Berkshire 602280 DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO 09/12/2017 $272,473.00 ROUTE 8 608167 CLARKSBURG- RESURFACING AND RELATED WORK ON ROUTE 8, FROM THE 04/19/2017 $3,254,458.24 NORTH ADAMS T.L. TO THE VERMONT S.L. 607550 LEE- SUPERSTRUCTURE REPLACEMENT, L-05-034, CHAPEL STREET OVER 08/24/2017 $1,323,592.69 GREENWATER BROOK 605799 WILLIAMSTOWN- RECONSTRUCTION & RELATED WORK ON ROUTE 43 (WATER 08/24/2017 $2,430,486.27 STREET) 607551 LEE- LENOX- BRIDGE REPLACEMENT, L-05-020=L-07-003, VALLEY STREET OVER 08/31/2017 $2,870,730.90 HOUSATONIC RIVER Grand Total $10,151,741.10
Cape Cod 608102 HARWICH- IMPROVEMENTS TO PARK AND RIDE FACILITY INCLUDING A NEW 04/06/2017 $284,750.78 BUS SHELTER AT ROUTE 124 PARK AND RIDE 608201 HARWICH- BREWSTER- ORLEANS- RESURFACING AND RELATED WORK ON 04/27/2017 $7,971,065.68 ROUTE 6 608544 BOURNE- RESURFACING AND RELATED WORK ON ROUTE 6 & 28 BYPASS ROAD 06/22/2017 $1,687,544.00 CC1000 BARNSTABLE - HYANNIS LOOP DEMONSTATION 7/6/2017 $685,464.00 606707 DENNIS- CORRIDOR AND STREETSCAPE IMPROVEMENTS ON MAIN STREET 08/31/2017 $6,568,010.63 (ROUTE 28), FROM DENNIS COMMONS DRIVE TO UPPER COUNTY ROAD Grand Total $17,196,835.09
Central Mass ProjInfo_ID ProjectInfo or Other Description Date 1 Sum of Fed Fund 602991 SPENCER- RESURFACING & RELATED WORK ON ROUTE 31 (MAPLE STREET & 11/10/2016 $4,254,667.20 CHARLTON ROAD) 606346 LEICESTER- RESURFACING & RELATED WORK ON ROUTE 56 (PAXTON 12/22/2016 $2,595,648.00 STREET), FROM MAIN STREET TO HYLAND AVENUE 606075 OXFORD- CLEANING AND PAINTING & RELATED WORK, O-06-032, CUDWORTH 01/27/2017 $2,325,575.36 ROAD OVER I-395 NORTHBOUND AND SOUTHBOUND; O-06-036, I-395 OVER DANA ROAD & O-06-037, I-395 (SB) OVER FEDERAL HILL ROAD 607562 WEBSTER- OXFORD- INTERSTATE MAINTENANCE & RELATED WORK ON I-395 02/03/2017 $2,047,867.38 607442 NORTHBOROUGH- SHREWSBURY- RECONSTRUCTION ON ROUTE 9 & ROUTE 20 04/12/2017 $1,840,379.59 RAMP IMPROVEMENTS 606206 OXFORD- RECONSTRUCTION ON CHARLTON STREET, BETWEEN MAIN STREET 05/25/2017 $4,740,088.20 AND DUDLEY ROAD 606638 SUTTON- BRIDGE REPLACEMENT, S-33-005, BLACKSTONE STREET OVER 07/21/2017 $3,109,841.87 BLACKSTONE RIVER 606434 WORCESTER- MAIN STREET BUSINESS DISTRICT STREETSCAPE 08/24/2017 $8,228,409.38 IMPROVEMENTS 602740 SHREWSBURY- RESURFACING & RELATED WORK ON MAIN STREET, FROM I- 08/31/2017 $5,123,341.06 290 RAMPS EASTERLY TO MAPLE AVENUE Grand Total $34,265,818.04
