ICAO Activities. IFPP work on the Manual for Continuous Descent Operations. Federal Aviation Administration

Similar documents
Air Navigation Bureau ICAO Headquarters, Montreal

MANUAL FOR CONTINUOUS DESCENT OPERATIONS V4-4 1 APRIL 2009

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

FLIGHT OPERATIONS PANEL (FLTOPSP)

Continuous Descent? And RNAV Arrivals

Optimized Profile Descents A.K.A. CDA A New Concept RTCA Airspace Working Group

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

PBN/TF/7 DRAFT Appendix D to the Report D-1

FLIGHT OPERATIONS PANEL

TWELFTH AIR NAVIGATION CONFERENCE

Continuous Climb Operations (CCO) Manual

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

CDA Continuous Descent Approach

TWELFTH AIR NAVIGATION CONFERENCE

Noise Abatement Arrival Procedures at Louisville International Airport. Prof. John-Paul Clarke Georgia Institute of Technology

Honeywell.com PBN Concepts Krakow, Poland

2012 Performance Framework AFI

INTERNATIONAL FEDERATION OF AIR TRAFFIC CONTROLLERS ASSOCIATIONS. Agenda Item: IFATCA 09 WP No. 79. ICAO OPSP Presented by Raimund Weidemann

Continuous Descent Arrivals (CDA) Workshop #2

FLIGHT OPERATIONS PANEL

Optimization of Airspace and Procedures in the Metroplex

European Joint Industry CDA Action Plan

Los Angeles Basin Terminal Airspace Redesign

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

KSFO RNAV TO GLS DEMONSTRATION

Decisions on which type of approach to use vary with each airline, and sometimes even for each flight. aero quarterly qtr_02 10

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

Required Navigation Performance (RNP) in the United States

CONTROLLED AIRSPACE CONTAINMENT POLICY

Atlanta NextGen PBN Activities

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

QUIETER OPERATIONS A GUIDE FOR PILOTS AND CONTROLLERS

AERONAUTICAL INFORMATION CIRCULAR 18/18

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1

NOISE ABATEMENT PROCEDURES

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

LAX Community Noise Roundtable Work Program A1 Review of SoCal Metroplex Proposed Procedures and Suggestions for Comment Letter.

ICAO Air Navigation Panels/Study Groups Work Programme

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

(RN R A N V A V & & RN R P N

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

CFIT-Procedure Design Considerations. Use of VNAV on Conventional. Non-Precision Approach Procedures

Work Programme of ICAO Panels and Study Groups

Implementation of PBN in Armenian airspace

Updates to Procedures at St. John s International Airport

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

RNP AR APCH Approvals: An Operator s Perspective

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

TWELFTH AIR NAVIGATION CONFERENCE

Environmental benefits of continuous descent approaches at Schiphol Airport compared with conventional approach procedures

Keywords: Advanced Continuous Descent Approach, CDA, CORADA, RTA, Arrival Management

INTERNATIONAL FEDERATION OF AIR TRAFFIC CONTROLLERS ASSOCIATIONS. Agenda Item: B.5.12 IFATCA 09 WP No. 94

SJC North and South Flow

RNP AR RWY 16 in Vienna Schwechat (LOWW) PBN based Noise Abatement

COMMUNITY NOISE MITIGATION SUGGESTIONS

Overview of On-Going and Future R&D. 20 January 06 Ray Miraflor, NASA Ames Research Center

Instrument Proficiency Check Flight Record

Have Descents Really Become More Efficient? Presented by: Dan Howell and Rob Dean Date: 6/29/2017

ATM 4 Airspace & Procedure Design

Título ponencia: Introduction to the PBN concept

Learning Objectives. By the end of this presentation you should understand:

Flight Trials of CDA with Time-Based Metering at Atlanta International Airport

ENVIRONMENTAL BENEFITS FROM IMPROVED OPERATIONAL MEASURES. Guido Kerkhofs Director ATM Programmes EUROCONTROL

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

Atlantic Interoperability Initiative to Reduce Emissions AIRE

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

Implementation of SESAR Pilot Common Project. - expected effects

Lecture Minimum safe flight altitude

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

TWELFTH AIR NAVIGATION CONFERENCE

Making the World A better place to live SFO

ILS APPROACH WITH B737/A320

A Pilot s perspective

ARRIVALS REVIEW GATWICK

Trajectory Based Operations (TBO)

IATA FUEL EFFICIENCY CAMPAIGN

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

Safety and Airspace Regulation Group

i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales

FUEL MANAGEMENT FOR COMMERCIAL TRANSPORT

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

Trajectory Based Operations

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene

Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures

USE OF RADAR IN THE APPROACH CONTROL SERVICE

International Civil Aviation Organization. ICAO Updates. 13 th COSCAP-NA Steering Committee Meeting

THE CIVIL AVIATION ACT (No. 21 of 2013 THE CIVIL AVIATION (OPERATION OF AIRCRAFT) (AMENDMENT) REGULATIONS, 2015

PBN Airspace Concept. ATS requirements

(Presented by the United States)

EASA RNP (AR) Workshop The Landscape Working Together

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING

Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding

Tailored Arrivals (TA)

Transcription:

ICAO Activities IFPP work on the Manual for Continuous Descent Operations Presented to: JPDO, EWG, Ops SC Workshop NASA Ames Facility, Moffet Field, CA By: Lynn Boniface, ISI, Supporting AFS-420 Date: July 29, 2009

