1 Summary Kvaerner s Investigation Report Fatal accident at Stord, Norway 7 March / 5
2 Summary of Kvaerner s internal Investigation Report of the fatal accident at Stord 7 March 2015 Background Kvaerner at Stord is Kvaerner's assembly yard for modules and topsides for fixed and floating oil and gas production platforms and the main part of the Topsides business area within Kvaerner. Kvaerner Stord is also responsible for multi discipline and mechanical construction contracts for onshore oil and gas plants in Norway. Within decommissioning of offshore structures, Kvaerner Stord is responsible for demolition methods and onshore execution of demolition of topsides and other structures. In April 2014, Kvaerner Stord AS was awarded the contract for dismantling and recycling the Draugen FLP buoy. (FLP: Floating Loading Platform). The work comprises the engineering, deconstruction and disposal of the Draugen FLP. The topside is 285 tonnes and was lifted on to the Eldøy deconstruction site by a heavy lift vessel, and the rest of the buoy weighing tonnes, was down ended and transported into the dry dock at Kvaerner Stord. The buoy has been cut in four sections and transported to Eldøyane deconstruction site for further demolition. The project is estimated to be completed during spring The core team at the deconstruction site consist of employees at Kvaerner Stord, supplemented by a small number of hired-in personnel, totalling 30 people. The decommissioning activities at the Eldøyane site include movement and deconstruction of large structures. Kvaerner at Stord has over time instituted numerous safety barriers beyond the requirements set out by the authorities in order to prevent work related accidents. In spite of these measures, a fatal accident occurred at the Eldøyane decommissioning site 7 March Following the accident, Kvaerner has performed an internal independent accident investigation with the objective to promote learning, improve work and safety and share knowledge internally and externally. The findings of the accident investigation are based on document reviews, inspections and interviews with involved persons related to the demolition activities at Kvaerner Stord. The labour inspection has concluded that there will be no need for additional measures. A police investigation is ongoing. The following is a summary of Kvaerner s internal independent investigation report: The accident In the morning of 7 March 2015, two operators were performing detail cutting of sections of the Draugen FLP buoy using cutting torches. During this operation, a plate fell onto one of the operators. The operator died of the injuries sustained in the accident. The operator was a hired-in, working under the supervision of Kvaerner Stord. 2 / 5
3 Immediate response Co-workers ran over to the scene of the accident immediately. Personnel from the emergency response team (ARL) arrived shortly after the accident and started CPR. Ambulances and a doctor arrived and the injured person was declared dead by the doctor. The company doctor and nurse arrived and contributed in the follow up work and debrief. Work at the site was stopped. In the days after the accident, management held five information meetings for all employees including hired in personnel and subcontractors. The emergency response arrangement was operational and well-functioning, and internal notifications were initiated according to established routines. Main causes The direct causes for the accident appears to be that the section standing up became unsecured from tilting over as more and more panels were cut off from the section. The cutting sequence was different to the method planned (narrow panels) as the remains of the section was cut in two larger pieces (A and B on illustration Plan view). The cut between the plate A and B (illustration Elevation view) was not fully completed when both plates fell over. When cutting, the deceased operator had placed himself on the outer side of the larger section. 3 / 5
4 Indirect causes leading up to the accident - No clear method defined for detailed cutting work on the section was available. -Some of the existing safety barriers were weak or imprecise. -Systematic learning from the incident history related to serious incidents at Kvaerner s operations at Stord and in the industry in general, was not fully utilized. - A separate risk assessment was not carried out for this specific work operation. Actions The internal investigation team has come up with recommendations to be implemented in the company. Some of them are related to the accident while others are related to general and continuous improvement activities. Recommendations related directly to the accident can be summarised as follows: Systematic learning More active use of experiential learning in the demolition industry when risk analyses are performed. Continuous improvement processes must ensure that recommended follow-up actions from the investigation team are developed and implemented. Review overall methods for demolition activities Minimize manual work and optimize use of machine tools. Introduce written instructions on the detailed cutting phase of operations. 4 / 5
