) 4 NEW JERSEY TURNPIKE WOOLWICH TWP. B INTERCHANGE 2 & B(N/S)

This quarterly brochure is compiled by the New York Metropolitan Transportation Council. Data Monitoring and Analysis Unit

Northeast Corridor Transportation Update

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

Union Station Queens Quay Transit Link Study

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1

Type Address City State Status Latitude Longitude

RETAIL POTENTIAL ON 1/2 ACRE SITE

Chapter 4.0 Alternatives Analysis

Score. Category. Access Aesthetics Community Resources

A travel description of the Brisbane Airport Domestic Terminal Precinct. Author: Mr Terry Boyle of the Tactual Mapping Committee (September 2013)

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

NJ TRANSIT ADJUSTS WEEKDAY SCHEDULES EFFECTIVE JUNE 4, 2018

New Jersey Turnpike Authority 2018 Capital Project & Investment Plan

GUIDE TO THE GREAT EASTERN TRAIL IN TENNESSEE

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

Student Information for NY Times Square

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

Chapter 4. Development Alternatives

1.2 Corridor History and Current Characteristics

A History of the Construction of the Radial Expressway System in Cook County

ELIZABETH PUBLIC LIBRARY NEW JERSEY CENSUS MICROFILM INVENTORY

TRANSCOM, Jersey City REGIONAL CONDITIONS REPORT Nov 04, :30AM Next Report 1:30PM

Great Development Opportunity

Appendix 1: Phase I Strategies

Lippincott Residence Hall

Site Location and Setting

100 KIMBALL DRIVE ONE JEFFERSON ROAD

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

Presented By: Deputy Executive Director February 17, 2011

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

Music, Mind, and Invention Workshop Directions, Transportation, and Parking DRIVING DIRECTIONS

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

LRTP Ref. Type of Work. Detailed Project Description. Cruise Terminal H Improvements C-6 $13,050 $13,050

Southwest LRT Alignment Video Narration

Corridor Management Committee Meeting. April 2, 2014

WHY MOVE YOUR BUSINESS TO HOLLYWOOD?

Special Committee on U.S. Route Numbering

A number of goals were identified during the initial work on this Big Lake Transportation Plan.

Route 29 Solutions Projects

Connecting Cleveland 2020 Citywide Plan Transit Improvement Recommendations

NJTPA DRAFT Transportation Improvement Program Fiscal Years

Welcome to GlobalPost Directions to our offices Pilot House Associates 32 Atlantic Ave. Lewis Wharf Boston, MA (617)

Lake Erie Commerce Center Traffic Analysis

Community Transit Solutions for the Suburbs CTAA Expo June 2014

Creating Connections in Niagara Region

SAN RAFAEL City Council January 20, 2015

SCOPING INFORMATION PACKET

Driving Directions to NTIS Symposium-Embassy Suites Cary 201 Harrison Oaks Blvd Cary, NC 27513

2. Proceed 3 and 3/4 miles on Fort Eustis Blvd to traffic light. Turn left on to Route 17 North (George Washington Memorial Highway).

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

Public Informational Meeting

List of Our Ongoing Noise and Vibration Monitoring Projects

Installation of a permanent generator at

2015%Ironbound%Spring%Warmup% Directions!

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP).

Transportation TRANSPORTATION PROJECTS

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026

Transcription:

Governor s Mobility Plan Corridors, Segments and Projects 10/12/89 Allied Junction Corridor northern terminus of New Jersey Turnpike/Hudson County Extension Segment I-A - New Rail Spur from Bergen Line l-a.1 New Station. l-a.2 Crossing of Berry s Creek (north of Route 3, onto Sports Complex). l-a.3 New rail spur from existing Bergen Line to Sports Complex. Segment I-B - Connection of Bergen and Main Lines I-B.2 Connection of Main and Bergen Lines. l-b.3 Existing Main Line into Allied Junction. l-b.4 Conversion of abandoned Bergen Line railbed to roadway from Allied Junction to Seaview Drive and Meadowlands Parkway. Segment I-C Allied Junction Development l-c.1 Rail transfer station with Main/Bergen Lines and conversion of abandoned Bergen Line to roadbed. I-C.2 Additional trackage on Main Line (also known as the Secaucus Transfer). l-c.3 Improvements to Northeast Corridor (also known as the Secaucus Transfer). l-c.4 Rail transfer station over Amtrak s Northeast Corridor Line l-c.5 Allied Junction Complex - 4,000 parking spaces; hotel and offices; total 3.5 million sq. ft. (Private development). l-c.6 New Turnpike Interchange - between 15E and 16E, at Allied Junction. Projects in segments from Sports Complex; southeast through Bergen Arches to 1-8.1 Existing Bergen Line southeast across the Hackensack River.

