AIRPORT WITH NO RUNWAYS IS A MALL

Similar documents

Fort Lauderdale Hollywood International Airport

Yakima Air Terminal/McAllister Field Airport Master Plan Update

EXECUTIVE SUMMARY FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT (FLL) MASTER PLAN UPDATE PHASE 1

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

APPENDIX B NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS

Partnership for Quieter Skies Report

Partnership for Quieter Skies Report

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

Partnership for Quieter Skies Report

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport

Finance and Implementation

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016

Quieter Skies Report. Partnership for. Fort Lauderdale-Hollywood International Airport. Prepared by: Broward County Aviation Department

Community Noise Consortium Meeting (CNC)

Master Plan Update Technical Advisory Committee Meeting

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Session Six: State Aviation System Plan Overview GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau

Community Noise Consortium Meeting (CNC)

SouthwestFloridaInternational Airport

Will it Fit? Preliminary Findings

FLL s international traffic has tripled in the last 10 years and it is now 16% of total traffic

EXECUTIVE SUMMARY. Master Plan Update Phase 2/3 FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 1. INTRODUCTION 2.

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

PFC Application #2 Niagara Falls International Airport

Partnership for Quieter Skies Report

BNA Master Plan Update Community Advisory Committee Meeting No. 5

State of the Airport Robert S. Bowen, Executive Director October 18, 2018

CHAPTER 1 EXECUTIVE SUMMARY

FLL. Fort Lauderdale-Hollywood International Airport Yesterday, Today and Tomorrow. The Brazilian Business Group

FAA Reauthorization Issues & Impacts on Airports

AVIATION. MichiganReportCard.com 5

Public Information Meeting. September 2015

CHAPTER TWO THE PROPOSAL

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures

Aviation Department Board Workshop. December 7, 2010

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

Quieter Skies Report. Partnership for. Fort Lauderdale-Hollywood International Airport. Prepared by: Broward County Aviation Department

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM

PUBLIC SCOPING MEETING APRIL 2018

Airport. Improvement Program (AIP) Overview. Federal Aviation Administration. Texas Aviation Conference Ben Guttery, Texas ADO April 2017

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

AirportInfo. Airport Improvement Program

Aviation Gridlock: Airport Capacity Infrastructure How Do We Expand Airfields?

Memphis International Airport Enplanements by Fiscal Year (000 s)

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Chapter 3. Demand/Capacity & Facility Requirements

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

BNA Master Plan Update Public Meeting No. 2

Chapter 4. Development Alternatives

FORECASTING FUTURE ACTIVITY

Community Noise Consortium Meeting (CNC)

Key Purpose & Need Issues

CHAPTER 3 ALTERNATIVES CONSIDERED

Quarterly Performance Measurement Report

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application

INTRODUCTION TO THE ADAPTING TO RISING TIDES EXISTING CONDITIONS AND STRESSORS REPORT

Public Notice July 14, 2017

AirportInfo. Passenger Facility Charge

Quieter Skies Report. Partnership for. Broward County Aviation Department Partnership for Quieter Skies Quarterly Report

Next Generation Air Transportation System Financing Reform Act of 2007

Update on the Aspen/Pitkin County Airport Improvements

Aviation Operating Administration/Executive

Study Committee Meeting. September 2015

Westover Metropolitan Airport Master Plan Update

Noise Abatement 101. July 13, Regular Board Meeting / August 7, 2014 Hillsborough County Aviation Authority

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

ECONOMIC DEVELOPMENT INCENTIVES AND PROGRAMS. Provide Airport Encroachment Protection. Standardize Ad Valorem Tax Exemptions

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

Airport Funding FAA Airport Improvement Program (AIP)

Quieter Skies Report. Partnership for. Broward County Aviation Department Partnership for Quieter Skies Quarterly Report

A Love Note from Me to You

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies

Table of Contents. Overview Objectives Key Issues Process...1-3

Las Vegas McCarran International Airport. Capacity Enhancement Plan

Sunshine Coast Airport Master Plan September 2007

P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS

Chapter 4 Noise. 1. Airport noise

April 4, McKinney Airport Advisory Committee Airport Master Plan Update.

