1 2008 ANNUAL REPORT

2 CONTENTS GENERAL MANAGER S REPORT 5 HUMAN RESOURCES 9 LEGAL STATUS AND ORGANIZATION OF COMPANY 11 COMPANY PERFORMANCE 15 POWER GENERATION DIVISION 19 HPP RAMA 20 HPP MOSTAR 21 HPP PEĆ MLINI 22 PSPP ČAPLJINA 23 HPP JAJCE I 24 HPP JAJCE II 25 HPP MOSTARSKO BLATO UNDER CONSTRUCTION 26 DEVELOPMENT PROJECTS 33 POWER DISTRIBUTION DIVISION 37 DISTRIBUTION FACILITIES IN POWER SUPPLY DIVISION 41 MANAGEMENT BOARD S EVALUATION OF COMPANY PERFORMANCE ANNUAL REPORT 3

3 GENERAL MANAGER S REPORT Elektroprivreda Hrvatske zajednice Herceg Bosne, d.d. Mostar, a public company for power generation, distribution and supply was founded on August 28, 1992 and since it has operated in 6 cantons in the Federation of Bosnia and Herzegovina. It is one of three power companies in Bosnia and Herzegovina and since April, 2004 it has been a joint stock company. The stock capital of the Company consists of 10% private capital and 90% state capital. The Company operates six hydro power plants ( Rama, Mostar, Jajce I, Jajce II, Peć Mlini and Čapljina) with the total capacity of 792 MW. The total power generation in 2008 was 1355,64 GWh. The total length of the distribution network is 11,131 km. On December 31, 2008, EP HZ HB supplied 183,706 customers, including Aluminij d.d. Mostar company as the biggest customer in Bosnia and Herzegovina, and had 1729 employees. In 2008, in spite of many problems and the business environment burdened with evident consequences of the economic crisis, the Company operated at a gross profit of BAM 7,333,131. The following contributed to good operating results: proper power system control, orientation to loss minimization and collection rate increase, conclusion of flexible contracts with customers and suppliers of electricity with risk sharing, good business relations with customers, control of operating costs and good human resources management. The application of new tariffs according to the FERC s decision on tariffs for non-eligible (tariff) customers and the planned reduction of delivery to the 100 kv and higher level customers also had a positive influence on the Company performance. As the strategic objective of the Company is construction of new generation facilities, the year 2008 was marked by continuation of the work on construction of the HPP Mostarsko Blato. Installation of the mechanical and electrical equipment (turbines-generators) and other equipment started in the already constructed facilities. Preparation of the design and tender documents continued for the projects approved through the POWER 4 program for the HPP Rama and PSPP Čapljina. For better efficiency, minor repair work and other activities were carried out in these plants and in the HPPs Jajce I and Jajce II. For the projects of use of hydro energy, preparation of the feasibility study started and the research work was carried out for the small hydro power plants Kravice, Stubica, Dubrava and Luke. The pre-feasibility study was prepared for the HPP Han Skela and the hydro power plants on the Ugar River. For the PSPP Vrilo, preparation of the feasibility study started and the tender documents for the research work were prepared. For the projects of use of wind energy, we started activities on preparation of a ANNUAL REPORT 2008 ANNUAL REPORT 5

4 comprehensive environmental and social impact assessment and of the general design for the 20/110 kv substations for the wind farms Borova Glava, Mesihovina and Velika Vlajna. The activities on issuing the building permits and solving the problem of property-rights relations were intensified. We carried out the internal review of the report on the detailed geological research in the Kongora Lignite Deposit and started activities for preparation of the study for recognition of the reserves by the competent cantonal ministry. Regular maintenance of the distribution network and facilities, and continuous investment of our own and credit funds in the distribution network improved the quality of electricity supply. The feasibility study for establishing the modern SCADA/DMS system of operation in the Power Distribution Division was prepared since we try to bring the distribution network and its operation as well as the supply quality to the level as required by the EU Directive. Supply to all customers was safe and reliable and establishment and implementation of the new information systems increased the collection rate. For further adjustment to the requirements of the modern business operations, all necessary preparations for production of the Financial Management Information System (FMIS) were made. The system will significantly modernize the financial management of the Company as a whole as well as of its organizational units. By implementation of this project, JP Elektroprivreda HZHB will be the first power company in the region to improve its business operations by integrating the processes of purchasing, selling, materials management, finance, controlling and fixed assets in a single, transparent and unified system. For permanent improvement of the control of all business processes in the Company, we continued the activities on introducing the quality control system according to ISO 9001:2008 as well as on investment in human resources of the Company through awarding scholarships, employment and professional improvement. Mato-Matan Žarić, B.Sc. (El. Eng.) General Manager PSPP Čapljina - reservoir ANNUAL REPORT 2008 ANNUAL REPORT 7

5 HUMAN RESOURCES SHAREHOLDERS' ASSEMBLY SUPERVISORY BOARD EXECUTIVE SECRETARY AUDIT BOARD INTERNAL AUDIT DEPARTMENT Goods Procurement Unit Electricity Planning and Analysis Unit Procurement Department Works and Services Procurement Unit Trade Department Electricity Billing Unit Project Implementation Unit Implementation Unit Electricity Trade Unit DIRECTOR'S OFFICE COMPANY'S DIVISION Advisers NERETVA River Basin Unit Education Department Education Unit Metering Department Unit for Relations with Regulatory Commissions Metering Unit Public Relations Department POWER GENERATION DIVISION Generation Control Center VRBAS River Basin Unit TECHNICAL DEPARTMENT DEVELOPMENT DEPARTMENT ECONOMIC AND FINANCIAL AFFAIRS DEPARTMENT LEGAL, PERSONNEL AND GENERAL AFFAIRS DEPARTMENT BIS DEPARTMENT Sections HPP RAMA, Prozor HPP MOSTAR, Mostar HPP PEĆ MLINI, Grude HPP MOSTARSKO BLATO under Construction, Mostar Autonomous Section PSPP ČAPLJINA, Čapljina TECHNICAL DEPARTMENT DEVELOPMENT DEPARTMENT ECONOMIC AND FINANCIAL AFFAIRS DEPARTMENT LEGAL, PERSONEL AND GENERAL AFFAIRS DEPARTMENT BIS DEPARTMENT Sections HPP JAJCE I HPP JAJCE II EXECUTIVE DIRECTOR OF FINANCIAL AFFAIRS AND ACCOUNTING DIVISION FINANCIAL AFFAIRS AND ACCOUNTING DIVISION Planning and Analysis Unit Accounting Unit Financial Affairs Unit EXECUTIVE DIRECTOR OF LEGAL, PERSONNEL AND GENERAL AFFAIRS DIVISION LEGAL, PERSONNEL AND GENERAL AFFAIRS DIVISION DIRECTOR'S OFFICE Distribution Area Unit SOUTH Legal Unit Personnel Unit General Affairs Unit Translation Unit POWER DISTRIBUTION DIVISION TECHNICAL DEPARTMENT DEVELOPMENT DEPARTMENT ECONOMIC AND FINANCIAL AFFAIRS DEPARTMENT LEGAL, PERSONNEL AND GENERAL AFFAIRS DEPARTMENT BIS DEPARTMENT CONTROL AND METERING DEPARTMENT HNC Sections Mostar Rama Doljani Čitluk Čapljina Neum Ravno Stolac WHC Sections Grude Š. Brijeg Posušje Ljubuški HBC Sections Livno Drvar Grahovo Glamoč Tomislavgrad Kupres TECHNICAL DEPARTMENT DEVELOPMENT DEPARTMENT ECONOMIC AND FINANCIAL AFFAIRS DEPARTMENT LEGAL, PERSONNEL AND GENERAL AFFAIRS DEPARTMENT BIS DEPARTMENT CONTROL AND METERING DEPARTMENT MBC Sections Novi Travnik Nova Bila Kiseljak Vareš Usora Busovača Uskoplje Kreševo Žepče Dobretići Vitez Jajce Fojnica Novi Šeher Distribution Area Unit CENTER GENERAL MANAGER Distribution Area Unit NORTH EXECUTIVE DIRECTOR OF DEVELOPMENT DIVISION DEVELOPMENT DIVISION Power Facilities Development Department IT and Telecommunications Department Restructuring Department Standards and Environmental Protection Department TECHNICAL DEPARTMENT DEVELOPMENT DEPARTMENT ECONOMICAND FINANCIALAFFAIRS DEPARTMENT LEGAL, PERSONNEL AND GENERAL AFFAIRS DEPARTMENT BIS DEPARTMENT CONTROL AND METERING DEPARTMENT PC Sections Orašje Domaljevac Odžak Energy Sources Development Unit Power Networks Development Unit IT Unit Telecommunications Unit Standards Unit Environmental Protection Unit MANAGEMENT BOARD DIRECTOR'S OFFICE Distribution Area Unit SOUTH EXECUTIVE DIRECTOR OF POWER GENERATION DIVISION POWER GENERATION DIVISION POWER SUPPLY DIVISION Distribution Area Unit CENTER EXECUTIVE DIRECTOR OF POWER DISTRIBUTION DIVISION POWER DISTRIBUTION DIVISION Distribution Area Unit NORTH BILLING DEPARTMENT COLLECTION DEPARTMENT ECONOMICAFFAIRS DEPARTMENT LEGAL, PERSONNEL AND GENERAL AFFAIRS DEPARTMENT BIS DEPARTMENT METERING DEPARTMENT HNC Sections Mostar Rama Doljani Čitluk Čapljina Neum Ravno Stolac BILLING DEPARTMENT COLLECTION DEPARTMENT ECONOMICAFFAIRS DEPARTMENT LEGAL, PERSONNEL AND GENERAL AFFAIRS DEPARTMENT BIS DEPARTMENT METERING DEPARTMENT MBC Sections Novi Travnik Nova Bila Kiseljak Vareš WHC Sections Grude Š. Brijeg Posušje Ljubuški Usora Busovača Uskoplje Kreševo Žepče HBC Sections Livno Drvar Grahovo Glamoč Tomislavgrad Kupres Dobretići Vitez Jajce Fojnica Novi Šeher EXECUTIVE DIRECTOR OF POWER SUPPLY DIVISION POWER SUPPLY DIVISION BILLING DEPARTMENT COLLECTION DEPARTMENT ECONOMICAFFAIRS DEPARTMENT LEGAL, PERSONNEL AND GENERAL AFFAIRS DEPARTMENT BIS DEPARTMENT METERING DEPARTMENT PC Sections Orašje Domaljevac Odžak On December 31, 2008 JP Elektroprivreda HZ Herceg-Bosne d.d. Mostar had 1729 employees. In comparison with the end of 2007, the number of employees increased by 7.1% or 114 employees. At the end of 2008, out of the total number of employees in the Company s Division and other organizational units, 86 were trainees employed on a temporary basis. Comparing the qualification structure of the employees at the end of 2007 and of 2008, the number of employees having university or associate degrees increased. This will undoubtedly have a positive influence on carrying out of the given tasks. The Company has been continuously working on professional improvement referring its employees to workshops, training courses and other types of education and training, and awarding scholarships and employing trainees to have jobs in high demand. Employee Qualification Structure Educational lecel Employee Qualification Structure as of December 31, 2008 Total number of employees: 1729 D.Sc. - 1 M.Sc. - 2 Secondary school B.Sc Associate degree - 89 Skilled Semi-skilled - 33 Unskilled 70 Power Generation Division Power Distribution Division Power Supply Division Company s Division and other organizational units Total Dec.31, 2007 Dec.31, 2008 Dec.31, 2007 Dec.31, 2008 Dec.31, 2007 Dec.31, 2008 Dec.31, 2007 Dec.31, 2008 Dec.31, 2007 Dec.31, 2008 Index 11/10 Structure in % Unskilled ,4 4 Semi-skilled ,9 2 Skilled ,7 23 Second. school ,2 30 Highly-skilled ,1 17 Assoc. degree ,9 5 B.Sc ,1 19 M.Sc ,7 0 D.Sc ,0 0 Total , ANNUAL REPORT 2008 ANNUAL REPORT 9