5 Securing of objects Establish procedures related to securing and supporting unstable structures. Improve communication and risk awareness Establish processes to ensure that all operators with no segregation related to nationality or culture have the same risk awareness and understanding of the particular work task. The same applies to the right and responsibility to stop the work if it is unclear if the work tasks can be performed in a safe manner. Improve management process Establish routines for the presence of supervisors at the work site. Actions from management after inspections are to be completed promptly. The way forward The purpose of the investigation report is to promote learning, improvements and sharing of knowledge within Kvaerner and related parties. The recommendations from the Kvaerner Independent Investigation Team will be implemented and together with reports and recommendations from the authorities, be fundamental in Kvaerner s work to improve the HSSE culture and performance in all phases of Kvaerner s operations. 5 / 5
Capital Markets Day 10 January 2013
Capital Markets Day 10 January 2013 Time Topic Speaker 09.00 Introduction Jan Arve Haugan, President & CEO 09.20 Concept / Front End, Engineering and Procurement Janne H. Rasten, EVP Project Support Tony
More informationSequoia & Kings Canyon National Parks Fire Update
Fire Update For Immediate Release September 28, 2004 Grant West Prescribed Fire Begins Today Today, fire crews will use hand-held drip torches to ignite 60 acres of the Grant West Prescribed Fire in Kings
More informationContents CONCRETE SUBSTRUCTURES ONSHORE FACILITIES STEEL JACKET SUBSTRUCTURES STRUCTURES
Contents 4 Topsides 6 Concrete substructures 9 Steel jacket substructures 11 Floating structures 12 Onshore facilities 14 Track record second to none 16 An effective execution model for global deliveries
More informationWintershall K10-B Decommissioning Case Study. Sven Vandamme, Scaldis Salvage & Marine Contractors
Wintershall K10-B Decommissioning Case Study Sven Vandamme, Scaldis Salvage & Marine Contractors SVEN VANDAMME PROJECT ENGINEER 01. COMPANY PROFILE 02. ING TRACK RECORD 03. SITE VISIT 04. PREPARATION PHASE
More informationFATALITY INVESTIGATION ACTIVITY #2
FATALITY INVESTIGATION ACTIVITY #2 UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION Surface Nonmetal Mine (Limestone)
More informationIMO RECYCLING OF SHIPS
INTERNATIONAL MARITIME ORGANIZATION E IMO MARINE ENVIRONMENT PROTECTION COMMITTEE 49th session Agenda item 3 MEPC 49/3/2 9 May 2003 Original: ENGLISH RECYCLING OF SHIPS Comments on the Report of the Correspondence
More informationKvaerner s yard at Stord. 19 March 2018 Steinar Røgenes, EVP EPCI
Kvaerner s yard at Stord 19 March 2018 Steinar Røgenes, EVP EPCI Kvaerner at Stord Core business Module and platform assembly Onshore plant installation Installation and hook-up Platform demolition and
More informationAker companies investor day, London Jan Arve Haugan, President & CEO Eiliv Gjesdal, CFO
Aker companies investor day, London Jan Arve Haugan, President & CEO Eiliv Gjesdal, CFO This is Kvaerner CONCRETE SOLUTIONS JACKETS TOPSIDES ONSHORE Global leader in marine concrete structures European
More informationGuideline: Rules and appropriate practices for disabled aircraft removal
Guideline for the Airport Community Guideline: Rules and appropriate practices for disabled aircraft removal Date of issue: May 2018 GUIDELINE-OCD001-R0 TABLE OF CONTENTS 1. Purpose and Scope... 3 2. Definitions
More informationEuropean Maritime Safety Agency MARINE CASUALTIES AND INCIDENTS
MARINE CASUALTIES AND INCIDENTS SUMMARY OVERVIEW 2011-2015 TAKING A BROADER VIEW IN ACCIDENT INVESTIGATION It is with great pleasure that I introduce this new publication based on EMSA s activities in
More informationU.S. Coast Guard - American Waterways Operators Annual Safety Report
American Waterways Operators U.S. Coast Guard - American Waterways Operators Annual Safety Report National Quality Steering Committee Meeting December 12, 2017 Established Safety Metrics For 17 years,
More informationREPORT A-017/2010 DATA SUMMARY
REPORT A-017/2010 DATA SUMMARY LOCATION Date and time Site Monday, 7 June 2010; 12:00 local time 1, approximately Girona Airport AIRCRAFT Registration EI-DAX Type and model BOEING 737-800 Operator Ryanair
More informationU.S. Coast Guard - American Waterways Operators Annual Safety Report
American Waterways Operators U.S. Coast Guard - American Waterways Operators Annual Safety Report National Quality Steering Committee Meeting August 3, 216 Established Safety Metrics For 16 years, the
More informationTable Top Exercise! The Shooting! Welcome & Introductions. Exercise Rules. Mode 1. Building Floor Plan. Company XYZ the setting!
