FY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council

Similar documents
Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Bridge - Off State System

Bridge - Off State System

2040 Regional Transit Element Adopted August 6, 2015

Chapter 2: Entire US287 Corridor

Additional Economic Development Strategy submissions- Klickitat County

FY Transportation Improvement Program Funding Summary: Local Match for Federal Funds

Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP)

US287 Asset Inventory FLEX Routes. Figure 3-1 FLEX Routes and Stops

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2016)

Presentation to the DRCOG Board August 16, 2017

FY Transportation Improvement Program Basic Project List (in Thousands)

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

Chapter 3: Current Transit Conditions

Changes in TIP projects Draft vs. Final Draft

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects

FY Transportation Improvement Program. Ozarks Transportation Organization

Meeting Minutes of the NORTH FRONT RANGE TRANSPORTATION & AIR QUALITY PLANNING COUNCIL

Wichita Falls MPO - MTP Project List 1 of 6

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2017)

Basic Project Information

Score. Category. Access Aesthetics Community Resources

Highways: Interstate. Highways: State Highways

2009 Regional Solicitation Selected Projects*

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

Progress Report for Projects of Regional Significance

November 21, 2012 Barbara Kelleher, (954)

CITY OF COACHELLA CAPITAL IMPROVEMENT PROGRAM TOTAL PROJECTS REVENUE SUMMARY TABLE ES-1

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)

A New Era of Transportation Solutions

US 19 Sunset Point Rd to Countryside Blvd.

Progress Report for Projects of Regional Significance

STAFF REPORT. MEETING DATE: February 7, 2008 AGENDA ITEM: 6

Major Projects Overview

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

NEW JERSEY DEPARTMENT OF TRANSPORTATION

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

Palm Beach County Traffic Report July 13 through July 20, 2012

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

Non-Motorized Transportation

Route 29 Solutions Projects

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

25 th Avenue Grade Separation. September 13, 2017

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

NWC Hwy 85 & 42 nd Street Evans, Colorado

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

SAN RAFAEL City Council January 20, 2015

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019

APPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026

Transportation TRANSPORTATION PROJECTS

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager

FY Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

Gulf Coast MPO Obligated Projects

Long water shutdown scheduled for Tuesday, September 18

Leesburg Streets and Highways. Tom Brandon Manager, Office of Capital Projects Potomac Section

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

University Region Non-Motorized Plan 2015

Transit Financial Summary Abilene MPO FY TIP

Chapter 6 Existing and Proposed Transportation Facilities

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

City of Grand Island Tuesday, December 12, 2017 Council Session

November 9, Society of American Military Engineers

GUAM TRANSPORTATION IMPROVEMENT PROGRAM AMENDMENT NO. 1 FY

MVFPD Quick Reference Protocols SECTION 10: Hospital Direction List

Table 1. TOTAL FOUR-YEAR PROGRAM SUMMARY AMATS FFY PC Approved(November 19, 2009)

Current Operations CHAPTER II INTRODUCTION DESCRIPTION OF TRANSPORTATION SERVICES

FLORIDA DEPARTMENT OF TRANSPORTATION Bay County Citizen s Plan Tentative Work Program Fiscal Years

TIMETABLE ROUTE. Customer Service. Holiday Bus Service. Effective10/31/10. Fares. Fare Deals. 10 Ride Pass: 10 Rides any time, any day.

TRANSPORTATION IMPROVEMENT PROGRAM. This Year s Document: FY 2017/ /22 Effective October 1, 2017 September 30, 2018

2 Construction Program

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

TBARTA: 2015 Master Plan and Tampa Bay Express Project

Downtown to Defiance Trolley Key Messages Jan. 2017

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

October 31, 2014 Chuck McGinness, (954)

Claremont Project Background and Update Community Meeting September 11, 2017

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager

APPENDIX C TRANSPORTATION PLANNING DOCUMENTS

5.1 Traffic and Transportation

FFY Development. Transportation Improvement Program (TIP) March 11, 2016 Cape Cod Joint Transportation Committee

Figure 4-37 Route 10: Ridership Type by Fare Category

Becky A. Bradley, AICP. Executive Director, LVPC Secretary, LVTS

DISTRICT/ATP 7 Data Input Worksheet DRAFT STIP June 29, 2018 Red is changes from previous ATIP