6 Employee Age Structure Years of age 300 under over Dec.31, 2007 Power Generation Division Power Distribution Division Power Supply Division Company s Division and other organizational units Total Index 11/10 Dec.31, 2007 Dec.31, 2008 Dec.31, 2007 Dec.31, 2008 Dec.31, 2007 Dec.31, 2008 Dec.31, 2007 Dec.31, 2008 Dec.31, 2007 Dec.31, under , , , ,8 25 over ,1 4 Total ,1 100 JP Elektroprivreda HZ Herceg-Bosne d.d. Mostar has a good age structure. About 40% are employees under 40 and this enables comparatively easy adjustment to new working and operating conditions. Employee Experience Structure Dec.31, 2008 Dec.31, 2007 Dec.31, 2008 Dec.31, 2007 Dec.31, 2008 Dec.31, 2007 Dec.31, 2008 Power Generation Power Distribution Power Supply Company's Division and other organizational units Structure in % Legal Status and Organization of Company JP Elektroprivreda Hrvatske zajednice Herceg Bosne, a joint stock company, headquartered in Mostar, 106 A Mile Budaka (hereinafter called: Company) has had the legal continuity since November 17, 1992 when the public company Elektroprivreda Hrvatske zajednice Herceg Bosne Inc. was registered in the register of companies of the Higher Court in Mostar under No In July 1996, the Company was transformed into a limited liability company with the name Javno poduzeće Elektroprivreda Hrvatske zajednice Herceg Bosne d.o.o. Mostar. According to the valid Decision on Approval of Registration of Privatization in the Register of Companies made by the Agency for Privatization in BiH Federation No: /04 of January 15, 2004, 10% state capital of the Company was privatized. Pursuant to the provisions of the stated Decision of the Agency for Privatization in BiH Federation and provisions of Article 76 of the Law on Amendments of the Law on Economic Subjects (Official Gazette of BiH Federation No.29/03), the first meeting of the Shareholders Assembly of JP Elektroprivreda Hrvatske zajednice Herceg Bosne d.d. Mostar was held on March 8, There was made the decision on change of the Company organization and adjustment of its status to the Law on Economic Subjects and the stated decision of the Agency for Privatization in BiH Federation, the Company by-law was adopted and its bodies were appointed. Based on the stated documents, the Company was transformed into a joint stock company, its name was replaced by the name : Javno poduzeće Elektroprivreda Hrvatske zajednice Herceg Bosne dioničko društvo Mostar, and it adjusted the capital and activities. The Company activities are determined by the Company by-law. The Company bodies are appointed according to the Company by-law: the Shareholders Assembly, Supervisory Board, Audit Board, and Management Board consisting of the general manager and executive directors of the Company. The Company was registered in the Register of Companies of the Higher Court in Mostar (it is now under jurisdiction of the Municipal Court) under No as well as in the Register of the Securities Commission of BiH Federation based on the Commission Decision No: /04 of April21, On April 28, 2004, the Company concluded a contract with the Securities Agency of BiH Federation. The contract stipulates registration, keeping and updating of the data on the Company s securities. According to the standard classification of activities, the Company was, as a legal entity, registered under the activity subclass code: 40,100 Power generation and distribution. The Company identification number is VAT ID No is The Company stock capital amounting to BAM 736,166,000 is divided into 7,361,660 ordinary shares. The nominal value of a share is BAM The stock capital consists of: 10% private capital 90% state capital Activities of the Company are: power generation, distribution and supply, trading, representing and agency services in the domestic electricity market, manufacture of the power distribution and control equipment, construction and maintenance of hydro power plants, electrical installation and other installation work, civil engineering construction, maintenance of facilities in civil engineering and building construction, wholesale of machines for industry, handicraft sector and navigation, telecommunications, renting of own property, machines and equipment, consulting services for computer equipment (hardware), data processing, accounting, bookkee ANNUAL REPORT 2008 ANNUAL REPORT 11

7 Share value of issuer JPEMR and number of shares traded by month in 2008 Share value 200,00 180,00 160,00 140,00 120,00 100,00 80,00 60,00 40,00 20,00 0, ping and auditing business concerning taxes, architectural and engineering activities and technical consulting, research and experimental development in technical and technological sciences and other business activities. Foreign trade operations of the Company are: Electricity imports and exports Foreign trade transactions in free zones Imports of goods and providing of services within the scope of the registered activities Agency services and representing in goods and services trade and Imports of spare parts, raw materials and equipment for carrying out of activities Structure of Company Shareholders According to the Decision of the Agency for Privatization in BiH Federation on Approval of Privatization Program and Company Initial Balance Sheet, Jan. 3 Feb.1 March 3 April 1 May 5 June 6 June 30 July 31 Aug. 29 Sept. 26 Oct.31 Nov.20 Dec Number of traded shares 600 in 2002, the public subscription for shares in the second round was carried out and 10% total capital amounting to BAM 73,616,600 was sold. Based on the data from the Securities Agency, on May 27, 2008 (30 days before the sixth meeting of the Shareholders Assembly on June 26, 2008), there were 1,635 shareholders. The ownership structure was as follows: Structure of Company Shareholders Shareholders Number of shares % of share Residents physical persons ,4 Residents legal entities ,2 RESIDENTS ,6 Non- residents physical persons ,09 Non- residents legal entities ,31 NON-RESIDENTS ,40 TOTAL HPP Rama - dam The largest share among residents-legal entities is owned by the Government of BH Federation (6,626,306 shares or 90%) and the rest (735,354 shares or 10%) is owned by investment funds, residents and non-residents legal entities and physical persons. Stock Trade SASE On September 15, 2004, JP Elektroprivreda Hrvatske zajednice Herceg Bosne d.d. Mostar was included in SASE- the Sarajevo Stock Exchange under the issuer symbol JPEMR and the initial share value was BAM 50. During the period of 2.5 years, the JPEMR share value was increased by more than 3 times and on December 31, 2006, the stock exchange quotation was BAM 155. At the beginning of 2007, the share value was BAM and JPEMR was included in the MFTS trading plan. This is a continuous trading plan and it is characteristic of the shares with a certain level of liquidity, frequency and intensity of trading in the stock exchange. At the beginning of 2008, the share value was BAM 180. After that, its value decreased and on December 31, 2008 dropped to 55% of its nominal value (55%). The graph shows the share value of the issuer JPEMR and number of shares traded by month in Shares in Related Legal Entities JP Elektroprivreda Hrvatske zajednice Herceg Bosne d.d. Mostar has a share in the stock capital of the company Konstruktor-Neretva d.o.o. Čapljina amounting to BAM 859,665. During 2006, the Company stock capital was increased by investment of the member Konstruktor-inženjering d.d. Split. This resulted in the decrease of our Company share to 14%. In the stock capital of the company Elektrokontrol HZ H B Čapljina amounting to BAM 432,500.00, JP Elektroprivreda Hrvatske zajednice Herceg Bosne d.d. Mostar has a share of BAM 247,139 or 57.14% ANNUAL REPORT 2008 ANNUAL REPORT 13

8 COMPANY PERFORMANCE In the period January December 2008, JP Elektroprivreda HZ Herceg- Bosne d.d. Mostar operated at a gross profit of BAM 7,333,131. The application of new tariffs from January 1, 2008 according to the FERC s decision on tariffs for non-eligible (tariff) customers and the planned reduction of delivery to the 100 kv and higher level customers (Aluminij d.d. Mostar) had a positive influence on the Company performance. As Aluminij d.d. Mostar also purchased electricity from other suppliers (HEP, EP BiH, Aluminij as an eligible customer), an adverse effect of the difference between the purchase and selling price according to tariffs was eliminated. So, in 2008 we did not have the problem we had during the whole year Profit and Loss Account The total income amounted to BAM 339,296,892. It was 23% higher than the plan and 2% lower than in the previous year. The operating income (income from sales of electricity and services) amounted to BAM 319,254,145. It was 23% higher than the plan. The income from sales of electricity included the income from sales to tariff customers at the distribution voltage levels (63.3%) and at 110 KV and higher levels (28.9%), and the income from international trade electricity exports (7.8%). The income from sales of services amounted to BAM 21,481,691. It included the income from sales of services to third parties (BAM 2,883,481) and the income from sales of reserve power in the international market according to the concluded contracts (BAM 18,598,210). The income from sales of services to third parties included the income from: issue of power connection certificates, project reviews, maintenan ANNUAL REPORT 2008 ANNUAL REPORT 15