Table Top Exercise! Welcome & Introductions Purpose of a Table Top Drill Provides an opportunity to apply our knowledge of how we would respond to a real life scenario in a classroom environment. We all
More informationKENNECOTT UTAH COPPER
12.2.1 INTRODUCTION: 12.2.1.1 The purpose of this standard is to define responsibilities and accountability when non-kuc Rio Tinto Groups (and their contractors and subcontractors) access and / or do work
More informationRESPONSIBLE SHIP RECYCLING IN PRACTICE
RESPONSIBLE SHIP RECYCLING IN PRACTICE Danish Maritime Days Sustainable Shipping 5 OCTOBER 2015 THE CLIPPER CONCORD WAS RECYCLED IN INDIA, MARCH-MAY 2015 Towards the end of 2014, Clipper decided to recycle
More informationWelcome! Telecommunications Towers & Site Safety
Welcome! Telecommunications Towers & Site Safety ITSC: Wednesday September 14, 2005 Site Safety This presentation is intended to allow for an overview of the Site Safety concerns that we all should be
More informationFINAL REPORT MARINE INCIDENT Keszthely 13 th August 2006 MS Almádi 01297
FINAL REPORT MARINE INCIDENT Keszthely 13 th August 2006 MS Almádi 01297 The sole objective of the technical investigation is to reveal the causes and circumstances of marine casualties, serious and very
More informationDangerous Goods Emergency Response
Dangerous Goods Emergency Response 10/23/2008 OBJECTIVES To provide an overview of the various Emergency Response Requirements. Review of the ICAO Emergency Response Requirements Review of the ICAO (Red
More informationAIRLINE FAMILY ASSISTANCE PLAN
AIRLINE FAMILY ASSISTANCE PLAN 29 September 2000 TABLE OF CONTENTS Page List of Corresponding Items i 1. Overview 2. 2.1. 2.2. 2.3. 2.4. 3. 3.1. 3.2. 3.3. Pre-Response Planning Committing Sufficient Resources
More informationShip Recyclin g. New Challenges within a European Scenario. 23 rd November 2017
Ship Recyclin g New Challenges within a European Scenario 23 rd November 2017 Safe & Sound Recycling of Ships The main recycling nations, employing over 100,000 workers, are: Pakistan Turkey Bangladesh
More informationAnnual Report Accident Investigation Board, Norway Railway Department
Annual Report 2010 Accident Investigation Board, Norway Railway Department Accident Investigation Board, Norway Postbox 213 N-2001 Lillestrøm Norway Phone: +47 63 89 63 00 Fax: +47 63 89 63 01 http://www.aibn.no
More informationDay of Mourning. April 28, 2018
Day of Mourning April 28, 2018 Day of Mourning Day of Mourning is a day intended to recognize those who lost their lives as a result of a work-related incident or occupational diseases. Ceremonies have
More informationCLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257
Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and
More informationChildren's Camps in New York State
Children's Camps in New York State A copy of the Children's Camp in New York State brochure is available in Adobe Portable Document Format (PDF, 99KB, 2pg.). In New York State, summer camps must have a
More informationPASSENGER SHIP SAFETY. Damage stability of cruise passenger ships: Monitoring and assessing risk from operation of watertight doors
E MARITIME SAFETY COMMITTEE 93rd session Agenda item 6 MSC 93/6/9 11 March 2014 Original: ENGLISH PASSENGER SHIP SAFETY Damage stability of cruise passenger ships: Monitoring and assessing risk from operation
More informationPareto s annual Oil & Offshore Conference: Presentation of Kværner ASA Jan Arve Haugan, President & CEO
Pareto s annual Oil & Offshore Conference: Presentation of Kværner ASA Jan Arve Haugan, President & CEO 1 HSE our licence to operate Our HSE mindset is a core value We: strive continuously for zero harm
More informationThe following are safety precautions to keep in mind when using safety knifes:
Reason Why Outline Nearly 40 percent of all injuries attributed to manual workshop tools in the UK involve knifes with or without retractable blades. We have had a series of accidents where employees have
More informationHuman external cargo draft
Section XXXXXXX Human external cargo OPS.SPA.001.HEC Human external cargo (HEC) (a) A helicopter shall only be operated for the purpose of human external cargo operations, if the operator has been approved
More informationMontreal, 15. (Presented SUMMARY
DGP-WG/2011-IP/4 18/10/12 DANGEROUS GOODS PANEL (DGP) MEETING OF THE WORKING GROUP OF THE WHOLE Montreal, 15 to 19 October 2012 Agenda Item 6: Other business REGULATORY FRAMEWORK FOR REMOTELY PILOTED AIRCRAFT
More informationTUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page
TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page 1.0 Disabled Aircraft Recovery Plan Overview 4 1.1 Overview 4 2.0 Aircraft Incident/Accidents 6 3.0 TAA
More informationFINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY
ICAO UNIVERSAL SAFETY OVERSIGHT AUDIT PROGRAMME (USOAP) Continuous Monitoring Approach (CMA) FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY (16 to 20 November
More informationGrowth and strategic development. 3 January 2019
Growth and strategic development 3 January 2019 3 key messages 1) Strong foundation for development 2) Market environment with new opportunities 3) Clear growth strategy 2 3 Status Some few examples from
More informationA Routine Inspection of the Fixed CO 2 Fire Extinguishing System that led to the Death of Four Officers!
