1 FINAL APPLICATION FOR LICENSE OF MAJOR UNCONSTRUCTED PROJECT NHC Meeting Notes LAKE ELSINORE ADVANCED PUMPED STORAGE PROJECT FEDERAL ENERGY REGULATORY COMMISSION PROJECT NUMBER Applicant: THE NEVADA HYDRO COMPANY, INC Cades Way Vista, California (760) (760) FAX July 2018

2

3 February 28, 2018 Meeting at US Forest Service, Cleveland National forest, Trabuco Ranger District, Corona, CA LEAPS Outreach Meeting Report Attending Darrell Vance, District Ranger, USFS Jake Rodriguez, Disrict Recreation and Lands Officer, USFS Jeff Heys, Forest Planner, USFS Brad Aughinbaugh, Forest Utility Coordinator, USFS Amy Reid, Natural Resources Specialist (Special Uses), USFS by phone Joe Raffaele, Forest Recreation Program Manager, USFS by phone Tristan Leong, R5 Hydroelectric Coordinator, USFS by phone Kim Villa, Resources Assistant, USFS by phone Rex Wait, Nevada Hydro David Kates, Nevada Hydro Keith Skoglund, Nevada Hydro Virgil Mink, consultant Greg Kahlen, The Kahlen Group Neutral Issues Discussion United States Forest Service (USFS) asked why the LEAPS Project was previously unsuccessful in getting a license from FERC. The Nevada Hydro Company (TNHC) answered that EVMWD s actions caused FERC to deny a license, which resulted in ligation between TNHC and EVMWD. TNHC immediately refiled for a new preliminary permit in its name only. TNHC was asked why the project does not need California PUC approval. TNHC explained that the original project was intended as an intertie project between SCE and SDG&E, which required PUC approval. It was further explained that the project now consists of two primary generation ties, which can be licensed by FERC, and do not require PUC approval. USFS asked TNHC to provide documents to verify the transmission lines are gen-ties. TNHC to provide FERC filing and FEIS to USFS. USFS stated that the benefits from the project have changed since the first FERC filing. TNHC agreed. USFS will need more information on the transmission lines as the project moves forward. Most of the Decker Canyon Reservoir is in the Wildhorse Inventoried Roadless Area (IRA). USFS stated that the 2001 Roadless Area Conservation Rule is now in effect, and roads are not allowed in an IRA. However, a reservoir for a hydroelectric project is permissible in an IRA as long as there are no roads constructed as part of the reservoir construction. TNHC provided a

4 map showing an overlay of the Wildhorse IRA on the current reservoir and dam footprint, which shows an area adjacent to South Main Divide Road that is out of the IRA and adjacent to the reservoir. There is a second location where the northwest edge of the reservoir is out of the IRA and adjacent to a dirt road. USFS confirmed that these areas could be used as access for construction equipment to the IRA, as long as no new roads are constructed within the IRA. This includes a maintenance road around the perimeter of the reservoir and dam. USFS asked if there was a Plan B for the Upper Reservoir if, for instance, geotechnical investigations indicated that Decker Canyon is not suitable for construction of a dam. TNHC stated that Genterra Consultants is part of the TNHC team as geotechnical consultants, and they are experts in dam design and safety. TNHC stated that if the configuration of the Upper Reservoir needed to be changed so that it was completely within the IRA (Plan B), construction equipment would be flown in by helicopter. TNHC provided a new Special Use Permit (SUP) Form SF-299 to USFS, signed by Rex Wait. The USFS screening process for SUPs, which is done in stages, was discussed. TNHC stated it has reviewed the USFS Screening Checklist and will provide comments to USFS on each item on the Checklist. After USFS performs an initial review of the SUP, a cost recovery account will be set up for USFS personnel to bill against while reviewing and otherwise being involved with LEAPS. USFS requested information on sources of water to maintain the lake level in Lake Elsinore. They recognize that water availability is a key issue and need to know that lake levels will be maintained. TNHC stated that it had been invited to a part of the LESJWA TMDL Task Force, and one of the goals of the Task Force is to improve the quantity and quality of the water in Lake Elsinore. TNHC also stated that negotiations are ongoing with EVMWD to settle their lawsuit and to provide reclaimed water to the Lake. USFS requested a document that identifies where and when water will be available. TNHC stated that a document will be filed with FERC by April 3, 2018 in response to FERC s deficiency letter that will address the water issue. TNHC also pointed out that additional water will not be required until construction of LEAPS is complete. Both parties agreed that communication between USFS and TNHC should continue to be via s to provide visibility and accountability. Minor issues may be handled with phone calls, if necessary. Darrell Vance will be the point of contact for USFS for all communications. USFS stated that all points of Will Metz s November 30, 2017 letter to FERC in response to TNHC s FLA need to be addressed. TNHC will provide information to USFS on the timing of the studies requested by Mr. Metz. USFS requested GIS shape files for the project be sent to them. Both parties agreed to meet again on March 26, 2018 at the Trabuco Ranger District offices in Corona to discuss progress. 2

