TriMet Core Capacity Concepts. TriMet Board January 25, 2017

Similar documents
Wedding Events And MAX Transit Stations

SCOPING INFORMATION PACKET

Lessons Learned from Rebuilding the Muni Subway Schedule Leslie Bienenfeld

December 2018 Monthly Performance Report

January 2019 Monthly Performance Report

Regional Planning for Tri-Rail Coastal Link

Silver Line Operating Plan

Volume 16 Issue 3 Summer Railfans on a Portland Rail Excursion

Union Station Rail Corridor East

Creating Connections in Niagara Region

Union Station Rail Corridor East Enhancements Project

Mercer SCOOT Adaptive Signal Control. Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017

The focus is the Central Broward County area. September 10,

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

Metro Green Line to LAX. January, 2012

Restoration of Historic Streetcar Services in Downtown Los Angeles

Authors. Courtney Slavin Graduate Research Assistant Civil and Environmental Engineering Portland State University

Workshop on Advances in Public Transport Control and Operations, Stockholm, June 2017

Transit Vehicle Scheduling: Problem Description

Here is one more (a big one) for tomorrow s hearing. Thanks and let me know if you have questions! Aaron C. Deas Office of Government Affairs

Title VI Service Equity Analysis

PREFACE. Service frequency; Hours of service; Service coverage; Passenger loading; Reliability, and Transit vs. auto travel time.

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

5.1 Traffic and Transportation

TERMINAL DEVELOPMENT PLAN

LA Metro Rapid - Considerations in Identifying BRT Corridors. Martha Butler LACMTA, Transportation Planning Manager Los Angeles, California

Date: 11/6/15. Total Passengers

BUSH INTERCONTINENTAL AIRPORT

Defining Capacity of Airport Passenger Buildings. Defining Capacity of Airport Passenger Buildings

UNLOCKING THE BRIGHTON MAINLINE

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

CURRENT SHORT-RANGE TRANSIT PLANNING PRACTICE. 1. SRTP -- Definition & Introduction 2. Measures and Standards

APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS

Project Advisory Group. May 23, 2013

Pedestrian Safety Review Spadina Avenue

EVALUATION OF TRANSIT SIGNAL PRIORITY EFFECTIVENESS USING AUTOMATIC VEHICLE LOCATION DATA

Mobile Farebox Repair Program: Setting Standards & Maximizing Regained Revenue

TORONTO TRANSIT COMMISSION REPORT NO.

Union Station Queens Quay Transit Link Study

Astoria Boulevard ADA and Station Renewal Track Improvements. January 30, 2019

Att. A, AI 46, 11/9/17

Title VI Service Equity Analysis

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018

Vasona Light Rail Signal Design Challenges. Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

Claremont Project Background and Update Community Meeting September 11, 2017

DEMOGRAPHICS AND EXISTING SERVICE

PERFORMANCE MEASURE INFORMATION SHEET #16

City of Austin Department of Aviation Austin Bergstrom International Airport 2040 Master Plan. Public Workshop #2 April 19, 2018

Major Scheme Business Case Summary Report for Programme Entry

EAKINS OVAL / 25 TH & PENNSYLVANIA AREA PROJECT SUMMARY 1

Airport Capacity, Airport Delay, and Airline Service Supply: The Case of DFW

Transportation Improvement District (TID) Exercise New Castle County Unified Development Code

PUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

PBN and RNAV concepts

Outline. 1. Timetable Development 2. Fleet Size. Nigel H.M. Wilson. 3. Vehicle Scheduling J/11.543J/ESD.226J Spring 2010, Lecture 18

TRI-COUNTY TRANSPORTATION FOR SENIORS AND/OR PERSONS WITH DISABILITIES MONTHLY PERFORMANCE REPORTS

PROPOSED FOR IMPLEMENTATION

APPENDIX B. Arlington Transit Peer Review Technical Memorandum

Approval of August 2019 Service Changes

CREATING CONNECTIONS IN CLARINGTON

Tampa International Airport Master Plan Update. December 12, 2012

Sydney CBD - Partnering with the coach industry for solutions

3660 MARKET STREET, ST. LOUIS, MO armorydistrict.com

Creating Sustainable Communities Through Public Transportation

Santa Cruz Wharf Improvement Project. Briefing Paper. Prepared by City of Santa Cruz. for

Appendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes

Birmingham City Centre Vision for Movement

Sharing the Way with Sustainable Transport Options

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis

Chapter 3. Burke & Company

Clydebank Healthcentre. Design Delivery Group Session Six- 19/04/2016

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Presentation to the Clackamas County Board of County Commissioners September 22, 2015

Trigger Point Justification Note 30 th August 2013

Crosswind dependent separations and update on TBS concept (transitional step)

