King s Cross Construction Impact Group Quarterly Monitoring Report 8 th June 2009

Similar documents
Construction News. Granary Complex scoops Mayor of London s top prize

Construction News. Fit-out works have commenced!

LUMIERE LONDON KING S CROSS INFORMATION and FAQs

UrbanBuzz. 2 nd December Roger Madelin Joint Chief Executive, Argent Group PLC

Message from the Managing Director... r...

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

SOUTHPORT MARKETING MARKETING SUPPORT FOR TOURISM BUSINESSES. #SouthportTime

LIVERPOOL AIRPORT CONSULTATIVE COMMITTEE 21 NOVEMBER 2014 (10.30 am pm)

KEEPING YOU INFORMED ON ALL CONSTRUCTION NEWS FROM THE ELEPHANT ISSUE 07 SPRING 2015

Day and night work: Hills M2 Motorway tunnel portals and Coral Tree Drive electrical substation

HISTORY IN THE MAKING. The UK s most important city centre development outside London. Being delivered by:

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament.

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

Parish Councils Briefing October 2013

IRISH PARKING ASSOCIATION. The use of Pay and Display in Traffic Management in Kilkenny City

PROTECTED AIRSPACE ASSESSMENT TOOL (PAAT) USER MANUAL

Cllr Karen Soons - County Councillor for Thingoe South. Annual Parish Report.

SYDNEY OPERA HOUSE. Artwork: Dreaming Sisters 2011 by Mary Smith. Copyright Mary Smith & Weave Arts Centre

Reducing traffic: a new plan for public transport

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

Ridership Growth Strategy (RGS) Status Update

2018/2019 Indigenous Tourism BC Action Plan

NHS Lanarkshire Corporate Communications Report January to March 2018

Annual Performance. South West May 2016 to April

2018 Accomplishments

REVIEW OF PERTH AIRPORT Noise Abatement Procedures

Metrolinx Board of Directors. President, Union Pearson Express Date: September 22, 2015 UP Express Quarterly Board Report

ANNUAL GENERAL MEETING OF NORTH EAST HAYLING RESIDENTS ASSOCIATION HELD AT NORTH HAYLING RECREATION HALL, HAYLING ISLAND

All Group bookings made through qantasgrouptravel.com are offered standard group block seating free of charge.

National Rail Performance Report - Quarter /14

Fourth Quarter 2014 Community Noise Consortium Meeting Thursday, January 22, 2015

KEEPING YOU INFORMED ON ALL CONSTRUCTION NEWS FROM THE ELEPHANT ISSUE 08 SUMMER 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

Construction Open Evening

TRAVEL AGENT NEW USER MANUAL

Press briefing. Richard Parry 13 February 2015 Chief Executive Update. Living waterways transform places and enrich lives

HILGAY PARISH COUNCIL

4.2 Regional Air Navigation/Safety Developments and Achievements. Group (NAM/CAR ANI/WG) INTEGRATION OF UNMANNED AIRCRAFT SYSTEMS (UAS)

Quarterly Report Transit Bureau, Local Transit Operations. First Quarter, Fiscal Year 2015 (July 2014 September 2014) ART & STAR

University of Birmingham Sustainable Travel Action Plan

Conservative Party Conference Event Review. your host

Brisbane Metro Infrastructure Association of Queensland 14 February 2018

Minutes of the Meeting of the Board of Scottish Canals held on 23rd August 2012 at The Kingsmills Hotel, Inverness at 9.00am.

LCR Railway Improvement Plan BID Travel and Transport Forum. Tuesday 28 th February 2017

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

Norfolk Integrated Housing and Community Support Service

Development and implementation of a marketing strategy for the European ecolabel on textiles and shoes in Denmark

Ferrybridge Community Liaison Group. 18 th July 2018

CONSULTATIVE GROUP 11 DECEMBER Lori Keeve Communications Grangegorman Development Agency

Mainland China Property Development

Dublin Airport Update Presented by Pat Molloy

Thamesmead newsletter April 2018

Annual Business Plan 2017/2018

TORONTO TRANSIT COMMISSION REPORT NO.

