HOST KA

Similar documents
22-23 Pavement Marking Items. (Pages 7 & 8 removed)


K SIGNAGE & TRAFFIC CONTROL. Table of Contents

General Highway System SHEET 1 HILTON HEAD ISLAND URBAN AREA

- detour drawings with traffic directions; - staging schemes with traffic directions; - number of lifts of pavement courses;

532 - PAVEMENT MARKING - OPSS 532

KDOT announces approved November bids

Riverside County Transportation Department Summary of Bids

MEMORANDUM. ~Department. TO: District Engineers DATE: February 3,2012. Texas. Carol T. Rawson, P.E., Director ~ t~ Pt Traffic Operations Division C /"

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE

Kansas Department of Transportation DISTRICT TE / TA-T043(301) Project(s): Min: Max:

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

MONTANA CONSTRUCTION REPORT 06 / 14 / 2016

State Route 8 Corridor. Northern Summit County s Path to Success

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

The following criteria shall be applied within the boundaries of the AO District:

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

FULL DEPTH RECLAMATION (FDR)

KDOT announces approved November bids

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

KDOT announces approved December bids

CITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $

ADDENDUM NO. TWO AB

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

02/21/2013 OKLAHOMA DEPARTMENT OF TRANSPORTATION PAGE: 2 09:04:10 FINAL MAY 2013 BID OPENING JBPRC068 JOB PIECE CD HIGHWAY MILES ADV.

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES

TYPICAL SECTION OF IMPROVEMENT

Culpeper District. Albemarle County Monthly Report December 2011

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

Progress Report for Projects of Regional Significance

SCOPE Chapter 2D shall Apply to Any Road or

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:

APPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS

November 21, 2012 Barbara Kelleher, (954)

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

FDOT Treasure Coast Traffic Report through

FY 2018-FY 2021 STATE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

FDOT Treasure Coast Traffic Impact Report

Canada and Alberta announce 33 new infrastructure projects

ROYAL VIEW DEVELOPMENT

Appendix E. Build Alternative Design Information

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES

Provincial Railway Technical Standards

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

Non-Motorized Transportation

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

Runway Roughness Evaluation- Boeing Bump Methodology

Special Committee on U. S. Route Numbering May 24, 2016 Waterloo Des Moines, Iowa Meeting Minutes

Runway Roughness Evaluation- Boeing Bump Methodology

Mainelli Wagner & Associates, Inc.

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

Runway Roughness Evaluation- Boeing Bump Methodology

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X

Welcome to Dayton Parkway Interchange Open House. November 26, 2018

DISTRICT/ATP 7 Data Input Worksheet DRAFT STIP June 29, 2018 Red is changes from previous ATIP

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District

MIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)

Grade Crossings in High Speed Rail Corridors

Pavement Management Study

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting

Fort Bend County Tabulation BID Term Contract for Traffic Signs Posts and Supplies. Term: 1 October 2010 through 30 September 2011

Culpeper District. Albemarle County Monthly Report. September 2012

ICAO Recommended Airport Signs, Runway And Taxiway Markings. COPYRIGHT JEPPESEN SANDERSON, INC., ALL RIGHTS RESERVED. Revision Date:

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

City of Pittsburg. WEST QUINCY AND COUNTRYSIDE ADDITION STREET IMPROVEMENTS 2018 Street Improvements Program

Palm Beach County Traffic Report July 13 through July 20, 2012

ELECTION SIGN GUIDELINES

Gulf Coast MPO Obligated Projects

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways

LANDER COUNTY RAIL ASSESSMENT NOVEMBER 2006

KDOT announces approved February bids

FDOT Treasure Coast Traffic Impact Report

Construction Update. Local Officials Briefing March 2016

DISTRICT CONSTRUCTION PROGRAM PROGRAM DISTRICT CONSTRUCTION

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

CHAPTER 2H. RECREATIONAL, HISTORICAL MARKER, TRAFFIC GENERATOR AND CULTURAL INTEREST AREA SIGNS

Florida Registration No Florida Registration No

University Region Non-Motorized Plan 2015

Arkansas Department of Transportation JOB DITCH AT L.M STR. & APPRS. (S) FEDERAL AID PROJECT NHPP-0074(34)

Segment 2: La Crescent to Miller s Corner

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices

Grove Field Airport Environmental Assessment

October 31, 2014 Chuck McGinness, (954)

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

Projected Advertisement Date

Transcription:

