NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

Similar documents
Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

Building the transportation network we need for the future in Niagara Region

SOUTHEAST BOULEVARD Planning Study Washington, DC. Progress Drawings October 6, 2014

EDEN PARK REDEVELOPMENT COMPLETED STADIUM DESIGN

Union Station Rail Corridor East Enhancements Project

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

FORT YORK PEDESTRIAN & CYCLE BRIDGE

Major Projects Overview

Atlantic Street Bridge Project CTDOT Project Nos & (Phase 2)

Atlantic Street Bridge Project Update CTDOT Project Nos & (Phase 2)

Southwest LRT Alignment Video Narration

I-70/I-71 Project Public Meeting Presented By

NEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS

MBTA WOLLASTON. Station Improvements Public Meeting. January 14, 2016

25 th Avenue Grade Separation. September 13, 2017

Link Union Station (LINK US)

Having trouble reading this ? View it in your browser. Welcome

Astoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Grade Crossings in High Speed Rail Corridors

TORONTO TRANSIT COMMISSION REPORT NO.

Welcome to the Cross County Trail Public Input Session!

SAN RAFAEL City Council January 20, 2015

Design Meeting Presentation

STUDY WORK GROUP MEETING No. 4. July 12, 2017

Union Station Queens Quay Transit Link Study

Connectivity is the new currency. -Mayor Pete Buttigieg, South Bend

Crenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017

Hospital Link Project Project Update Winter 2018

Transportation Supporting Dulles Airport

TORONTO TRANSIT COMMISSION REPORT NO.

Route 29 Solutions Projects

DESIGN AND CONSTRUCTION OPEN HOUSE

UNION STATION ACCESS AND CAPACITY IMPROVEMENT STUDY PROJECT REPORT

Processing NEPA at the NFTA

Crenshaw/LAX Transit Project Construction Community Meeting July 26 th, 2017

Wellesley Station Second Exit and Automatic Entrance Public Open House. Tuesday, September 23, 2014 Central YMCA 20 Grosvenor Street

Corridor Management Committee Meeting. April 2, 2014

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

JANUARY MODERNIZATION UPDATE: MAJOR PROJECTS ON TAP AT LAX AS NEW YEAR BEGINS

FY TRANSPORTATION IMPROVEMENT PROGRAM. Authority Projects FY

Non-Motorized Transportation

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

Main Street Station Upgrades

HARP AUTHORITY GATEWAY CENTER BOATHOUSE & CHANNEL EXTENSION TO SANTA FE AVENUE. Pueblo City Council Presentation September 17, 2018

Creating Connections in Niagara Region

Lake Erie Commerce Center Traffic Analysis

First rail. August 2011

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014

Construction Update. Local Officials Briefing March 2016

Bridging Brisbane Survey 2017 Supplementary Report

AUGUST 5, 2010 UPDATE # 3 AMTRAK/FEC PROJECT: STATION LOCATIONS AND CONCEPTUAL DRAWINGS

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

Mission Statement. Spur 601 Project Highlights

Expo E-News. Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2. Keeping Our Community Informed

University Region Non-Motorized Plan 2015

Spadina Avenue which would include two new underground stations located at Yonge Street and at University Avenue.

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

Photographic Log Client: Project Number: Site Location: Site Name: Photograph ID: Date: Location: Direction: Comments: Photograph ID:

Centurion Way Chichester

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018

2600 COLORADO ENTRY DESIGN

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation

AVAILABLE FOR SALE ENTITLED 53,228 SF BUILDING FOR SALE Washington Dr., Fontana. Property Features:

Madison Metro Transit System

COCONUT GROVE WATERFRONT MASTER PLAN. ERA / Curtis Rogers / ConsulTech / Paul George Ph.D.

Guide to. Road Construction Projects

TORONTO TRANSIT COMMISSION REPORT NO.

City of Olathe, Kansas Capital Improvement Plan Projects 2016 thru 2020

OR MISSION TRAIL ELEMENTARY

MONTGOMERY COUNTY PUBLIC SCHOOLS BETHESDA-CHEVY CHASE MIDDLE SCHOOL #2 SAMAHA ASSOCIATES, PC

Draft Environmental Assessment and Draft Section 4(f) Determination. Appendix A Station Headhouse Alternatives Analysis

A. CONCLUSIONS OF THE FGEIS

TORONTO TRANSIT COMMISSION REPORT NO.

Cambridge Avenue. Cleveland Avenue. Chicago Avenue. Chicago Avenue. Curbed planters with groundcover,

CHAPTER 4: ALTERNATIVES

Geary Avenue: Option 2_Reconstruction

4. Safety Concerns Potential Short and Medium-Term Improvements

Stakeholders Meeting

US 19 Sunset Point Rd to Countryside Blvd.

Meeting Notes Public Open House

Meeting Summary. 1. Welcome and Review of Meeting Summary

Crenshaw/LAX Transit Project Construction Update Community Meeting November 29 th, 2017

5.1 Traffic and Transportation

Marymount University Ballston Center Redevelopment

Reston EastPointe Sunset Hills Road Reston, VA 20190

Welcome. Welcome to our public exhibition which explains our proposed changes to the Brentford Community Stadium development, at Lionel Road South.