AMC and GM to Part-SPO Amendment 3

Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport

Work on the Implementation of the EU Ecolabel Scheme in the Areas of Marketing Lot 8. ITB Berlin 7-11 March 2007

Monifieth Out Of School Care Club (Seaview) Day Care of Children Seaview Primary School Victoria Street Monifieth Dundee DD5 4HL Telephone: 01382

A Master Plan is one of the most important documents that can be prepared by an Airport.

SIAFI Europe 2005 Paris, Passenger Rights: Problems at issue and latest developments (passenger charter, etc.)

1. King s Cross. 2. Retail. 3. Office Location Site Map Facts & Figures

MINUTE of a MEETING of the Board of Directors of Culture and Sport Glasgow held at the Mitchell Library, Glasgow on 31 March 2010 at 10.30am.

ROTHER LOCAL STRATEGIC PARTNERSHIP BOARD MEETING Minutes of a Meeting held on 4 th September 2003 at the Watch Oak, Battle

Moxon Street Car Park Community Liaison Group meeting #10 - Minutes

Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 26 January 2018

Communications Update

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Community newsletter. Construction progress for Galloper Offshore Wind Farm. Community drop-in sessions. Issue 5 Construction newsletter March 2017

Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012

SPONSORSHIP & EXHIBITION OPPORTUNITIES

AMC and GM to Part-CAT Issue 2, Amendment 3

CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES

Suite 224 Pentagon Centre 36 Washington Street Glasgow G3 8AZ T:

Forty years of vision. The EUROCONTROL Maastricht UAC story. years of vision EUROCONTROL MAASTRICHT UAC EUROCONTROL

The BMW Club - National AGM 2018

AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG)

Updated Revalidation FAQs (October 2012)

York Region Rapid Transit Corporation Board of Directors. Mary-Frances Turner, President

Air Operator Certification

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Introduction. Ichthys LNG Project 2014 highlights. INPEX.com.au

Plan B When the Show Simply Can t Go on

What s happening with Transport in Bristol?

BASCHURCH PARISH COUNCIL CHAIRMAN S ANNUAL REPORT 2017

Heathrow Consultation January March 2018

International Marketing Programme September 2015 August 2016

First Quarter 2013 Community Noise Consortium Meeting Thursday, May 16, 2013

To advise members of the recent activity of the NET s, Land & Countryside Services teams for the period 1 st April to 31 st July 2016

Borough High Street Low Emission Neighbourhood

AZERLEY PARISH COUNCIL

More reliable journeys arriving in May 2018 Our Great North Rail Project between Preston and Blackpool March 2017

Media Release. Qantas Group Full Year 2017 Financial Result 1. Sydney, 25 August 2017

BOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017

National Park Authority Board Meeting

E&M West Buildings Union Street, Aberdeen, AB10 1GD

Felixstowe Branch Line FAQ

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS

A N D R E W R O S S AMAMI, CPM

Administration Policies & Procedures Section Commercial Ground Transportation Regulation

Transcription:

King s Cross Construction Impact Group Quarterly Monitoring Report 8 th June 2009 Contents: Introduction Progress Update Newsletters and Flyers Press Update Noise monitoring summary report Air Quality monitoring summary report Summary of Helpline calls King s Cross Central Construction Website Future events

Introduction Welcome to the June edition of the King s Cross Central Quarterly Monitoring Report which is designed to keep the Construction Impact Group (CIG) up to date with progress on the Argent development during the last three months. Argent have now been working on the University of the Arts London for the last seven months and the new five storey building within the old Assembly Shed is beginning to take shape with new floors and walls. The refurbishment of all six floors of the Granary is nearing completion and work on the central atrium has begun. The roads to the north and west of the university buildings are now usable and form part of the vehicle circuit. Kier have started work on the Energy Centre building and are preparing to place the floor slab that will hold the boilers that will eventually heat the whole King s Cross Central complex. BAM Nuttall is about to start work on the new Regent s Canal bridge which will form the main connection between the north and south parts of King s Cross Central. The structural work on the Great Northern Hotel has been completed and the arcade that has been formed on the ground floor is now being fitted out and will be ready by the end of October. The King s Cross construction website, www.constructionatkingscross.com, is being well used and has been receiving over 500 visits a month. The Helpline (0800 328 8840) continues to receive general enquiries about the King s Cross Development and has yet to receive a complaint about any aspect of the construction. Progress Update A considerable amount of progress has been made on the King s Cross Central site since the last CIG report but due to the distance of York Way from the works, there has been little for the public to actually see apart from the three tower cranes. BAM Construction has made good progress on the University of the Arts London within the Eastern Goods Yard (EGY) where the floor slabs have been completed in the Eastern Transit Shed and concrete works continue to form the framework of the assembly shed. The Granary roof is being stripped off and the atrium formed down through the middle to allow in extra light.