W PLAINS E ZENITH E 00 RD E 000 RD W 00 RD W 00 RD W 00 RD W 0 RD W 00 RD W 00 RD W 000 RD W 00 RD W 00 RD W 00 RD W 00 RD W 00 RD W 00 RD W 0 RD W 00 RD E 00 RD E 00 RD E 0 RD E 00 RD E 00 RD E 00 RD E 00 RD E 00 RD E 00 RD E 000 RD E 00 RD E 00 RD E 0 RD W ARROW W BUFFALO W CHEROKEE W DAKOTA W EAGLE W GRANITE W HUNTER W KIOWA W LIMESTONE W NAVAJO W OSAGE W QUAIL W THUNDER W UNION W VICTORY LN W ZENITH W BIG BEAR LN W COZY COVE W DAY DREAM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Glade 0 0 0 0 0 0 0 0 0 0 Kirwin National Wildlife Refuge 0 0 0 0 Francis Wachs Wildlife Area 0 0 0 0 0 0 Agra E ARROW E BUFFALO E CHEROKEE E DAKOTA E EAGLE E FOX E GRANITE E HUNTER E IRON RD E JADE E KIOWA E LIMESTONE E MOHAWK E NAVAJO E OSAGE E PLAINS E QUAIL E RIDGE E SANTA FE E THUNDER E UNION E VICTORY E YANKEE E APACHE ACRE E BIG BEAR E COZY COVE E DAY DREAM RS 0 RW RW West Big Creek HOST -0 KA 0-0 - 0' R eb ecca Cr eek RS Bone Cr. Cro w Creek Creek Elk reek C Ja ckcreek Second Guide Meridian West W e st Crow West M West Cedar Creek West Plum Battle Creek Pra iddle Ceda r Creek irie DogCr. Creek Hanson Creek Trap Cre ek Ea st Big Cree k Spring Creek Bissell C reek Starvation Cre ek Wildcat Creek Cree k Bo ughtoncreek Ea st Plum Prairie View P lotner Cr eek KYLE Deer reek C C rooke d Creek Ash Creek Beav er Creek Creek Big Turner Creek Plum Wolf Cr ee k Creek Speed Gretna Cact us Creek Logan Long Island Stuttgart Woodruff RS RS RS RS RS RS RS RS Phillipsburg RS Kirwin Reservoir Kirwin Fork Solomon River No rt h RS - 0' - ' 0 00' 0 00' 0' 0' RW RW R0W R0W 0' 0' T0S T0S T0S T0S RS T0S T0S reek Me dicin e C Bow Creek T0S T0S First Standard Parallel South T0S T0S RW RW RW - 0' R0W RW - 0' RW RW RW RW Nebraska HIGHWAY MARKERS BOUNDARIES HIGHWAY CLASSIFICATIONS Interstate County Seat State Route - Undivided Populated Place ROAD CLASSIFICATIONS! Locale RS Route - Paved RS Route - Unpaved DRAINAGE Minor Road - Paved River or Major Drainage Minor Road - Gravel Lake or Reservoir Minor Road - Soil MAP SYMBOLS ROAD SYSTEM DESIGNATION RS Rural Secondary System Roundabout Interchange ST RD County Road System State System Bridge End of Designated System s GENERAL HIGHWAY MAP PHILLIPS COUNTY KANSAS PREPARED BY THE KANSAS DEPARTMENT OF TRANSPORTATION BUREAU OF TRANSPORTATION PLANNING IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION Miles 0 MARCH 0 KDOT makes no warranties, guarantees, or representations for the accuracy of this information and assumes no liability for errors or omissions. R0W RW T0S T0S T0S T0S T0S T0S T0S T0S T0S T0S County T0S T0S Rooks County Franklin RW County RW RW RW RW RW RW - ' Norton Smith County County Graham Harlan - KA 0-0 0 Interstate Numbered Highway County Boundary State Boundary Kansas Turnpike Authority Military Fort Boundary 0 U.S. Numbered Highway Indian Reservation or Half-Breed Land 0 State Numbered Highway Section Park or Wildlife Area Incorporated City Limit Kansas Turnpike (KTA) Urban Area Controlled Access US Route - Divided CITIES OR TOWNS US Route - Undivided State Capitol State Route - Divided Railroad Co. W 00 RD W 00 LN LOGAN LAKE RD W 00 RD W 00 RD W 000 RD W 00 RD W 00 RD W 00 RD W 00 RD W 00 RD W 0 RD W 00 RD W 00 RD CENTER RD E 00 RD E 0 RD E 00 RD E 00 RD E 00 RD E 00 RD E 0 RD Page