A Routine Inspection of the Fixed CO 2 Fire Extinguishing System that led to the Death of Four Officers! by Mr. H.K. Leung Marine Department, Hong Kong Special Administrative Region Synopsis On preparing
More informationINTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur
INTERNAL AUDIT DIVISION REPORT 2017/051 Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur There was a need to effectively address issues identified and
More informationNordic Energy Summit, Oslo Jan Arve Haugan, President & CEO
Nordic Energy Summit, Oslo Jan Arve Haugan, President & CEO Kvaerner delivers amazing projects UPSTREAM DOWNSTREAM & INDUSTRIALS CONCRETE SOLUTIONS JACKETS CONTRACTORS NORWAY CONTRACTORS INTERNATIONAL
More informationREPORT 2014/065 INTERNAL AUDIT DIVISION. Audit of air operations in the United. Nations Assistance Mission in Afghanistan
INTERNAL AUDIT DIVISION REPORT 2014/065 Audit of air operations in the United Nations Assistance Mission in Afghanistan Overall results relating to the effective management of air operations in the United
More informationOVERVIEW OF THE PROGRAM
HeLa Ventures Site 147, Comp. 12, RR#4 Rocky Mountain House, AB T4T 2A4 Lana Ohler-Madsen, Director Phone: (780) 468-1492 Camp Phone: (403) 845-4325 Cell: (780) 932-4820 helaventures@gmail.com OVERVIEW
More informationSTANDARD OPERATING PROCEDURES TACTICAL OPERATIONS b AIRCRAFT INCIDENTS AND ACCIDENTS EFFECTIVE: OCTOBER 2007
STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS 202.15b AIRCRAFT INCIDENTS AND ACCIDENTS EFFECTIVE: OCTOBER 2007 AIRCRAFT INCIDENTS AND ACCIDENTS Goals 1. To familiarize with Airport Index 2. To familiarize
More information4 Rights and duties in connection with the conduct of petroleum activities
Guidelines for application for Acknowledgment of Compliance (AoC) for mobile facilities intended for use in the petroleum activities on the Norwegian Continental Shelf (Unofficial translation), issued
More informationcontinuous improvement in our performance. Rigorous maintenance and inspection programs are integral to
During the investigation into the Anacortes explosion, Fault Lines requested responses from the Tesoro Corporation in two separate emails. The following are responses from the company on November 23, 2016:
More informationDERWENT ENTERTAINMENT. Where ideas happen. Southern Tasmanian Dance Eisteddfod INDUCTION 2018
DERWENT ENTERTAINMENT CENTRE Southern Tasmanian Dance Eisteddfod INDUCTION 2018 THE DERWENT ENTERTAINMENT CENTRE IS WHOLLY OWNED AND OPERATED BY THE GLENORCHY CITY COUNCIL. THIS SITE INDUCTION IS FOR ALL
More informationPART FOUR SAFETY AND SANITATION CHAPTER 11 SAFETY
PART FOUR SAFETY AND SANITATION CHAPTER 11 SAFETY PROMOTING SAFETY AWARENESS Safety in field operations (as elsewhere) may be called common sense in action. Class I and food service personnel can prevent
More informationINTSOK 12 th Annual Russian-Norwegian Oil & Gas Conference
INTSOK 12 th Annual Russian-Norwegian Oil & Gas Conference Kvaerner Concrete Solutions for Arctic Exploration Drilling, LNG and Oil & Gas Production Platforms By Erik Gulbrandsen Vice President Business
More informationSafety Investigation Report Ref. AAIU Issue date: 22 March 2016 Status: Final
Final report SYNOPSYS Air Accident Investigation Unit (Belgium) City Atrium Rue du Progrès 56 1210 Brussels SYNOPSIS Classification: Safety Investigation Report Ref. Issue date: 22 March 2016 Status: Final
More informationForeign Air Carrier Family Support Act. August, 2011