BAM Nuttall has concreted the surface of Transit Street and completed the retaining wall and eventually this street will be cobbled. Drainage and site heating is being laid under Goods Street West and at the Eastern end of the street the concrete protection slabs have been placed over the Gasworks Tunnel. The cobbles have been removed in the West Handyside Canopy in preparation for installing drainage and in Granary Square more drainage is being installed. To the south of the Regents Canal BAM Nuttall have completed the connecting stub on the subway between King s Cross LUL Northern Ticket Hall and St Pancras and the main subway will be brought into service in December 2009. Kier have completed the piling and remediation work on the Energy Centre building, known as T1, which will be supplying hot water and heating to the University of the Arts by Summer 2011. Carillion are awaiting to start on the Sainsbury building, but have recently learned that they have been nominated for Camden s 2009 Building Quality Awards for the King s Cross Construction Skills Centre. The scheme aims to promote good building practice and includes such factors as sustainability and inclusion design. Newsletter and Flyers The fourth edition (Spring) King s Cross Construction Newsletter has been produced by Argent and 2,000 copies have been distributed to stakeholders and local residents. Hard copies are available in the London Borough of Camden s library and the German Gymnasium. The Summer edition will be out shortly. A flyer informing local users of the Regent s Canal tow path will be distributed this week informing them that the path will be closed from Monday 22 nd to Friday 26 th June 2009 in order to start the work on the new vehicle bridge across the canal. Signs giving this information have already been placed at either end of the section of tow path to be closed and once closed diversion signs will be set up. Press Update March started busily with a high profile King s Cross Central presence at MIPIM, when we announced a 250 million investment in the project ( 150m from the partners, LCR, Argent and DH Supply Chain) and 100m from the UAL construction contract. This attracted solid national, trade and local media coverage.

MIPIM was swiftly followed by the official opening of the King s Cross Construction Skills Centre, built by King s Cross Central (KXC), and which has now been handed over to Camden Council. The opening event was well attended, with speeches from Robert Evans, Keith Moffitt, Andrew Marshall and Richard Barnes. The opening secured good local media coverage. April saw 1-3 Canal Street (T1), the building that will house the site wide Energy Centre, securing reserved matters approval. At the beginning of May, we worked with Sadler s Wells on a stunning exhibition called Scattered Crowd, which was held in the Victorian Midland Goods Shed. This was a very strong picture story and drove home the message about how arts and culture will be at the heart of KXC. Over the last couple of months we have carried out a number of high profile media tours and briefings, resulting in some very positive coverage of KXC. These include Bricks and Mortar (The Times) and Homes and Property (Evening Standard). Since that last update, the BBC documentary, English Heritage, has been broadcast, with the last programme in the series focusing on King s Cross Central. There is a lot of activity on site at the moment, with more than 400 construction workers on site and some key construction milestones approaching (bottoming out at the Shared Service Yard). We have some particularly strong construction photography and are currently targeting trade and London titles with these. Coming up, we are planning to launch a major national design competition for Gasholder No.8 (w/c 8 June) and an event is scheduled for 1 July at the German Gymnasium when we will mark KXC being awarded National Skills Academy status and we will also be signing a Construction Charter with the key contractors on KXC. We are also shortly expecting to announce the selected hotel partner for the Great Northern Hotel. London Communications Agency (LCA) continues to monitor all national, regional, local and trade press on behalf of the King s Cross Central General Partnership (KCCGP). Noise Monitoring Summary Report Noise monitoring has been carried out continuously at the two fixed monitoring locations (York Central and Camley Street Natural Park) and the second noise monitoring report has been issued which presents the results for February, March, and April 2009. A third meter was installed at the Construction Skills Training Centre on 23 April, however, the connection to the Camden Council computer network has been denied and we are now