Franklin 602316 BUCKLAND- CHARLEMONT- RESURFACING & RELATED WORK ON ROUTE 2, 10/25/2016 $6,743,252.50 FROM MM 27.41 (R.R. BRIDGE) TO MM 37.39 (BUCKLAND/SHELBURNE T.L.) EXCLUDING MM 29.5 TO MM 30.75 (VILLAGE CENTER) 607671 HEATH- BRIDGE REPLACEMENT, H-14-001, SR 8A (JACKSONVILLE STREET) 01/20/2017 $1,357,894.22 OVER MILL BROOK 607584 COLRAIN- BRIDGE REPLACEMENT, C-18-020, HEATH ROAD OVER WEST 04/12/2017 $1,378,726.76 BRANCH NORTH RIVER 608311 BUCKLAND- BRIDGE MAINTENANCE, B-28-003, ROUTE 112 OVER ROUTE 2 AND 05/25/2017 $512,934.00 PAN AM RAILROAD 607527 ORANGE- BRIDGE REPLACEMENT, O-03-009, HOLTSHIRE ROAD OVER MILLERS 08/31/2017 $4,713,895.17 RIVER 607182 DEERFIELD- BERNARDSTON- GREENFIELD- INTERSTATE MAINTENANCE & 08/31/2017 $14,682,190.41 RELATED WORK ON ROUTE I-91 607548 SHELBURNE- BRIDGE REPLACEMENT, S-11-006, BARDWELL FERRY ROAD 09/08/2017 $1,725,659.92 OVER DRAGON BROOK Grand Total $31,114,552.98
Martha's V 608529 WEST TISBURY- RESURFACING OF CORRELLUS STATE FOREST BIKEPATH (PHASE 1 - DOCTOR FISHER ROAD PATH AND HOPPS FARM ROAD) 08/24/2017 $922,330.00 RTD0004569 BUY REPLACEMENT 30-FT BUS (2) 06/07/2017 $292,702.00 Grand Total $1,215,032.00
Merrimack 607561 ANDOVER- METHUEN- INTERSTATE MAINTENANCE & RELATED WORK ON I-93 04/12/2017 $12,445,174.56 607573 HAVERHILL- RECONSTRUCTION ON ROUTE 97 (BROADWAY), FROM SILVER 05/12/2017 $5,724,706.98 BIRCH LANE TO RESEARCH DRIVE 608002 LAWRENCE- IMPROVEMENTS AT BRUCE ELEMENTARY SCHOOL (SRTS) 06/22/2017 $1,850,692.43 604585 FLEX TO FTA FOR MVRTA NEW BUS UPGRADE TO CLEANER FUEL BUSES 2/2/2017 $516,672.00 608187 HAVERHILL- MERRIMAC- AMESBURY- TRAFFIC & GUIDE SIGN REPLACEMENT 08/10/2017 $4,055,596.20 ON A SECTION OF I-495 606669 AMESBURY- POWWOW RIVERWALK CONSTRUCTION AT WATER STREET 09/08/2017 $549,657.00 608261 LAWRENCE- INTERSECTION IMPROVEMENTS AT MARSTON STREET & FERRY 09/14/2017 $1,058,753.62 STREET/COMMONWEALTH DRIVE Grand Total $26,201,252.79
Montachusett 607252 GARDNER- RESURFACING & RELATED WORK ON MATTHEW STREET 11/21/2016 $1,176,529.76 608193 FITCHBURG/LEOMINSTER - TWIN CITIES RAIL TRAIL RIGHT OF WAY 01/13/2017 $2,276,800.00 ACQUISITION 607475 WINCHENDON- RESURFACING & RELATED WORK ON ROUTE 12, FROM MILL 03/02/2017 $1,360,892.80 STREET/BEGINNING OF STATE HIGHWAY TO NEW HAMPSHIRE STATE LINE (2.5 MILES) 607529 WINCHENDON- BRIDGE REPLACEMENT, W-39-015, NORTH ROYALSTON ROAD 04/10/2017 $1,795,094.72 OVER TARBELL BROOK 606435 HUBBARDSTON- RESURFACING AND RELATED