PEARL RIVER DELTA DEVELOPMENT OPPORTUNITIES AND CHALLENGESFOR HONG KONG AVIATION

Sunshine Coast Airport Master Plan September 2007

Update on the Thameslink programme

PRESENTATION TO THE RICHMOND REGIONAL TRANSPORTATION PLANNING ORGANIZATION: JUNE 2, 2016 BRT CONNECTIVITY AND LAND USE ANALYSIS PLAN JOSH MALLOW

DRAFT Service Implementation Plan

MIT ICAT. Robust Scheduling. Yana Ageeva John-Paul Clarke Massachusetts Institute of Technology International Center for Air Transportation

FUTURE PASSENGER PROCESSING. ACRP New Concepts for Airport Terminal Landside Facilities

4. Safety Concerns Potential Short and Medium-Term Improvements

Airport analyses informing new mobility shifts: Opportunities to adapt energyefficient mobility services and infrastructure

JAL Group Announces its FY Medium-Term Business Plan

Fiscal Management and Control Board. Fare Policy October 16, Draft for Discussion & Policy Purposes Only

MONTHLY OPERATIONS REPORT DECEMBER 2015

South of England north-south connectivity

TRI-COUNTY TRANSPORTATION FOR SENIORS AND/OR PERSONS WITH DISABILITIES MONTHLY PERFORMANCE REPORTS

Home of Southbank Partners. Riverfront Commons. Southbank Partners. Covington Newport Bellevue Ft. Thomas Dayton Ludlow

CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES

KING STREET PILOT STUDY PUBLIC MEETING

RW Bruhn Bridge and Approaches Project

B. Congestion Trends. Congestion Trends

Central Oregon Intergovernmental Council

September 2014 Prepared by the Department of Finance & Performance Management Sub-Regional Report PERFORMANCE MEASURES

2017 Proposed Service Changes. For Public Meetings January 2017

SAMTRANS SERVICE PLAN

Transcription:

1 TriMet Core Capacity Concepts TriMet Board January 25, 2017 1

2 Regional Growth 400,000 more people and 260,000 more jobs in less than 20 years Concentrated in Regional Centers, Town Centers, Station Areas, and Main Streets $13.1 billion worth of development in station areas since decision to build 5% of the area (MAX station areas) had 39% of all the housing units developed on it since the decision to build each line 2

3 (18.3 M) Population 12,000,000 10,000,000 8,000,000 6,000,000 4,000,000 #24 2,000,000 0 Source: NTD 2014 3

4 Boardings per Capita 233 140 120 100 80 #9 60 40 20 0 Source: NTD 2014 4

5 Boardings (4.2 B) 700,000,000 600,000,000 500,000,000 400,000,000 300,000,000 200,000,000 #11 100,000,000 0 Source: NTD 2014 5

More than 3 VMT saved for every 1 mile ridden on Westside MAX 6 6

Transit and Development - Westside 7 Intel Orenco MAX 7

Busy Trains 8 8

9 Reliability and Capacity When uneven headways occur, some trips are extra busy Original MAX system design started about 35 years ago. Growth forces systems to mature and adapt. We re doing our part on the operations side, but we can seek help with trackwork, switches, signals, junctions, stations and other infrastructure 9

Blue Line Westbound is At Capacity within 5 years according to FTA Core Capacity Criteria 10 Expo Center Airport PM Peak Blue Line 5.6 sq ft/ psgr Union Station Rose Quarter Gateway Hillsboro Pioneer Square Gresham PSU Beaverton Clackamas Town Center Park Ave FTA Threshold: 5.7 sq ft/psgr or less = at capacity within 5 years 5.6 sq ft/psgr = medium rating for project need 10

11 Two Different Markets 1. Less busy Red Line trains serve as far as Beaverton TC (3 stations on westside) 2. Heavily loaded Blue Line trains serve Silicon Forest and Hillsboro (14 additional stations beyond Beaverton TC) Expo Center Airport Union Station Rose Quarter Gateway Hillsboro Pioneer Square Gresham PSU Beaverton Clackamas Town Center Park Ave 11

12 Key locations in a growing system Expo Center Airport Union Station Rose Quarter Gateway Hillsboro Pioneer Square Gresham PSU Beaverton Clackamas Town Center Park Ave 12

13 Gateway Junction Single-track section 498 trains per day in all directions Single track conflicts: -IB Red w/ OB Red -OB Red w/ IB Red Merge point Merge point & Conflicts: -IB Red w/ OB Blue -IB Red w/ OB Green -OB Blue w/ IB Red -OB Green w/ IB Red Merge point & Conflicts: -OB Blue w/ IB Green -IB Green w/ OB Blue 13

