Framework Brief. Edinburgh SIDs

Similar documents
Edinburgh Airport TUTUR1C Trial Findings Report

LAMP 2 - FASI(S) Network

CAA MINDED TO REJECT EDINBURGH AIRSPACE CHANGE PROPOSAL

Safety and Airspace Regulation Group

Edinburgh Airport Airspace Change Proposal. What we have proposed and why

Airports Commission s Senior Delivery Group - Technical Report Number 01

NATS TMA Programmes. #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA. Mark McLaren

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

CAA DECISION LETTER. LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

Safety and Airspace Regulation Group

Glasgow Prestwick Airport RNAV1 Routes

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

UK Implementation of PBN

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

Edinburgh Airport Limited Consultation: A Draft Response Template.

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

FUTURE AIRSPACE CHANGE

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

Arriving and departing aircraft at Edinburgh Airport

UK Performance-based Navigation (PBN) Implementation Status

Flight Path Option Design

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

Honeywell.com PBN Concepts Krakow, Poland

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

GATWICK RNAV-1 SIDS CAA PIR ROUTE ANALYSIS REPORT

Feasibility Study into increasing the altitude of the Noise Preferential Routes (NPRs) from 3000 to 4000 feet

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

Noise Action Plan Summary

Prestwick Lower Airspace Systemisation (PLAS) Future Airspace Strategy Implementation North (FASI-N)

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

AIRSPACE PRINCIPLES CONSULTATION DOCUMENT JANUARY 2018

PBN Implementation in the UK

RNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement.

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

TECHNICAL NOTE: Edinburgh Airport new SIDs ACP reworking of noise contours for revised Runway 06 SIDs

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

GATWICK RNAV-1 SIDS CAA PIR ROUTE ANALYSIS REPORT

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

Atlantic Interoperability Initiative to Reduce Emissions AIRE

Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR)

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Status of PBN implementation in France

What is an airspace change?

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

Airspace Design Guidance: Noise mitigation considerations when designing PBN departure and arrival procedures

RNP AR APCH Approvals: An Operator s Perspective

ENVIRONMENT ACTION PLAN

Opportunities to improve noise management and communications at Heathrow

European Joint Industry CDA Action Plan

Consultation on revised hold and link routes in Scottish TMA

AIRSPACE CHANGE COMMUNITY ENGAGEMENT REPORT

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

PBN and airspace concept

CAA Consultation on the Scope and Management of an RNAV 1 Mandate for Operations in the London Terminal Manoeuvring Area

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014

Doncaster Sheffield Airport Airspace Change Proposal for the Introduction of RNAV (GNSS) Departure and Approach Procedures ANNEX B TO PART B

Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures

GATWICK ARRIVALS REVIEW REPORT AND RECOMMENDATIONS

Meeting Ref: Project Title/No:

TWELFTH AIR NAVIGATION CONFERENCE

Navigation at the. Federal Aviation Administration Crossroads

Towards the Future ATM

AIRSPACE. Aviation Consultancy at its best. Specialist aviation support to help solve problems for airports and airport developers

DVOR Rationalisation and NDB Withdrawal. NATS Update SAM, OCK, LON. NATMAC 83 1 st June NATS Project Manager NATS Airspace Change Specialist

2012 Performance Framework AFI

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Future Airspace Strategy Deployment Plan

CAA AIRSPACE CHANGE DECISION

Christchurch PBN Flight Paths Trial. Interim Report

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Performance through Innovation. Case study: Singapore airspace Enhancing airport performance

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Learning Objectives. By the end of this presentation you should understand:

Birmingham Airport Airspace Change Proposal. Proposed changes to flightpaths for aircraft departing Runway 33

Contextual note SESAR Solution description form for deployment planning

ARRIVALS REVIEW GATWICK

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY

Heathrow s Blueprint for noise reduction. Ten practical steps to cut noise in 2016/17

Continuous Descent? And RNAV Arrivals

Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

Name of Customer Representative: Bruce DeCleene, AFS-400 Division Manager Phone Number:

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL

Updates to Procedures at St. John s International Airport

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

CONTROLLED AIRSPACE CONTAINMENT POLICY

(RN R A N V A V & & RN R P N

Optimization of Airspace and Procedures in the Metroplex

Making the World A better place to live SFO

Los Angeles Basin Terminal Airspace Redesign

MANAGING THE CHANGES AS A STATE CASE STUDY UAE Airspace Restructuring Project

Airspace Consultation Feedback Report Part B The Proposed Airspace Design

Edinburgh Airport Corporate Responsibility Report 2008

PBN Implementation Plan Tonga

Edinburgh Airport Arrival and Departures

Sustainable Aviation & Airports AOA Operations and Safety Conference, June 2014 Jonathon Counsell, SA Chair, Head of Environment, British Airways

Transcription:

Framework Brief 11-Nov-2015 CAA House Edinburgh SIDs

2 Security Statement Unclassified This presentation has been approved for public distribution and publication on the CAA website. Copyright 2015 NATS/ Edinburgh Airport Ltd.

3 Framework Brief: Background Objectives/Justification Existing Airspace/routes Proposed Airspace/routes Consultation Environment Timeline

4 Edinburgh Airport is a fundamental component of the UK plc national transport infrastructure, and provides a major contribution to the prosperity of the Scottish economy. Edinburgh airport is the busiest airport in Scotland, and the 6 th busiest in the UK It served 10.2 million passengers in 2014 (+4% on 2013) (28,000 passengers per day) 29 airlines serving 120+ destinations 109,000 aircraft movements per year Typically 350 flights per day Background

5 Justification Due to forecast passenger and airline traffic growth, EAL commissioned an independent study by York Aviation to determine the current and future capacity needs of runway, taxiway delays and airspace congestion. This report highlighted: Delays at peak times are forecast to be unacceptable & unsustainable for 2017 traffic. Current service is suboptimal, suffering at peak hours in particular first wave departures during the summer peak schedule, due to current requirements of minimum 2 minute (departure-departure) separation interval. Current runway and airspace capacity is likely to be inadequate by 2020. In addition, the VOR rationalisation programme requires that reliance on ground based navigation aids is removed by 2017. The changes will integrate with wider network changes being proposed by NATS, and together these will enable further efficiencies. EAL is intensely committed to progressing improvement to the airspace infrastructure at Edinburgh.

6 Objectives 60 second departure intervals from RWY24 & 06 Increased runway capacity accommodating 50 movements per hour at peak Increase overall airspace capacity to accommodate the EGPH s projected traffic demand to 2025. Reduced taxi time and lower risk of ground movement gridlock. Reduced fuel cost and CO 2 emissions on the ground. Increase in on-time departures. Mitigate noise impact of low level over-flights, minimising the populations overflown (e.g. flights over water where possible).

7 Edinburgh Airport Ltd (EAL) is the sponsor of this ACP. NATS (Services) Ltd have been contracted by EAL to manage the technical change process. Departure Management Redesigned GRICE 06/24 Redesigned TALLA 06/24 Revised 24 route to south Replication of GOSAM 24 Redesigned GOSAM 06 New GOSAM offload 06/24 New RNAV1 offload SIDs providing 1 minute departure/departure splits from both RWY06 and RWY24 Integration with the ScTMA network improvements to provide safety, capacity and environmental benefits. Arrival Management Scope RNAV transitions to final approach. RNAV (GNSS) final approach procedures and revised ILS procedures as required. Redesign of terminal holds and associated STARs (in coordination with PLAS)

8 ATS Units Edinburgh: systemisation will increase capacity Prestwick Centre: systemisation will result in better traffic presentation to AC, and improvement in overall network capacity. Civil Air Traffic Reduction in delays Shorter taxi times Improved climb & descent profiles Improvement in cockpit workload Reduction in Fuel burn MoD / Operational Air Traffic No anticipated impact GA/S&RA No anticipated impact Impacts

Airspace & Routes 9

EGPH Current Traffic (inc TUTUR) 10

11 EGPH Current Traffic (inc TUTUR) 0-4000ft

12 EGPH Current Traffic (inc TUTUR) 0-7000ft

13 EGPH Current Traffic (inc TUTUR) 0-FL195

TUTUR SID trial The TUTUR1C SID trial ran from 25 th June to 28 th Oct 2015. The trial demonstrated: Improved departure intervals from RWY24 Reduced departure delays Improved runway capacity The SID to FL concept was proved to work. Network performance was improved with positive feedback from Prestwick Centre. 14