WORK ON ROUTE 68, FROM 04/19/2017 $3,117,408.64 BRIGHAM ROAD TO THE RUTLAND T.L. 607770 LUNENBURG- RESURFACING & RELATED WORK ON ROUTE 13 (CHASE ROAD), 06/29/2017 $1,372,484.80 FROM NORTHFIELD ROAD TO THE TOWNSEND T.L. 606124 FITCHBURG- LUNENBURG- LEOMINSTER- RECONSTRUCTION OF SUMMER 08/17/2017 $1,728,210.40 STREET AND NORTH STREET 608250 ROYALSTON- BRIDGE REPLACEMENT, R-12-001 (B35), STOCKWELL ROAD OVER 09/08/2017 $1,231,382.50 LAWRENCE BROOK 606575 STERLING- LANCASTER- LEOMINSTER- INTERSTATE MAINTENANCE & 09/08/2017 $14,992,824.19 RELATED WORK ON I-190 Grand Total $29,051,627.81
Nantucket Grand Total
N Middlesex 608420 LOWELL- RECONSTRUCTION AND REHABILITATION OF SIX BRIDGES (ENEL 08/11/2017 $13,289,750.00 BRIDGES) TIGER GRANT 608181 BILLERICA- INTERSECTION & SIGNAL IMPROVEMENTS AT ROUTE 3A (BOSTON 04/27/2017 $2,290,076.40 ROAD) AND ALLEN ROAD 608036 WESTFORD- INTERSECTION IMPROVEMENTS @ GROTON ROAD (ROUTE 40) & 05/25/2017 $2,763,282.63 OAK HILL ROAD NM0001 BRIDGE STREET-MERRIMACK RIVERWALK/ DOWNTOWN LOWELL CANALWAY PEDESTRIAN IMPROVEMENTS/ PAWTUCKET CANAL BRIDGE IMPROVEMENTS 06/07/2017 $1,055,000.00 607752 LOWELL- INTERSECTION & SIGNAL IMPROVEMENTS AT 2 LOCATIONS: SR 113 09/08/2017 $1,825,435.44 (VARNUM AVENUE & VFW HIGHWAY) AT MAMMOTH ROAD & VFW AT AIKEN STREET 607421 CHELMSFORD- INTERSECTION IMPROVEMENTS AT ROUTE 4 & I-495 (EXIT 33) 09/08/2017 $3,376,387.62 Grand Total $24,599,932.09
Old Colony 605038 PLYMOUTH- RECONSTRUCTION OF TAYLOR AVENUE, FROM WHITE HORSE 09/08/2017 $7,335,476.08 ROAD TO MANOMET POINT ROAD, INCLUDES BRIDGE REPLACEMENT OF P-13-010 Grand Total $7,335,476.08
Pioneer 608192 AGAWAM- CHICOPEE- HOLYOKE- WEST SPRINGFIELD- STORMWATER 10/20/2016 $1,101,038.18 IMPROVEMENTS ALONG I-91, I-391, ROUTE 57 AND ROUTE 5 608211 CHICOPEE- SPRINGFIELD- INTERSTATE MAINTENANCE & RELATED WORK ON I- 12/29/2016 $4,069,479.87 291 PV0001 PIONEER VALLEY REGIONAL BICYCLE SHARE (PHASE 1) 06/14/2017 $1,075,176.80 607528 AMHERST- BRIDGE REPLACEMENT, A-08-008, MILL STREET OVER MILL RIVER 07/28/2017 $2,342,482.24 608023 AMHERST- HADLEY- SIDEWALK & WHEELCHAIR RAMP CONSTRUCTION ON 07/28/2017 $978,969.50 ROUTE 9 604033 SOUTHWICK- RECONSTRUCTION CONGAMOND ROAD (ROUTE 168), FROM 08/24/2017 $5,542,770.13 COLLEGE HIGHWAY & ENDS 250 FEET SHORT OF STATE LINE (1.2 MILES) 605011 LUDLOW- RECONSTRUCTION OF CENTER STREET (ROUTE 21), FROM 35' WEST 09/08/2017 $5,060,387.16 OF BEACHSIDE DRIVE WESTERLY TO GAS