ZTL ARTCC. Augusta Regional

Similar documents
ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011

Greenville Spartanburg International

Piedmont Triad International Airport

ERIE ATCT STANDARD OPERATING PROCEDURES

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES

Charlotte - Douglas International Airport Traffic Control Tower

Burlington ATCT Standard Operating Procedures

Virtual Jacksonville Air Route Traffic Control Center Tallahassee ATCT Standard Operating Procedures

RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES

BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE KALB) ALBANY APPROACH (ALB

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures

Cape Area Airports Standard Operating Procedures

Albany ATCT Standard Operating Procedures

Charlotte - Douglas International

PITTSBURGH ATCT STANDARD OPERATING PROCEDURES

Virtual Jacksonville Air Route Traffic Control Center Daytona Beach ATCT Standard Operating Procedures

- Updated formatting - Re-drawn airspace delegation diagram

Providence ATCT Standard Operating Procedures

VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION. SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating Procedures

Standard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control

AIR TRAFFIC ROUTE CONTROL CENTER

9/23/2010 RDU B. Raleigh-Durham Air Traffic Control Tower. Standard Operating Procedures

RELEASE RECORD. Version Date Author Notes Dec 2006 SK Initial Release

VATUSA C90 TRACON AND O HARE ATCT LETTER OF AGREEMENT

INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME

VATUSA Approval 3/21/18

Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW)

Southern California TRACON and Lindbergh Tower LETTER OF AGREEMENT SUBJECT: INTER-FACILITY COORDINATION AND CONTROL PROCEDURES

Instrument Refresher Course. Airfield Operations Flight Tower 412 OSS/OSAT

D01 TERMINAL RADAR APPROACH CONTROL

VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012

ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT. EFFECTIVE: July 10, SUBJECT: APPROACH CONTROL SERVICE

Standard Operating Procedures

Southern California Terminal Radar Approach Control and Ontario Airport Traffic Control Tower

Version O January 21, 2019

ORDER MSY V. New Orleans. Standard Local Operating Procedures. Rev 3 December 7, 2011

STANDARD OPERATING PROCEDURES (CLE SOP) December 3, 2016

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR)

A PILOT S GUIDE To understanding ATC operations at Lancaster Airport

IVAO Switzerland Division

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

- Initial. - Added MCRAY and new PDC s. - General update. - Added ATIS frequency - Added gate diagram appendix - Typo fixes - Minor formatting changes

LGB HELICOPTER OPERATIONS

SOUTHERN CALIFORNIA TRACON LOS ANGELES AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

FLIGHT ADVISORY WASHINGTON D.C. SPECIAL FLIGHT RULES AREA LEESBURG MANUVERING AREA

USE OF RADAR IN THE APPROACH CONTROL SERVICE

Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations

Jacksonville ARTCC. F11 TRACON Standard Operating Procedures

THE AREA CONTROL CENTRE (CTR) POSITION

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

ATLANTA ARTC CENTER AND CHARLOTTE TOWER LETTER OF AGREEMENT

IFR SEPARATION USING RADAR

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons.

GENERAL OPERATING PROCEDURES FINLAND(GOP)

HOUSTON AIR ROUTE TRAFFIC CONTROL CENTER VATSIM United States Division. Letter of Agreement. Revised: July 25, 2004 Effective: July 25, 2004

THE TOWER CONTROL POSITION (TWR)

Letter of Agreement. between. and

VIRTUAL AIR TRAFFIC SIMULATION NETWORK CARIBBEAN DIVISION ZSU SAN JUAN CERAP

PILOT BRIEFING GENEVA RFE 2018

NATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION

SECTION 4 - APPROACH CONTROL PROCEDURES

IFR SEPARATION WITHOUT RADAR

JACKSONVILLE CENTER AND SAVANNAH TRACON. LETTER OF AGREEMENT EFFECTIVE: December 22, 2006

CHICAGO TRACON (C90) O HARE INTERNATIONAL AIRPORT MIDWAY INTERNATIONAL AIRPORT SATELLITE AIRFIELDS STANDARD OPERATING PROCEDURES

Chapter 6. Nonradar. Section 1. General DISTANCE

SFAR 93 and Minimum Altitudes

FLIGHT STRIP MANAGEMENT - APPROACH LEVEL

MILWAUKEE MKE TRACON GEN. MITCHELL INTL AIRPORT (KMKE) MKE TRACON SATELLITE AIRPORTS STANDARD OPERATING PROCEDURES

RWY 24. Designator Route Remarks. All traffic shall initially climb to 4000FT QNH with climb gradient 3.3% MNM, unless instructed otherwise by ATC.

Standard Operating Procedures (SOPs) for BAGHDAD (ORBI)

GENERAL INFORMATION The aerodrome consists of three runways (04L-22R, 04R-22L, 12-30) and four aprons.