9 Profit and Loss Account Item Description Jan.-Dec Realization ce and reconstruction of the power network (Power Distribution Division), inspection of metering points, meter calibration, replacement of time switches, and cutting and reconnection of customers (Power Supply Division). The other income (BAM 19,449,456) included the income from: premium of life insurance of all employees of the Company from the insurance company Croatia osiguranje d.d. Ljubuški (BAM 12,382,251), donations Jan.-Dec Plan Jan.-Dec Realization 3 Plan Realization 5/3 5/4 1 Operating income ( ) Income from electricity sales ( ) Income from tariff customers at distribution voltage levels Income from other 35 kv customers Income from 110 kv and higher level customers and other non-tariff customers Income from electricity trade Income from sales of services Financial income Other income TOTAL INCOME ( 1+2+3) Operating expenses ( ) Costs of electricity purchases Operating expenses Depreciation costs Staff costs Financial expenses Other expenses TOTAL EXPENSES (5+6+7) Gross profit/loss (4-8) Index 5/3 Index 5/4 (BAM 3,380,088), compensations for damages from insurance companies (BAM 267,048), collection of written-off receivables (BAM 2,714,284) and the income from previous years (BAM 414,822). The total expenses amounted to BAM 331,963,761. They were 20% higher than the plan and 18% lower than in the previous year. The expenses were higher than the plan because we had to purchase 64% more electricity than we plannned (generation was lower than the plan due to unfavourable hydrological circumstances). The operating expenses amounted to BAM 316,974,634, financial expenses (interest and negative exchange rate differences) BAM 1,899,285 and other expenses BAM 13,089,842. The largest portion of other expenses included the bad and doubtful debts (BAM 8,395,301) written-off according to accounting policies as follows: for households - after one year and for other classes of customers - after three years. The remaining portion included penalties and compensations for damages (BAM 323,426), subsequently determined expenses from the previous years (BAM 3,431,750), shortages (BAM 761,257) and other expenses (BAM 178,108). The operating expenses (without depreciation costs, costs of electricity purchases and staff costs) were 10% lower than the plan and 8% lower than in the previous year. They were lower than the plan due to the reduced costs of raw materials and materials (76.1%), maintenance services (78.4), spare parts (85.7%), insurance of property and persons (58.2%), contributions, membership fees and other levies (94.8%), PTT services (90.5%), other staff costs (85.4%). The total expenses were 19.9% higher than the plan and 17% lower than in the previous year. The salary budget was 1% smaller than the plan. It was 28% bigger than in the previous year due to the increase according to the Collective Agreement signed between the Trade Union of Electricity Workers of BiH and the Government of FBiH. This Agreement stipulates the new payroll computation method based on the lowest net hourly rate of BAM 2.45 and average number of working hours of 174. This method was applied retroactively from January 1, On December 31, 2008, the total receivables were BAM 200,715,197. They were lower than on December 31, 2007 by 3% or by BAM 5.76 M since the electricity purchased by Elektroprivreda BiH in December 2007 Capital Structure as of December 31, 2008 Stock capital was paid in 2008 (BAM 7,949,757). Receivables from the tarrif customers at distribution voltage levels were lower than at the end of the previous year. They were reduced to the greatest extent (by BAM 4.8 M) in the Supply Area Unit SOUTH. Balance Sheet Retained earnings Accumulated losses Revaluation reserves On December 31, 2008, the Company assets value was BAM 1,181,281,837. It was 2.5% higher than on December 31, The value of the fixed assets (real property, facilities and equipment) was increased by 2.4% and of the current assets (raw material, material and spare part inventories) by 3.6% ANNUAL REPORT 2008 ANNUAL REPORT 17

10 Balance Sheet (in BAM) POWER GENERATION DIVISION Item DESCRIPTION As of Dec.31, 2007 As of Dec.31, 2008 Share (in %) Index 4/ I ASSETS 1. Fixed assets ,4 2. Current assets ,6 A TOTAL ASSETS (1+2) ,5 Contingent assets ,0 II LIABILlTIES 1. Capital ,8 2. Ling-term liabilities ( ) , Long-term financiai commitments , Long-term accruals and provisions ,9 3. Current liabilities ( ) , Short-term financiai commitments , Trade payables and other Iiabilities , Other current Iiabilities ,8 B TOTAL LIABILlTIES (1+2+3) ,5 Contingent liabilities ,0 The Power Generation Division is a part of JP Elektroprivreda HZ Herceg Bosne d.d. Mostar which core activity is power generation but auxiliary and system services are also provided. The total capacity of six hydro power plants (HPPs Rama, Mostar, Jajce I, Jajce II, Peć Mlini and PSPP Čapljina) is 792 MW.The HPP Mostarsko Blato (2x30 MW) with the planned annual output of 167 GWh is expected to be put into operation in the last quarter of The operating conditions in all hydro power plants are very good and they are included in the system of generation remote control from the Main Dispatch Centre of EP HZ HB in Mostar. Activities on the projects of power generation from renewable sources are in progress. This would provide additional MWs for the needs of EP HZ HB. In the total assets, a share of the fixed assets was 88% and of the current assets 12%. In the liabilities, a share of the capital was 78%, of the long-term liabilities 15% and of the current liabilities 7%. In the long-term liabilities, a share of the deferred income was 43% and of the long-term credits 57%. The capital consists of the stock capital amounting to BAM 736,166,001.00, revaluation reserves BAM 262,970,5224, retained earnings BAM 18,673,600 and accumulated losses BAM 92,162,950. HPP Mostar - dam ANNUAL REPORT 2008 ANNUAL REPORT 19

11 HPP RAMA HPP MOSTAR The hydro power plant Rama is the largest plant in the system of the hydro power plants on the Neretva river. It is located in Herzegovina- Neretva Canton. The power house is situated by the road Jablanica-Rama and the dam and reservoir in the very vicinity of the town of Prozor-Rama. It was put into operation in The hydro power plant Mostar is the last plant in the range of the plants constructed on the Neretva river and is located 3.73 km upstream of the city of Mostar in Herzegovina- Neretva Canton. It was put into operation in 1987 and again in 1997 after rehabilitation of the war damages. MAIN DATA Number of generating sets 2 Installed capacity 160 MW Plant type Diversion - storage MAIN DATA Number of generating sets 3 Installed capacity 72 MW Plant type Adjacent-to-dam - storage GENERATORS Type 3-phase synchronous S Manufacturer Končar Put into operation 1968 Nominal power 90 MVA GENERATORS Type 3-phase synchronous S Manufacturer Končar Put into operation 1987/1988 Nominal power 30 MVA TURBINES Type Francis Manufacturer Litostroj Installed capacity 80 MW TURBINES Type Kaplan K - 5 Manufacturer Litostroj Installed capacity 23.6 MW DAM and RESERVOIR Dam construction height 103 m Dam height 96 m Hydraulic height 89 m Crest length 230 m Headrace tunnel length 9536 m DAM and RESERVOIR Dam construction height 44 m Dam height 28 m Crest length m Crest elevation 81 m a.s.l. Headrace tunnel diameter 5 m ANNUAL REPORT 2008 ANNUAL REPORT 21

12 HPP PEĆ MLINI PSPP ČAPLJINA The hydro power plant Peć Mlini is located in the municipality of Grude in West Herzegovina Canton. It uses energy potential at a head of 107 m between the Imotski-Grude field-nuga reservoir and power house in the Petnik hill foot in Peć Mlini. It was put into operation in HPP Peć Mlini HPP Peć Mlini The pumped storage power plant is located on the lower Trebišnjica river in Herzegovina- Neretva Canton. It collects its catchment inflow water and the Trebišnjica water through the Popovo field. It was put into operation in MAIN DATA Number of generating sets 2 Installed capacity 30 MW Plant type Diversion - run-of-river MAIN DATA Number of generating sets 2 Installed capacity 440 MW Plant type Reversible - pumped storage GENERATORS Type 3-phase synchronous Manufacturer Končar Put into operation 2004 Nominal power 18 MVA GENERATORS Type 3-phase synchronous Manufacturer AEG Put into operation 1979 Nominal power 240 MVA TURBINES Type Francis K - 5 Manufacturer Litostroj Installed capacity MW TURBINES Type Francis Manufacturer Riva - Calzoni Installed capacity 210 MW DAM and RESERVOIR Upper reservoir level - maximum 252 m a.s.l. Upper reservoir level - minimum 249 m a.s.l. Nominal discharge 15 m 3 /sec Headrace tunnel length 1547 m Headrace tunnel diameter 3.6 m PSPP Čapljina DAM and RESERVOIR Upper reservoir level - maximum m a.s.l. Upper reservoir level - minimum 224 m a.s.l. Nominal discharge turbine mode 112 m 3 /sec Nominal discharge pumping mode 85 m 3 /sec ANNUAL REPORT 2008 ANNUAL REPORT 23

13 HPP JAJCE I HPP JAJCE II The hydro power plant Jajce I is located on the left bank of the Vrbas river by the road Jajce- Banjaluka in Middle Bosnia Canton. It is 7 km far from the town of Jajce. It collects the water of the Big Pliva lake which is situated at the height of 428 m asl. It was put into operation in The hydro power plant Jajce II was constructed on the Vrbas river 17 km downstream of the town of Jajce in Middle Bosnia Canton. It was put into operation in Number of generating sets 2 Number of generating sets 3 MAIN DATA Installed capacity 60 MW MAIN DATA Installed capacity 30 MW Plant type Diversion - run-of-river Plant type Diversion - run-of-river GENERATORS Type 3-phase synchronous Manufacturer Končar Put into operation 1957 Nominal power 36 MVA GENERATORS Type 3-phase synchronous Manufacturer Končar Put into operation 1954 Nominal power 12.5 MVA TURBINES Type Francis Manufacturer KMW Installed capacity 30 MW TURBINES Type Francis Manufacturer Voith + Litostroj Installed capacity 10 MW Minimum operating reservoir level m a.s.l. Minimum operating reservoir level m a.s.l. DAM and RESERVOIR Maximum operating reservoir level m a.s.l. Headrace tunnel length 5700 m DAM and RESERVOIR Maximum operating reservoir level m a.s.l. Headrace tunnel length 2880 m a.s.l. Headrace tunnel diameter 5.4 m Headrace tunnel diameter 5.5 m ANNUAL REPORT 2008 ANNUAL REPORT 25

14 HPP MOSTARSKO BLATO UNDER CONSTRUCTION The hydro power plant Mostarsko Blato is located south-west of Mostar and will use energy potential of the Lištica river at the head of 176 m between Mostarsko Blato and Mostarsko Field. Construction period: The hydro power plant Mostarsko Blato will be connected to the 110 kv Mostar 4 (Čule) Mostar 5 (Rodoč) transmission line. PREPARATION AND DELIVERY OF GENERAL AND FINAL DESIGNS FOR HPP MOSTARSKO BLATO The design team of Elektroprojekt prepared the general designs for the HPP Mostarsko Blato and in 2008, preparation of the final designs was in the final stage. CONSTRUCTION OF INTAKE STRUCTURE, HEADRACE TUNNEL, SURGE CHAMBER AND VALVE CHAMBER In 2008, we started the intensive work on construction of the intake structure, headrace tunnel, surge chamber and valve chamber. We also started installation of the trashrack in the intake structure and grouting of the reinforced concrete lining in the headrace tunnel. With this, construction of the headrace tunnel as a big and important facility will be completed. CONSTRUCTION OF PENSTOCK, POWER HOUSE, TAILRACE BASIN AND FLOOD CHANNEL The penstock supports and power house were constructed. This enabled installation of the mechanical and electrical equipment. Installation of the generating sets (turbines-generators) and other equipment started in the power house. In 2008, all preparations were made for construction of the tailrace basin and flood channel. MECHANICAL AND ELECTRICAL EQUIPMENT Most of the mechanical and electrical equipment was manufactured, factory tested, transported to the site and partially installed. We started installation of the generating sets 1 and 2 and other equipment ANNUAL REPORT 2008 ANNUAL REPORT 27