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

Mid Region Metropolitan Planning Organization List Date: July 12, Cross Refrence List of TIP Projects by Project Title 1 of 15

Transportation Supporting Dulles Airport

About the Foothill Gold Line

EVANSVILLE METROPOLITAN PLANNING ORGANIZATION TECHNICAL COMMITTEE MINUTES

Transcription:

Bridge - On State System PREVIOUS ENTRY P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 SR46598 State State Highway Fund - - 199 100 150 150 598 SR45218.183 - SH14C: Ft Collins East Lemay to I-25 mp135.7-139.5 CDOT Region 4 SR45218.179 - US34D: (C-18-J) Bridge Preventative Maintenance CDOT Region 4 Total - - 1,155 583 869 869 3,475 Pool Description: Summary of CDOT Region 4 Bridge - On System Pool Programming in the North Front Range region. REVISED ENTRY P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 SR46598 State State Highway Fund - - 199 100 150 150 598 SR45218.183 - SH14C: Ft Collins East Lemay to I-25 mp135.7-139.5 CDOT Region 4 SR45218.179 - US34D: (C-18-J) Bridge Preventative Maintenance CDOT Region 4 SR46598.054 - I-25 RR Bridge Preventative Maintenance CDOT Region 4 Pool Description: Summary of CDOT Region 4 Bridge - On System Pool Programming in the North Front Range region. Reason: Roll forward pool project SR46598.054 from FY18-21 TIP to FY19-22 TIP. No change to pool totals. Total - - 1,155 583 869 869 3,475 Bridge - Off State System PREVIOUS ENTRY P-5 Region 4 Bridge - Off System Pool CDOT Region 4 Bridge Federal Bridge Replacement - - 1,155 - - - 1,155 SR46601 Various Below Reconstruct Local Local - - 288 - - - 288 Local Overmatch Local Overmatch - - 1,377 - - - 1,377 Total - - 2,820 - - - 2,820 SR46601.027 - Spring Ck at Riverside (FCRVSDE-S.2PRST) Fort Collins Project Description: Bridge Rebab/replace Project Description: Summary of CDOT Region 4 Bridge - Off System Pool Programming REVISED ENTRY P-5 Region 4 Bridge - Off System Pool CDOT Region 4 Bridge Federal Bridge Replacement - - 1,992 - - - 1,992 SR46601 Various Below Reconstruct Local Local - - 498 - - - 498 SR46601.027 - Spring Ck at Riverside (FCRVSDE-S.2PRST) Fort Collins SR46601.031-8th St Bridge (LOV1825W.8th St) Loveland Project Description: Summary of CDOT Region 4 Bridge - Off System Pool Programming Reason: Adding pool project SR46601.031 with $837K Federal/$209K local funding in FY19. FY 2019 - FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) Local Overmatch Local Overmatch - - 1,377 - - - 1,377 Total - - 3,867 - - - 3,867 FASTER (North Front Range Listings of State Highway Locations) PREVIOUS ENTRY P-7 Region 4 FASTER Safety Pool CDOT Region 4 FASTER Safety State FASTER Safety 1,000 - - - - - - SR46606 Local Local - - - - - - - Summary of CDOT Region 4 FASTER Safety Project Programming in the North Front Range region. Local Overmatch Local Overmatch - - - - - - - Total 1,000 - - - - - - Pool Description: REVISED ENTRY P-7 Region 4 FASTER Safety Pool CDOT Region 4 FASTER Safety State FASTER Safety 1,000-4,178 - - - 4,178 SR46606 Local Local - - - - - - - SR46606.073 - I-25: Fort Collins North Cable Rail CDOT Region 4 Project Description: Safety Improvement SR46606.083 - SH-60 and WCR-40 Intersection CDOT Region 4 Project Description: Safety Improvement SR46606.089 - College & Troutman Signal Upgrades CDOT Region 4 Project Description: Safety Improvement Local Overmatch Local Overmatch - - - - - - - Total 1,000-4,178 - - - 4,178 Pool Description: Summary of CDOT Region 4 FASTER Safety Project Programming in the North Front Range region. Reason: Adding three pool projects: SR46606.073 (I-25: Fort Collins North Cable Rail)/$2428K; SR46606.089 (College & Troutman Signal Upgrades)/$250K; SR46606.083 (SH-60 and WCR-40 Intersection)/$1500K -funded with FY19 state funding. Page 1 of 5