Foreign Air Carrier Family Support Act August, 2011 Principles of Family Assistance Deutsche Lufthansa AG d/b/a Lufthansa German Airlines and Lufthansa Cargo AG (hereinafter referred to collectively as
More informationREPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire
INTERNAL AUDIT DIVISION REPORT 2014/111 Audit of air operations in the United Nations Operation in Côte d Ivoire Overall results relating to the effective management of air operations in the United Nations
More informationHealth and Safety Report 2016
Health and Safety Report 2016 Reg. No. OHS 508824 Health and Safety Report 2016 Contents Foreword 3 Health and Safety Context 4 Health and Safety Policy 4 Health and Safety Goals 5 Governance 5 Operational
More informationSERVICE BULLETIN FLIGHT CONTROLS - INSPECTION FOR CONTROL COLUMN INTERFERENCE WITH WIRING BEHIND THE INSTRUMENT PANEL
Beech SERVICE BULLETIN TITLE: FLIGHT CONTROLS - INSPECTION FOR CONTROL COLUMN INTERFERENCE WITH WIRING BEHIND THE INSTRUMENT PANEL 1. Planning Information A. Effectivity (1) Airplanes Beech Bonanza A36,
More informationUAB Avion Express FAMILY ASSISTANCE PLAN
UAB Avion Express FAMILY ASSISTANCE PLAN 1. Overview 1.1. The purpose of the UAB Avion Express Family Assistance Plan is to provide company personnel with the guidelines, procedures and training that will
More informationVancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety
Vancouver Airport Authority Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety - 2017 CSMP Contractor Expectations - 2017 i Contents Contents Contents Introduction ii
More informationEDINBURGH AIRPORT LTD COACHPARK
EDINBURGH AIRPORT LTD COACHPARK - Terms & Conditions of Use - October 2013 CONTENTS SECTION 1. 0 Introduction 1. Purpose 2. Authorised Users 2.0 Responsibilities 2.1 Edinburgh Airport Ltd 2.2 Bus and Coach
More informationSession 2. ICAO Requirements related to Cabin Safety. Overview
Session 2 ICAO Requirements related to Cabin Safety Overview Definition of cabin safety ICAO cabin safety requirements ICAO cabin crew training requirements Relevant manuals and circulars Points to remember
More informationU.S. Coast Guard - American Waterways Operators Safety Report National Quality Steering Committee
Am erican Waterways Operators August 05, 2015 Established Safety Metrics U.S. Coast Guard - American Waterways Operators Safety Report National Quality Steering Committee Towing Industry Safety Statistics
More informationHOME OWNER PRE- DELIVERY INSTRUCTIONS
Congratulations on your decision to enjoy the finest spas available Welcome to the growing family of Sundance Spa owners HOME OWNER PRE- DELIVERY INSTRUCTIONS Please take the time to read these instructions
More informationMIFACE INVESTIGATION: #03MI022
MIFACE INVESTIGATION: #03MI022 SUBJECT: Indoor amusement manager killed when struck by a moving roller coaster Summary On March 1, 2003, a 43-year old male amusement manager of an indoor restaurant and
More informationCooperative Development of Operational Safety and Continuing Airworthiness Programme COSCAP-SOUTH ASIA
Cooperative Development of Operational Safety and Continuing Airworthiness Programme COSCAP-SOUTH ASIA TRAINING INVESTIGATORS International Civil Aviation Organization AND MAINTAINING THEIR EXPERTISE 20
More informationWORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World
WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating
More informationR/V «Dr. Fridtjof Nansen» - Fishery and oceanographic research vessel