LINE BESIDE MTA OVERPASS (3,500 FEET) 606903 HOLYOKE- IMPROVEMENTS TO LOWER WESTFIELD ROAD ON I-91 09/08/2017 $2,056,843.70 (INTERCHANGE 15) 607549 CHESTERFIELD- BRIDGE REPLACEMENT, C-12-009, IRELAND STREET OVER 09/14/2017 $3,166,716.46 WEST BRANCH BRONSON BROOK 605150 GOSHEN-RESURFACING & RELATED WORK ON WEST STREET 09/14/2017 $3,571,328.54 605384 AGAWAM- WEST SPRINGFIELD- BRIDGE REPLACEMENT, A-05-002=W-21-014, 09/14/2017 $25,608,195.56 ROUTE 147 OVER THE WESTFIELD RIVER & INTERSECTION & SIGNAL IMPROVEMENTS @ 3 LOCATIONS Grand Total $54,573,388.14
Boston 1570 Green Line Extension 3/1/2017 $28,927,735.00 603711 NEEDHAM- WELLESLEY- 6 BRIDGE LOCATIONS ON I-95/ROUTE 128: N-04-020, N- 09/12/2017 $19,631,853.00 04-021, N-04-022, N-04-026, N-04-027, N-04-037 & W-13-023 (ADD-A-LANE - CONTRACT V) 29492 BEDFORD- BILLERICA- MIDDLESEX TURNPIKE IMPROVEMENTS, FROM CROSBY 09/12/2017 $7,373,440.83 DRIVE NORTH TO MANNING ROAD, INCLUDES RECONSTRUCTION OF B-04-006 (PHASE III) 601630 WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REPLACING W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) 09/18/2017 $19,907,054.02 607499 RANDOLPH- BOSTON- BRAINTREE- STEEL SUPERSTRUCTURE CLEANING (FULL 01/27/2017 $1,622,820.80 REMOVAL) AND PAINTING OF 3 BRIDGES: R-01-006 (344), B-16-261 (3FK) & B-21-027( 36E) 607477 LYNNFIELD- PEABODY- RESURFACING & RELATED WORK ON ROUTE 1 04/03/2017 $7,203,949.80 607481 BOSTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-93 04/03/2017 $3,903,209.28 608763 MEDFORD- STONEHAM- WOBURN- READING- HIGHWAY LIGHTING 04/27/2017 $15,634,771.30 REHABILITATION ON I-93 (PHASE II) 604810 MARLBOROUGH- RECONSTRUCTION OF ROUTE 85 (MAPLE STREET) 06/22/2017 $5,225,855.70 608458 BOSTON- REVERE- GUIDE AND TRAFFIC SIGN REPLACEMENT ON ROUTE 1A 06/23/2017 $1,451,229.75 608217 MARLBOROUGH- SUDBURY- STORMWATER IMPROVEMENTS ALONG ROUTE 20 06/29/2017 $137,873.00 607309 HINGHAM- RECONSTRUCTION & RELATED WORK ON DERBY STREET, FROM 08/24/2017 $5,699,326.01 POND PARK ROAD TO CUSHING STREET 608003 WEYMOUTH- IMPROVEMENTS AT PINGREE ELEMENTARY SCHOOL (SRTS) 08/24/2017 $386,845.60 608004 WATERTOWN- IMPROVEMENTS AT HOSMER ELEMENTARY SCHOOL (SRTS) 08/24/2017 $1,032,835.38 608650 SALEM- ADAPTIVE SIGNAL CONTROLS ON ROUTE 107 (HIGHLAND AVENUE) 08/25/2017 $441,193.80 607999 REVERE- IMPROVEMENTS AT GARFIELD ELEMENTARY & MIDDLE SCHOOL 08/31/2017 $929,963.02 (SRTS) BN0002 MBTA BUS STOP ACCESSIBILITY AND OPERATIONAL