Page - KA 0-0 HOST -0 KA 0-0

General Notes //0 Page of Project No. -0 KA 0-0 Note The contractor is responsible for establishing and maintaining centerline of the traveled way for the duration of the project. Splitting the traveled way with a tape measure is an acceptable technique to establish centerline. This work is considered subsidiary to other items in the contract. The Contact signs the listed local are KDOT the minimum Area office required. for the location The contractor of the RAP shall sampling provide all stockpiles. signs and other traffic control devices, for proper traffic control of all construction activities. The contractor must place the inlay on the same day. No traffic will be allowed on these milled surfaces and the contractor must have a contingency plan in case of bad weather and/or equipment breakdown. All millings will become the property of the contractor. Milling thickness will be adjusted at the beginning and ending of the project, at bridge approaches and at all grade crossings to allow a smooth transition. Page

Sheet of Rock Wedge TYPICAL SECTION A C. in. Overlay in. Mill & Inlay Rock Wedge : @ edge of Asphalt Match Existing Surface or varies ft wedge ft+ not to scale Typical slope. % on tangents and on super-elevated sections to match existing super or as directed by the Engineer. Existing surface may be irregular and contain edge ruts. Contractor to fill to finished slope. Material for wedges shall be furnished by the contractor and paid for as Pavement Edge Wedge (Rock). To allow for a reasonable transition the overlay is to be tapered approximately three feet at all paved side roads and entrances (except those that are approved to be fully paved). ROADWAY WIDTHS Approx. Overlay Location mile Width Mill & Inlay Sq YDS SQ YDS Normal roadway. 0, 0, Widening at Kirwin.,, Transition in wid @ Kirwin.0,0,0 Transition out wid @ Kirwin.0,0,0 Total.,, Beginning. miles west of Kirwin; Thence East. miles to the Phillips/Smith County Inlay based on SR- -A @. Ton/yd Overlay based on SR-.-A @.0 Ton/yd RATE OF APPLICATION SS-HP @ 0.0 gal/yd Edge AS- @ Wedge 0 Tons/Mile (Rock) @ 0 Tons/Mile Date: //0 : PM Phillips Co. PROJ. NO. - KA 0-0 Page KANSAS DEPARTMENT OF TRANSPORTATION.0 Mill and Inlay with a. Overlay

Typical Section B Sheet of Not to Scale Mill existing surface." to " ' per one inch overlay Existing Pavement Roadway Widths Location Miles Approx. Width Square Yards Trans Out BR # 0.00 0 * Beginning of Job 0.00 *0 Material from the milling operation shall become the property of the contractor and wasted at a site approved by the Engineer. This shall be subsidiary to the bid item Milling. Traffic shall not be allowed on milled surfaces. Wedging and drop-off treatments may be used on the edges of milled surfaces. This shall be subsidiary to the bid item Milling. HMA Surface course shall be placed to match original lines and grades of the existing asphalt pavement. *This is for information only Square yards are inluded in normal roadway milling quantities - KA 0-0 Page Include in Contract Documents

Typical Section C Sheet of Not to Scale Mill existing surface " to." ' per one inch overlay Existing Pavement Roadway Widths Location Miles Approx. Width Square Yards Trans Out BR # 0.00 0 * Material from the milling operation shall become the property of the contractor and wasted at a site approved by the Engineer. This shall be subsidiary to the bid item Milling. Traffic shall not be allowed on milled surfaces. Wedging and drop-off treatments may be used on the edges of milled surfaces. This shall be subsidiary to the bid item Milling. HMA Surface course shall be placed to match original lines and grades of the existing asphalt pavement. *This is for information only Square yards are inluded in normal roadway milling quantities - KA 0-0 Page Include in Contract Documents

TYPICAL SECTION D Sheet of List of Sideroads, Entrances, and Mailbox Turnouts Recieves." Overlay only based on.0 tons/sqyd Location Radius Side Roads Side SQYDS Sq.Yds. Overlay SQYDS E 00 & Hwy LT 0 0 0 E 00 & Hwy RT 0 MM. Drive RT 0 0 MM. Side Road RT 0 0 MM. Drive LT MM. Side Road RT MM.0 Side Road RT MM. Drive LT MM. Drive LT E 0 Side Road RT 0 E 0 Side Road LT MM. Drive LT E 00 Side Road RT E 00 Side Road LT 0 Mailbox turnouts total Both Varies Total,0 - KA 0-0 Phillips County - KA -0. " Overlay Page