investigating alternative means of provision of a broadband connection. Data from this meter is being downloaded manually during the attended noise surveys until a connection is arranged. Inspection of the measured data from the continuous noise monitors shows that the noise at both sites was broadly similar to the levels reported in the baseline noise survey, indicating that no significant increases in noise occurred due to construction. This was confirmed by observation during the attended noise surveys. One exception was during February 2009 when particularly low levels were recorded during the period of snowfall, causing reduced road traffic on York Way. The alert threshold of 77 db L Aeq was exceeded at 08:00 on 6 April due to road works by EDF to install electrical cables and this took place near to the noise monitoring location on York Central. Air Quality Monitoring Report There are now six monitors that measure the mass of the particles in the air both upwind and downwind of the Kings Cross construction site. There are three monitors to the south west of the site and three to the north east providing geographical coverage which will assess the impact of construction activity over a wide range of wind directions. There are two types of monitor, the FDMS (Filter Dynamics Measurement System) located on York Way and Coopers Lane, and the Osiris instruments which are located in Bingfield Park, Copenhagen Street, Camley Street and Coopers Lane. These instruments measure the mass of particles less than 10 microns wide as these small particles can enter the lungs. When the mass of these particles exceeds a certain level, the control centre sends an automatic alert to the London Borough of Camden and contacts at the construction site. Action is then taken to tackle the source of the dust particles. The particulate monitoring equipment at the sites in Copenhagen Street Bingfield Park and the Camley Street Nature Reserve continue to operate successfully. During the last three months these sites have achieved a data capture of 100 %, 100 % and 88 % respectively. During this period there have been no breaches of the 250 µg m -3 alert threshold at any of these sites. Preparations for the installation of additional monitoring equipment in Coopers Lane and the Construction Skills Centre, York Way has continued. The concrete bases have been laid and the cabins and equipment have been delivered to both locations. Electrical work to connect power supplies to both sites is scheduled for the middle of June. Instrument commissioning and particulate monitoring will commence shortly afterwards.

Summary of Helpline Calls (0800 328 8840) The King s Cross Freephone Helpline is continually staffed during normal working hours and from 09:00 to 13:00 on Saturdays. It has been running since 2 nd June 2008 and received quite a number of calls about the scheme but to date none of these have been complaints. During the last quarter, 40 calls were taken by the Helpline of which 8 came through the construction website. March 2009 Fifteen calls mainly concerning training and job opportunities. April 2009 Eight calls on property, training and general enquiries. May 2009 Seventeen calls about providing services, jobs and training. King s Cross Central Construction Website King s Cross Central construction website is proving to be very popular and is often used instead of the Helpline to pose questions. Many more articles have been added to the site and so if you want to read them just click onto; www.constructionatkingscross.com for more information. The website allows you to ask any question about the scheme by simply typing it into the Ask us box and sending it directly to us. There is also a list of frequently asked questions with answers, a gallery of photographs showing site progress and some useful links to associated parties. The website has received some 1,600 visits since its launch at the beginning of 2009. Future Events During the next three months the majority of the work at King s Cross Central will be taking place in the Eastern Goods Yard where BAM Construction is turning the Granary and associated buildings into a new Central St Martins College, part of the University of the Arts London. This will be ready to accept 6,500 students and staff in September 2011 and a lot of work has to be achieved in the mean time. The parapet stonework is being repaired and the windows refurbished. Two new lifts will be installed on the north facing wall and a lightwell is being constructed through the centre of the building.

BAM Nuttall will continue with construction of Goods Street both east and west as well as putting drainage into West Handyside Canopy. They will soon start building the new canal bridge which will be the main link between the northern and southern parts of the development as well as carrying important services such as gas. The bridge work will commence with piled foundations on the banks just west of the original bridge and the first tow path closure will commence on 22 nd June. Kier / Wallis will continue with the Great Northern Hotel until October where it will complete the fit-out of the arcade but leave the development of the hotel to future contractors. Kier have made a good start on the Energy Centre and will soon be pouring the base slab which will be 1.5m thick. It will form the foundations for the building as well as accommodating the large boilers and transformers that will provide heat and power to the rest of King s Cross Central.