SOUTHERN CALIFORNIA TRACON STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

CHAPTER 5 SEPARATION METHODS AND MINIMA

Virtual Jacksonville Air Route Traffic Control Center Orlando International ATCT Standard Operating Procedures

Section 5. Radar Separation

Aerodrome Control Guide

Pilot ATC RT Phraseology

FEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC

WAKE TURBULENCE SEPARATION MINIMA

VATSIM JORDAN vacc QUICK REFERENCE HANDBOOK QUICK REFERENCE - STANDARD FORMATS FOR COMMUNICATION

AIRAC AIP SUPPLEMENT A 16/17 08 June 2017

SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11

LETTER OF AGREEMENT. Between

CE 563 Airport Design

Temporary Radio Mandatory Zone

10-February 2019 ZTL JO B VIRTUAL AIR TRAFFIC SIMULATION NETWORK ATLANTA CENTER

WASHINGTON DULLES ATCT STANDARD OPERATING PROCEDURES

Northern Regional Training Scheme. EGBB Birmingham Airport Pilot s Guide. REVISION 1 (Monday, 30 January 2012)

CHICAGO MIDWAY INTERNATIONAL AIRPORT (KMDW) STANDARD OPERATING PROCEDURES

Understanding Role of Flight Data Processing Across NAS Operational Domains

LFPG / Paris-Charles de Gaulle / CDG

S2 Tower Controller. Allama Iqbal Int l Airport Lahore ( OPLA ) June 2016 Pakistan vacc

LETTER OF AGREEMENT BETWEEN DENMARK FIR AND SWEDEN FIR. VATSIM Scandinavia 4 April 2013

TABLE OF CONTENTS. 3 Airport Managers Notice, Arlington Airport Closures. 4 Air Show Operations, Arlington Area Frequencies

The NOTAM described will replace previously issued FDC NOTAMs 6/2550 and 7/7778 for the DC ADIZ/FRZ.

VATSIM MINNEAPOLIS ARTCC MINNEAPOLIS TRACON LETTER OF AGREEMENT

Letter of Agreement. between

UNIVERSITY OF ALABAMA FOOTBALL

DO NOT BEGIN THIS WORK UNTIL YOU HAVE COMPLETED ALL REQUIRED ASSIGNED READING AND EXERCISES.

Transcription:

ZTL ARTCC Augusta Regional Air Traffic Control Tower Standard Operating Procedures AGS 7110.65B Effective: May 1, 2011 1

CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1-1-1. Callsign Usage and Frequency Delegation: The following callsigns and frequencies shall be used when working positions at BHM ATCT / TRACON. Callsign Frequency VOX Channel ATIS 132.750 KAGS_ATIS Ground Control 121.900 AGS-GC Local Control 118.700 AGS-LC Approach/Departure 119.150 AGS-APP 2-1-1. RESPONSIBLITIES & PROCEDURES Ground Control shall: CHAPTER 2. GROUND CONTROL SECTION 1. POSITION DUTIES AND RESPONSIBILITIES a. Process and forward flight plan information. b. Issue clearances and ensure accuracy of pilot readback. c. Formulate and issue clearances for all Augusta IFR/SVFR/ TRSA (Flight Following) departures. Issue: 1) All IFR/SVFR/TRSA aircraft departing Augusta Regional a departure frequency and an appropriate beacon code. 2) VFR/TRSA departures requesting an altitude above 5,000, issue a restricted altitude to maintain VFR at or below 5000. 3) VFR aircraft requesting pattern work do not need a squawk code, but may be issued one. 4) IFR departures requesting an altitude above 5000, shall be issued 5000 and their requested altitude within 10 minutes; issue requested altitude to all others. d. Record the ATIS when appropriate. e. responsible for the safe, orderly and expeditious flow of aircraft operating at AGS Airport within moment areas (all taxiways and inactive runways). CHAPTER 3. LOCAL CONTROL SECTION 1. POSITION DUTIES AND RESPONSIBILITIES 2