Sheet of Rock Wedge TYPICAL SECTION A C. in. Overlay in. Mill & Inlay Rock Wedge : @ edge of Asphalt Match Existing Surface or varies ft wedge ft+ not to scale Typical slope. % on tangents and on super-elevated sections to match existing super or as directed by the Engineer. Existing surface may be irregular and contain edge ruts. Contractor to fill to finished slope. Material for wedges shall be furnished by the contractor and paid for as Pavement Edge Wedge (Rock). To allow for a reasonable transition the overlay is to be tapered approximately three feet at all paved side roads and entrances (except those that are approved to be fully paved). ROADWAY WIDTHS Approx. Overlay Location mile Width Mill & Inlay Sq YDS SQ YDS Normal roadway.,, Total.,, Beginning @ Phillips/Smith County then East. miles to JCT US RATE OF APPLICATION Inlay based on SR- -A @. Ton/yd Overlay based on SR-.-A @.0 Ton/yd SS-HP @ 0.0 gal/yd AS- Edge @ Wedge 0 Tons/Mile (Rock) @ 0 Tons/Mile Date: //0 : PM KANSAS DEPARTMENT OF TRANSPORTATION Smith Co. PROJ. NO. - KA 0-0.0 Mill and Inlay with a. Overlay Page

Typical Section B Sheet of Not to Scale Mill existing surface." to " ' per one inch overlay Existing Pavement Roadway Widths Location Miles Approx. Width Square Yards Trans Out BR # 0.00 0 * Trans Out BR # 0.00 0 * Trans Out BR # 0.00 0 * Trans Out BR # 0.00 0 * Material from the milling operation shall become the property of the contractor and wasted at a site approved by the Engineer. This shall be subsidiary to the bid item Milling. Traffic shall not be allowed on milled surfaces. Wedging and drop-off treatments may be used on the edges of milled surfaces. This shall be subsidiary to the bid item Milling. HMA Surface course shall be placed to match original lines and grades of the existing asphalt pavement. *This is for information only Square yards are inluded in normal roadway milling quantities - KA 0-0 Page Include in Contract Documents

Typical Section C Sheet of Not to Scale Mill existing surface " to." ' per one inch overlay Existing Pavement Roadway Widths Location Miles Approx. Width Square Yards Trans Out BR # 0.00 0 * Trans Out BR # 0.00 0 * Trans Out BR # 0.00 0 * Trans Out BR # 0.00 0 * End of Job 0.00 *0 Material from the milling operation shall become the property of the contractor and wasted at a site approved by the Engineer. This shall be subsidiary to the bid item Milling. Traffic shall not be allowed on milled surfaces. Wedging and drop-off treatments may be used on the edges of milled surfaces. This shall be subsidiary to the bid item Milling. HMA Surface course shall be placed to match original lines and grades of the existing asphalt pavement. *This is for information only Square yards are inluded in normal roadway milling quantities - KA 0-0 Page 0 Include in Contract Documents

TYPICAL SECTION D Sheet of List of Sideroads, Entrances, and Mailbox Turnouts Recieves." Overlay only based on.0 tons/sqyd (Sheet of ) Location Radius Side Roads Side SQYDS Sq.Yds. Overlay SQYDS MM. Drive LT 0 MM. Drive LT 0 MM. Drive LT 0 C Side Road RT 0 0 C Side Road LT 0 MM. Drive RT 0 MM. Side Road LT 0 E Road Side road RT E Road Side road LT F Road Side Road LT G Road Side Road RT G Road Side Road LT 0 MM. Drive RT MM. Drive RT MM. Drive RT MM. Side Road RT 0 MM. Drive LT 0 MM. Main St cedar RT 0 MM. Drive LT 0 MM. H Side Road RT 0 MM. H Side Road LT MM. Drive LT 0 MM.0 Drive LT 0 MM. Drive RT 0 MM. Drive LT MM. I Lane RT MM. J RD RT MM. J RD LT MM. K RD LT 0 MM. Drive LT 0 MM. Drive RT MM. Drive RT MM. Drive LT MM. L RD RT MM. th ST RT 0 MM.th ST LT MM.0th ST RT MM.0th ST LT MM.th ST RT 0 MM. Lenav ST LT 0 0 MM. Elevator Ent RT Total this sheet, Smith County - KA 0-0 Page. " Overlay