Overview History leading to ICAO Tasking IFPP Highlights of the Manual for Continuous Descent Operations 2

History Nov 2006: Obstacle Clearance Panel (OCP) Singapore Noted that internationally, design of CDA s was diverging Proposed publishing changes in PANS-OPS/ABC/ATM to standardize the intent of CDAs to ATC, pilots and proc designrs Mar 2007: OCP Montreux, CH ID d disciplines to be addressed & cross panel coord (OPSP, SASP, CAEP, ATM section, EuroCont CDA Focus Group) Agreed an Op Concept should be developed Aug 2007: Instrument Flight Procedures Panel (IFPP/1) Montreal, CA (OCP renamed to IFPP Apr07... same panel) Must address operationally, the lack of harmonization globally CDA is multi-disciplined, Concept of Ops presented Two main types: Radar vectoring & prescribed track 3

History (continued) Sep 2007: OPSP/7, Montreal, CA Strong support for concept of an idle descent Term CDA caused problems Small group formed response to WP/12 Mar 2008: IFPP/2, Montreal, CA Joint meeting with ATM, Chief/ENV, IFALPA, CAEP Need guidelines to ATC, pilots, designers. Tasked ATM WG to develop doc for either a Manual or Circ Action: The IFPP ATM WG, in close collaboration with CAEP, will produce guidance document on CDA... Apr 08: ATM WG... Sep 08: IFPP/3: Seattle 4

History (continued) Nov 2008: EWG Ops SC, Georgia Tech. Manual first briefed to JPDO s EWG. Solicited participation to improve manual. Feb 2009: Pheonix, IFPP s ATM WG Joint mtg of ICAO, FAA, OPSP, Euro Cont, Industry Terms harmonized (compromised), Continuous Descent Operations introduced Mar 2009: IFPP/4 Montreal. 1 st version of Manual for CD Ops May 2009: IATA/ICAO meeting in Montreal July 2009: EWG, NASA Ames, Moffet Field Aug 2009: IATA/ICAO mtg, Montreal Small drafting group in prep for Sept IFPP/5 5

Manual Highlights: (version 4-4, 1 April 2009) EXECUTIVE SUMMARY DEFINITIONS AND ABBREVIATIONS INTRODUCTION PURPOSE FACILITATING CD OPERATIONS CONCEPTS OF OPERATIONS CONTINUOUS DESCENT OPERATIONS SPECIFIC STAKEHOLDER ISSUES PROCEDURE DESIGN CHARTING ISSUES FLIGHT OPERATION ATC TECHNIQUES Attachment A CD Implementation checklist 6

Manual Highlights: (version 4-4, 1 April 2009) Definitions and explanation of Terms Continuous Descent (CD): A aircraft operating technique, enabled by airspace design, procedure design and ATC facilitation, in which an arriving aircraft continuously descends by employing minimum engine thrust, ideally in a low drag configuration, prior to the Final Approach Fix (FAF)/Final Approach Point (FAP). Note: An optimum CD starts from the Top of Descent and uses descent profiles that reduce noise, fuel burn and emissions. 7

Manual Highlights: (version 4-4, 1 April 2009) Definitions and explanation of Terms (continued) Continuous descent final approach (CDFA): A technique, consistent with stabilized approach procedures, for flying the final approach segment of a non-precision instrument approach procedure as a continuous descent, without level-off, from an altitude/height at or above the final approach fix altitude/height to a point approximately 15 m (50 ft) above the landing runway threshold or the point where the flare maneuver should begin for the type of aircraft flown. Note: The CDFA technique simplifies the final segment of the non-precision approach by incorporating techniques similar to those used when flying a precision or APV approach procedure. The CDFA technique improves pilot situational awareness, and is entirely consistent with all stabilized approach criteria. Optimized Profile Descent (OPD): A form of CD operations where a descent profile is comprised of idle-power performance descent profile segments and geometric descent profile segments that maximize altitude, minimize the thrust required to remain on the path, terminates the path at the desired end location and satisfy the altitude and speed constraints along the path. 8

Manual Highlights: (version 4-4, 1 April 2009) Para 1: INTRODUCTION The purpose of this manual is to standardize and harmonize the development and implementation of CD operations. The stakeholders involved in implementing... Aircraft operators and pilots Air Navigation Service Providers including controllers Instrument Flight Procedures Designers Airport Operators Airspace Concept: ICAO PBN Manual (Doc 9613) 9

Manual Highlights: (version 4-4, 1 April 2009) Continuous Descent Operations A CD is an ATC Facilitated operating technique Reduced Noise footprint Path Stretching Point Merge 3 Options: CD embedded in a STAR ATC Radar Vectors Hybrid: open or closed downwind leg (DTW) ATC facilitated Research underway to develop tools... Metering by adjacent centers (TMA) 10

Manual Highlights: (version 4-4, 1 April 2009) Stakeholder Issues Procedure Design Charting Issues Flight Operations ATC Techniques CD Implementation (Attachment A) 13 pages Not meant to be a blue print Collaboration 11

Closing Thoughts The purpose of this manual is standardize and harmonize the development and implementation of continuous descent procedures As real estate, CD Ops have 3 critical elements: Collaboration, Collaboration and Collaboration IATA-ICAO drafting group meets 3 rd week of August 12