Departure from Ruby Junction Departure from Clackamas Town Center Gateway Transit Center Departure from PDX Arrival at Gateway 5:00 PM 4:42 PM 5:01 PM 5:01 PM 5:02 PM 4:46 PM 5:03 PM 5:03 PM 5:04 PM 5:05 PM 4:48 PM 5:06 PM 5:06 PM Window needs to stay open to leave gap for Yellow Line merge at Steel Bridge 5:07 PM 5:08 PM 5:09 PM 5:10 PM 5:11 PM 4:57 PM 5:12 PM 5:12 PM 5:13 PM 5:14 PM 4:57 PM 5:15 PM 5:15 PM 5:16 PM 5:17 PM 5:01 PM 5:18 PM 5:18 PM 5:19 PM 5:20 PM 5:02 PM 5:21 PM 5:21 PM Window needs to stay open to leave gap for Yellow Line merge at Steel Bridge 5:22 PM 5:23 PM 5:24 PM 5:25 PM 5:26 PM 5:12 PM 5:27 PM 5:27 PM 5:28 PM 5:29 PM 5:11 PM 5:30 PM 5:30 PM Currently 2+ minute buffer required between trains Only 2 obvious windows between 5-5:30 PM without additional capacity improvements Hillsboro Beaverton Union Station PSU Expo Center Pioneer Square Rose Quarter Park Ave Gateway Airport Clackamas Town Center 14 14

15 Gateway Double-Track & Station Concept Add second track New double-track New station platform with walkway to Blue/Green station and bus transfers Removes conflicts in both directions 15

16 Another Gateway Option for Discussion New 2nd-track Removes conflicts in both directions 16

17 Airport Single Track Expo Center Airport Rose Quarter Union Station Gateway Conflicts: -IB Red w/ OB Red -OB Red w/ IB Red Hillsboro Beaverton PSU Pioneer Square Clackamas Town Center Park Ave Conflicts: -IB Red w/ OB Red -OB Red w/ IB Red Single-track section causes conflicts between IB Red and OB Red 17

18 Airport Double Track Conflicts: -IB Red w/ OB Red -OB Red w/ IB Red Conflicts: -IB Red w/ OB Red -OB Red w/ IB Red Add second track 18

19 Gateway and Airport Interact Airport animation Gateway animation 19

Cleveland MAX Station Layover & Recovery Expo Center Airport 20 Rose Quarter Union Station Gateway Pioneer Square Gresham PSU Clackamas Town Center Park Ave No Crossover behind station limits number of trains that can dwell and therefore limits: Headways Ability to recover from late arrivals 20

21 Rose Quarter/Steel Bridge Merge point & Conflicts: -OB Green w/ IB Red -OB Green w/ IB Blue -OB Yellow w/ IB Red -OB Yellow w/ IB Blue -IB Red w/ OB Yellow -IB Red w/ OB Green -IB Blue w/ OB Yellow -IB Blue w/ OB Green Merge point & Conflicts: -Traffic (car and pedestrian) signal clearance timing impacts all movements -OB Yellow w/ib Blue -OB Yellow w/ib Red -OB Yellow w/ib Green -IB Blue w/ OB Yellow -IB Red w/ OB Yellow -IB Green w/ OB Yellow 21

5:08 PM 5:09 PM Schedule Overlap Limits Resiliency Gateway Rose Quarter 5:10 PM Yellow 5:25 PM 5:26 PM 5:11 PM Steel Bridge Providence Park Beaverton TC 5:12 PM 5:12 PM Red 5:27 PM 5:28 PM 5:42 PM 6:00 PM 5:13 PM 5:14 PM Hillsboro/ Hatfield 5:15 PM 5:15 PM Blue 5:30 PM 5:31 PM 5:45 PM 6:03 PM 6:33 PM 5:16 PM 5:17 PM 5:18 PM 5:18 PM Green 5:33 PM 5:34 PM 5:19 PM 5:20 PM 5:21 PM 5:21 PM Blue 5:36 PM 5:37 PM 5:51 PM 6:09 PM 6:38 PM 5:22 PM 5:23 PM 5:24 PM 5:25 PM Yellow 5:40 PM 5:41 PM 5:26 PM 5:27 PM 5:27 PM Red 5:42 PM 5:43 PM 5:57 PM 6:15 PM 5:28 PM 5:29 PM 5:30 PM 5:30 PM Blue 5:45 PM 5:46 PM 6:00 PM 6:18 PM 6:47 PM 5:31 PM 5:32 PM 5:33 PM 5:33 PM Green 5:48 PM 5:49 PM 5:34 PM 5:35 PM 5:36 PM 5:36 PM Blue 5:51 PM 5:52 PM 6:06 PM 6:24 PM 6:53 PM 606 trains/day in all directions through Rose Quarter/Steel Bridge on average weekday Hillsboro Window for another train less resilient to delay without further capacity and reliability improvements Beaverton Union Station PSU Expo Center Pioneer Square Rose Quarter Park Ave Gateway 22 Airport Clackamas Town Center 22