Information to cruise participants on board "Dr. Fridtjof Nansen" Ref.id.: KS&SMS-3-2.13.2-06 Standard Side 1 av 7 R/V «Dr. Fridtjof Nansen» - Fishery and oceanographic research vessel Ref.id.: KS&SMS-3-2.13.2-06
More informationCapital Markets Day 10 January 2013
Capital Markets Day 10 January 2013 Time Topic Speaker 09.00 Introduction Jan Arve Haugan, President & CEO 09.20 Concept / Front End, Engineering and Procurement Janne H. Rasten, EVP Project Support Tony
More informationTABLE OF CONTENTS SECTION TITLE PAGE NUMBER
WORKER FALLS DOWN A FLIGHT OF STAIRS Date of Incident: August 17, 2007 Type of Incident: Fatality, Worker passed away September 7, 2007 TABLE OF CONTENTS SECTION TITLE PAGE NUMBER 1.0 DATE AND TIME OF
More informationAIRCRAFT ACCIDENT REPORT AND EXECUTIVE SUMMARY
Section/division Accident and Incident Investigations Division Form Number: CA 12-12a AIRCRAFT ACCIDENT REPORT AND EXECUTIVE SUMMARY Aircraft Registration Type of Aircraft Reference: CA18/2/3/9312 ZU-EDB
More informationThe Town of Fort Frances
The Town of Fort Frances First Aid Policy SECTION Health and Safety NEW: August 2004 REVIEWED:2015 Resolution No. 095 Supercedes Resolution No. 317 (consent) 08/09 Policy Number 5.7 PAGE 1 of 3 1. Purpose
More informationCooperative Development of Operational Safety Continuing Airworthiness Programme. COSCAP-Gulf States. Training of Airworthiness Inspectors
COSCAP- Training of Airworthiness Inspectors Part V _ STATE SAFETY OVERSIGHT SYSTEM (ICAO Doc 9734, Part I) By Nadia Konzali COSCAP-GS Project Coordinator FLIGHT PLAN 1. Civil aviation regulations; 2.
More informationOur local knowledge teamed with our global expertise provides our customer base with the complete heavylift and transportation solution across
Our local knowledge teamed with our global expertise provides our customer base with the complete heavylift and transportation solution across Australia. www.ale-ecr.com.au OVERVIEW ALE ECR Heavylift is
More informationCHG 0 9/13/2007 VOLUME 2 AIR OPERATOR AND AIR AGENCY CERTIFICATION AND APPLICATION PROCESS
VOLUME 2 AIR OPERATOR AND AIR AGENCY CERTIFICATION AND APPLICATION PROCESS CHAPTER 5 THE APPLICATION PROCESS TITLE 14 CFR PART 91, SUBPART K 2-536. DIRECTION AND GUIDANCE. Section 1 General A. General.
More informationTown of Canandaigua 5440 Routes 5 & 20 West Canandaigua, NY (585) Established 1789
Town of Canandaigua 5440 Routes 5 & 20 West Canandaigua, NY 14424 (585) 394-1120 www.townofcanandaigua.org Established 1789 In an effort to ensure the most efficient use of taxpayer resources, the Town
More informationMott Canyon Hazard Tree Incident
Mott Canyon Hazard Tree Incident Lake Tahoe Basin Management Unit August 25, 2016 On August 25, 2016 while constructing a trail, John, a member of the Tahoe Rim Trail Association (TRTA) working under a
More informationAircraft Maintenance Organisations - Certification. Contents
Contents Rule objective... 3 Extent of consultation... 3 New Zealand Transport Strategy... 4 Summary of submissions... 5 Examination of submissions... 6 Insertion of Amendments... 6 Effective date of rule...
More informationDEPARTMENT OF AIR ACCIDENT INVESTIGATION
REPUBLIC OF KENYA MINISTRY OF TRANSPORT DEPARTMENT OF AIR ACCIDENT INVESTIGATION P.O. Box 52696 Nairobi Telephone: 254-20-2729200 Fax: 254-20-2737320 CIVIL AIRCRAFT INCIDENT REPORT CAV/INC/AUC/06 OPERATOR:
More informationAirport Rules and Regulations
Airport Rules and Regulations 10/10/2017 Contents 1 General information... 3 2 Users information... 3 2.1 Accessibility... 3 2.2 Emergency numbers... 3 2.3 Safety Department... 4 2.4 Security Control Centre...