TUTUR SID 15

16 Typical altitudes 7000 8000 9000 10,000 6000 5000 4000 0-FL160

General Public TUTUR Feedback Total number of individual complainants: 567 Number of complaints confirmed as regarding TUTUR: 43% Number of complaints not related to TUTUR: 57% 40% of the total complaints were from 5 people Airlines Generally very supportive. Initial technical issues identified and being investigated. Very good conformance to the SID profile within RNAV1 tolerances. Climb gradients achieved were significantly greater than the design assumptions. Prestwick ATC Area Control Very supportive. Traffic presentation to TUTUR provides significant network benefit and is congruent with ScTMA development plans. 17

Current SIDs 18

Current STARs STARs - RNAV1 replication. Redesigned STARs to be coordinated with NATS PLAS. STIRA & TWEED holds subject to review. 19

EGPH PBN Equipage Airport RNAV10 RNAV5 RNAV1 RNP1 RNP APCH EGPH EDINBURGH 100.0% 100.0% 91.3% 70.1% 69.7% Totals All Airports 99.7% 99.6% 89.6% 71.7% 64.9% RNAV1: 91.3% RNP1: 70.1% (data June 2015) Conventional SIDs/STARs will be removed when the RNAV1 SIDs/STARs are introduced. Experience of TLA VOR out of service has not created an issue. The intention is to allow RNAV5 /non RNAV traffic alternative via tactical radar monitoring. EAL does not intend to introduce an RNAV1 mandate. 20

Environmental Considerations 21

Environmental: CO 2 Emissions The proposed changes will improve climb & descent profiles, enabling consistent continuous climb departures (CCDs) and continuous descent approaches (CDAs). CO 2 emissions analysis will be carried out using KERMIT (Kerosene Emissions Research Model In the TMA). A 3DI (3 Dimensional Inefficiency) analysis of the current and proposed airspace will also be performed to quantify the benefit of the proposed changes. 22

23 Environmental: Over-flight/Noise RNAV Replications The proposed RNAV replications will result in concentration of flight paths along the centre-lines of the existing procedures. The design aim of the replications will be to match the existing conventional nominal centrelines Current GRICE 3C (RWY24) is not able to be replicated accurately within PANS-OPS RNAV rules. Hence a new nominal track of this SID will be proposed. There was more feedback related to the GRICE SID during the TUTUR trial than for TUTUR. New SIDs The proposed new SIDs will change the pattern of over-flights experienced by those under the proposed flight path. The design aim for the proposed flight paths is, where possible to route a over sparsely populated area and the Firth of Forth below 7000ft. The aim is to reduce the population currently overflown and hence provide a net benefit to the overall population. Analyses required SEL footprint noise analysis will be performed Population analysis will be performed Leq contour analysis will be assessed and included if necessary TUTUR noise analysis (monitored actual flights using 4 sound level monitors) in progress

24 Consultation Planning There has been widespread pre-engagement via TUTUR trial There will initially be a 12 week (at least) consultation on swathes to gather feedback & determine if there are any factors which will influence the design contrary to default government policy. This is proposed to commence May July 2016 (after Scottish Elections - May 5 th 2015). A more limited detailed public engagement on the final lines, for the low level portions (below 4000ft) will be run (targeted for Q4 2016)

25 Consultation Stakeholders NATMAC - 39 Organisations MOD - via DAATM Politicians - All MPs, MSPs, MEPs, Councils within the area Community Councils: Broxburn, Dechmont, Ecclesmachan, Linlithgow, Linlithgow Bridge Philpstoun, Uphall, Blackness, Bathgate, Newton, Ochiltree residents Airlines All airlines operating from Edinburgh Local residents representatives and individuals Representatives of the tourism industry, the business community, airport passengers, Scottish transport industry. Edinburgh Airport staff Local and national media

26 Expectations Standard 16+1 weeks Regulatory Decision Period The implementation date will be coordinated with NATS network changes (PLAS) and other airport changes via the FAS/SDDG. CAA workload also a contributory factor. Single ACP submission Phased implementation targeted for spring 2018

27 FAS SDDG/NDDG Timeline Redacted

AOB & Questions 28