// Circle of Mobility Segments - pg. 2 Segment l-d - Allied Junction to Bergen Arches I-D.1 l-d.2 Abandoned Bergen Line right of way, converted to a roadbed between Allied Junction and the Bergen Arches. Grade separations andlor bridges at Penhorn Creek and Croxton Yard. l-d.3 Connection of Allied Junction & Bergen Arches with Routes 1 & 9 (Tonnele Ave.). Segment l-e - Bergen Arches I-E.1 I-E.2 l-e.3 Rehabilitation of Bergen Arches. Fly-over Conrail at easterly end of Arches. Connecting ramps to 6th and 11th Streets and to South Busway/Waterfront Blvd. l-e.4 Connecting ramps to 11th Street and Waterfront Blvd. from 1 Hudson County Turnpike Extension. Segment I-F - Route 17 South to Route 280/Interchange 15W l-f.1 Route 17 south from Route 3 to Route 280/Interchange 15W. l-f.2 Abandoned rail right-of-way for Routel7 South Extension to Route 280, or Exit 15W of the Turnpike Segment l-g - Route 3 Bridge over Berry s Creek Bridge rehabilitation and expansion from two lanes to three lanes in each direction. II. Waterfront Corridor Projects in segments from easterly end of Bergen Arches, northward between the base of the Palisades and the Hudson River: to the entrance of the Lincoln Tunnel and northward to the North and South Tunnels and to the North Busway. This Corridor is currently the subject of a $2M, 18 month formal UMTA Alternatives Analysis (AA). Segment Il-A - Right of Way at Base of Palisades (Now incumbered by Conrail s River Line; under contract to NJ TRANSIT) ll-a.1 Interim roadway behind Hoboken from Hudson County Turnpike Extension to Weehawken.

Segment tl-d - South busway to Lincoln Tunnel Connection of South busway to Lincoln Tunnel. Segment II-E - Lincoln Tunnel to North Busway Connection of North busway to Lincoln Tunnel. Segment Il-F - NJ TRANSIT s Waterfront Connection Connects the Northeast Corridor, North Jersey Coastline and Raritan Valley Lines (now under construction). Circle of Mobility Segments - pg. 3 ll-a.2 Permanent improvements behind Hoboken from Hudson County Turnpike Extension to Weehawken (Waterfront Blvd./South Busway). Point Road to Route 5. Caven li-a.3 Waterfront Blvd. - ll-a.4 Route 169/1 85 - Bayonne Bridge to Caven Point Road and Route 440 (now under construction). Segment Il-B - Northern Branch ll-b.1 Paterson Plank Road grade separation. li-b.2 Secaucus Road grade separation. ll-b.3 Croxton Yard rail improvements. ll-b.4 Marion Junction rail improvements. ll-b.5 North Bergen Yard rail improvements. ll-b.6 Purchase of Conrail s River Line and Weehawken Tunnel. Segment Il-C - Peoplemover li-c.1 Bayonne to Hoboken Terminal ll-c.2 Hoboken Terminal to North Bergen Yard ll-c.3 Extension from North Bergen Yard to Sports Complex through relocated Interchange 17E

Segment Ill-C - Connection of Westerly Portals of Twin Tunnels to Relocated Turnpike Interchange 17E. Crossing of Cromakill Creek by 5 lanes (2-South Tunnel/3-North Tunnel) inclusive of peoplemover. Segment lli-d - Relocated Turnpike Interchange 17E lll-d.1 Expanded Vince Lombardi Park n Ride. lli-d.2 Construction of relocated Turnpike interchange. Segment IIl-E - Peoplemover Extension from Relocated Interchange 17E to Sports Complex lii-e.1 Crossing of Hackensack River over Paterson Plank Rd. Bridge replacement.!circte of Mobility 4 pg. Segments - III. Twin Tunnels Corridor Projects in segments from North busway/waterfrant Blvd. westerly through the existing South (Weehawken) and new North Tunnels to the North Bergen Yard and relocated Interchange 1 7E. Inclusive of new alignment west of relocated 17E for a peoplemover extension, new roadbed, and bridge replacement at Paterson Plank Rd. to the Sports Complex. Existing Segment Ill-A - South (Mass Transit Only) Tunnel - Weehawken Tunnel under contract from conrail to NJ TRANSIT. Ill-Al Connection of easterly portal with Waterfront. lll-a.2 South Tunnel rehabilitation. IIl-A.3 Connection of western portal to existing or new road system. Ill-A.4 Park n Ride at Wassil site. Segment Ill-B - North Tunnel (New) lll-b.1 Connection of easterly portal with Waterfront. IlI-B.2 Construction of 3-lane North Tunnel. lll-b.3 Connection of western portal to existing or new road system.

Circle of Mobility Segments - pg. 5 Segment Ill-F - Paterson Plank Road Bridge Replacement ll-f.1 Westerly connection to Turnpike Interchange 17W. ll-f.2 Replacement span over Hackensack River. lll-f.3 Easterly connection to Meadowlands Parkway. lll-f.4 Connection of Meadowlands Parkway Extension with relocated Turnpike Interchange 17E. 3 Corridors 1 9 Segments 55 Projects (combined into 7 clusters) Added to original plan elements