15 Power Generation in Hydro Power Plants in 2008 by Month (GWh) HPP Rama PSPP Čapljina HPP Mostar HPP Jajce I HPP Jajce II HPP Peć Mlini TOTAL January 56,37 14,09 25,78 19,72 15,45 7,58 139,00 February 60,48 8,25 16,76 13,77 11,43 4,86 115,54 March 13,03 14,19 26,51 23,63 16,97 11,60 105,93 April 16,45 5,33 35,02 30,55 19,44 13,85 120,65 May 24,10 0,00 21,79 23,32 17,27 7,20 93,67 June 75,93 0,44 14,88 17,36 12,81 2,84 124,26 July 55,85 0,90 9,52 10,89 9,11 0,94 87,20 August 58,43 1,16 8,06 7,95 6,89 0,24 82,73 September 77,35 2,36 12,00 7,16 6,34 0,03 105,24 October 68,72 3,58 19,35 8,66 7,58 0,05 107,95 November 35,05 17,80 22,68 13,05 9,51 3,81 101,89 December 15,54 47,33 37,88 33,15 19,59 18,09 171,59 TOTAL 557,31 115,42 250,25 209,21 152,38 71, ,64 POWER GENERATION IN HYDRO POWER PLANTS IN 2008 PER MONTHS 80 SHARE OF PLANTS IN TOTAL POWER GENERATION IN 2008 HPP Rama 5% 11% 15% HPP Mostar 42% 9% 18% HPP Jajce I HPP Jajce II Total Power Generation in 2007 and 2008(GWh) HPP Rama 467,03 557,31 PSPP Čapljina 111,24 115,42 HPP Mostar 193,33 250,25 HPP Jajce I 170,90 209,21 HPP Jajce II 141,79 152,38 HPP Peć Mlini 39,79 71,08 TOTAL 1124, , Power Generation from 2000 to 2008 (GWh) HPP Rama 653,80 722,90 455,00 570,00 674,98 729,26 864,64 467,03 557,31 PSPP Čapljina 121,65 283,18 117,00 162,00 327,20 317,59 331,68 111,24 115,42 20 HPP Mostar 181,13 197,34 199,00 200,00 257,10 239,02 242,47 193,33 250,25 10 HPP Jajce I 197,95 226,81 229,00 163,00 241,48 240,63 229,07 170,90 209,21 HPP Jajce II 152,63 170,31 173,00 137,00 161,00 173,65 161,70 141,79 152,38 0 January February March April May June July August September October November December HPP Peć Mlini 6,89 68,53 55,22 39,79 71,08 TOTAL 1307, , , , , , , , ,64 HPP Rama HPP Mostar HPP Jajce I HPP Jajce II ANNUAL REPORT 2008 ANNUAL REPORT 29

16 POWER GENERATION TREND FROM 2000 TO POWER GENERATION IN 2007 AND 2008 BY MONTH January February March April May June July August September October NovemberProsinac HPP Rama HPP Mostar HPP Jajce I HPP Jajce II POWER GENERATION TREND FROM 2000 TO 2008 HPP Rama PSPP Čapljina HPP Mostar HPP Jajce I HPP Jajce II HPP Peć Mlini TOTAL ,80 121,65 181,13 197,95 152, , ,90 283,18 197,34 226,81 170, , ,00 117,00 199,00 229,00 173, , ,00 162,00 200,00 163,00 137, , ,98 327,20 257,10 241,48 161,00 6, , ,26 317,59 239,02 240,63 173,65 68, ,69 POWER GENERATION TREND FROM 2000 TO ,64 331,68 242,47 229,07 161,70 55, , ,03 111,24 193,33 170,90 141,79 39, , ,31 115,42 250,25 209,21 152,38 71, , ANNUAL REPORT 2008 ANNUAL REPORT 31

17 DEVELOPMENT PROJECTS In order to have our own development program and meet the demands of our customers, we launched development projects having in mind the electricity demand up to Our development is based on: Use of wind energy Use of hydro energy Kongora lignite mine and thermal power plant In addition, the preparations are made for the project of use of solar energy and we have to consider the place and role of EP HZHB in the projects of gasification in this area. According to the strategic plan and program for BiH energy, the development projects of EP HZHB are included in the top-priority projects in BiH. Use of Wind Energy After the activities on research and development that started in 2004, three wind farm projects are ready for implementation: Borova Glava - Livno (26 wind turbines x 2 MW), Mesihovina - Tomislavgrad (22 x 2 MW) and Velika Vlajna - Mostar (16 x 2 MW). The foreseen annual output in these wind farms is 370 MWh. In 2008, we started preparation of the general design for the 20/110 kv substations for the wind farms Borova Glava, Mesihovina (Tomislavgrad Municipality) and Velika Vlajna. For these substations, the research work was carried out, research reports were prepared and preliminary design was prepared and reviewed. The activities on issuing of the building permits for the first three wind farms were intensified. Within the bilateral cooperation between the Federal Republic of Germany and BiH, the German Development Bank (KfW) indicated its willingness to finance construction of the wind farm Mesihovina with a possibility of extension of the cooperation to other projects. The Loan Agreement for construction of the wind farm Mesihovina was concluded between the Government of the Federal Republic of Germany and the Council of Ministers of BiH. The funds would be available in Before providing the credit funds for construction of the wind farm Mesihovina, KfW provided a grant for preparation of the feasibility study that confirmed a possibility of use of wind energy in three sites: Mesihovina, Borova Glava and Velika Vlajna. KfW accepted the study in October, The Development Department of EP HZHB gave the technical support for preparation of the study and reviewed it. We started the activities on preparation of a comprehensive environmental and social impact assessment also financed out of the grant funds provided by KfW. Similar arrangements were negotiated with other potential financiers and significant progress was made in the field of cooperation with some financial institutions (EIB, EBRD, WB). Use of Hydro Energy Elektroprivreda HZHB d.d. Mostar works on the projects of research and development of small, pumped storage and conventional hydro power plants in the Neretva, Tihaljina Mlade Trebižat (T-M-T), Lištica, Upper Cetina and Vrbas river basins. The total installed capacity of these plants will be about 213 MW and annual output about 546 GWh. The Development Department prepared the study Hydro Power Solutions in Neretva River Basin downstream of HPP Mostar and after that the Faculty of Civil Engineering of Mostar University prepared the pre-feasibility study for the HPP Skakala. In the T-M-T and Lištica river basins, the research work was carried out and the research reports were prepared for the small hydro power plants Kravice, Stubica, Dubrava, Luke and Fratarska. The studies of alternatives were prepared for the stated small hydro power plants in the T-M-T and Lištica river basins ANNUAL REPORT 2008 ANNUAL REPORT 33

18 In the Vrbas river basin, the study Hydro Power Plants on Ugar River for three plants: Ugar Ušće, Ivik and Vrletna Kosa was prepared and reviewed. For the HPP Bravnice (Han Skela) on the Vrbas river, the tender documents were prepared and the procedure for public procurement of the service of the design preparation was carried out. In the Upper Cetina river basin, the research program was prepared within the preparation of the feasibility study for the PSPP Vrilo. Based on this program, the Financing Agreement for the project implementation was signed between KfW and JP EP HZHB. The European Bank for Reconstruction and Development (EBRD) finances the study Strategic Environmental Assessment of Trebižat and Cetina River Basins to be prepared in accordance with the EU directives (Directive 2001/42/EC) and appropriate documents. The Draft Final Report was prepared and we started the activities for carrying out of public consultations. Kongora Lignite Mine and Thermal Power Plant Deposit. Preparations were started for the analysis of the level of exploration for coal in the rest of Herceg Bosnia Canton. GIS Project The official cadastral plans and maps M 1:2500 and 5000 were vectorized for the project of the PSPP Vrilo. The usufruct data base was made for the projects of the wind farms Mesihovina, Borova Glava and Velika Vlajna, and the small hydro power plants Kravice, Stubica, Dubrava, Luke and Fratarska. The 3 D models were created for making of complex geoanalyses, automatic calculation of surface and cubic volume within the given area, automatic profile generation etc. on the basis of the created network 3D models in the GIS tool environment. Table Installed capacity and annual output of existing and new generation facilities Map of existing and planned generation facilities of JP EPHZHB In the period , JP Elektroprivreda HZHB d.d. Mostar carried out the detailed geological research in the Kongora Lignite Deposit in Tomislavgrad. This research supplemented the previous research. In 2008, the following documents were prepared: Report on Research Drilling and Excavation, Study on Coal Quality and Study on Geomechanical and Laboratory Testing of Physical-Mechanical Features of Coal and Accompanyng Seams. Preparation of the Study on Kongora Lignite Deposit Classification, Categorization and Estimate of Reserves was started. The results of the geomechanical testing and hydrogeological research prove that this deposit is suitable for surface extraction with application of the latest technologies. The obtained results confirm the assumptions. In some important parameters (weighted lower heating value, total sulphure and total balance reserves) they are even better than the assumption. It enables continuation of preparation of the designs and studies for the Kongora Lignite Mine and Thermal Power Plant. We started preparation of the hydrogeological study for the Kongora Item Name 1. Wind farms 2. Hydro power plants out of which Pumped storage power plant Small hydro power plants 3. Thermal power plants 4. Renewable energy sources 5. Fossil fuels 7 Total Capacity Year Annual output MW GW MW GW MW GW MW 0 15,28 37,62 47,62 GW MW GW MW GW MW GW MW GW ANNUAL REPORT 2008 ANNUAL REPORT 35

19 Power Distribution Division Distribution Facilities 35/x kv SS 15 pcs. 10(20)/0.4 kv SS pcs. 35 kv overhead lines 278 km 10(20) kv overhead lines km 1 kv overhead lines km 35 kv underground lines 7 km 10(20) kv underground lines 544 km 1 kv underground lines 576 km In 2008, a share of the Power Distribution Division in the total investment of the Company was 35.5% The network and facilities are operated conventionally through five dispatch centers in the headquarters of the distribution areas units and sections. The modern SCADA/DMS system of operation is planned to be established soon.the feasibility study was prepared in In 2008, there were 8,346 power connection applications out of which 8,091 were approved. Telecommunications and Computer Network As late as 2005, establishment of the connection system through HT was completed. This enabled closing and connecting of the distribution business system. Using the established computer network, the work of users was organized and connection to Internet was made. Internet access is controlled through the ISA server and antivirus protection is ensured through the system. In 2008, the computer equipment was procured and development of the computer networks continued. We started preparation of the telecommunication infrastructure project of installation of optic cables between the 110/xkV substations and office buildings. This would enabled closing of the telecommunications system through OPGW cables. Metering in Power System At the points of electricity acceptance from TRANSCO, meters are installed by TRANSCO. At the 0.4 and 10 kv points of electricity acceptance between power companies, meters are installed by the Power Distribution Division in cooperation with the Power Supply Division. Meters are installed and electricity and power are metered in all points. Activities on installation of control meters started. This project is financed out of the EBRD credit funds and also includes construction of the distribution metering center in Mostar. This is a very important project because its implementation will make it possible for us to have exact data on losses in the MV network and locate losses in the LV network ANNUAL REPORT 2008 ANNUAL REPORT 37