More informationAir Accident Investigation Unit Ireland
Air Accident Investigation Unit Ireland FACTUAL REPORT ACCIDENT Avions de Transport Régional ATR 72-212A, EI-FAT Cork Airport 26 May 2017 ATR 72-212A, EI-FAT Cork Airport 26 May 2017 FINAL REPORT Foreword
More informationReport from Marcel Meier Dog-handler sub-commission regarding the dog-handler gathering that be held by Marcel last winter.
Avalanche commission report Killarney Ireland 2015 Oct. Practical day : Presence of the President of the avalanche commission. Assembly of Delegates of the Avalanche Rescue Commission: Welcome / Meeting
More informationCommunity engagement in the Northern Territory January 2017 update
Community engagement in the Northern Territory January 2017 update Introduction Racing to the start of 40 years The INPEX-led Ichthys LNG Project is racing to the start of more than 40 years of operations.
More informationIATA Training and Qualification Initiative (ITQI) - A Total System Approach to Training
IATA Training and Qualification Initiative (ITQI) - A Total System Approach to Training Viktor Robeck, Assistant Director, SO&I Training & Qualifications 230 airlines Representing 93% of scheduled international
More informationKLHQ Fairfield County Emergency Response Plan (August 13, 2012)
(August 13, 2012) Purpose The purpose of this plan is to ensure the safe and efficient handling of emergency situations that may arise at the Fairfield County (KLHQ) Lancaster, Ohio Airport. It is intended
More informationMIFACE INVESTIGATION: #02MI106
MIFACE INVESTIGATION: #02MI106 SUBJECT: Highway Worker Killed by Passenger Vehicle While Setting Up Highway Work Zone Warning Signal Summary On Friday, August 9, 2002, a 26-year-old technical sales representative
More informationSHIP RECYCLING. Your guide to compliance. Move Forward with Confidence
SHIP RECYCLING Your guide to compliance. Move Forward with Confidence WHY DID THE EU INTRODUCE THE REGULATION? The majority of ships today are demolished in South East Asia, mainly by grounding ships on
More informationErhama bin Jaber Al Jalahma Shipyard
client Nakilat Erhama bin Jaber Al Jalahma Shipyard Introduction The North Field, located in the State of Qatar s territorial waters, is the one of the world s largest natural gas fields, with reserves
More informationThai Airline Passengers' Opinion and Awareness on Airline Safety Instruction Card
1 Thai Airline Passengers' Opinion and Awareness on Airline Safety Instruction Card Chantarat Manvichien International College, Suan Sunandha Rajabhat University, Thailand Chantarat.ma@ssru.ac.th Abstract
More informationINTRODUCTION TO THE SAFE PROGRAM
January 2016 Page 1 INTRODUCTION TO THE SAFE PROGRAM Los Angeles World Airports (LAWA) is committed to providing the airport community with a safe and secure workplace. This document describes the purpose
More informationAZ MARINE OFFSHORE SERVICES PTE LTD. Safety Rules & Regulations for Compliance by the Ship s Crew
AZ MARINE OFFSHORE SERVICES PTE LTD Safety Rules & Regulations for Compliance by the Ship s Crew To : Master of Vessel cc : Superintendent of Vessel Chief Engineer Chief Officer Re : SAFETY RULES AND REGULATIONS
More informationTECHNICAL REPORT IN-018/2005 DATA SUMMARY
TECHNICAL REPORT IN-018/2005 DATA SUMMARY LOCATION Date and time Site Wednesday, May 25th 2005; 16:00 local time Jerez Airport (Cádiz) AIRCRAFT Registration Type and model Operator PH-BWA BEECHCRAFT BONANZA
More informationSpecial Needs Summer Camp Parent Guide
Special Needs Summer Camp Parent Guide 2018 Dear Parents/Guardians: Welcome to Summer Camp! We are very excited about the opportunity to share the summer with your child(ren). Camp runs for eight weeks
More informationThe Role of the Paramedic in Transport Medicine and Crew Resource Management
The Role of the Paramedic in Transport Medicine and Crew Resource Management Approved by the IAFCCP Board of Directors October 2017 The International Association of Flight and Critical Care Paramedics
More informationHazardous Cattle Crossing: Use of Flashing Amber Lamps
