Appendix C Stage 1 Road Safety Audit

Similar documents
Queen s Circus Roundabout

ACORNS PROJECTS LIMITED

LLANBEDR ACCESS IMPROVEMENTS

Finchley and Golders Green Area Committee 27 April 2017

Sky Temporary Car Park Transport Statement

BUSINESS ZONE - OPTION 400 (Western footpath) Have your say. Love the Bay Delivering on the Cycleway

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Movement Strategy. November On behalf of Barton Oxford LLP

Project No Brent Cross, Cricklewood London, UK Phase 1A North RMA

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

Commissioning Director - Environment

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

CAPITA SYMONDS PHASE 2 KESWICK TOWN CENTRE ENVIRONMENTAL IMPROVEMENTS STAGE 3 ROAD SAFETY AUDIT. Work Order: 31986

The Point Roundabout Improvement Scheme

Commissioning Director - Environment. Officer Contact Details Jane Shipman;

All reports. 1. Governance Service receive draft report Name of GSO DPR

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Planning Committee. Thursday, 26 May 2016

THE WELSH MINISTERS STATEMENT OF REASONS

Proposal for gypsy and traveller accommodation on land at Lower Hollow Copse (Pot Common), Copthorne. Statement of Community Involvement

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

London Borough of Barnet Traffic & Development Design Team

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council

Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London

5.7 Local road upgrades

5.5 Material Assets - Transportation

The Network Rail (Suffolk Level Crossing Reduction) Order

I508. Devonport Peninsula Precinct

7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT

Sport Capital Improvement Plan. Paul Borci Manager, Campus Planning Property & Campus Services

Air Operator Certification

Major Scheme Business Case Summary Report for Programme Entry

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

Donegal County Council

Riverside Heights, Norwich. Travel Plan

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

Wanaka Community Board 15 April Report for Agenda Item: 4

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011.

John Betts School Crossing Review

CAPITA SYMONDS. I March 2005 III _ KESWICK TOWN CENTRE ENVIRONMENTAL IM:PROVEMENTS PHASE 4

IRISH PARKING ASSOCIATION. The use of Pay and Display in Traffic Management in Kilkenny City

REVIEW OF PERTH AIRPORT Noise Abatement Procedures

an Inspector appointed by the Secretary of State for Communities and Local Government

Proposed Arthurs Point Special Housing Area. Housing Accords and Special Housing Areas Act Expression of Interest

Non-technical summary

AERODROME LICENCE APPLICATION PROCESS

4. The Council s LTCCP decision on 30 June 2009 confirmed the extended tram route and funding.

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

November 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.

EPPING FOREST DISTRICT COUNCIL WITH ESSEX COUNTY COUNCIL LOCAL HIGHWAY PANEL 2 nd JULY 2018 REPORT 1 APPROVED SCHEMES UPDATE

2.0 POLICY AND DEVELOPMENT FRAMEWORK. Introduction. Transport21. Celbridge Development Plan 2002

POST CONSTRUCTION ROAD SAFETY AUDIT. Island Bay Cycleway

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

Kilkenny Mobility Management age e Plan The plan sets out a series of mobility management proposals together with an implementation pro

To: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A.

ADDENDUM 2 APPENDIX D STANDARD DRAWINGS

Next Generation Cycleway Design. Improving connectivity and cycling behaviours through design

APPENDIX A RELEVANT DOCUMENTATION

20mph Speed Limit Zones

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

Borough High Street Low Emission Neighbourhood

Cuadrilla Elswick Ltd

Scotchbarn Lane, Prescot Accessibility Statement

Terms of Reference for rulemaking task RMT Regular update of ATM/ANS rules (IR/AMC/GM)

Wolverhampton City Council

Invitation to participate in the ATOL Reporting Accountants scheme CAP 1288

A31 Ringwood improvement scheme

(Also known as the Den-Ice Agreements Program) Evaluation & Advisory Services. Transport Canada

EXPLANATORY STATEMENT

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Cabinet Member Report

Environment Committee 24 September 2015

Woodford Community Council

SUBJECT: Integration of Health & Social Care Update from H&SC North Lanarkshire

AERODROME SAFETY COORDINATION

THE HIGHWAYS ACT and- THE ACQUISITION OF LAND ACT 1981

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan

COMMISSION IMPLEMENTING REGULATION (EU)

Context. Site Development. Brassington Avenue

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Tel:

M621. Junctions 1 to 7 Improvement scheme. Share your views

PUBLIC CONSULTATION - THE PURPOSE

Sunshine Coast Airport Master Plan September 2007

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

4. Safety Concerns Potential Short and Medium-Term Improvements

Uniclass L534+L212. August home zones. paving PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS.