IMPROVEMENTS 4/27/2017 $908,221.00 BN0003 MBTA BUS STOP ACCESSIBILITY AND OPERATIONAL IMPROVEMENTS 4/27/2017 $1,001,475.00 BN0004 MBTA BUS STOP ACCESSIBILITY AND OPERATIONAL IMPROVEMENTS WITHIN 4/27/2017 $129,995.00 TH E LONGWOOD MEDICAL AREA BN0005 ASSABET RIVER NATIONAL WILDLIFE REFUGE - REHAB WHITE POND RD, AKA NORTH ENTRANCE RD (RTE. 101) 4/27/2017 $460,000.00
Boston continued BN0006 GREAT MEADOWS NATIONAL WILDLIFE TRANSPORTATION PROJECT 4/27/2017 $42,662.00 BN0007 GREAT MEADOWS NATIONAL WILDLIFE TRANSPORTATION PROJECT 4/27/2017 $152,362.00 607488 SOUTHBOROUGH- RESURFACING & RELATED WORK ON ROUTE 9, FROM THE 09/08/2017 $4,176,865.60 FRAMINGHAM T.L TO WHITE BAGLEY ROAD 604935 WOBURN- RECONSTRUCTION OF MONTVALE AVENUE, FROM I-93 09/08/2017 $4,583,639.19 INTERCHANGE TO CENTRAL STREET (APPROX. 1,850 FT) 607507 WAKEFIELD- BRIDGE DECK REPLACEMENT, W-01-021 (2MF), HOPKINS STREET 09/08/2017 $1,884,667.36 OVER I-95/ST 128 604173 BOSTON- BRIDGE REHABILITATION, B-16-016, NORTH WASHINGTON STREET 09/14/2017 $28,000,000.00 OVER THE BOSTON INNER HARBOR 09/22/2017 $21,565,936.13 604761 BOSTON- MULTI-USE TRAIL CONSTRUCTION (SOUTH BAY HARBOR), FROM 09/14/2017 $2,795,761.60 RUGGLES STATION TO FORT POINT CHANNEL 607754 MILTON- INTERSECTION & SIGNAL IMPROVEMENTS AT GRANITE AVENUE & 09/14/2017 $768,731.63 SQUANTUM STREET 607954 DANVERS- BRIDGE REPLACEMENT, D-03-018, ST 128 OVER WATERS RIVER 09/14/2017 $17,315,947.52 608806 WATERTOWN- CAMBRIDGE- MULTI-USE PATH CONSTRUCTION (PHASE II) 09/14/2017 $3,075,524.56 602165 STONEHAM- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 28/NORTH 09/22/2017 $2,551,402.80 STREET Grand Total $208,923,147.68
SE Mass 608080 WESTPORT- RESURFACING AND RELATED WORK ON ROUTE 88 FROM MILE 12/20/2016 $4,888,422.51 MARKER 1.2 (JUST NORTH OF DRIFT ROAD) NORTHERLY TO MILE MARKER 7.5, JUST SOUTH OF OLD COUNTY ROAD 608176 BERKLEY- FREETOWN- RESURFACING & RELATED WORK ON ROUTE 24 04/10/2017 $5,821,017.26 608101 NEW BEDFORD- PARK AND RIDE IMPROVEMENTS INCLUDING A NEW BUS SHELTER REPLACEMENT AT THE MOUNT PLEASANT STREET PARK AND RIDE 04/10/2017 $404,974.50 607563 WAREHAM- ROCHESTER- MIDDLEBORO- INTERSTATE MAINTENANCE & 04/19/2017 $11,685,638.80 RELATED WORK ON I-495 605372 NORTH ATTLEBOROUGH- TRAFFIC SIGNAL AND INTERSECTION 08/24/2017 $1,727,578.38 IMPROVEMENTS @ EAST WASHINGTON STREET (ROUTE 1) & CHESTNUT STREET 605328 RAYNHAM- BRIDGE REPLACEMENT, R-02-013 (3PA), US 44 (CAPE HIGHWAY) 