Non-Regionally Significant Regional Priority Program (RPP) PREVIOUS ENTRY P-11 Non-Regionally Significant Regional Priority Program P CDOT Region 4 Safety and Federal Surface Transportation Program - - - - - - - SR46600 Various Below Bridge Replacement State State Highway Fund - HUTF 300-100 - 100 SR46600.054 - Fort Collins CBC Underpass (College Ave S/O Foothills Park CDOT Region 4 SR46600.059 - US85: Signal at WCR 76 N. of Eaton Eaton Local Local - - 150 - - - 150 Local Local Overmatch 20 20 Total 300-270 - - - 270 Pool Description: Summary of CDOT Region 4 Non-Regionally Significant Regional Priority Program (RPP) Project Programming in the North Front Range region. REVISED ENTRY P-11 Non-Regionally Significant Regional Priority Program P CDOT Region 4 Safety and Federal Surface Transportation Program - - 911 - - - 911 SR46600 Various Below Bridge Replacement State State Highway Fund - HUTF 300-100 - 100 SR46600.054 - Fort Collins CBC Underpass (College Ave S/O Foothills Parkway) CDOT Region 4 SR46600.059 - US85: Signal at WCR 76 N. of Eaton Eaton NEW ENTRY - US 287: SH1 to LaPorte Bypass CDOT Region 4 Pool Description: Summary of CDOT Region 4 Non-Regionally Significant Regional Priority Program (RPP) Project Programming in the North Front Range region. Reason: Adding new project STIP ID: SR46606.NEW (US 287: SH1 to LaPorte Bypass) with $911K Federal/ $189K Local Funding. Local Local - - 339 - - - 339 Local Local Overmatch - - 20 20 Total 300-1,370 - - - 1,370 Region 4 ADA Pool PREVIOUS ENTRY P-23 Region 4 ADA Pool CDOT Region 4 Curb Ramp Upgrades State State Highway Fund - - 2,000 2,000 2,000 2,000 8,000 SR47021 Total - - 2,000 2,000 2,000 2,000 8,000 SR47021.003 - Greeley ADA Curb Ramps Phase 1 Project Description: Region 4 curb ramp upgrades to ADA compliance. REVISED ENTRY P-23 Region 4 ADA Pool CDOT Region 4 Curb Ramp Upgrades State State Highway Fund - - 2,000 2,000 2,000 2,000 8,000 SR47021 SR47021.003 - Greeley ADA Curb Ramps Phase 1 CDOT Region 4 SR47021.004 - Loveland ADA Curb Ramps Phase 1 CDOT Region 4 SR47021.006 - Windsor ADA Curb Ramps CDOT Region 4 Project Description: Region 4 curb ramp upgrades to ADA compliance. Reason: Adding new projects SR47021.004 & SR47021.006 to R4 pool funded with State funding. No change to pool total. Project Description: Pedestrian Underpass Project Description: Install Signal Project Description: Pedestrian Underpass Project Description: Install Signal Project Description: Intersection Improvements Total - - 2,000 2,000 2,000 2,000 8,000 Page 2 of 5