THE HIGHWAYS AGENCY THE SCOTTISH OFFICE DEVELOPMENT DEPARTMENT THE WELSH OFFICE Y SWYDDFA GYMREIG THE DEPARTMENT OF THE ENVIRONMENT FOR NORTHERN IRELAND Hazardous Cattle Crossing: Use of Flashing Amber
More informationCompany Profile. H&R Hassarati Pty Ltd. H&R HASSARATI PTY LTD Demolition & Excavation Contractors
5-7 Juno Pde, Phone: (02) 9539 7799 Fax: (02) 9539 7797 H&R Hassarati Pty Ltd Company Profile OVERVIEW H&R Hassarati Pty Ltd staff and employees are one of the most experienced teams in the demolition
More informationTECHNICAL REPORT A-010/2001 DATA SUMMARY
TECHNICAL REPORT A-010/2001 DATA SUMMARY LOCATION Date and time Site Saturday, 10 March 2001; 17:15 hours Vicinity Aerod. of Casarrubios del Monte (Toledo) AIRCRAFT Registration Type and model Operator
More informationJOB ANNOUNCEMENT P/T CAMP COUNSELOR PARKS AND RECREATION
JOB ANNOUNCEMENT P/T CAMP COUNSELOR PARKS AND RECREATION Posting Date: January 12, 2017 Job Code: 033PT-CC-6100.00 Closing Date: Open Until Filled Grade: 0001 Non-Exempt Pay Range : Hourly: $9.00 Work
More informationA Closer Look at the European Owners' Visit to Alang
A Closer Look at the European Owners' Visit to Alang By Wendy Laursen 2016-05-08 19:44:39 At the end of April, European shipowners, government officials from France, Germany and Belgium, and the European
More informationAIRCRAFT ACCIDENT REPORT AND EXECUTIVE SUMMARY
Section/division Accident and Incident Investigation Division Form Number: CA 12-12a AIRCRAFT ACCIDENT REPORT AND EXECUTIVE SUMMARY Reference: CA18/2/3/8798 Aircraft Registration ZU-EFG Date of Accident
More informationREQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT
REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT March 13, 2012 LINCOLN COUNTY BOARD OF COMMISSIONERS 104 N. MAIN, STE. 110 CANTON, SD 57013-1703 (605)764-5732
More informationELEVATOR UNIT NARRATIVE Elevator or Device No. C-17549
..STATE OF CALIFORNIA ACCIDENT INVESTIGATION REPORT 1 DEPARTMENT OF JNDUSTRIAL RELATIONS DIVISION OF OCCUPATIONAL SAFETY AND HEALTH ELEVATOR UNIT Page 3 0f 7 NARRATIVE Elevator or Device No. C-17549 1
More informationInterim Investigation Report pertaining to the investigation report No. 268/15. Very Serious Marine Casualty
Federal Higher Authority subordinated to the Ministry of Transport and Digital Infrastructure Interim Investigation Report pertaining to the investigation report No. 268/15 Very Serious Marine Casualty
More informationFor Immediate Release: May 30, Complaint & Violation Summary for 335 East 91 st Street:
For Immediate Release: May 30, 2008 www.nyc.gov/buildings Complaint & Violation Summary for 335 East 91 st Street: Since construction began in July 2007, there have been a total of 22 complaints (not including
More informationHarbourmaster s Office
Harbourmaster s Office Recommendations That the Board: i. note the recent transfer of the harbourmaster department from Auckland Council to Auckland Transport. ii. note the roles and responsibilities of
More informationForm 91 Application for Approval of an EFB System
Form 91 Application for Approval of an EFB System This form must be completed by the Flight Representative (FOR) or Operator as recorded on the current Form 20. Please refer to RP4 Guidance to Operators
More informationSession 4. Cabin Safety Aspects in Accident Investigation
1 Session 4 Cabin Safety Aspects in Accident Investigation Overview Information specific to cabin safety Types of occurrences / ICAO templates Preparing for the investigation Self-protection at crash site
More informationSelected Financial Data Maryland Public Schools Part 2 Expenditures
Selected Financial Data Maryland Public Schools 2016-2017 Part 2 Expenditures Maryland State Department of Education Local Financial Reporting Office 200 West Baltimore Street Baltimore MD 21201-2595 April
More informationOverview of Industrial Holding BLRT Grupp
Overview of Industrial Holding BLRT Grupp On June 12, 1912 was decided to establish Russo-Baltic Shipbuilding Yard in Tallinn. Year 1916 manufacturing area of Russo-Baltic Shipbuilding Yard in Tallinn,
More information