TYPICAL SECTION D Sheet of List of Sideroads, Entrances, and Mailbox Turnouts Recieves." Overlay only based on.0 tons/sqyd (Sheet of ) Location Radius Side Roads Side SQYDS Sq.Yds. Overlay SQYDS MM. th Street LT MM.th Street LT MM.rd Street LT 0 MM. M Road RT MM. M Road LT 0 MM. N Road RT MM. N Road LT MM. Drive LT 0 MM. Drive LT 0 0 MM. Drive RT 0 MM. O Road RT 0 MM. Drive RT MM. Drive RT MM. O Lane LT Mailboxes turnouts total both varies Total this sheet,0 Total previous sheet, Total,0 Smith County - KA 0-0. " Overlay Page

0 0 " SOLID EDGELINE " SOLID LINE " DOTTED EXTENSION LINE " SOLID EDGELINE D/ " BROKEN LANE LINE " LANE DROP LINE NOTE: DOTTED EXTENSION LINE TAPER LENGTH POSTED SPEED * FOR POSTED SPEEDS ABOVE 0 MPH W - D TYPICAL MARKING FOR AUXILIARY PASSING LANE " BROKEN LANE LINE " SOLID LINE SHOULDER LINE EDGE OF PAVEMENT " SOLID EDGE LINE TYPICAL SPACING FOR DOTTED EXTENSION LINES, UNLESS OTHERWISE NOTED ON PLANS. " SOLID EDGE LINE EDGE OF PAVEMENT SHOULDER LINE " BROKEN LANE LINE " BROKEN LINE TWO-WAY LEFT TURN DETAIL FOR FIVE LANE ROADWAY TYPICAL SPACING FOR LANE DROP. UNLESS OTHERWISE NOTED ON PLANS. " SOLID LINE SHOULDER LINE EDGE OF PAVEMENT " SOLID EDGE LINE " SOLID EDGE LINE EDGE OF PAVEMENT TYPICAL SPACING FOR BROKEN LINES UNLESS OTHERWISE NOTED ON PLANS SHOULDER LINE " BROKEN LINE TWO-WAY LEFT TURN DETAIL FOR THREE LANE ROADWAY " " SPACING (FT) 0 X SPEED (MPH) TWO-WAY LEFT TURN ARROW SPACING DETAIL " TYPICAL SPACING FOR NO PASSING LINES UNLESS OTHERWISE NOTED ON PLANS NOTE: IF ARROWS ARE USED SPACE THE ARROWS AS SHOWN IN THE SPACING DETAIL. Page Pg of // Added Dotted Extension and Lane Drop s B.A.H. B.D.G. /0/0 Removed Aux. Passing Lane Dotted Ext. J.F.F. B.D.G. //0 New FHWA Approval Date J.F.F. B.D.G. NO. DATE REVISIONS BY APP D KANSAS DEPARTMENT OF TRANSPORTATION TYPICAL PAVEMENT MARKING DETAILS FOR UNDIVIDED ROADWAYS TE FHWA APPROVAL //0 APP D Brian D. Gower DESIGNED J.F.F. DETAILED J.F.F. QUANTITIES TRACED DESIGN CK. B.D.G. DETAIL CK. B.D.G. QUAN. CK. TRACE CK.

NOTE: ALL PAVEMENT MARKINGS SHALL BE BROKEN AT CROSS ROADS. FOR HIGHWAY JUNCTIONS THE NO PASSING ZONE WILL EXTEND 000 FROM INTERSECTION. " BROKEN LINE " SOLID LANE LINE " SOLID LINE " EDGE LINE " EDGE LINE 00 00 " EDGE LINE " SOLID LANE LINE " SOLID LINE " BROKEN LINE " EDGE LINE TYPICAL ROAD JUNCTION MARKINGS WITH BYPASS LANES EDGE OF PAVEMENT " BROKEN LANE LINE SHOULDER LINE " SOLID EDGE LINE " SOLID DOUBLE LINE " SOLID EDGE LINE EDGE OF PAVEMENT SHOULDER LINE " BROKEN LANE LINE TYPICAL MARKINGS FOR FOUR LANE ROADWAY " SOLID EDGE LINE W- EDGE OF PAVEMENT " BROKEN LINE " SOLID NO PASSING LINE EDGE OF PAVEMENT SHOULDER LINE " SOLID EDGE LINE TYPICAL TWO LANE MARKINGS NOTE: LONGITUDINAL PAVEMENT MARKING LINES SHALL BE OFFSET A MINIMUM OF " FROM LONGITUDINAL PAVEMENT JOINTS. Pg of NOTE: ON NON I, US, AND K ROUTES, " EDGE LINES MAY BE INSTALLED. " EDGE LINES ARE NOT REQUIRED ON NON I, US, AND K ROUTES. Page // Added Dotted Extension and Lane Drop s B.A.H. B.D.G. /0/0 Removed Aux. Passing Lane Dotted Ext. J.F.F. B.D.G. //0 New FHWA Approval Date J.F.F. B.D.G. NO. DATE REVISIONS BY APP D KANSAS DEPARTMENT OF TRANSPORTATION TYPICAL PAVEMENT MARKING DETAILS FOR UNDIVIDED ROADWAYS TE FHWA APPROVAL //0 APP D Brian D. Gower DESIGNED J.F.F. DETAILED J.F.F. QUANTITIES TRACED DESIGN CK. B.D.G. DETAIL CK. B.D.G. QUAN. CK. TRACE CK.