CDOT Region 4 Transportation Alternatives (TA) PREVIOUS ENTRY P-14 CDOT Region 4 Transportation Alternatives Program CDOT Region 4 Bike/Ped Facility Federal Transportation Alternatives Program 987 1,250 60 1,340 700 700 4,050 SR47020 Pool Various Below Local Local 463 312 60 1,727 175 175 2,449 Local Overmatch Local Overmatch - - - 546 - - 546 Total 1,450 1,562 120 3,613 875 875 7,045 SR47020.026 - Power Trail Grade Separation at Harmony Rd Fort Collins Project Description: Harmony Rd west of Timberline SR47020.028 - Namaqua Ave Trail Underpass Loveland Project Description: Namaqua Ave South of US34 SR47020.019 - Secure Bicycle Parking Ft Collins Project Description: Downtown Transit Center and University MAX Station SR47020.016 - Sheep Draw Trail 2015 Project Greeley Project Description: Along Sheep Draw from 71st Ave West and south to 20th St SR47020.017 - LCR 17 Expansion & Bike Lanes (Larimer/Berthoud) Berthoud Project Description: LCR 17 between LCR 16 & US287 Project Description: Summary of CDOT Region 4 Bridge - On System Pool Programming REVISED ENTRY P-14 CDOT Region 4 Transportation Alternatives Program CDOT Region 4 Bike/Ped Facility Federal Transportation Alternatives Program 987 1,250 393 1,340 700 700 4,383 SR47020 Pool Various Below Local Local 463 312 143 1,727 175 175 2,532 Local Overmatch Local Overmatch - - 739 546 - - 1,285 Total 1,450 1,562 1,275 3,613 875 875 8,200 SR47020.026 - Power Trail Grade Separation at Harmony Rd Fort Collins Project Description: Harmony Rd west of Timberline SR47020.028 - Namaqua Ave Trail Underpass Loveland Project Description: Namaqua Ave South of US34 SR47020.019 - Secure Bicycle Parking Ft Collins Project Description: Downtown Transit Center and University MAX Station SR47020.016 - Sheep Draw Trail 2015 Project Greeley Project Description: Along Sheep Draw from 71st Ave West and south to 20th St SR47020.017 - LCR 17 Expansion & Bike Lanes (Larimer/Berthoud) Berthoud Project Description: LCR 17 between LCR 16 & US287 SR47020.029 - West Alice & Inez Blvd Ped Improvements Miliken Project Description: SH60 & Dorothy Ave, Forrest Street & Alice Blvd, Alice Ave & CR25 Project Description: Summary of CDOT Region 4 Bridge - On System Pool Programming Reason: Add new pool project (SR47020.029) with $333 Federal/$83K Local. Increase funding SR47060.016 ($739K Local Overmatch) in FY19. Congestion Mitigation & Air Quality (CMAQ) PREVIOUS ENTRY 2020-008 Weld County CNG Vehicles Weld County Rolling Stock Federal Congestion Mitigation Air Quality - - - 1,050 1,150-2,200 SST7007.009 Replacement Local Local - - - 218 239-457 Project Description: Purchase of 2 medium duty bi-fuel natural gas vehicles and 12 heavy duty dedicated natural gas vehicles. Total - - - 1,268 1,389-2,657 REVISED ENTRY 2020-008 Weld County CNG Vehicles Weld County Rolling Stock Federal Congestion Mitigation Air Quality - - - 1,050 1,150-2,200 SST7007.114 Replacement Local Local - - - 218 239-457 Project Description: Purchase of 2 medium duty bi-fuel natural gas vehicles and 12 heavy duty dedicated natural gas vehicles. Reason: Correct STIP ID from SST7007.009 to SST2007.114. Total - - - 1,268 1,389-2,657 PREVIOUS ENTRY NF0772 Jefferson Street/SH14 Improvements Fort Collins Other TDM Strategies Federal Congestion Mitigation Air Quality 1,000 - - - - - - SNF5173.015 Design Local Local 249 - - - - - - Project Description: Jefferson Street/SH14 Improvements Total 1,249 - - - - - - REVISED ENTRY NF0772 Jefferson Street/SH14 Improvements Fort Collins Other TDM Strategies Federal Congestion Mitigation Air Quality 564 436 - - - - 436 SNF5173.015 Design Local Local 158 91 - - - - 91 Project Description: Jefferson Street/SH14 Improvements Reason: Roll project and some funding ($436K Federal/$91K Local) from FY12-17 TIP. Total 722 527 - - - - 527 Page 3 of 5