20 DISTRIBUTION FACILITIES IN (10) line in Herzeg Bosnia Canton PDD Number of 110/10(20) kv substations Substations x/10(20) kv substations 10(20)0.4 kv substations 35 kv MV lines 10(20) kv MV lines 0.4 kv LV lines Number of 35/10(20) kv substations Installed power MVA Total number of substations Installed power KVA Length of overhead lines (km) Length of underground lines (km) Total length (km) Length of overhead lines (km) Lines Length of underground lines (km) Total length (km) Length of overhead lines (km) Length of underground lines (km) HNC TRANSCO WHC TRANSCO HBC TRANSCO MBC TRANSCO PC TRANSCO TOTAL Total length (km) SUBSTATIONS LINES DAU 35/10(20) kv substations 10(20)/0.4 kv substations 35 kv MV lines 10(20) kv MV lines 0.4 kv LV lines Number of substations Installed power MVA Number of substations Installed power KVA Length of overhead lines (km) Length of underground lines (km) Total length (km) Length of overhead lines (km) Length of underground lines (km) Total length (km) Length of overhead lines (km) Length of underground lines (km) 1 w DAU SOUTH DAU CENTER DAU NORTH TOTAL Total length (km) ANNUAL REPORT 2008 ANNUAL REPORT 39

21 Power Supply Division The organizational parts of the division are: 1. Executive Director s Office 2. Supply Area Unit SOUTH 3. Supply Area Unit CENTER 4. Supply Area Unit NORTH Supply area units consist of departments and sections carrying out the activity of power supply. The employees of the division are responsible for safe and reliable supply to customers as well as for electricity billing and collection. On December 31, 2008, there were 183,570 customers. Customers by supply area unit 9% 65% 26% Number of Customers by Class as of December 31, 2008: SAU SOUTH SAU CENTER SAU NORTH Class Number of customers 110 kv 3 35 kv 3 10 (20) kv 119 Households Other consumption Street lighting Total Accepted electricity by supply area unit 8% 70% 22% SAU SOUTH SAU CENTER SAU NORTH ANNUAL REPORT 2008 ANNUAL REPORT 41

22 Collection rate at distribution level: Supply Area Unit SOUTH 99,69 % Supply Area Unit CENTER 99,73 % Supply Area Unit NORTH 99,47 % Distribution network losses: Supply Area Unit SOUTH 18,34 % Supply Area Unit CENTER 18,37 % Supply Area Unit NORTH 10,26 % Structure of billed electricity (MWh) 11% 11% 2% 20% 53% Maximum (December 31, 2008 at 7 p.m.) and minimum (June 26, 2008 at 5 a.m.) daily consumption in MAX (MW) MIN (MW) Maximum and minimum hourly consumption by month in 2008 mjesec I II III IV V VI VII VIII IX X XI XII MAX (MW) MIN (MW) Number of suits brought for debt: Supply Area Unit SOUTH Supply Area Unit CENTER Supply Area Unit NORTH 101 Number of inspections of metering points and connections: Supply Area Unit SOUTH Supply Area Unit CENTER Supply Area Unit NORTH Households Other consumption 10 kv Ratio of electricity accepted by customers at distribution level and by other tariff customers 39% Other 35 kv customers Street lighting 35 kv Daily Load Diagram June 26, 2008 December 31, % 300 Tariff customers (distribution level) Other tariff customers ANNUAL REPORT 2008 ANNUAL REPORT 43

23 MANAGEMENT BOARD S EVALUATION OF COMPANY PERFORMANCE In 2008, the total power generation in the hydro power plants operated by our Company was GWh or 88.7% of the plan. Power generation in all hydro power plants except in the HPP Mostar was lower than the plan due to unfavourable hydrological circumstances. The total power consumption (2, GWh) was higher than the plan (107.4%). The losses at the distribution voltage levels of 15.62% were still higher than the plan (13.77%) but lower than in the previous year (16.63%). The collection rate was 97.83%. It was at the level of the plan (97%). Achievement of the planned collection rate had a positive influence on the Company liquidity. All liquidity ratios ratios of current liquidity, day-today liquidity, accelerated liquidity and financial stability were within the scope of the plan and better than in In the period January December 2008, the planned investment amounted to BAM 144,943,321 and realized investment BAM 72,591,576 or 50%. As a result of the good Company performance in 2008, the profitability ratios gross profit margin, ROA (return on assets), ROE (return on equity), ROI(return on investment), EBITDA (earnings before interest, taxes, depreciation and amortization) and EBIT (earnings before interest and taxes) were better than in the previous year. The investment indicators labour productivity and EPS (earnings per share) were better than in The economic indicators - coefficients of economy of all business activities, and operating and working factors were better than in 2007 and were at the level of reference values except the coefficient of economy of financing that was below the reference value since the financial expenses (interest on loans from the previous years) were higher than the financial income (return interest and positive exchange rate differences). After evaluation of the Company s performance in 2008, the Management Board set the following tasks to be carried out in the following period: Electricity loss minimization and collection rate increase through implementation of the project of remote reading and consumption control for theft prevention and proper control of the power distribution system Conclusion of flexible contracts with customers and suppliers of electricity with delivery risk sharing Cultivation of good business relations with all customers for joint planning of the future services Safe and reliable supply to customers at all voltage levels Control of operating expenses in all business activities Successful human resources management in the Company 245 kv switchgear of PSPP Čapljina ANNUAL REPORT 2008 ANNUAL REPORT 45

24 ANNUAL REPORT

JP ELEKTROPRIVREDA HZ HB d.d Mostar Mile Budaka 106a Mostar Bosnia and Herzegovina Tel.: Fax:

JP ELEKTROPRIVREDA HZ HB d.d Mostar Mile Budaka 106a Mostar Bosnia and Herzegovina Tel.: Fax: 2009 ANNUAL REPORT JP ELEKTROPRIVREDA HZ HB d.d Mostar Mile Budaka 106a 88000 Mostar Bosnia and Herzegovina Tel.: +387 36 335 700 Fax: +387 36 335 777 ephzhb@ephzhb.ba www.ephzhb.ba CONTENTS GENERAL MANAGER

More information

ANNUAL REPORT. Ulica zagrebačka 1, Mostar tel.: fax:

ANNUAL REPORT. Ulica zagrebačka 1, Mostar tel.: fax: 26 ANNUAL REPORT Ulica zagrebačka 1, 88 Mostar tel.: +387 36 31 847 fax: +387 36 317 157 e-mail: ephzhb@ephzhb.ba www.ephzhb.ba ANNUAL REPORT 1 INTRODUCTION Supervisory Board and Management of JP Elektroprivreda

More information

Ulica Mile Budaka 106 A, Mostar, Bosnia and Herzegovina Tel.: Fax:

Ulica Mile Budaka 106 A, Mostar, Bosnia and Herzegovina Tel.: Fax: 2007 Annual Report Ulica Mile Budaka 106 A, 88000 Mostar, Bosnia and Herzegovina Tel.: +387 36 33 57 00 Fax: +387 36 33 57 77 E-mail: ephzhb@ephzhb.ba www.ephzhb.ba CONTENTS Introduction... 7 Employees...

More information

JP ELEKTROPRIVREDA HZ HB d.d Mostar Mile Budaka 106a Mostar Bosnia and Herzegovina Tel.: Fax:

JP ELEKTROPRIVREDA HZ HB d.d Mostar Mile Budaka 106a Mostar Bosnia and Herzegovina Tel.: Fax: ANNUAL REPORT 2010 JP ELEKTROPRIVREDA HZ HB d.d Mostar Mile Budaka 106a 88000 Mostar Bosnia and Herzegovina Tel.: +387 36 335 700 Fax: +387 36 335 777 ephzhb@ephzhb.ba www.ephzhb.ba contents GENERAL

More information

Pumped storage hydroelectric power plants: Issues and applications BIH Case Study

Pumped storage hydroelectric power plants: Issues and applications BIH Case Study Pumped storage hydroelectric power plants: Issues and applications BIH Case Study Sasa Scekic, Head of Licensing and Technical Affairs Dpt., SERC BIH www. erranet.org Power System of Bosnia and Herzegovina

More information

1. TITLE OF THE PROJECT HYDROPOWER SYSTEM UPPER HORIZONS. 2. SECTOR Energy

1. TITLE OF THE PROJECT HYDROPOWER SYSTEM UPPER HORIZONS. 2. SECTOR Energy 1. TITLE OF THE PROJECT HYDROPOWER SYSTEM UPPER HORIZONS 2. SECTOR Energy 3. LOCATION The term Upper Horizons means the undeveloped part of the hydropower system Trebišnjica, which is located above the

More information

EPCG is seated at the address no 2 Vuka Karadžića St. in Nikšić

EPCG is seated at the address no 2 Vuka Karadžića St. in Nikšić hpp Piva CONTENTS: About us 1 hpp "Piva" 3 Construction 5 Technical features 7 Generation 9 Reconstruction and modernization 11 Environment 13 Society 15 Contact 17 About us Elektroprivreda Crne Gore A.D.

More information

Reforms in Kosovo s power System

Reforms in Kosovo s power System Reforms in Kosovo s power System SABRI LIMARI FIEK University of Kosovo Prishtina, KOSOVO ARMEND YMERI KEKJSC, Gjilan, KOSOVO FEHMI AZEMI TOOB, Univesity Abstract: -Within the South East European Integrations,

More information

Company ID. Bosnia and Herzegovina Entity: The Federation of Bosnia and Herzegovina Canton: The Herzegovina-Neretva Canton

Company ID. Bosnia and Herzegovina Entity: The Federation of Bosnia and Herzegovina Canton: The Herzegovina-Neretva Canton Company ID State: Bosnia and Herzegovina Entity: The Federation of Bosnia and Herzegovina Canton: The Herzegovina-Neretva Canton City: Mostar Address: Baćevići bb, 88000 Contact: +387 (0) 36 375 555 /

More information

Elektroprivreda BiH. 6th South East Europe Energy Dialogue (6th SEEED) Redefining SE Europe s Energy Map

Elektroprivreda BiH. 6th South East Europe Energy Dialogue (6th SEEED) Redefining SE Europe s Energy Map Power Sector Projects And Investment Opportunities Elektroprivreda BiH 6th South East Europe Energy Dialogue (6th SEEED) Redefining SE Europe s Energy Map MAY 2012 Bosnia and Herzegovina ELECTRIC SECTOR

More information

Wind Energy in South-east Europe: Seminar III: WIND ENERGY PROJECT DEVELOPMENT. Mostar,

Wind Energy in South-east Europe: Seminar III: WIND ENERGY PROJECT DEVELOPMENT. Mostar, Wind Energy in South-east Europe: Seminar III: WIND ENERGY PROJECT DEVELOPMENT UNIVERSITY OF SPLIT FACULTY OF ELECTRICAL ENGINEERING, MECHANICAL ENGINEERING AND NAVAL ARCHITECTURE Wind Project Development

More information

Workshop on WATER-FOOD-ENERGY-ECOSYSTEMS NEXUS ASSESSMENT IN THE SAVA RIVER BASIN. Sectoral goals in the Sava River Basin