Appendix 6 Fulbourn Greenway Review

Regulatory Committee

INFORMATION FOR LONGFORD, HARMONDSWORTH, SIPSON, HARLINGTON AND CRANFORD CROSS COMMUNITIES

D L R C C T R A F F I C N E W S

AS/NZS :2015. Lighting for roads and public spaces AS/NZS :2015. Part 4: Lighting of pedestrian crossings. Australian/New Zealand Standard

Emmet Square BIRR PUBLIC REALM

Prince Albert Road Towpath Ramp, Camden Feasibility Report

Chapter 21 Route window W6 West Ealing station. Transport for London

Transcription:

Monaghan County Council N2 Monaghan Town to Emyvale Road Improvements Part 8 Application Description of Proposed Development Appendix C Stage 1 Road Safety Audit Draft 1 11 April 2013 \\DUBNTS03\DUBLIN_JOBS\218000\218692-00\4. INTERNAL PROJECT DATA\4-04 REPORTS\4-04-03 INFRASTRUCTURE\PART 8\CORRACRIN PART 8 REPORT.DOCX Page B2

Corracrin Village Improvement Works N2 Road Realignment Stage 1 Road Safety Audit RSA1 Draft 1 17 April 2013 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number 218692-00 Ove Arup & Partners Ireland Arup 50 Ringsend Road Dublin 4 Ireland www.arup.com

Corracrin Village Improvement Works N2 Road Realignment Stage 1 Road Safety Audit Contents 1 Introduction 1 2 Items raised within this Stage 1 Road Safety Audit 3 Page 2.1 Problem: Right Turning Facility length 3 2.2 Problem: Right Turn Facility at Church Entrance 3 2.3 Problem: Property Entrances 3 2.4 Problem: Cyclist Facilities 3 2.5 Problem: Pedestrian Facilities 4 2.6 Problem: Pedestrian and Cyclist crossing facilities 4 2.7 Comment: Adjacent Schemes 4 3 Audit Team Statement 5 RSA1 Draft 1 17 April 2013 Arup \\DUBNTS03\DUBLIN_JOBS\218000\218692-00\4. INTERNAL PROJECT DATA\4-04 REPORTS\4-04-03 INFRASTRUCTURE\RSA\CORRACRIN VILLAGE\218692-00 - RSA1 - D1.DOCX Page 1

Monaghan County Council Corracrin Village Improvement Works Stage 2 Road Safety Audit 1 Introduction Monaghan County Council are proposing to realign and widen the N2 in Corracrin and Arup has been requested to carry out a Stage 1 Road Safety Audit on this proposed scheme. A plan showing the location of the scheme in the context of the surrounding local road network is presented in Figure 1. The audit was carried out on the 15 th April 2013 both on site and in the Arup Dublin office. The audit team members were as follows: Shane FitzGerald BA BAI, MIEI (Team Leader) Arup Dublin Kieran Malone BA BA1, CEng MIEI - (Team Member) Arup Dublin The audit comprised an examination of the drawings relating to the scheme and site visits on Monday 15th April 2013 between the hours of 10:00 and 13:00. On the day of the site visit the weather was dry, and the road surface was wet. No previous Stage 1 or 2 Road Safety Audit has been undertaken on these schemes. Information provided to assist the Auditors comprised of the drawings which are referenced in Appendix A. The Audit has been carried out in accordance with the relevant sections of HD 19/12, Road Safety Audits. The team has examined only those issues within the design relating to road safety implications of the scheme, and has therefore not examined or verified the compliance of the design to any other criteria. The audit team were not made aware of any relaxations or departures from standards. No drawings relating to Drainage, Public Lighting or Signing & Lining were provided to the Auditors and these aspects of the scheme have therefore not been examined. The designers response to the audit issues is included in Appendix B. An Audit Team Statement and feedback is included at the end of the Report. RSA1 Draft 1 17 April 2013 Arup \\DUBNTS03\DUBLIN_JOBS\218000\218692-00\4. INTERNAL PROJECT DATA\4-04 REPORTS\4-04-03 INFRASTRUCTURE\RSA\CORRACRIN VILLAGE\218692-00 - RSA1 - D1.DOCX Page 1

Monaghan County Council Corracrin Village Improvement Works Stage 2 Road Safety Audit Figure 1 - Location of site in local road network RSA1 Draft 1 17 April 2013 Arup \\DUBNTS03\DUBLIN_JOBS\218000\218692-00\4. INTERNAL PROJECT DATA\4-04 REPORTS\4-04-03 INFRASTRUCTURE\RSA\CORRACRIN VILLAGE\218692-00 - RSA1 - D1.DOCX Page 2

