SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2

Similar documents
HIGH PERFORMING AIRPORTS CASE ZURICH AIRPORT. Geert Boosten ASDA CATO Delft 21 July 2015

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

Surveillance and Broadcast Services

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

DMAN-SMAN-AMAN Optimisation at Milano Linate Airport

Total Airport Management Solution DELIVERING THE NEXT GENERATION AIRPORT

APPENDIX D MSP Airfield Simulation Analysis

The SESAR Airport Concept

Airport s Perspective of Traffic Growth and Demand Management CANSO APAC Conference 5-7 May 2014, Colombo, Sri Lanka

Supplementary airfield projects assessment

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Future Airport Concept (Increasing the Airport Capacity)

SIMMOD Simulation Airfield and Airspace Simulation Report. Oakland International Airport Master Plan Preparation Report. Revised: January 6, 2006

AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

Mirkovic 1 AIRFIELD MODELLING STATE OF THE ART

AIRPORT MASTER PLAN UPDATE

Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator

Integrated Optimization of Arrival, Departure, and Surface Operations

Leveraging on ATFM and A-CDM to optimise Changi Airport operations. Gan Heng General Manager, Airport Operations Changi Airport Group

Airport Characterization for the Adaptation of Surface Congestion Management Approaches*

Aircraft Arrival Sequencing: Creating order from disorder

TRANSPORTATION RESEARCH BOARD. Preparing and Using Airport Design Day Flight Schedules. Wednesday, July 18, :00-3:30 PM ET

Defining and Managing capacities Brian Flynn, EUROCONTROL

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)

Airport Systems: Planning, Design, and Management

LONG BEACH, CALIFORNIA

Airfield Capacity Prof. Amedeo Odoni

Overview of Congestion Management Issues and Alternatives

Airport Simulation Technology in Airport Planning, Design and Operating Management

Alternative solutions to airport saturation: simulation models applied to congested airports. March 2017

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Airport Slot Capacity: you only get what you give

Evaluation of Strategic and Tactical Runway Balancing*

Airport Planning and Terminal Design

Forecast and Overview

An Overview of GMR Megawide Consortium s Unsolicited Proposal. March 2018

Approximate Network Delays Model

ART Workshop Airport Capacity

Efficiency and Automation

Analysis of ATM Performance during Equipment Outages

Validation of Runway Capacity Models

Validation Results of Airport Total Operations Planner Prototype CLOU. FAA/EUROCONTROL ATM Seminar 2007 Andreas Pick, DLR

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

SOURDINE II EU- 5FW project on Noise Abatement Procedures. Overall view. Ruud den Boer / Collin Beers Department: ATM & Airports

Performance Evaluation of Individual Aircraft Based Advisory Concept for Surface Management

Financing Infrastructure: Working with your Users. Julie Garg Manager Airport & ATC Charges

Changi Airport A-CDM Handbook

Price-Setting Auctions for Airport Slot Allocation: a Multi-Airport Case Study

Data Analysis and Simula/on Tools Prof. Hamsa Balakrishnan

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

NORTHERN ROCKIES REGIONAL AIRPORT Terminal Expansion ANALYSIS 31 st August 2012

The Use of Simulation Models for Airport Planning and ATM Analysis at the Institute of Flight Guidance. Slide 1

Six Must Have Capabilities to Improve the Passenger Experience

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

MASTER PLAN GEORGE BUSH INTERCONTINENTAL AIRPORT/HOUSTON. Houston Airport System Houston, Texas DRAFT TECHNICAL REPORT.

2012 Performance Framework AFI

EN-024 A Simulation Study on a Method of Departure Taxi Scheduling at Haneda Airport

WakeNet3-Europe Concepts Workshop

Capacity Planning Overview

NextGen AeroSciences, LLC Seattle, Washington Williamsburg, Virginia Palo Alto, Santa Cruz, California

Airport Engineering Lectures

Merritt Island Airport

SIAMOS Put your airport ahead through innovation. Siemens AG All rights reserved.