Workshop on WATER-FOOD-ENERGY-ECOSYSTEMS NEXUS ASSESSMENT IN THE SAVA RIVER BASIN. Sectoral goals in the Sava River Basin Workshop on WATER-FOOD-ENERGY-ECOSYSTEMS NEXUS ASSESSMENT IN THE SAVA RIVER BASIN Sectoral goals in the Sava River Basin B&H : Strategic orientation in energy sector Zagreb, 4.3. 14. Prof. Tarik Kupusović

More information

2. SECTOR Energy 1. PROJECT TITLE LOWER VRBAS HYDROPOWER PLANTS

2. SECTOR Energy 1. PROJECT TITLE LOWER VRBAS HYDROPOWER PLANTS 1. PROJECT TITLE LOWER VRBAS HYDROPOWER PLANTS. SECTOR Energy 3. LOCATION The lower course of the Vrbas, i.e. the stretch from the city of Banja Luka to the mouth of the Vrbas, is planned to accommodate

More information

University of Mostar in brief. Prof.Dražena Gašpar, Ph.D. Vice-Rector for International Relations and Business

University of Mostar in brief. Prof.Dražena Gašpar, Ph.D. Vice-Rector for International Relations and Business University of Mostar in brief Prof.Dražena Gašpar, Ph.D. Vice-Rector for International Relations and Business 1 UNIVERSITY OF MOSTAR - HISTORY 1. 1895 - Origins from the Franciscan School of Theology the

More information

LAW ON THE AGENCY FOR PRESCHOOL, PRIMARY AND SECONDARY EDUCATION

LAW ON THE AGENCY FOR PRESCHOOL, PRIMARY AND SECONDARY EDUCATION Pursuant to Article IV.4.a) of the Constitution of Bosnia and Herzegovina, at the 16th session of the House of Representatives, held on October 11th and 30th, 2007, and at the 9th session of the House

More information

Public Seminar 30 October 2018, Lisbon. Water sector in B&H

Public Seminar 30 October 2018, Lisbon. Water sector in B&H Public Seminar 30 October 2018, Lisbon Water sector in B&H Ministry of Foreign Trade and Economic Relations www.mvteo.gov.ba Boško Kenjić, Head of Department Tel: +387 33 262 155 E-mail: bosko.kenjic@mvteo.gov.ba

More information

Ivan Lovrić. Telephone Mobile phone Fax

Ivan Lovrić. Telephone Mobile phone Fax PERSONAL INFORMATION Surname and first name Ivan Lovrić Address Work: Faculty of Civil Engineering, University of Mostar, Matice hrvatske bb, 88000 Mostar, Bosnia and Herzegovina Telephone +387 36 355

More information

ASSET MANAGEMENT AND AUTOMATION: ANDRITZ DIGITAL SOLUTIONS AND CASE STUDIES

ASSET MANAGEMENT AND AUTOMATION: ANDRITZ DIGITAL SOLUTIONS AND CASE STUDIES HYDRO ASSET MANAGEMENT AND AUTOMATION: ANDRITZ DIGITAL SOLUTIONS AND CASE STUDIES DIEGO ALIPRANDI SALTO GRANDE HPP AUGUST 27 TH 2018 COMPREHENSIVE EXPERTISE OF ANDRITZ HYDRO We are a global supplier of

More information

Wind Power Plant Podveležje

Wind Power Plant Podveležje Wind Power Plant Podveležje Public Information Meeting Mostar, Topics 1. PROJECT BACKGROUND AND OBJECTIVES 2. PROJECT DESCRIPTION 3. PERMITTING STATUS 4. DESCRIPTION OF THE ENVIRONMENTAL CONDITIONS Physical

More information

FIRST QUARTER RESULTS 2017

FIRST QUARTER RESULTS 2017 FIRST QUARTER RESULTS 2017 KEY RESULTS In the 1Q17 Interjet total revenues added $4,421.5 million pesos that represented an increase of 14.8% over the income generated in the 1Q16. In the 1Q17, operating

More information

IEEJ: June 2010 JICA JFY 2010 Energy Policy (B) NO. J / ID Country Report: Bosnia and Herzegovina March 2010 Prepared by JICA trainee

IEEJ: June 2010 JICA JFY 2010 Energy Policy (B) NO. J / ID Country Report: Bosnia and Herzegovina March 2010 Prepared by JICA trainee JICA JFY 2010 Energy Policy (B) NO. J1000606 / ID. 1080149 Country Report: Bosnia and Herzegovina March 2010 Prepared by JICA trainee Mile Srdanovic Bosnia and Herzegovina basic energy related figures

More information

THIRD QUARTER RESULTS 2018

THIRD QUARTER RESULTS 2018 THIRD QUARTER RESULTS 2018 KEY RESULTS In the 3Q18 Interjet total revenues added $ 6,244.8 million pesos that represented an increase of 7.0% over the revenue generated in the 3Q17. In the 3Q18, operating

More information

The Electric Power System

The Electric Power System The Electric Power System - Bosnia and Herzegovina - Bosnia and Herzegovina Power System 1 2 Basic facts Area: 51.197 km 2 Population: 3.791.622 Number of electricity consumers: 1.505.015 Number of TSOs:

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010 COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)

More information

INVESTMENT PROJECT Preparation and management for professional automatic greenhouses

INVESTMENT PROJECT Preparation and management for professional automatic greenhouses INVESTMENT PROJECT Preparation and management for 10-100 professional automatic greenhouses Ministry of Economy of the Central Bosnia Canton Travnik, 2015. Ministry of Economy of the Central Bosnia Canton

More information

The Potential of Renewable Energy Sources in Bosnia and Herzegovina

The Potential of Renewable Energy Sources in Bosnia and Herzegovina The Potential of Renewable Energy Sources in Bosnia and Herzegovina Petar M.Gvero, Ph.D.,M.Sc. Assistant Professor Climate Change in South-Eastern European Countries: Causes, Impacts, Solutions Graz, Austria

More information

112 SYSTEM IN BOSNIA AND HERZEGOVINA

112 SYSTEM IN BOSNIA AND HERZEGOVINA Ministry of Security of Bosnia and Herzegovina 112 SYSTEM IN BOSNIA AND HERZEGOVINA Mirnesa Softic Operational Communication Center BH - 112 Ministry of Security of Bosnia and Herzegovina Zagreb, 16 November

More information

FRAMEWORK LAW ON THE PROTECTION AND RESCUE OF PEOPLE AND PROPERTY IN THE EVENT OF NATURAL OR OTHER DISASTERS IN BOSNIA AND HERZEGOVINA

FRAMEWORK LAW ON THE PROTECTION AND RESCUE OF PEOPLE AND PROPERTY IN THE EVENT OF NATURAL OR OTHER DISASTERS IN BOSNIA AND HERZEGOVINA Pursuant to Article IV4.a) of the Constitution of Bosnia and Herzegovina, at the 28 th session of the House of Representatives held on 29 April 2008, and at the 17 th session of the House of Peoples held

More information

Q1 Fiscal 2018 Statistics

Q1 Fiscal 2018 Statistics Q1 Fiscal 2018 Statistics FedEx Corporation Financial and Operating Statistics First Quarter Fiscal 2018 September 19, 2017 This report is a statistical supplement to FedEx s interim financial reports

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) 18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services

More information

MAJEVICA AD HOLDING BACKA PALANKA

MAJEVICA AD HOLDING BACKA PALANKA MAJEVICA AD HOLDING BACKA PALANKA General Information Full legal name Address MAJEVICA AD HOLDING BACKA PALANKA Zarka Zrenjanina 123, Backa Palanka Identification Number 08005613 Core activity Production

More information

Republika e Kosovës Republika Kosova-Republic of Kosovo Qeveria - Vlada - Government New Kosovo Project

Republika e Kosovës Republika Kosova-Republic of Kosovo Qeveria - Vlada - Government New Kosovo Project Republika e Kosovës Republika Kosova-Republic of Kosovo Qeveria - Vlada - Government New Kosovo Project March 20, 2018 Bringing Kosovo s energy sector closer to Europe Content of Presentation 1. Project

More information

THE MUNICIPALITY of PROZOR-RAMA

THE MUNICIPALITY of PROZOR-RAMA Bosnia and Herzegovina Federation of Bosnia and Herzegovina Herzegovina-Neretva Canton THE MUNICIPALITY of PROZOR-RAMA I T S D E V E L O P M E N T S T R A T E G Y B U S I N E S S ZONES S U B S I D Y S

More information

OPERATING AND FINANCIAL HIGHLIGHTS

OPERATING AND FINANCIAL HIGHLIGHTS Copa Holdings Reports Financial Results for the Fourth Quarter of 2015 Excluding special items, adjusted net income came in at $31.7 million, or EPS of $0.73 per share Panama City, Panama --- February

More information

Copa Holdings Reports Record Earnings of US$41.8 Million for 4Q06 and US$134.2 Million for Full Year 2006

Copa Holdings Reports Record Earnings of US$41.8 Million for 4Q06 and US$134.2 Million for Full Year 2006 Copa Holdings Reports Record Earnings of US$41.8 Million for 4Q06 and US$134.2 Million for Full Year 2006 Panama City, Panama --- March 7, 2007. Copa Holdings, S.A. (NYSE: CPA), parent company of Copa

More information

FOURTH QUARTER RESULTS 2017

FOURTH QUARTER RESULTS 2017 FOURTH QUARTER RESULTS 2017 KEY RESULTS In the 4Q17 Interjet total revenues added $5,824.8 million pesos that represented an increase of 10.8% over the revenue generated in the 4Q16. In the 4Q17, operating

More information

Interim Report 6m 2014

Interim Report 6m 2014 August 11, 2014 Interim Report 6m 2014 Investors and Analysts Conference Call on August 11, 2014 Joachim Müller, CFO Latest ad-hoc release (August 4, 2014) Reduction of forecast, primarily due to a further

More information

NORWEGIAN AIR SHUTTLE ASA QUARTERLY REPORT SECOND QUARTER 2006 [This document is a translation from the original Norwegian version]

NORWEGIAN AIR SHUTTLE ASA QUARTERLY REPORT SECOND QUARTER 2006 [This document is a translation from the original Norwegian version] NORWEGIAN AIR SHUTTLE ASA QUARTERLY REPORT SECOND QUARTER 2006 SECOND QUARTER IN BRIEF had earnings before tax of MNOK 24.8 (20.6) in the second quarter. The operating revenue increased by 44 % this quarter,

More information

BUDUCNOST JSC PRESEVO Presevo

BUDUCNOST JSC PRESEVO Presevo BUDUCNOST JSC PRESEVO Presevo General Information Full legal name ENTERPRISE OF BUILDING MATERIAL BUDUCNOST JSC PRESEVO, PRESEVO Address No. 38 Dimitrija Tucovica Street Identification Number 07179243

More information

Q3 Fiscal 2018 Statistics

Q3 Fiscal 2018 Statistics Q3 Fiscal 2018 Statistics FedEx Corporation Financial and Operating Statistics Third Quarter Fiscal 2018 March 20, 2018 This report is a statistical supplement to FedEx s interim financial reports and