08/31/2017 $20,771,026.32 OVER SR 24 608734 DARTMOUTH- BRIDGE PRESERVATION, D-04-002 (3J4), BRIDGE STREET OVER 08/31/2017 $787,011.96 APPONAGANSETT RIVER 608081 WESTPORT- RESURFACING AND RELATED WORK ALONG ROUTE 88, FROM 09/08/2017 $6,897,701.22 MILE MARKER 0.0 (BEGINNING OF STATE HIGHWAY) NORTHERLY TO MILE MARKER 1.2, JUST NORTH OF DRIFT ROAD MA187 New Bedford Pier Multimodal Improvements. Demo # MA187 09/14/2017 $5,500,000.00 608124 MIDDLEBOROUGH- INTERIM IMPROVEMENTS AT ROUTES 18/28/44 (ROTARY) 09/14/2017 $1,115,976.96 602564 CARVER- MIDDLEBOROUGH- BRIDGE REPLACEMENT, C-04-004=M-18-025, 09/14/2017 $3,333,345.47 ROCHESTER ROAD OVER WEWEANTIC RIVER 608740 WESTPORT- GUARD RAIL INSTALLATION ON I-195 09/14/2017 $404,619.08 Grand Total $63,337,312.46
Statewide 82865 MassRides Travel Options 04/12/2017 $241,536.99 RRC Statewide RR Grade Crossings 09/18/2017 $3,705,480.00 607482 DISTRICT 5- DISTRICT 6- ITS CONSTRUCTION ON ROUTE 3, FROM BRAINTREE 09/12/2017 $1,258,349.60 TO PLYMOUTH 607514 DISTRICT 5- BRIDGE MAINTENANCE AT VARIOUS LOCATIONS ALONG THE 11/04/2016 $1,467,459.76 ROUTE 24 & ROUTE 3 CORRIDORS MSC17 SHRP Reliability Data and Analysis Tools Implementation Assistance Funds 03/06/2017 $100,000.00 STIC Incentive to develop and implement a Statewide Construction Documentation 04/03/2017 $100,000.00 (CPD) Sharepoint System TPF-5 (360) Core Program Services for a Highway RD&T Program 7/10/2017 $1,562.56 OJT-OJT2(017)X - On the Job Training Supportive Services Statements of Work for 08/23/2017 $91,113.13 2017 HRR-003S(117)X - High Risk Rural Roads Program Work in District 4 and District 5 09/08/2017 $736,102.95 HIF-003S(115)X - Call for Pilot Projects - Asset Management, Extreme Weather and 09/13/2017 $120,000.00 Proxy Transportation Fund Study TPF-5(316), "Traffic Control Device Pooled Fund 4/7/2017 $25,000.00 Study" Transportation Fund Study TPF-5(249), "Updating US Precipitation Frequency 4/6/2017 $28,027.00 Estimates for the Northeastern Region TPF-5 (218) Clear Roads Winter Operations 4/6/2017 $25,000.00 TPF-5 (222) New England Transportation 3/24/2017 $100,000.00 NCHRP Contribution 1/24/2017 $388,082.00 SPR117 Statewide Planning and Research Work Program I (SPR I), Planning 01/12/2017 $11,750,250.16 SPR217 Statewide Planning and Research Work Program II (SPR II), Research 01/12/2017 $3,243,735.20 606577 NORTHAMPTON- HATFIELD- WHATELY- DEERFIELD- INTERSTATE 01/20/2017 $14,419,926.63 