Analysis of Air Transportation Systems. Airport Capacity

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

6.0 AIRFIELD DEVELOPMENT PLAN

EUROCONTROL EUROPEAN AVIATION IN 2040 CHALLENGES OF GROWTH. Annex 4 Network Congestion

I n t e r m o d a l i t y

SAN JOSÉ INTERNATIONAL AIRPORT

Reducing Departure Delays at LaGuardia Airport with Departure-Sensitive Arrival Spacing (DSAS) Operations

APPLICATION OF SIMULATION MODELS IN AIRPORT FACILITY DESIGN

Capacity assessment at Dublin Airport for the purpose of setting slot coordination parameters

Airport Master Planning Process & Update

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

Airport-CDM Workshop. Stephane Durand Co-chair CANSO CDM sub-group International Affairs DSNA

Current practice of separation delivery at major European airports ATM R&D Seminar, June 2015, Lisbon

AIRPORTS AUTHORITY OF INDIA S AIRPORT COLLABORATIVE DECISION MAKING SYSTEM. (Presented by Airports Authority of India) SUMMARY

Airline Schedule Development Overview Dr. Peter Belobaba

TERMINAL DEVELOPMENT PLAN

Simulation Analysis of Dual CRDA Arrival Streams to Runways 27 and 33L at Boston Logan International Airport

12 th Facilitation Division

Noise Action Plan Summary

System Oriented Runway Management: A Research Update

Sunshine Coast Airport Master Plan September 2007

System Wide Modeling for the JPDO. Shahab Hasan, LMI Presented on behalf of Dr. Sherry Borener, JPDO EAD Director Nov. 16, 2006

Surface Congestion Management. Hamsa Balakrishnan Massachusetts Institute of Technology

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Performance monitoring report 2017/18

KJFK Runway 13R-31L Rehabilitation ATFM Strategies

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM. April 10 th 2017

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

ATM Seminar 2015 OPTIMIZING INTEGRATED ARRIVAL, DEPARTURE AND SURFACE OPERATIONS UNDER UNCERTAINTY. Wednesday, June 24 nd 2015

Ground movement safety systems and procedures - an overview

Evaluation of Quality of Service in airport Terminals

Transcription:

- Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2 2 nd User Group Meeting Overview of the Platform List of Use Cases UC1: Airport Capacity Management UC2: Match Capacity and Demand UC3: Airport Airside Analysis UC4: Fleet Characteristics Impact on Airport Operations UC5: Airport Capacity Utilization UC6: Airport Capacity Determination UC7: Airport Capacity vs. Airport Performance and Environment UC8: Taxiing Methodology UC9: Impact of New Procedures and Equipment

