Elected Officials Briefing

Similar documents
North Metro Rail Line Elected Officials Briefing. November 16, 2017

Section 3.6. Parklands & Recreation Areas

Figure 1: Little Dry Creek Trail Crossing

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

BUILD. Update CONSTRUCTION. In this issue: FEATURED PROJECT: KENT AVENUE ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEBRUARY 2019

Exposition Light Rail Transit Project

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

25 th Avenue Grade Separation. Community Meeting November 13, 2018

Cell: (408) Release MA June 25, 2012

BORDER WEST EXPRESSWAY (LOOP 375)

DEN is the #1 Economic Engine of the State of Colorado and the Rocky Mountain region Generating over $26 Billion annually in economic benefit DEN

Chapter 2: Entire US287 Corridor

Mason Street Bike/Pedestrian Trail Project

The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension

North Denver Cornerstone Collaborative. Six Projects One Vision

Presentation to the DRCOG Board August 16, 2017

US287 Asset Inventory FLEX Routes. Figure 3-1 FLEX Routes and Stops

NORTH METRO EIS PUBLIC COMMENTS October 2006

Construction Update. Local Officials Briefing March 2016

BOND PROGRAMS PROJECTS SCHEDULE AND DELIVERY

CITY COUNCIL AGENDA MEMORANDUM

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

York Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016

Having trouble reading this ? View it in your browser. Welcome

CREATING CONNECTIONS IN CLARINGTON

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

OFFERING MEMORANDUM East Arapahoe Road, Greenwood Village, CO. JEFF HALLBERG PRINCIPAL

PUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado

Claremont Project Background and Update Community Meeting September 11, 2017

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

Huntington Metro Station Joint Development

Capital Programs Update

Colorado Department of Transportation The Role of State Departments of Tr of T ansportation

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

PROGRESS REPORT WATERFRONT PROGRAM. Q (January - March) Highlights from Q1 2018

Head to University Avenue and save!

Lake Erie Commerce Center Traffic Analysis

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014

Expo E-News. Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2. Keeping Our Community Informed

ACCELERATED CONSTRUCTION LANE RENTAL FEES & A+B BIDDING DALLAS DISTRICT. June 7, 2018 Transportation Planning Conference June 7, 2018

Quality of Life Study

JAIPUR METRO. One of the world s fastest project completions. A presentation by. Nihal Chand Goel Chairman & MD Jaipur Metro Rail Corporation

3.6 PARKLANDS, OPEN SPACE, AND RECREATION AREAS

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

Hospital Link Project Project Update September 2015

Regional Connector Transit Project Community Leadership Council. 2 nd Hope Station & Flower St Committees January 17, 2017

Transportation Supporting Dulles Airport

STUDY PROCESS. Study. PHASE I Research. PHASE II Develop & Analyze Options. PHASE III Recommendations. Regional Transit

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018

3.6 PARKLANDS, OPEN SPACE, AND RECREATION AREAS

MCTC Regional Transportation Plan / Sustainable Communities Strategy (RTP/SCS)

Rocky Mountain Crude Oil Market Dynamics. Tad True, Belle Fourche & Bridger Pipelines Wyoming Pipeline Authority October 26, 2010

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

Grand Junction, Colorado

Guide to. Road Construction Projects

Central Broward Transit (CBT) Phase 1 Public Open House January 21, 2016

LEASING OPPORTUNITY OFFICE RETAIL MEDICAL RESTAURANT CONTACTS. Investment Contacts: Mike Krebsbach

Master Commercial Developer Industry Forum

York Region Rapid Transit Corporation. City of Vaughan VMC Sub-Committee October 18, 2017

World-Class Bus Rapid Transit: New Foundations for Transit Oriented Development and Job Access

Main Line System Recommendations

NORTH METRO EIS PUBLIC COMMENTS January 2007

G Street Undercrossing. City Council Meeting Date: November 3, 2008

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

Phoenix Sky Harbor transit guideway bridge

25 th Avenue Grade Separation. December 13, 2017

September 28, :15 pm MDT

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

Tower 55 Rail Reliever Study Technical Advisory Group

About the Foothill Gold Line

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

STATION TYPOLOGIES. Typology Matrix 35

APPENDIX F List of Commitments

The vision for enhanced service on Riverside between downtown and the airport is not a new concept.

Inside Government Conference Case Study: Norwich Northern Distributor Road

Port MacKenzie Rail Extension

METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017

Wildlife and Vegetation Fauna y Vegetación

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

Northern Rail Extension, Phase One

Corridor Management Committee Meeting. April 2, 2014

CREATING CONNECTIONS IN DURHAM REGION

First rail. August 2011

A Public Transportation Review Evaluating Metro s Operational Efficiency, Service Capacity and Fiscal Impact

Service Performance 2017 Networked Family of Services

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

Freight Study Phase II. Kick-Off Meeting

Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 12 January 2018

The Olathe Quiet Zone

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP.