More information

Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of

Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of environment, mining and spatial planning Department of project

More information

CONTACT: Investor Relations Corporate Communications

CONTACT: Investor Relations Corporate Communications NEWS RELEASE CONTACT: Investor Relations Corporate Communications 435.634.3200 435.634.3553 Investor.relations@skywest.com corporate.communications@skywest.com SkyWest, Inc. Announces Fourth Quarter 2017

More information

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT (Kuwait, 17 to 20 September 2003) International

More information

OPERATING AND FINANCIAL HIGHLIGHTS. Subsequent Events

OPERATING AND FINANCIAL HIGHLIGHTS. Subsequent Events Copa Holdings Reports Net Income of US$113.1 Million and EPS of US$2.57 for the First Quarter of 2015 Excluding special items, adjusted net income came in at US$106.0 million, or EPS of US$2.41 per share

More information

ARTWEI ARTWEI ARTWEI

ARTWEI ARTWEI ARTWEI Protection / Management Plans for Natura 2000 areas and Maritime Spatial Plan for internal sea waters - including the Szczecin Lagoon Szczecin, 7th May 2011 Andrzej Zych Inspectorate of Coast Protection

More information

Policy PL Date Issued February 10, 2014

Policy PL Date Issued February 10, 2014 Subject RENEWABLE ENERGY ON CROWN LAND Compiled by Renewable Energy Program, Biodiversity Branch Replaces Policy Directives Waterpower Site Release Crown Land Onshore Windpower Development - Crown Land

More information

GROUP ULJANIK PLOVIDBA CONSOLIDATED AUDITED FINANCIAL STATEMENTS FOR THE PERIOD JANUARY - DECEMBER 2014

GROUP ULJANIK PLOVIDBA CONSOLIDATED AUDITED FINANCIAL STATEMENTS FOR THE PERIOD JANUARY - DECEMBER 2014 GROUP ULJANIK PLOVIDBA CONSOLIDATED AUDITED FINANCIAL STATEMENTS FOR THE PERIOD JANUARY - DECEMBER 2014 Pula, April 2015 CONTENT: Consolidated audited Financial Statements of GROUP ULJANIK PLOVIDBA with

More information

Aviation Data and Analysis Seminar February Economics of Airports and Air Navigation Services Providers

Aviation Data and Analysis Seminar February Economics of Airports and Air Navigation Services Providers Aviation Data and Analysis Seminar 20-23 February 2017 Economics of Airports and Air Navigation Services Providers 250 7000 6000 200 5000 150 4000 Growth of air transport World recession SARS Freight Tonne

More information

NORWEGIAN AIR SHUTTLE ASA QUARTERLY REPORT FIRST QUARTER 2004 [This document is a translation from the original Norwegian version]

NORWEGIAN AIR SHUTTLE ASA QUARTERLY REPORT FIRST QUARTER 2004 [This document is a translation from the original Norwegian version] NORWEGIAN AIR SHUTTLE ASA QUARTERLY REPORT 2004 IN BRIEF At the start of 2003, Norwegian has become a pure low-fare airline. The Fokker F-50 operations have been terminated, and during the quarter the

More information

Technical Assistance to support implementation of

Technical Assistance to support implementation of Technical Assistance to support implementation of water & sanitation programme This project is funded by the European Union Project implemented by IGIP GmbH in consortium with NAMA S.A. and EXERGIA S.A.

More information

Belgrade Chamber of Economy.

Belgrade Chamber of Economy. Belgrade Chamber of Economy www.kombeg.org.yu Facts about Belgrade Belgrade, the capital of the State Union of Serbia and Montenegro and the capital of the Republic of Serbia, is not only the seat of

More information

Spirit Airlines Reports First Quarter 2017 Results

Spirit Airlines Reports First Quarter 2017 Results Spirit Airlines Reports First Quarter 2017 Results MIRAMAR, Fla., April 28, 2017 - Spirit Airlines, Inc. (NASDAQ: SAVE) today reported first quarter 2017 financial results. GAAP net income for the first

More information

OPERATING AND FINANCIAL HIGHLIGHTS SUBSEQUENT EVENTS

OPERATING AND FINANCIAL HIGHLIGHTS SUBSEQUENT EVENTS Copa Holdings Reports Net Income of US$6.2 Million and EPS of US$0.14 for the Third Quarter of 2015 Excluding special items, adjusted net income came in at $37.4 million, or EPS of $0.85 per share Panama

More information

CONTACT: Investor Relations Corporate Communications

CONTACT: Investor Relations Corporate Communications NEWS RELEASE CONTACT: Investor Relations Corporate Communications 435.634.3200 435.634.3553 Investor.relations@skywest.com corporate.communications@skywest.com SkyWest, Inc. Announces Second Quarter 2017

More information

FACTORY CONSTRUCTION FOR THE PRODUCTION OF FERROSILICIUM IN GORNJI VAKUF - USKOPLJE MINISTRY OF ECONOMY, CENTRAL BOSNIAN CANTON

FACTORY CONSTRUCTION FOR THE PRODUCTION OF FERROSILICIUM IN GORNJI VAKUF - USKOPLJE MINISTRY OF ECONOMY, CENTRAL BOSNIAN CANTON FACTORY CONSTRUCTION FOR THE PRODUCTION OF FERROSILICIUM IN GORNJI VAKUF - USKOPLJE MINISTRY OF ECONOMY, CENTRAL BOSNIAN CANTON Travnik, september 2013 Ministry of economy, Central Bosnian Canton Construction

More information

Golden Ocean Group Limited Q results March 1, 2007

Golden Ocean Group Limited Q results March 1, 2007 Golden Ocean Group Limited Q4 2006 results March 1, 2007 PROFIT & LOSS 2005 2006 (in thousands of $) 2006 2005 Oct-Dec Oct-Dec Jan - Dec Jan - Dec Operating Revenues 37 292 91 253 Time charter revenues

More information

Comparison on the Ways of Airworthiness Management of Civil Aircraft Design Organization

Comparison on the Ways of Airworthiness Management of Civil Aircraft Design Organization Available online at www.sciencedirect.com Procedia Engineering Procedia Engineering 00 (2011) 17 000 000 (2011) 388 395 Procedia Engineering www.elsevier.com/locate/procedia The 2nd International Symposium

More information

THIRD QUARTER RESULTS 2017

THIRD QUARTER RESULTS 2017 THIRD QUARTER RESULTS 2017 KEY RESULTS In the 3Q17 Interjet total revenues added $5,835.1 million pesos that represented an increase of 22.0% over the revenue generated in the 3Q16. In the 3Q17, operating

More information

HYDROELECTRIC POWER PLANTS ON THE LOWER SAVA RIVER

HYDROELECTRIC POWER PLANTS ON THE LOWER SAVA RIVER HYDROELECTRIC POWER PLANTS ON THE LOWER SAVA RIVER The construction of a chain of hydroelectric power plants on the lower course of the Sava River is a multi-purpose project that makes a significant contribution

More information

Historical Statistics

Historical Statistics Historical Statistics FedEx Corporation Financial and Operating Statistics FY 2005 FY 2014 This report is a statistical supplement to FedEx s interim financial reports and is prepared quarterly. Additional

More information

Spirit Airlines Reports Fourth Quarter and Full Year 2016 Results

Spirit Airlines Reports Fourth Quarter and Full Year 2016 Results Spirit Airlines Reports Fourth Quarter and Full Year 2016 Results MIRAMAR, FL. (February 7, 2017) - Spirit Airlines, Inc. (NASDAQ: SAVE) today reported fourth quarter and full year 2016 financial results.

More information

Q4 Fiscal 2017 Statistics

Q4 Fiscal 2017 Statistics Q4 Fiscal 2017 Statistics FedEx Corporation Financial and Operating Statistics Fourth Quarter Fiscal 2017 July 17, 2017 This report is a statistical supplement to FedEx s interim financial reports and

More information

Q3 Fiscal 2017 Statistics

Q3 Fiscal 2017 Statistics Q3 Fiscal 2017 Statistics FedEx Corporation Financial and Operating Statistics Third Quarter Fiscal 2017 February 28, 2017 This report is a statistical supplement to FedEx s interim financial reports and

More information

Technical Assistance to support implementation of

Technical Assistance to support implementation of Technical Assistance to support implementation of water & sanitation programme This project is funded by the European Union Project implemented by IGIP GmbH in consortium with NAMA S.A. and EXERGIA S.A.

More information

Bilfinger The international engineering and services group. April 7, 2016

Bilfinger The international engineering and services group. April 7, 2016 Bilfinger The international engineering and services group April 7, 2016 Bilfinger The best of two worlds THE ENGINEER THE SERVICE PROVIDER Bilfinger combines the qualities of its employees like no other

More information

Cathay Pacific Airways Limited Abridged Financial Statements

Cathay Pacific Airways Limited Abridged Financial Statements To provide shareholders with information on the results and financial position of the Group s significant listed associated company, Cathay Pacific Airways Limited, the following is a summary of its audited

More information

LEGISLATIVE OFFICIALS, GOVERNMENT ADMINISTRATORS AND GOVERNMENT EXECUTIVES; MANAGERS

LEGISLATIVE OFFICIALS, GOVERNMENT ADMINISTRATORS AND GOVERNMENT EXECUTIVES; MANAGERS CODE FRAME 1: OCCUPATION For use in the following questions: d3_12d d5_5a, d5_31a and d5_40a d6_4b LEGISLATIVE OFFICIALS, GOVERNMENT ADMINISTRATORS AND GOVERNMENT EXECUTIVES; MANAGERS 11 Legislative officials,

More information

THIRD QUARTER AND NINE MONTHS OF 2014 KEY RESULTS

THIRD QUARTER AND NINE MONTHS OF 2014 KEY RESULTS THIRD QUARTER AND NINE MONTHS OF 2014 KEY RESULTS In 3Q14 INTERJET total revenues were $ 3,643.4 million, representing an increase of 9.9% on revenues generated in the 3Q13. Accumulated 9M14 INTERJET total

More information

Cathay Pacific Airways Limited Abridged Financial Statements

Cathay Pacific Airways Limited Abridged Financial Statements To provide shareholders with information on the results and financial position of the Group s significant listed associated company, Cathay Pacific Airways Limited, the following is a summary of its audited

More information

Short Project Summary Cebren & Galiste Hydropower Project Republic of Macedonia

Short Project Summary Cebren & Galiste Hydropower Project Republic of Macedonia Short Project Summary Cebren & Galiste Hydropower Project Republic of Macedonia A strategic investment opportunity at the heart of South-East Europe s integrated electricity market Outline Macedonian Power

More information

4.6 Other Aviation Safety Matters FLAGS OF CONVENIENCE. (Presented by the Secretariat)

4.6 Other Aviation Safety Matters FLAGS OF CONVENIENCE. (Presented by the Secretariat) International Civil Aviation Organization 23/07/09 North American, Central American and Caribbean Office (NACC) Tenth Meeting of Directors of Civil Aviation of the Central Caribbean (C/CAR/DCA/10) Grand