Airport Capacity Management (UC1) Assess the impact of changes in airport infrastructure, operational procedures, and/or traffic volume or distribution Analyses are built around key Frequently Asked Questions (FAQ) that deal with the following types of changes in: Airport Infrastructure (e.g., expansion of runway system, apron area, check-in counters) Operational Procedures / Requirements (e.g., security procedures, service times / disciplines, separation minima) Traffic (e.g., fleet characteristics, changes in passengers characteristics, traffic peaking, traffic growth) Capacity Delays Third Party Risk Financial Costs and Benefits MACAD: Airside Capacity and Delays analysis SLAM: Terminal Capacity, Delays, and LoS analysis FLASH: Flight Schedule Generator TRIPAC: Third Party Risk Assessment Basic / Indicative Categories of Input Demand characteristics, patterns, and traffic profile Airport Topology and capacity / infrastructure characteristics Operational and Service characteristics Basic / Indicative Categories of Output Airside capacity per airport element (i.e., runways, taxiways, apron) Airside delays by source and airport element Landside / terminal usage patterns and delays per facility provided to passengers according to IATA standards contours / levels, external risks (risk contours), etc. Detailed and aggregate costs and benefits per flight etc. Match Capacity and Demand (UC2) Provide a generic analysis for airport strategic planning problems: What is the airport performance for a business as usual strategy? What is the airport performance for alternative strategies? Build a new runway Manage demand Analyses are built around key Frequently Asked Questions (FAQ) What is the airport s baseline performance? What is the effect on airport performance for a business as usual strategy? What is the effect on airport performance after expanding the runway system? What is the effect on airport performance after the implementation of a demand management strategy? Provide an assessment of the airport performance in terms of capacity, delay, noise, third-party risk, and costs / benefits. ABS-FSG: the ABS Flight Schedule Generator for generating future flight schedules ABS-ACD: the ABS Airport Capacity Delay model for analysis of airside capacity and delay and landside capacity TRIPAC: Third Party Risk Assessment Tool Daily flight schedule Target year and traffic growth characteristics (for generating a future flight schedule) ATM system performance (e.g., separation standards) Runway scheme (e.g., runway configuration and usage) Airside runway capacity and average airside delay impact (contours, grid points) Third-party risk (individual risk contours, group risk) Detailed and aggregate costs and benefits per flight

Airport Airside Analysis (UC3) Assess the effects of changes in infrastructure/procedures from an airport airside perspective in order to highlight the airport zones that will be more congested or generate the largest delays. The user can choose to: Analyze one single airport layout and how traffic increases affects its performance. Compare how traffic increases affect two alternative airport infrastructures and/or procedure / configurations. Capacity Flow, demand, and delay Safety (in terms of bottlenecks) SIMMOD: Capacity and Delays analysis Luciad ATC Playback: Visualization tool of aircraft movements and safety-related indicators Traffic profile (offline) Traffic increment (online) Airport topology and infrastructure characteristics (offline) Airport capacity indicators Flow, demand and estimated average delay trend Airside delays per cause and type of node (air or ground) contours and levels Delays per trajectory (within the simulation playback) Fleet Characteristics Impact on Airport Operations (UC4) Assess how potential changes in fleet characteristics (e.g., aircraft type, city pair, airline, flight schedule) will affect airport operations. Analyses are built around two Frequently Asked What effect will a change in flight schedule What effect will a change in aircraft type Have on: Capacity (airside), efficiency, noise, as well as costs and benefits. TAAM: Total Airspace & Airport Modeller, a fasttime simulation tool for detailed airside performance analysis RAMSPLUS: ATM simulation tool (as alternative to TAAM) TRAFGEN: Traffic generator, an analytical tool to generate flight schedules ESTOP: Runway Occupancy Time Estimator Tool Aircraft Performance database Airport layout procedures Flight schedules (Traffic generator) aircraft type Total number of movements handled Calculated costs and benefits for different stakeholders (i.e., airlines, airport), or different categories (i.e., per time period, per aircraft type) Average airside delays footprint