MAINTENANCE & RELATED WORK ON I-91, FROM MM 26.97 TO MM 38.1 (NB) AND MM 37.7 (SB) 608559 STATEWIDE- VARIOUS SAFETY STRATEGIES TO ADDRESS SHSP (TO BE 01/27/2017 $46,800.00 DETERMINED) 607988 KINGSTON- DUXBURY- MARSHFIELD- RESURFACING & RELATED WORK ON 04/20/2017 $12,553,143.30 ROUTE 3 607992 ANDOVER- BEDFORD- BILLERICA- TEWKSBURY- STORMWATER 05/04/2017 $1,964,869.41 IMPROVEMENTS ALONG I-93, ROUTE 3 AND ROUTE 3A 607517 DISTRICT 2- SYSTEMATIC BRIDGE MAINTENANCE AT VARIOUS LOCATIONS 05/05/2017 $1,333,461.60 (2017) 607916 FALL RIVER TO RANDOLPH- GUIDE & TRAFFIC SIGN REPLACEMENT ON A SECTION OF ROUTE 24 06/22/2017 $5,952,672.90
Statewide continued 608570 MIDDLEBOROUGH- PLYMPTON- ROCHESTER- SIGNAGE IMPROVEMENTS AT 07/21/2017 $888,334.81 VARIOUS LOCATIONS 608554 DISTRICT 1- RETROREFLECTIVE SIGN UPGRADE ON SECONDARY ROADS 08/24/2017 $504,073.49 608555 DISTRICT 2- RETROREFLECTIVE SIGN UPGRADING ON SECONDARY ROADS 08/24/2017 $782,319.38 608732 DISTRICT 4- PEDESTRIAN AND BICYCLE FACILITY UPGRADES AT VARIOUS 08/24/2017 $464,178.38 LOCATIONS 608539 DISTRICT 5- PEDESTRIAN AND BICYCLE FACILITY UPGRADES AT VARIOUS 08/31/2017 $603,961.31 LOCATIONS SWGEO CRASH DATA SYSTEM - GEOCODING SYSTEM 09/05/2017 $1,350,000.00 608604 DISTRICT 4- DISTRICT 6- ITS EQUIPMENT (CCTV CAMERAS, TRAFFIC SENSORS 09/08/2017 $5,400,669.24 AND VMS) FOR HIGHWAY OPERATIONS 608540 DISTRICT 6- PEDESTRIAN AND BICYCLE FACILITY UPGRADES AT VARIOUS 09/08/2017 $547,695.00 LOCATIONS 607039 DISTRICT 4- ADA RETROFITS AT VARIOUS LOCATIONS 09/08/2017 $1,049,544.45 608556 DISTRICT 3- RETROREFLECTIVE SIGN UPGRADING ON SECONDARY ROADS 09/08/2017 $1,032,590.25 607496 DISTRICT 6- RETROREFLECTIVE SIGN UPGRADE ON SECONDARY ROADS 09/08/2017 $287,342.48 UPWP18 Metropolitan Planning for the Unified Planning Work Program 09/12/2017 $8,991,269.60 09/15/2017 $584,664.00 SPR118 Statewide Planning and Research Work Program I (SPR I), Planning 09/14/2017 $10,421,585.24 SPR218 Statewide Planning and Research Work Program II (SPR II), Research 09/14/2017 $5,446,698.31 607041 DISTRICT 5- ADA RETROFITS AT VARIOUS LOCATIONS 09/14/2017 $626,520.32 607042 DISTRICT 6- ADA RETROFITS AT VARIOUS LOCATIONS 09/14/2017 $1,333,648.32 607038 DISTRICT 3- ADA RETROFITS AT VARIOUS LOCATIONS 09/14/2017 $1,002,811.08 608607 DISTRICTS 3- DISTRICT 5- ITS EQUIPMENT (CCTV CAMERAS, TRAFFIC SENSORS 09/14/2017 $6,563,476.40 AND VMS) FOR HIGHWAY OPERATIONS Grand Total $107,533,955.25