Monaghan County Council Corracrin Village Improvement Works Stage 2 Road Safety Audit 2 Items raised within this Stage 1 Road Safety Audit 2.1 Problem: Right Turning Facility length Location: Ch. 0+050 On the mainline, at the junction. Issue: The right turning pocket appears to be quite short and the Auditors are concerned that there will be insufficient length available for agricultural vehicles with trailers or for queuing vehicles, thereby creating the potential for queuing vehicles to block the main road and increasing the risk of rear end shunt type collisions. Recommendation: The designers should ensure that sufficient space for agricultural vehicles with trailers and queuing vehicles, as indicated by anticipated traffic volumes, is provided. 2.2 Problem: Right Turn Facility at Church Entrance Location: Ch. 0+220 On the mainline, at the entrance to the church car-park. Issue: On the drawings there is an angled line within the median on approach to the church and the auditors are not clear as to whether a right turning facility for the church is proposed. Recommendation: A right turning facility should be provided for the church. 2.3 Problem: Property Entrances Location: Throughout the scheme. Issue: There are a number of entrances along the main road where dropped kerbs for entrances are not shown. Recommendation: Dropped kerbs should be provided at each entrance. 2.4 Problem: Cyclist Facilities Location: Throughout the scheme. Issue: The drawings provide no indication as to the directionality of the cycle tracks. In addition, the cycle only area between Ch. 0+120 and CH. 0+260 discourages pedestrians from egressing and returning from/to the residential property on the western side of the road. Recommendation: Permitted cycle movements should be outlined on the drawings and consideration should be given to re-allocating this cycle only area for shared use. RSA1 Draft 1 17 April 2013 Arup \\DUBNTS03\DUBLIN_JOBS\218000\218692-00\4. INTERNAL PROJECT DATA\4-04 REPORTS\4-04-03 INFRASTRUCTURE\RSA\CORRACRIN VILLAGE\218692-00 - RSA1 - D1.DOCX Page 3

Monaghan County Council Corracrin Village Improvement Works Stage 2 Road Safety Audit 2.5 Problem: Pedestrian Facilities Location: Ch. 0+050 On the mainline, at the junction. Issue: There are footpaths alongside the road approaching the junction on the mainline from the north; however, no crossing point has been shown on the drawings and no footpath is indicated on the south side of the junction. Recommendation: Adequate pedestrian crossing facilities should be provided across all entrances, facilitating pedestrian desirelines where possible and to include dropped kerbs with tactile paving. 2.6 Problem: Pedestrian and Cyclist crossing facilities Location: Ch. 0+120 & 0+260 On the mainline. Issue: The drawings indicate that one pedestrian crossing point and one cyclist crossing point are to be provided, with the cyclist crossing outside the school. In particular the cyclist crossing should also accommodate pedestrians due to its close proximity to the school. No dropped kerbs or tactile paving is indicated on the drawings. Recommendation: These crossing points should both be dual-purpose, i.e. the provision of shared crossings, facilitating both pedestrians and cyclists, should be considered. Additionally, tactile paving should be provided at these crossing points. 2.7 Comment: Adjacent Schemes Location: Scheme Extents Issue: There are other schemes proposed to connect with the subject scheme, and the Auditors have not been given details with respect to these schemes. The Auditors feel that once all schemes have been constructed an overall audit should be undertaken to ensure that there is consistency across the schemes. RSA1 Draft 1 17 April 2013 Arup \\DUBNTS03\DUBLIN_JOBS\218000\218692-00\4. INTERNAL PROJECT DATA\4-04 REPORTS\4-04-03 INFRASTRUCTURE\RSA\CORRACRIN VILLAGE\218692-00 - RSA1 - D1.DOCX Page 4

Appendix A Information provided and referenced within this Stage 1 Road Safety Audit

A1 List of Drawings provided and referenced within this Stage 1 Road Safety Audit N2-P-000-101 N2-P-000-102 N2-P-000-103 N2-P-100-101 N2-P-100-201 Scheme Layout Proposed Site Layout Plan Proposed Site Boundary Proposed Plan Layout & Vertical Alignment Proposed Cross Sections Mainline

Appendix B Designer's Response

Corracrin Village Improvement Works N2 Road Realignment Stage 1 Road Safety Audit RSA1 Draft 1 17 April 2013 Arup \\DUBNTS03\DUBLIN_JOBS\218000\218692-00\4. INTERNAL PROJECT DATA\4-04 REPORTS\4-04-03 INFRASTRUCTURE\RSA\CORRACRIN VILLAGE\218692-00 - RSA1 - D1.DOCX