Airport Capacity Utilization (UC5) Analyse the impacts of changes in external factors (e.g., airline alliances) and/or minor changes in terminal infrastructure or allocation rules (e.g., check-in, stands). Analyses are built around three Frequently Asked What is the effect of changes in airline alliances or the introduction of new Schengen countries What is the effect of changes security / check-in procedures What is the effect of changes in check-in / stand allocation rules With view to capacity, passengers / baggage throughput, as well as costs and benefits TAAM: Total Airspace & Airport Modeller, a fasttime simulation tool for detailed airport airside performance analysis SAMANTA: Airport Simulation and Capacity Management Airport infrastructure data Flight schedule List of airlines and airline groups, list of Schengen destinations Check-in and security characteristics for baggage & passengers Runway configuration, runway peak-hour capacity figures Changes in airline alliances New countries in Schengen area New security procedures for passengers and/or baggage New check-in procedures or allocation rules New stand allocation rules Total number of flights handled Total number of passengers and baggage handled Throughput times for passengers and baggage Queue length Costs and benefits Average airside delays Airport Capacity Determination (UC6) Assess the impact of changes in traffic or operational usage of airside elements (e.g., cloning traffic, closing or opening runways, changing weather). Analyses are built around three key Frequently Asked Assess the impact of traffic changes Assess the impact of operational use of airside elements (e.g., runway configuration, taxiing speeds, separations) Assess the impact of changes in weather conditions (e.g., wind speed and direction, visibility, temperature) Capacity Delay (airside) TAAM: Total Airspace and Airport Modeller TRAFGEN: Traffic Generator CAST: 3D Visualisation Tool TAAM airport usage files TAAM wake turbulence files TAAM weather files Traffic Number of flights, aircraft type Origin and destination airport, STD/STA Runway usage, taxiing speed Wake vortex separation, weather conditions TAAM report files Charts Showing: Practical capacity, delay and LoS Saturation delay and LoS

Airport Capacity vs. Performance (UC7) Analyze the impact of airport optimization (in terms of capacity or noise) on airport performance. Analyses are built around five key Frequently Asked What is the maximum environmental (noise) capacity of the airport? What is the impact of a noise optimised flight schedule? What is the impact of adding new flights? What is the maximum airside capacity of the airport? What is the impact of an airside optimised flight schedule? Performance indicators: Capacity (airside and landside) Third-party Risk Financial Costs and Benefits TAAM: Total Airspace and Airport Modeler SIMMOD: Airport and Airspace Simulation Model (as an alternative tool to TAAM) SAMANTA TRAFGEN TRIPAC: Third Party Risk Assessment Tool LuciadATC Playback: Visualization tool of aircraft movements Airport scenarios (airside and landside): baseline and optimized Specification of additional flights: At high level (e.g., through percentage increase) or At detailed level (e.g., adding specific flights to a timetable) Airside capacity and delay Terminal capacity and delay (passengers and baggage) Third-party risk Economical impact Taxiing Methodology (UC8) Use the taxiing methodology (AENA) to optimize airport performance. The taxiing methodology can be applied: to the airport baseline scenario to alternative airport scenarios created by modifying traffic, operational use and/or weather conditions with view to the following metrics: Global Quality Factor Secondary metrics Capacity (airside) Delays (airside) Safety (number of conflicts) Efficiency (Global quality factor) TAAM: Total Airspace and Airport Modeller TRAFGEN: Traffic Generator Airport layout, operational procedures, traffic files Traffic changes (e.g., total number of flights, by call sign, by STD, STA, by origin/destination) Operational usage of the airside elements (e.g., gates, taxi speed, taxi configuration selection, push-back) Weather conditions (e.g., wind direction and velocity, temperature, visibility, cloud base) Global Quality Factor: Secondary metrics: Demand/flow ratio during the whole day Number of ground conflicts Average delays for departures Average taxi time for arrivals (taxiing and delays) Average taxi time for departures

Impact of new procedures and equipment (UC9) Assess the impact of implementing new procedures and airport equipment on investment cost, return on investment and operational benefits. Analyses are built around key Frequently Asked Impact of a change in the night slot regime Impact of reduced separation minima Impact of changes in aircraft turnaround time With view to airport capacity, efficiency, economy and environment Capacity (airside & terminal) Delays (airside & terminal) Third Party Risk Financial Costs and Benefits TAAM: Total Airspace and Airport Modeler, a fasttime simulation tool for detailed airside performance analysis SAMANTA: a fast-time simulation tool for detailed analysis of passenger and baggage flows TRIPAC: Third Party Risk Assessment Tool Baseline scenario Predefined procedure, constraint, or equipment Night regime schedule Changes in separation minima Changes in aircraft turnaround time Airside capacity and delay Terminal capacity and delay (passengers and baggage) contours and levels Third-party risk Costs and benefits