3-1-1. RESPONSIBLITIES Local Control shall: a. Ensure Separation b. Initiate control instructions c. Coordinate as necessary ( Example. Opposite Direction Departures). 3-1-2. PROCEDURES LC shall: a. Coordinate active runway changes with CD, GC, and the TRACON prior to change b. Have automatic releases of departures off the active runways unless specifically coordinated otherwise. Once the aircraft is issued the takeoff clearance, push the strip to the appropriate RADAR Controller. c. Coordinate releases of opposite direction departures with radar sector that will provide service to aircraft. d. Be responsible for separation of aircraft within Tower airspace lateral boundaries. NOTE - Unless otherwise coordinated, the Radar Controller shall assume control of a departing aircraft upon frequency change. e. Local Control shall assume control of arriving aircraft upon frequency change. When sequencing an aircraft to a runway other than previously sequenced, if and/or when it will interrupt the flow of arrival traffic, coordinate with the appropriate radar position. f. Unless otherwise coordinated, all missed approaches/go arounds shall be instructed to fly runway heading and issued an altitude restriction of 3,000 feet. f. Verbally coordinate with the TRACON on missed approaches and/or go-arounds prior to communications transfer. g. Aircraft executing multiple approaches must be verbally coordinated with the appropriate Radar Position by Local Control upon climb out unless the the aircraft will remain in the VFR traffic pattern. h. Assign the following headings to IFR/SVFR/TRSA departures: 1) Runway 8 Heading 100 2) Runway 35 - Heading 330, Runway Heading, or heading 020 3

3) Runway 17 Heading 140, Runway Heading, or heading 200 4) Runway 26 Heading 230, Runway Heading, or heading 290 3-1-3. DELEGATED AIRSPACE Local Control airspace is defined as All runway surface areas and airspace within 5 mile radius of the AGS Airport, up to 2,00 feet. 3-1-4. LINE UP AND WAIT (LUAW) Line Up and Wait is authorized during ALL times / intersections/ runways at KAGS 4-1-1. RESPONSIBLITIES CHAPTER 4. APPROACH / DEPARTURE SECTION 1. POSITION DUTIES AND RESPONSIBILITIES Appraoch/Departure shall: Ensure separation, initiate control instructions and provide radar approach control service for IFR / TRSA VFR / SVFR etc. aircraft within their airspace. 4-1-2. PRE-ARRANGED COORDINATION Automatic releases for IFR / SVFR / VFR TRSA departures off AGS Airport only if Local Control pushes the strip immediately after issuing takeoff clearance to the departure. Automatic releases are NOT authorized for opposite direction departure. 4-1-3. PROCEDURES a. Assign runway heading and 3,000 feet to all touch-and-go / low approach aircraft unless specifically coordinated otherwise. b. Transfer communications to AGS Tower between 5 and 7 NM from the airport for arriving aircraft. 4

APPENDIX A. TRACON AIRSAPCE. 5

APPENDIX B. AGS/ZTL/ZJX Letter Of Agreement. a. Arrivals. (1) ARTCC shall clear arrivals operating at 11,000 feet or above to the via direct, via an assigned vector to the airport or filed flight plan route and to cross the common boundary at 11,000. (2) ARTCC shall clear arrivals operating at 10,000 feet or below to the destination airport to cross the common boundary level at an altitude appropriate for direction of flight direct direct direct destination, or assigned radar vector, or via filed route. (3) In the event ATCT negates a crossing restriction, ATCT shall assume the responsibility of coordination with the appropriate ARTCC sectors. AGS shall transition arrivals into TRACON airspace as soon as possible to avoid having to point out to other ZTL/ZJX sectors. b. Departures. (1) ATCT shall clear aircraft requesting 11,000 feet or above to maintain 10,000 feet and expect requested altitude ten minutes after departure. Departures shall be cleared on course. (2) Aircraft requesting 10,000 feet or below shall be cleared at an altitude appropriate for direction of flight. Departures shall be cleared on course. (3) ATCT shall provide 5 NM lateral separation and/or 1,000 feet vertical separation, constant or increasing, for aircraft entering ARTCC airspace. NOTE - The transfer of control point (TCP) is defined as the vertical and lateral limits of the airspace delegated to ATCT. 6

APPENDIX C. Scratch Pad Procedures. All aircraft inbound to BHM shall display the type approach and / or assigned runway / request in the scratchpad. Coordination is required if the scratch pad is left blank or opposite direction arrival information is included. If the approach will be completed to a runway in use, the runway number/designator is optional. Airports with parallel runways will use the last digit of the runway number followed by the L/C/R designator. ALL missed/low/option approaches SHALL be coordinated with the appropriate Local Controller. Scratchpad Entry TYPE OF APPROACH I (XX) V (XX) N (XX) R (XX) T (XX) G (XX) L (XX) Z (XX) TG LA SG PTN OPT OVH VS VL VR ILS Approach Visual Approach NDB Approach VOR Approach TACAN Approach GPS/RNAV Approach Localizer Approach Definition VFR arrivals assigned a runway Aircraft requesting a Touch and Go Aircraft requesting Low Approach Aircraft requesting Stop and Go Aircraft is requesting Pattern Work (closed traffic) Aircraft requesting the Option Aircraft requesting the Overhead Maneuver Aircraft is maintain visual separation / following the preceding aircraft. Aircraft is maintain visual separation with the closest aircraft on adjacent final to it's left. Aircraft is maintain visual separation with the closest aircraft on adjacent final to it's right. 7