SUMMARY OF PAVEMENT MARKINGS " Diagonal " Edge " Broken " " Double " Edge " Stop " Type II Crosswalk " Type I Crosswalk " Chevron " Diagonal " Dotted Extension " Gore " Broken Lane Drop " Lane " Broken Lane Drop " Dotted Extension " Broken Lane (PCP) " Broken Lane " Edge " Edge LOCATION Entire Project, 0,0, Kirwin Widening Page x. x x. TOTALS 0, 0 0 0 0 0 0 0 0 0 0 0 0 0 0,0,0 0 0 NOTE: For Specific pavement marking details and dimensions see plan sheets - KA 0-0 NOTE: ALL TOTALS REFLECT ACTUAL QUANTITY OF PAVEMENT MARKING MATERIALS REQUIRED Project No. - KA -0

Project No. RECAPITULATION OF QUANTITIES - KA 0-0 - KA -0 ITEMS TOTAL UNITS PAVEMENT MARKING (MULTI-COMPONENT)()(") PAVEMENT MARKING (MULTI-COMPONENT)()("),0 PAVEMENT MARKING (MULTI-COMPONENT)()(") PAVEMENT MARKING (MULTI-COMPONENT)()(") PAVEMENT MARKING (MULTI-COMPONENT)()("), PAVEMENT MARKING (MULTI-COMPONENT)()(") PAVEMENT MARKING (MULTI-COMPONENT)()(") PAVEMENT MARKING (THERMOPLASTIC)()(") PAVEMENT MARKING (THERMOPLASTIC)()(") PAVEMENT MARKING (THERMOPLASTIC)()(") PAVEMENT MARKING (THERMOPLASTIC)()(") PAVEMENT MARKING (THERMOPLASTIC)()(") PAVEMENT MARKING (THERMOPLASTIC)()(") PAVEMENT MARKING (THERMOPLASTIC)()(") PAVEMENT MARKING (EPOXY)()(") PAVEMENT MARKING (EPOXY)()(") PAVEMENT MARKING (EPOXY)()(") PAVEMENT MARKING (EPOXY)()(") PAVEMENT MARKING (EPOXY)()(") PAVEMENT MARKING (EPOXY)()(") PAVEMENT MARKING (EPOXY)()(") PAVEMENT MARKING (INTERSECTION GRADE) () (") PAVEMENT MARKING (INTERSECTION GRADE)()(") PAVEMENT MARKING (INTERSECTION GRADE)()(") PAVEMENT MARKING SYMBOL (INTERSECTION GRADE) () (R/R XING) EACH PAVEMENT MARKING SYMBOL (INTERSECTION GRADE) () (Lt Turn Arrow) EACH PAVEMENT MARKING SYMBOL (INTERSECTION GRADE) () (Rt Turn Arrow) EACH PAVEMENT MARKING SYMBOL (INTERSECTION GRADE) () ( ONLY ) EACH PAVEMENT MARKING SYMBOL (INTERSECTION GRADE) () (Rt/Thru Arrow) EACH PAVEMENT MARKING REMOVAL NOTE: WORDS & SYMBOLS SHALL CONFORM TO THE LATEST EDITION OF "STANDARD ALPHABETS FOR HIGHWAY SIGNS AND PAVEMENT MARKINGS" PRINTED BY THE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION. PRIOR TO COMMENCEMENT OF PAVEMENT MARKING WORK THE ENGINEER WILL ESTABLISH THE LIMITS FOR "NO PASSING" ZONES. THESE LIMITS SHALL BE USED FOR THE LOCATION OF " NO PASSING" LINES AND FOR THE COMPUTATION OF ACTUAL MARKING QUANTITIES FOR THIS LINE TYPE Page