More information

OPERATING AND FINANCIAL HIGHLIGHTS. Subsequent Events

OPERATING AND FINANCIAL HIGHLIGHTS. Subsequent Events Copa Holdings Reports Financial Results for the First Quarter of 2016 Excluding special items, adjusted net income came in at US$69.9 million, or EPS of US$1.66 per share Panama City, Panama --- May 5,

More information

INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA. CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI

INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA. CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI No: JPAC 841-B80-17 This Invitation for Tenders is published

More information

SKYWEST, INC. ANNOUNCES THIRD QUARTER 2014 RESULTS

SKYWEST, INC. ANNOUNCES THIRD QUARTER 2014 RESULTS NEWS RELEASE For Further Information Contact: Investor Relations Telephone: (435) 634-3203 Fax: (435) 634-3205 FOR IMMEDIATE RELEASE: October 29, 2014 SKYWEST, INC. ANNOUNCES THIRD QUARTER 2014 RESULTS

More information

1. Introduction. 3. Tentative List. 2. Inventories / lists / registers for cultural and natural heritage. Page 1. 1.

1. Introduction. 3. Tentative List. 2. Inventories / lists / registers for cultural and natural heritage. Page 1. 1. 1. Introduction 1.1 - State Party Bosnia and Herzegovina 1.2 - Date of ratification of the World Heritage Convention 12/07/1993 1.3 - Entities involved in the preparation of Section I of the Periodic Reporting

More information

Historical Statistics

Historical Statistics Historical Statistics FedEx Corporation Financial and Operating Statistics FY 2006 FY 2015 This report is a statistical supplement to FedEx s interim financial reports and is prepared annually. Additional

More information

THE YORK WATER COMPANY York, PA

THE YORK WATER COMPANY York, PA VOLUME 1 THE YORK WATER COMPANY York, PA INFORMATION SUBMITTED TO PENNSYLVANIA PUBLIC UTILITY COMMISSION PURSUANT TO: Title 52 Pennsylvania Code Exhibit No. H(a)-1 through Exhibit No. HII-13 Supplement

More information

Civil Aviation, Annual Operating and Financial Statistics, Canadian Air Carriers, Levels I to III

Civil Aviation, Annual Operating and Financial Statistics, Canadian Air Carriers, Levels I to III Catalogue no. 51-004-X Vol. 49, no. 4. Aviation Civil Aviation, Annual Operating and Financial Statistics, Canadian Air Carriers, Levels I to III 2015. Highlights In 2015, Canadian Level I to III air carriers

More information

Energy efficiency project for municipality Bijelo Polje, Montenegro

Energy efficiency project for municipality Bijelo Polje, Montenegro Energy efficiency project for municipality Bijelo Polje, Montenegro Lucija Rakocevic, MSc Montconsult d.o.o. Inter-regional Workshop on Energy Efficiency Investment Projects Pipeline projects Background

More information

MIRAMAR, Fla., April 29, 2015 (GLOBE NEWSWIRE) -- Spirit Airlines, Inc. (Nasdaq:SAVE) today reported first quarter 2015 financial results.

MIRAMAR, Fla., April 29, 2015 (GLOBE NEWSWIRE) -- Spirit Airlines, Inc. (Nasdaq:SAVE) today reported first quarter 2015 financial results. April 29, 2015 Spirit Airlines Announces First Quarter 2015 Results; Adjusted Net Income Increases 87.1 Percent to $70.7 Million and Pre-Tax Margin Increases 900 Basis Points to 22.7 Percent MIRAMAR, Fla.,

More information

Interim Business Report 2017

Interim Business Report 2017 April 1, 2017 through September 30, 2017 November 22, 2017 Contents SECTION 1 01 Consolidated Statement of Income 02 Factors Leading to Difference in Consolidated Ordinary Income Compared With Same Period

More information

Jadran JSC, Nova Gajdobra

Jadran JSC, Nova Gajdobra Jadran JSC, Nova Gajdobra General Information Full legal name Joint stock company Jadran, Nova Gajdobra Address No. 41 Proleterska Street, 21431 Nova Gajdobra Identification Number 08058130 Core activity

More information

DOMESTIC LPG STOVE. Profile No.: 46 NIC Code: INTRODUCTION: 2. PRODUCT & ITS APPLICATION:

DOMESTIC LPG STOVE. Profile No.: 46 NIC Code: INTRODUCTION: 2. PRODUCT & ITS APPLICATION: Profile No.: 46 NIC Code: 27504 DOMESTIC LPG STOVE 1. INTRODUCTION: Liquefied Petroleum Gas and Natural Gas have become accepted fuels for domestic and commercial cooking mode of cooking as they offer

More information

OPERATING AND FINANCIAL HIGHLIGHTS SUBSEQUENT EVENTS

OPERATING AND FINANCIAL HIGHLIGHTS SUBSEQUENT EVENTS Copa Holdings Reports Financial Results for the Third Quarter of 2016 Excluding special items, adjusted net income came in at $55.3 million, or adjusted EPS of $1.30 per share Panama City, Panama --- November

More information

CONFERENCE ON THE ECONOMICS OF AIRPORTS AND AIR NAVIGATION SERVICES

CONFERENCE ON THE ECONOMICS OF AIRPORTS AND AIR NAVIGATION SERVICES ANSConf-WP/23 4/2/00 ITEM 6 CONFERENCE ON THE ECONOMICS OF AIRPORTS AND AIR NAVIGATION SERVICES (Montreal, 19-28 June 2000) Agenda Item 6: Guidance and assistance by ICAO ICAO ACTIVITIES IN THE FIELD OF

More information

SIMULATION OF BOSNIA AND HERZEGOVINA AIRSPACE

SIMULATION OF BOSNIA AND HERZEGOVINA AIRSPACE SIMULATION OF BOSNIA AND HERZEGOVINA AIRSPACE SECTORIZATION AND ITS INFLUENCE ON FAB CE Valentina Barta, student Department of Aeronautics, Faculty of Transport and Traffic Sciences, University of Zagreb,

More information

1. International Conventions 2. South African Legislation 3. Swaziland Legislation

1. International Conventions 2. South African Legislation 3. Swaziland Legislation A. Legal context WATER FOR EVER 1. International Conventions 2. South African Legislation 3. Swaziland Legislation B. Evolution of KOBWA 1. Treaties 2. Evolution Stages 3. Main Objectives 4. Need for Bi-national

More information

The Hydro Tasmania group

The Hydro Tasmania group Statement of Corporate Intent Hydro Tasmania is the trading name of the Hydro-Electric Corporation, an integrated energy business owned by the State of Tasmania. The Minister for Energy has portfolio responsibility

More information

Sewerage and Water Board of New Orleans Page 1

Sewerage and Water Board of New Orleans Page 1 Sewerage and Water Board of New Orleans Page 1 Statement of Budgeted Revenues and Expenses By Funds For 2005 Operations: Enterprise Water Sewerage Drainage Fund Net Revenue from Charges $55,832,400 $85,445,200

More information

Presentation on Results for the 2nd Quarter FY Idemitsu Kosan Co.,Ltd. November 14, 2018

Presentation on Results for the 2nd Quarter FY Idemitsu Kosan Co.,Ltd. November 14, 2018 Presentation on Results for the 2nd Quarter FY 2018 Idemitsu Kosan Co.,Ltd. November 14, 2018 Table of Contents 1. FY 2018 2nd Quarter Financials (1) Overview (2) Segment Information 2. Reference Materials

More information

Catchment and Lake Research

Catchment and Lake Research LARS 2007 Catchment and Lake Research Multilateral versus bilateral agreements for the establishment of river based organizations: comparison of legal, economic and social benefits in the Zambian experience.

More information

Decision Enacting the Law on Salaries and Other Compensations in Judicial and Prosecutorial Institutions at the Level of Bosnia and Herzegovina

Decision Enacting the Law on Salaries and Other Compensations in Judicial and Prosecutorial Institutions at the Level of Bosnia and Herzegovina Decision Enacting the Law on Salaries and Other Compensations in Judicial and Prosecutorial Institutions at the Level of Bosnia and Herzegovina In the exercise of the powers vested in the High Representative

More information

MGM Resorts International Reports Second Quarter Financial Results

MGM Resorts International Reports Second Quarter Financial Results NEWS RELEASE MGM Resorts International Reports Second Quarter Financial Results 8/5/2014 Consolidated Adjusted EBITDA Increased 8%, Led By 10% Growth In Wholly Owned Domestic Resorts MGM China Declares

More information

SECOND QUARTER RESULTS 2018

SECOND QUARTER RESULTS 2018 SECOND QUARTER RESULTS 2018 KEY RESULTS In the 2Q18 Interjet total revenues added $ 5,781.9 million pesos that represented an increase of 9.6% over the revenue generated in the 2Q17. In the 2Q18, operating

More information

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport Screening Chapter 14 Single European Sky (SES) 18 December 2014 SINGLE EUROPEAN SKY OBJECTIVES: INCREASE SAFETY, EFFICIENCY, CAPACITY & PERFORMANCE Reduce fragmentation and complexity of ATM in Europe

More information

The role of Serbia in the security of supply in Europe

The role of Serbia in the security of supply in Europe 1 The role of Serbia in the security of supply in Europe What is the goal of security of supply? 1. Obtaining sufficient natural gas quantities to cover end-customer demand even under extreme conditions.

More information

CONTACT: Investor Relations Corporate Communications

CONTACT: Investor Relations Corporate Communications NEWS RELEASE CONTACT: Investor Relations Corporate Communications 435.634.3200 435.634.3553 Investor.relations@skywest.com corporate.communications@skywest.com SkyWest, Inc. Announces Second Quarter 2016

More information

Civil-Military Cooperation in Germany. Roland Mallwitz German Air Navigation Services Head of Surveillance Services

Civil-Military Cooperation in Germany. Roland Mallwitz German Air Navigation Services Head of Surveillance Services Civil-Military Cooperation in Germany Roland Mallwitz German Air Navigation Services Head of Surveillance Services Agenda 50 Years of Development in ATM Evolution of Cooperation in Surveillance and Identification

More information

Copa Holdings Reports Fourth Quarter and Full Year 2007 Results

Copa Holdings Reports Fourth Quarter and Full Year 2007 Results Copa Holdings Reports Fourth Quarter and Full Year 2007 Results Panama City, Panama --- February 21, 2008. Copa Holdings, S.A. (NYSE: CPA), parent company of Copa Airlines and Aero Republica, today announced

More information

MLADI BORAC JSC Sonta

MLADI BORAC JSC Sonta MLADI BORAC JSC Sonta General Information Full legal name Address AGRICULTURAL PRODUCTION COMPANY MLADI BORAC JSC SONTA No Num. Salas Mladi Borac Street, Sonta Identification Number 08644586 Core activity

More information