23 Rose Quarter/Steel Bridge Process Multiple options Long-term conceptual analysis underway 23

24 Idealized Concept for Rose Quarter/Steel Bridge Separate the lines minimize conflicts and maximize the capacity Yellow completely separate from Blue/Red Consider reconfiguring RQ station to allow Green Line to separate before RQ station 24

Current Steel Bridge/RQ 25 Gateway Rose Quarter Steel Bridge Providence Park Beaverton TC Hillsboro 5:08 PM 5:09 PM 5:10 PM Yellow 5:25 PM 5:26 PM 5:11 PM 5:12 PM 5:12 PM Red 5:27 PM 5:28 PM 5:42 PM 6:00 PM 5:13 PM 5:14 PM 5:15 PM 5:15 PM Blue 5:30 PM 5:31 PM 5:45 PM 6:03 PM 6:33 PM 5:16 PM 5:17 PM 5:18 PM 5:18 PM Green 5:33 PM 5:34 PM 5:19 PM 5:20 PM 5:21 PM 5:21 PM Blue 5:36 PM 5:37 PM 5:51 PM 6:09 PM 6:38 PM 5:22 PM Window for another train less resilient to delay without further capacity and reliability improvements 5:23 PM 5:24 PM 5:25 PM Yellow 5:40 PM 5:41 PM Expo Center Airport 5:26 PM 5:27 PM 5:27 PM Red 5:42 PM 5:43 PM 5:57 PM 6:15 PM 5:28 PM Union Station Rose Quarter 5:29 PM 5:30 PM 5:30 PM Blue 5:45 PM 5:46 PM 6:00 PM 6:18 PM 6:47 PM Hillsboro Pioneer Square Gateway 5:31 PM 5:32 PM 5:33 PM 5:33 PM Green 5:48 PM 5:49 PM 5:34 PM Beaverton PSU Clackamas Town Center 5:35 PM 5:36 PM 5:36 PM Blue 5:51 PM 5:52 PM 6:06 PM 6:24 PM 6:53 PM Park Ave 25

With Steel Bridge/RQ Fix 26 5:08 PM 5:09 PM 5:10 PM 5:11 PM Gateway Rose Quarter 4-track Bridge Providence Park Beaverton TC 5:12 PM 5:12 PM Red 5:27 PM 5:28 PM 5:42 PM 6:00 PM 5:13 PM 5:14 PM Hillsboro 5:15 PM 5:15 PM Blue 5:30 PM 5:31 PM 5:45 PM 6:03 PM 6:33 PM 5:16 PM 5:17 PM add'l westside 5:18 PM 5:18 PM Green 5:33 PM only capacity 5:19 PM 5:20 PM 5:21 PM 5:21 PM Blue 5:36 PM 5:37 PM 5:51 PM 6:09 PM 6:38 PM 5:22 PM 5:23 PM 5:24 PM 5:25 PM 5:26 PM 5:27 PM 5:27 PM Red 5:42 PM 5:43 PM 5:57 PM 6:15 PM 5:28 PM 5:29 PM 5:30 PM 5:30 PM Blue 5:45 PM 5:46 PM 6:00 PM 6:18 PM 6:47 PM 5:31 PM 5:32 PM add'l westside 5:33 PM 5:33 PM Green 5:48 PM only capacity 5:34 PM 5:35 PM Many new possible windows for more trains open up 5:36 PM 5:36 PM Blue 5:51 PM 5:52 PM 6:06 PM 6:24 PM 6:53 PM Separating lines allows more capacity. Separated tracks at Steel Bridge/RQ would mean more capacity for Westside Blue Line and other lines (e.g., Yellow would no longer have any impact on Blue Line and Green Line impact would be reduced) Expo Ctr Rose Quarter 4-track Bridge PSU 5:06 PM Yellow 5:25 PM 5:26 PM 5:41 PM Green 5:33 PM 5:34 PM 5:21 PM Yellow 5:40 PM 5:41 PM Many new possible windows for more trains open up Green 5:48 PM 5:49 PM 26

27 More vehicles & Storage track LRVs for more MAX service Ruby Junction expansion to store them 27

We re making the Operational Improvements but can seek FTA help with Capital Improvements 28 28

29 Potential Grant Sources 5309 Capital Investment Grant opportunities 29