Mission Statement. Spur 601 Project Highlights

Similar documents
NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES

Project Location. Connects I-10 in Duval County to I-95 in St. John County Four lane limited access toll facility. Jacksonville

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:

PRIORITIES COMMITTEE MEETING

1.2 Corridor History and Current Characteristics

Airport Planning Area

INTERSTATE 35 CORRIDOR UPDATE

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release.

San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1

The Transportation Corridor Overlay District

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

I-579 Urban Open Space CAP Project. Final Land Development Plan (FLDP) Pittsburgh Department of City Planning

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Additional Economic Development Strategy submissions- Klickitat County

Project Deliverable 4.1.3d Individual City Report - City of La Verne

September 1, 2017 I-10 night closures scheduled for September hour full closure of I-10 West happens Sunday, Sept. 10

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required.

N Prime Retail Pads w/ Direct CA-99 & Betty Dr Access. Direct Access to Upgraded HWY 99 Off/On Ramps

2013 El Paso County Comprehensive Mobility Plan. December 16, 2013

CHAPTER 1 INTRODUCTION MORENO VALLEY GENERAL PLAN 1. INTRODUCTION. 1.1 What is a General Plan?

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

US 19 Sunset Point Rd to Countryside Blvd.

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Wichita Falls MPO - MTP Project List 1 of 6

PUBLIC INFORMATION SESSION #2

CHAPTER 5: Operations Plan

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

Governor s Mobility Plan. Corridors, Segments and Projects. Allied Junction Corridor 10/12/89

CIAB Report to Legislature September 30, 2014 Highlights of key recommendations/findings.

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

York Region Rapid Transit Corporation. City of Vaughan VMC Sub-Committee October 18, 2017

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

Corridor Management Committee Meeting. April 2, 2014

Full I-35E Mainlane Closure at Beckley Avenue - July 27-30

SCOPING INFORMATION PACKET

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

I-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps.

GSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026

Mayor Dave Bronconnier cc: All City of Calgary Alderman. Eastbound Extension of Airport Trail and Related Works

Public Informational Meeting

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

Stage 2 - November 2017 Survey and Map Comments (verbatim)

All closures this week happen at night, including full closures of Mesa and I-10

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

Florida Department of TRANSPORTATION. First Coast Expressway

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices

5.1 Traffic and Transportation

The Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m.

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

State Route 189 Project and Draft Resolution of Support. November 2014

PROGRESS PARK CONNECTOR

Milestone: Bridge to Nowhere scheduled for demolition Aug 14

Route 29 Solutions Projects

STATE ROUTE CHANGE DESCRIPTION USRN DECISION IOWA

SOUTHERN BELTWAY I-79 TO MON/FAYETTE EXPRESSWAY

South of Fraser Transportation Priorities March 2017 Engagement

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

Chapter 4. Development Alternatives

I-35 Reconstruction Project

Road School. Project Overview. March 8, 2011

Construction of Interstate 91 in Derby

PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #4 MASTER PLAN ADVISORY COMMITTEE (MPAC) - MEETING #4

Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee

Site Location and Setting

US 380 FEASIBILITY STUDY

FHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date

SCOH Report. From. Special Committee on U.S. Route Numbering Annual Meeting

CHAPTER 4: ALTERNATIVES

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

Trails, steps, & P-Patch to be south of I- 5 Colonnade

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

INVESTMENT SUMMARY. RESIDENTIAL COMMERCIAL ** *

Westover Metropolitan Airport Master Plan Update

A RESOLUTION NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EL PASO THAT:

Public Open House. Chief Peguis Trail Project

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

Report to the Strategic Development Committee

1.0 Purpose and Organization of the Community Impact Assessment Addendum

A History of the Construction of the Radial Expressway System in Cook County

EXECUTIVE SUMMARY FALL Introduction. Findings

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail

State of Texas. District: County: Condition: Roadway: Direction: Time: Limits:

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

Northeast Anthony Henday Drive. Bill van der Meer Urban Construction Manager - Edmonton Alberta Transportation

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

CTPS staff considered roadways that carry on average more than 1,500 weekday MBTA bus passengers in one direction as candidates for dedicated bus