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

Work in 2015 and Annual Mobility- Management Plan

Road log for railway features east of Thunder Bay

Appendix 6 Fulbourn Greenway Review

National Model Railroad Association

Markham Multi-use Pathway (MUP) (16 th Avenue to Bob Hunter Memorial Park) Development Services Committee. January 27, Schollen & Company Inc.

Dear Councilmembers of the Arts, Entertainment, Parks and River Committee:

Astoria Boulevard ADA and Station Renewal Track Improvements. January 30, 2019

LAS VARAS RANCH CA COASTAL TRAIL PROPOSED ALIGNMENT

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

Transcription:

Alternative A South Park Avenue Alternative A Summary Alternative A extends Metro Rail service around the foot of Main Street east along South Park Avenue to serve a new station platform located along South Park Avenue on the north side of the existing NFTA Yard and Shop Facility. A pair of new mainline tracks will turn off from the existing mainline tracks located on Main Street to extend Metro Rail service along South Park Avenue to a new station located along the north side of the NFTA Yard and Shop Facility. The mainline track turnoff at the foot of Main Street allows the new mainline tracks to be separated from the Yard and Shop tracks and will also maintain two vehicular travel lanes along South Park Avenue. One of the mainline tracks would upgrade an existing Yard & Shop Facility track located along South Park Avenue that currently sits inside the security fence that provides access to the Operations & Maintenance Building, the other track would be a new track located within the South Park Avenue right-of-way. South Park Avenue would need to be reconstructed to narrow the section to two 10 or 11-foot lanes and would require removal of the existing bike lanes (South Park could incorporate a Shared Lane Marking Sharrow ) and shifting of the sidewalks. A new 300-foot long by 22-foot wide station platform would be located along South Park Avenue, alongside the existing DL&W Terminal Building. The new station platform would consist of vertical circulation (stairs and elevator) to access the 2 nd level of the DL&W Terminal and stairs/ ramps at the station platform ends to provide access to street level. The new station would allow for direct access to the First Niagara Center Parking Ramp as well as First Niagara Center via a new pedestrian bridge spanning South Park Avenue. Mainline tracks would be extended east beyond the new station platform and tie into the existing loop track that exists at the east end of the NFTA Yard and Shop facility. This will allow NFTA to load trains to the new mainline track from the east rather than pulling trains out of the western end of the Yard and Shop Facility and backing them into the new station platform. Future extensions to the east can lead into the existing NFTA owned right-of-way east of Michigan Avenue or can continue along South Park Avenue.

Alternative A Concept Plan New Mainline Track New Station New Mainline Track

Alternative A Cross-Section (Looking East Down South Park Avenue)

Alternative A Concept Rendering (Looking East Down South Park Avenue)

Alternative B Buffalo River Alternative B Summary Alternative B extends Metro Rail service through the foot of Main Street towards the Buffalo River, then parallel to the Buffalo River into the DL&W Terminal Building to serve a new station platform located on the ground level of the DL&W Terminal. A pair of new mainline tracks are extended from the existing mainline tracks located on Main Street to extend Metro Rail service south towards the Buffalo River. Existing tracks within the NFTA Yard & Shop Facility and security fencing would need to be relocated to keep new mainline service separate from these Yard & Shop tracks. New mainline tracks are extended east, parallel to the Buffalo River, into the ground level of the DL&W Terminal. A new 300-foot long by 22-foot wide station platform would be located on the ground floor of DL&W Terminal. The new station platform would consist of vertical circulation (stairs and elevator) to access the 2 nd level of the DL&W Terminal and stairs/ ramps at the station platform ends to provide access to the Riverwalk. Under this alternative, the southern side of the DL&W Terminal is opened up to the Buffalo River and integrated with the Riverwalk. Security fencing or wall would need to be constructed within the DL&W Terminal to separate the new station from on-going operations and maintenance activities within the Yard & Shop Facility. Vertical access to the 2 nd level of DL&W Terminal would require immediate improvements to the 2 nd level to provide an access corridor in order to access South Park Avenue. Similar to Alternative A, the new station would allow for direct access to the First Niagara Center Parking Ramp as well as First Niagara Center via a new pedestrian bridge spanning South Park Avenue. Mainline tracks would be extended east beyond the new station platform and tie into the existing loop track that exists at the east end of the NFTA Yard and Shop facility. This will allow NFTA to load trains to the new mainline track from the east. Future extensions to the east can lead into the existing NFTA owned right-of-way east of Michigan Avenue. Extension along South Park Avenue is more difficult under this alternative.

Alternative B Concept Plan New Mainline Track New Station

Alternative B Cross-Section (Looking East)

Alternative B Concept Rendering (Looking Southwest from DL&W Terminal)

Alternative B Concept Rendering (Looking West along Buffalo River)

Alternative B Concept Rendering (Looking East Down South Park Avenue)