SUMMARY OF PAVEMENT MARKINGS " Diagonal " Edge " Broken " " Double " Edge " Stop " Type II Crosswalk " Type I Crosswalk " Chevron " Diagonal " Dotted Extension " Gore " Broken Lane Drop " Lane " Broken Lane Drop " Dotted Extension " Broken Lane (PCP) " Broken Lane " Edge " Edge LOCATION Entire Project,0,,, Page x. x x. TOTALS 0,0 0 0 0 0 0 0 0 0 0 0 0 0 0 0,,, 0 0 NOTE: For Specific pavement marking details and dimensions see plan sheets - KA 0-0 NOTE: ALL TOTALS REFLECT ACTUAL QUANTITY OF PAVEMENT MARKING MATERIALS REQUIRED Project No. - KA -0

Project No. RECAPITULATION OF QUANTITIES - KA 0-0 - KA -0 ITEMS TOTAL UNITS PAVEMENT MARKING (MULTI-COMPONENT)()(") PAVEMENT MARKING (MULTI-COMPONENT)()("),0 PAVEMENT MARKING (MULTI-COMPONENT)()(") PAVEMENT MARKING (MULTI-COMPONENT)()(") PAVEMENT MARKING (MULTI-COMPONENT)()("), PAVEMENT MARKING (MULTI-COMPONENT)()(") PAVEMENT MARKING (MULTI-COMPONENT)()(") PAVEMENT MARKING (THERMOPLASTIC)()(") PAVEMENT MARKING (THERMOPLASTIC)()(") PAVEMENT MARKING (THERMOPLASTIC)()(") PAVEMENT MARKING (THERMOPLASTIC)()(") PAVEMENT MARKING (THERMOPLASTIC)()(") PAVEMENT MARKING (THERMOPLASTIC)()(") PAVEMENT MARKING (THERMOPLASTIC)()(") PAVEMENT MARKING (EPOXY)()(") PAVEMENT MARKING (EPOXY)()(") PAVEMENT MARKING (EPOXY)()(") PAVEMENT MARKING (EPOXY)()(") PAVEMENT MARKING (EPOXY)()(") PAVEMENT MARKING (EPOXY)()(") PAVEMENT MARKING (EPOXY)()(") PAVEMENT MARKING (INTERSECTION GRADE) () (") PAVEMENT MARKING (INTERSECTION GRADE)()(") PAVEMENT MARKING (INTERSECTION GRADE)()(") PAVEMENT MARKING SYMBOL (INTERSECTION GRADE) () (R/R XING) EACH PAVEMENT MARKING SYMBOL (INTERSECTION GRADE) () (Lt Turn Arrow) EACH PAVEMENT MARKING SYMBOL (INTERSECTION GRADE) () (Rt Turn Arrow) EACH PAVEMENT MARKING SYMBOL (INTERSECTION GRADE) () ( ONLY ) EACH PAVEMENT MARKING SYMBOL (INTERSECTION GRADE) () (Rt/Thru Arrow) EACH PAVEMENT MARKING REMOVAL NOTE: WORDS & SYMBOLS SHALL CONFORM TO THE LATEST EDITION OF "STANDARD ALPHABETS FOR HIGHWAY SIGNS AND PAVEMENT MARKINGS" PRINTED BY THE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION. PRIOR TO COMMENCEMENT OF PAVEMENT MARKING WORK THE ENGINEER WILL ESTABLISH THE LIMITS FOR "NO PASSING" ZONES. THESE LIMITS SHALL BE USED FOR THE LOCATION OF " NO PASSING" LINES AND FOR THE COMPUTATION OF ACTUAL MARKING QUANTITIES FOR THIS LINE TYPE Page