Update Report - Etobicoke Creek and South Mimico Creek Trails

Chapter 4.0 Alternatives Analysis

2017 Work and Launch of the Next Phase. Information meeting, Montréal-Ouest September 14, 2017

Chapter 1: Introduction Draft

PROPOSED ALTERATION AND EXPANSION OF THE MOUNT PEARL MUNICIPAL BOUNDARY TO INCLUDE THE AREA OF THE FORMER PEARL ESTATE LANDS & ENVIRONS

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017

Transcription:

Mission Statement SPUR 601 is a TxDOT project dedicated to provide a safe, efficient, reliable new corridor to improve the mobility in east-central El Paso. The SPUR 601 team is working in partnership with the United States Army, the City of El Paso, roadway users and other interested parties to provide for the future transportation needs of an area that destined for rapid road user growth. Spur 601 Project Highlights A. Governor Rick Perry met with Pentagon and State Officials in 2004 and committed the state to support military bases through infrastructure improvements. B. The Spur 601 Project provides connectivity with the International Ports of Entry and highways around the El Paso Region. C. Total estimated cost of project is $ 367,450,000,000. D. Project length is 7.4 miles delivered in 41 months. 1. Four lanes from LP375 to Airport Rd. Interchange. 2. Six lanes from Airport Rd to US 54. 3. Elevated six-lane section from Chaffee to US 54. E. Segment A-1 Global Reach Interchange and realignment open to traffic Summer 2008. F. Segment A-2 Global Reach Interchange to LP 375 opens to traffic Spring 2009. G. Spur 601 to be completed Winter 2011.

The City of El Paso is experiencing rapid growth that is resulting from the US Department of Defense s expansion to Fort Bliss as well as private development along Loop 375, which is also known as Purple Heart Memorial Freeway. Fort Bliss is currently developing a Temporary Unit of Action Facility to house 21,000 new troops and the City of El Paso recently annexed land east of Loop 375 to accommodate the planned development of housing subdivisions. To meet the corresponding demand of significant traffic growth the proposed Spur 601 provides a 7.4 mile mobility connection between US 54 on the west and Loop 375 on the east. The alignment follows the existing Fred Wilson Avenue from US 54 to the Airport Road/Sergeant Major Boulevard intersection, progresses eastward through an underdeveloped area north of and along Founders/Walter Jones Boulevards, traverses the property lines between El Paso International Airport, Biggs Army Airfield and Fort Bliss Military Reservation, and terminates at Loop 375.. SEGMENT A1-A3 Approximately five miles of Spur 601, from the east abutment of the overpass bridge at the intersection of Airport Road and Sergeant Major Boulevard to Loop 375. Includes the relocation of Global Reach Drive to George Perry Drive Includes the relocation of Walter Jones Boulevard Includes the backage road at East Biggs Control Access Point Road SEGMENT A-1 Defined as the relocation of Global Reach Drive and Walter Jones Boulevard. It is intended to be the first segment of the project to be opened to traffic. This segment will provide access to a new gate that Fort Bliss will put into permanent service.

SEGMENT A-2 Defined as Spur 601 from the east abutment of the Global Reach overpass to and including the Loop 375 interchange. Extending east of East Biggs Access Control Point is a proposed 3,550 foot long backage road leading to future development being coordinated by Fort Bliss.

SEGMENT A-3 Defined as the Spur 601 from the east abutment of the over pass bridge at the intersection of Airport Road and Sergeant Major Boulevard, to the east abutment of the Global Reach Overpass. SEGMENT B Defined as the Spur 601 main lanes west of the intersection of Airport Road and Sergeant Majors Boulevard, and is proposed to consist primarily of elevated freeway on twin structures (separate structures for east bound and west bound traffic). The service road from US 54 to Chaffee Road will be located between the twin main lane structures and provide one 12-foot lane in each direction separated by a continuous left turn lane. The frontage roads from Chaffee Road to the Airport Road and Sergeant Major Boulevard Interchange will be one way and will provide 12-foot lanes. Access ramps are proposed at Marshall Street (east side) and Chaffee Road. The existing three-level interchange project at Airport Road and Sergeant Major Boulevard. is proposed to be completed and incorporated into this Spur 601, Inner Loop project by tying into its main lanes and by providing an additional connector (north bound Airport Road to west bound Sergeant Major Boulevard). Segment B also includes four direct connectors at the intersection with US 54. These direct connectors will provide non-stop access from US 54 to Spur 601 in all directions of travel.