Session 6 Airport Finance 101 Funding Sources for Airports

IDENTIFICATION AND EVALUATION OF ALTERNATIVES ST. PETERSBURG-CLEARWATER INTERNATIONAL AIRPORT

CHAPTER 4 DEMAND/CAPACITY ANALYSIS

STUDY WORK GROUP MEETING No. 3. November 29, 2016

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Dr. Antonio A. Trani Professor of Civil Engineering Virginia Polytechnic Institute and State University. Spring 2015 Blacksburg, Virginia

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.

Punta Gorda Airport Master Plan Update

Transcription:

RUNWAY EXTENSION INITIATIVE AT FT. LAUDERDALE HOLLYWOOD INTERNATIONAL AIRPORT ISMAEL IZZY BONILLA DEPUTY DIRECTOR BROWARD COUNTY AVIATION AUTHORITY AIRPORT WITH NO RUNWAYS IS A MALL

Runway Business Case Insufficient airfield capacity* to accommodate demand Demand dictated a new runway in 2004 FLL is essentially a one commercial runway airport 30 large hub airports in US FLL is one of only 2 large hub airports that have 1 runway The Runway Extension will increase capacity from 310,000 to 445,000 operations per year * Capacity is measured as the point at which the average departure is delayed by 6 minutes. Estimated $50.00 per minute costs to airlines 5 Runway Business Case The key driver of the Runway 9R/27L expansion project is that FLL does not currently have adequate runway capacity to meet the number and mix of aircraft operations forecast for the Airport without delays reaching unacceptable levels. Runway 9L/27R (North Runway) is the only runway that can handle large air carrier aircraft such as the A320 and Boeing 767 without weight and size restrictions. The existing parallel runway, Runway 9R/27L, can accommodate only limited types of commuter jet and general aviation aircraft due to insufficient runway length, width, and inadequate separation from its taxiway.

While Runway 13/31 provides sufficient length and width to accommodate a portion of the aviation fleet, its use is limited because of its length, crosswind orientation and intersection with the parallel runways. The operational delay caused by this deficiency will increase because the number of large air carrier aircraft operating at FLL is forecast to increase through the forecast period (FY2030). The primary runway, Runway 9L/27R, at its existing length and width, can accommodate all aircraft types currently operating, and forecast to operate, at FLL. Enplanements & Operations 1995-2020 Source: 2008 Terminal Area Forecast 16.000.000 450.000 14.000.000 400.000 12.000.000 10.000.000 310,000 operations 350.000 300.000 Enplanements 8.000.000 6.000.000 250.000 200.000 150.000 Operations 4.000.000 100.000 2.000.000 50.000-1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 - Enplanements Operations 8

Traffic Update: Jan Oct 2010 Total traffic 17,411,841 up 5.6% Domestic traffic 15,581,885 up 4.5% International traffic 2,810,235 up 12.7% FLL ranked 1st among large US Airports for total traffic growth for September 2010 vs. 2009, up 10.3%. September and October both set all time FLL traffic records for those months. Seats per departure have increased from 114 in 2005 to 134 in 2010. Typical Cruise Season Scenes 10

Typical Cruise Season Scenes 11 THE PROCESS Airports that plan to build runways must comply with what can become a complex process involving three general phases that often overlap: 1. Planning 2. Environmental Review 3. Design and Construction

1. PLANNING THE PROCESS Airports and local officials determine the type of development and estimated costs in both political and economic terms. Establishing the purpose and need for the runway Coordinating land use issues with Planning Boards Preparing or updating Master Plans, Airspace Reviews, Costs Benefit Analyses How will the Airport Sponsor fund the project? THE PROCESS 2. ENVIRONMENTAL REVIEW Most Challenging Phase of the Process FAA determination of the extent to which the proposed project will affect the environment. The FAA will make one of three determinations: a) The project will not directly affect the environment. b) Project has measurable impacts, but impacts will not exceed guidelines. (FONSI) c) Project has significant environmental impacts.

THE PROCESS 3. DESIGN AND CONSTRUCTION Project Engineering Financing Contracting Land Acquisition Site Preparation Project Construction Project Certification

Noise Mitigation Program Noise mitigation program is estimated at $175 million in the EIS/ROD. Congress directs that approximately $1 billion be set aside annually for noise mitigation programs throughout the US. Funds are distributed on an 80% federal/20% local formula. FLL has reserved $35 million to date in local PFC funds dedicated to a noise mitigation program. This will fund a total program of $175 million. 18

Airfield Refinement Plan 19 Possible Design for Tunnel 20

Airfield Plan Runway Extension