Surface Transportation Block Grant (STBG) PREVIOUS ENTRY 2018-002 US34 Widening Loveland: Denver Ave to Boyd Lake Loveland Highway Added Capacity Federal STP Metro 1,099-1,221 - - - 1,221 SNF5788.040 Ave Local Local 228-254 - - - 254 Bike/Ped Facility Total - - 1,475 - - - 1,475 Project Description: Widening of existing 4 lane arterial to 6 lanes, including bike lanes and sidewalks. REVISED ENTRY 2018-002 US34 Widening Loveland: Denver Ave to Boyd Lake Loveland Highway Added Capacity Federal STP Metro - 1,099 1,221 - - - 2,320 SNF5788.040 Ave Local Local - 228 254 - - - 482 Bike/Ped Facility Total - 1,327 1,475 - - - 2,803 Project Description: Widening of existing 4 lane arterial to 6 lanes, including bike lanes and sidewalks. Reason: Rolling previous funding ($1,099K Federal/$228K State) to FY19. FTA 5310 - Enhanced Mobility of Seniors and Individuals with Disabilities Program PREVIOUS ENTRY 2016-030 NFRMPO Mobility Management NFRMPO Capital Federal FTA5310 10 - - - - - - SST6727.035 Local Local 3 - - - - - - Project Description: Capitalized operating of the Mobility Management Program. Total 13 - - - - - - PREVIOUS ENTRY 2016-030 NFRMPO Mobility Management NFRMPO Capital Federal FTA5310 10 27 - - - - 27 SST6727.035 Local Local 3 7 - - - - 7 Project Description: Capitalized operating of the Mobility Management Program. Reason: Roll project from FY16-19 TIP. Add funding awarded in FY18 to rolled column: $27K Federal and $7K Local. Total 13 34 - - - - 34 FTA 5339 - Bus and Bus Facilities Program PREVIOUS ENTRY 2018-21 Facilities Maintenance - Concrete Fort Collins Capital Maintenance Federal FTA 5339 96 - - - - - - SST7066.005 repair at Transfort Facilities Local Local 24 - - - - - - Total 120 - - - - - - Project Description: Repair damaged/worn concrete at Transfort facilities REVISED ENTRY 2018-21 Facilities Maintenance - Concrete Fort Collins Capital Maintenance Federal FTA 5339-96 - - - - 96 SST7066.005 repair at Transfort Facilities Local Local - 24 - - - - 24 Total - 120 - - - - 120 Project Description: Repair damaged/worn concrete at Transfort facilities PREVIOUS ENTRY 2017-050 Bus Wash Replacement Fort Collins Capital Purchase Federal FTA 5339 291 - - - - - - SST7066.022 Local Local 73 - - - - - - Total 364 - - - - - - Project Description: Replacement of internal components of the existing Transfort Maintenance Facility (TMF) bus wash REVISED ENTRY 2017-050 Bus Wash Replacement Fort Collins Capital Purchase Federal FTA 5339-357 - - - - 357 SST7066.022 Local Local - 89 - - - - 89 Total - 446 - - - - 446 Project Description: Replacement of internal components of the existing Transfort Maintenance Facility (TMF) bus wash Reason: Roll project and all FY18 funding from FY18-21 TIP ($291K Federal and $73K Local). Add $66K Federal from unobligated FY15/16 FTA funds and add $16K Local to rolled. Page 4 of 5

PREVIOUS ENTRY 2018-19 E-Faring Project Fort Collins Capital Purchase Federal FTA 5339 51 - - - - - - SST7064.023 Local Local 13 - - - - - - Total 64 - - - - - - Project Description: Design and implementation of electronic faring system for the Transfort Fixed Route system REVISED ENTRY 2018-19 E-Faring Project Fort Collins Capital Purchase Federal FTA 5339-51 - - - - 51 SST7064.023 Local Local - 13 - - - - 13 Total - 64 - - - - 64 Project Description: Design and implementation of electronic faring system for the Transfort Fixed Route system PREVIOUS ENTRY 2018-20 Pavers at MAX Stations Fort Collins Capital Purchase Federal FTA 5339 28 - - - - - - SST7066.026 Local Local 7 - - - - - - Total 35 - - - - - - Project Description: Replacement of damaged pavers at MAX stations REVISED ENTRY 2018-20 Pavers at MAX Stations Fort Collins Capital Purchase State FTA 5339-10 - - - - 10 SST7066.026 Local Local - 3 - - - - 3 Total - 13 - - - - 13 Project Description: Replacement of damaged pavers at MAX stations Reason: Roll project and some funding from FY18-21 TIP ($10K Federal and $3K Local). Remove remaining funds ($18K Federal, $4K Local) from the project due to revised cost estimate. PREVIOUS ENTRY 2018-22 Replacement of Non-Revenue Fort Collins Capital Purchase Federal FTA 5339 208 - - - - - - SST7066.027 Pool Vehicles Local Local 52 - - - - - - Total 260 - - - - - - Project Description: Purchase of end of life non-revenue pool vehicles REVISED ENTRY 2018-22 Replacement of Non-Revenue Fort Collins Capital Purchase Federal FTA 5339-208 - - - - 208 SST7066.027 Pool Vehicles Local Local - 52 - - - - 52 Total - 260 - - - - 260 Project Description: Purchase of end of life non-revenue pool vehicles Page 5 of 5