Airport Planning Area

IRONTON-RUSSELL BRIDGE REPLACEMENT

Overview. ECO RAPID TRANSIT Meeting April 8, 2015 Don Sepulveda, P.E. Executive Officer Regional Rail

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

Transcription:

Elected Officials Briefing North Metro Rail Line February 12, 2015 1

Welcome and Introductions 2

Rick Clarke RTD Assistant General Manager Capital Programs 3

The RTD FasTracks Plan 122 miles of new light rail and commuter rail 18 miles of Bus Rapid Transit (BRT) service 31 new Park-n-Rides; more than 21,000 new parking spaces Enhanced Bus Network & Transit Hubs (FastConnects) Redevelopment of Denver Union Station 57 new rail and/or BRT stations 4 Opportunities for Transit Oriented Communities

FasTracks Status West Rail Line (W Line) Opened Denver Union Station Opened East/Gold/Northwest Rail Lines (EAGLE) 70.2% complete; commuter rail cars are arriving I-225 Rail Line 48% complete U.S. 36 BRT Phase 1 of managed lanes 91% complete, Phase 2 46% North Metro Line Design underway, early work in progress Southeast Rail Extension In process for federal grant 5 5

National Western Center Master Plan Update Jenn Hillhouse City and County of Denver Project Manager 6

Project Status Ashland Vaughn RTD North Metro Rail Project Manager 7

North Metro Rail Line 18.5 Miles, building 12.5 Electrified Commuter Rail 8 Stations, building 6 Frequency 20 minute peak 30 minute off-peak DUS 124 th 27 minutes Single track with multiple passing tracks Serves Denver, Commerce City, Thornton, Northglenn, Adams County 8

Design 1 st /Quarter 2015 90% design drawings being submitted 2nd and 3rd Quarter 2015 100% design packages/rfc Early drainage packages will be 100%/RFC in the next couple of weeks December 2015 Deadline to exercise option for Phase II December 2015 9

Suncor Rocky Mountain Pipeline 102 miles of 16 inch crude oil pipeline 9.5 miles in RTD right-of-way Travels from Cheyenne, Wyoming to the Suncor Refinery in Commerce City, Colorado Phase 1 Suncor Refinery to 128 th Avenue is substantially complete Phase 2 128 th Avenue to Fort Lupton is out for bid. Work is scheduled to begin June 10

11 Suncor Energy Pipeline

Agreement Update ROW status/atlas FRICO BNSF 12

Construction Status Dave Trent RRP North Metro Rail Project Director 13

Construction Update 1 st Quarter 2015 Geotechnical drilling complete Surveying & utility potholing complete UPRR track removal begins Utility and drainage work begins 2 nd Quarter 2015 Bridge construction begins - 120 th Avenue/Skyway/ BNSF Marion 14

15 Construction Update

16 New Bridges South Platte 1 parallel to Denargo Street and over the Union Pacific railroad tracks and the South Platte River South Platte 2 over the South Platte River and Washington Street. 46th Avenue over 46 th Avenue near Brighton Boulevard BNSF Marion railroad bridge over Marion Street near the National Western Complex Race Street over Race Street north of the National Western Complex Skyway Bridge crosses (from south to north) the Burlington Northern and Santa Fe railroad tracks, Brighton Boulevard, a Union Pacific railroad spur track, the FRICO Ditch, the Metro Wastewater and Suncor sites, Sand Creek, and Highway 270 88th Avenue over 88 th Avenue near Welby Road 104 th Avenue Twin bridges over 104 th Avenue near Colorado Boulevard 120th Avenue over 120 th Avenue near Claude Court

Building a Bridge Early Work Surveys Permits Traffic management plan Erosion control measures Clearing and grubbing Utility relocations Prepare laydown areas Solicitation of subcontractors 17

Building a Bridge Structural Work Foundations Abutments Columns Pier caps Girders Deck pour Finishes 18

Building a Bridge Track & Systems Work Track bed Rail Signal System Communications System Traction Electrification System Overhead Contact System Power Supply System 19

120 th Avenue Bridge Pre-cast girder bridge Out for bid in Spring 2015 Construction duration 3-6 months Potential 8-10 week lane closure on 120 th Avenue 20

Skyway Bridge 9,533.5 feet long will be the longest bridge in Colorado Pre-cast girder bridge Currently out for bid, proposals due end of the month The winning team will dictate the schedule Scheduled to start construction 2 nd quarter 2015 Scheduled completion spring 2017 Minimal construction impacts to the public 21

Kathy Berumen RRP North Metro Rail Public Information Manager 22

Construction Impact Mitigation Business Outreach Construction e-mail notices Roadside Variable Message signs Coordination with city PIO s Flyers as needed Website Monthly newsletter Public meetings planned for June Final Design Review 23 Conduct of Construction

Questions? Kathy Berumen RRP Public Information Manager Kberumen@rrpjv.com 720-370-0897 Brenda Tierney RTD Public Information Manager Brenda.tierney@rtd-denver.com 303-299-2401 24