SUMMARY OF TRAFFIC CONTROL DEVICES (FOR INFORMATION ONLY) All traffic control devices shall be placed in accordance with the applicable KDOT Traffic Control Standards. The contractor shall provide all signs and other traffic control devices for proper traffic control of all construction activities. Quantities listed are estimates only. Contractor operations may require additional signs and traffic control devices, this will be subsidiary to the bid item traffic control. SIGN NO. R- 0 R- WORK ZONE SIGNS * SIZE SQ. FT. 0-..-.. & OVER W- W- W- 0 W- W0- W0- W0- W0-A W- KG0-0 G0- W- W-P KM-0 KG0- KI-0a KI-0a LIGHTED DEVICES * WORK ZONE WARNING LIGHT (TYPE A LOW INTENSITY) WORK ZONE WARNING LIGHT (RED TYPE B HIGH INTENSITY) ARROW DISPLAY PORTABLE CHANGEABLE MESSAGE SIGN BARRICADES * CHANNELIZING DEVICES * TYPE III ( TO ) PEDESTRIAN FIXED PORTABLE PEDESTRIAN SUMMARY OF TRAFFIC CONTROL DEVICES (EACH) 0 WORK ZONE SIGN (SPECIAL) SIGN NO.. SQ. FT. & LESS. SQ. FT. & OVER RECAPITULATION OF QUANTITIES ITEM QUANTITY UNIT WORK ZONE SIGNS (0 TO. SQ. FT.) WORK ZONE SIGNS (. TO. SQ. FT.) WORK ZONE SIGNS (. SQ. FT. & OVER) WORK ZONE BARRICADES (TYPE TO ) WORK ZONE BARRICADES (PEDESTRIAN) CHANNELIZER (FIXED) CHANNELIZER (PORTABLE) CHANNELIZER (PEDESTRIAN) WORK ZONE WARNING LIGHT (TYPE A LOW INTENSITY) WORK ZONE WARNING LIGHT (RED TYPE B HIGH INTENSITY) ARROW DISPLAY PORTABLE CHANGEABLE MESSAGE SIGN PAVEMENT MARKING (TEMPORARY) " SOLID (TYPE I) STA./LINE " SOLID (TYPE II) STA./LINE " BROKEN (')(TYPE I) STA./LINE " BROKEN (')(TYPE II) STA./LINE " BROKEN (')(TYPE I). STA./LINE " BROKEN (')(TYPE II). STA./LINE " DOTTED EXTENSION (TYPE I) STA./LINE " DOTTED EXTENSION (TYPE II) STA./LINE SOLID (LINE MASKING TAPE) STA./LINE BROKEN (LINE MASKING TAPE) STA./LINE SYMBOL (TYPE I) EACH SYMBOL (TYPE II) EACH FLEXIBLE RAISED PAVEMENT MARKERS (" BROKEN ( )) STA./LINE FLEXIBLE RAISED PAVEMENT MARKERS (" BROKEN ( )) STA./LINE PAVEMENT MARKING REMOVAL LIN. FT. CONCRETE SAFETY BARRIER (TYPE F) (TEMPORARY) LIN. FT. CONCRETE SAFETY BARRIER (TYPE F) (TEMP.-INSTALL ONLY) LIN. FT. CONCRETE SAFETY BARRIER (TYPE F) (TEMP.-RELOCATE) LIN. FT. INERTIAL BARRIER SYSTEM EACH REPLACEMENT MODULES (IBS) EACH WORK ZONE SIGN (SPECIAL) (. SQ. FT. & LESS) EACH WORK ZONE SIGN (SPECIAL) (. SQ. FT. & OVER) EACH RIGID RAISED PAVEMENT MARKER (TYPE I) EACH RIGID RAISED PAVEMENT MARKER (TYPE II) EACH TRAFFIC SIGNAL INSTALLATION (TEMPORARY) LUMP SUM TRAFFIC CONTROL (INITIAL SET UP) LUMP SUM TRAFFIC CONTROL LUMPSUM LUMP SUM FLAGGER (SET PRICE) HOUR NOTES: " BROKEN (')(TYPE I)& " BROKEN (')(TYPE II) Phillips County =. STA Smith County =. STA/ Subsidiary Both Types White Phillips County. STA/ /0/ Removed Replacement Modules Summary Table, Added JGB (IBS) to Replacement Modules description NO. DATE REVISIONS BY APP D KANSAS DEPARTMENT OF TRANSPORTATION TRAFFIC CONTROL SUMMARY OF DEVICES RECAPITULATION OF QUANTITIES TE FHWA APPROVAL 0/0/ APP D Kristina Erickson DESIGNED B.A.H. DETAILED R.W.B. QUANTITIES TRACED DESIGN CK. DETAIL CK. QUAN. CK. TRACE CK. Smith/Phillips Co. Proj. No. -0 KA 0-0 Title: Traffic Control Page