5 Commitments by TNHC Revise Volume 2 of the FLA (Applicant Prepared EIR) to clearly define transmission lines as generation ties. Provide USFS with the FERC filing on transmission lines TNHC (Kahlen) to provide precise coordinates for where the upper reservoir is outside of the Wildhorse IRA, suitable for construction staking and inspection by USFS. Submit revised SF-299 to USFS with clarifications to indicate transmission lines are gen-ties. Submit SUP Screening Checklist to USFS with TNHC comments. Provide timing to USFS for studies requested by USFS (Will Metz). Provide precise answers to issues raised by Will Metz s November 30, 2017 letter to FERC. Provide LEAPS GIS shape files to USFS (Kahlen) complete 3/01/18. Follow Up: What & When? Next meeting: March 26,

6 4

7 5

8 This page intentionally left blank.

Susitna-Watana Hydroelectric Project (FERC No ) Recreation Resources Study Study Plan Section Study Implementation Report

Susitna-Watana Hydroelectric Project (FERC No ) Recreation Resources Study Study Plan Section Study Implementation Report (FERC No. 14241) Recreation Resources Study Study Plan Section 12.5 2014 Study Implementation Report Prepared for Prepared by AECOM November 2015 TABLE OF CONTENTS 1. Introduction... 4 2. Study Objectives...

More information

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION. Title: Certification of Air Navigation Services Providers

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION. Title: Certification of Air Navigation Services Providers Page 1 of 6 1.0 PURPOSE 1.1. This order provides direction and guidance to the Inspectors in the process of certification of ANSPs as required by the Civil Aviation (Air Navigation Services) Regulations.

More information

Appalachian Power Company Smith Mountain Hydroelectric Project FERC No Debris Management Plan

Appalachian Power Company Smith Mountain Hydroelectric Project FERC No Debris Management Plan Appalachian Power Company Smith Mountain Hydroelectric Project FERC No. 2210 Debris Management Plan Final July2008 TABLE OF CONTENTS Description Page SUMMARY 1 1.0 Introduction.. 2 1.1 Project Lands and

More information

Planning and Resource Management for Our Communities and the Environment

Planning and Resource Management for Our Communities and the Environment Planning and Resource Management for Our Communities and the Environment 7 June 2002 Scott E. Shewbridge, Ph.D., P.E., G.E. Senior Engineer - Hydroelectric El Dorado Irrigation District 2890 Mosquito Road

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

January 14, Orange County Transportation Authority Attn: M2 NCCP/HCP 550 South Main Street P.O. Box Orange, CA

January 14, Orange County Transportation Authority Attn: M2 NCCP/HCP 550 South Main Street P.O. Box Orange, CA Equestrian Trails, Inc. Corral 357 P.O. Box 1026 Trabuco Canyon, CA 92678 http://saddlebackcanyonriders.com/ President: James Iacono... 714-612-1789 January 14, 2016 Orange County Transportation Authority

More information

Maps Reports WLF Links Media Articles Multimedia Comments

Maps Reports WLF Links Media Articles Multimedia Comments Maps Reports WLF Links Media Articles Multimedia Comments Incident Name: Stewart Fire, Trabuco District of the Cleveland NF Date: 12/18/58 Personnel: Joe E Adam Age: 34 Agency/Organization: US Forest Service

More information

Advisory Circular AC19-1. Test Pilot Approvals 03 July Revision 0

Advisory Circular AC19-1. Test Pilot Approvals 03 July Revision 0 Advisory Circular AC19-1 Revision 0 Test Pilot Approvals 03 July 2009 General Civil Aviation Authority Advisory Circulars contain information about standards, practices, and procedures that the Director

More information

Napa County Planning Commission Board Agenda Letter

Napa County Planning Commission Board Agenda Letter Agenda Date: 7/20/2011 Agenda Placement: 10A Napa County Planning Commission Board Agenda Letter TO: FROM: Napa County Planning Commission Hillary Gitelman - Director Conservation, Development & Planning

More information

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION IN RE: IGUS BEARINGS, INC. : DOCKET NO. 4652 PETITION FOR A PRIVATE AT-GRADE CROSSING : REPORT AND ORDER On September 30, 2016,

More information

This advisory circular relates specifically to Civil Aviation Rule Part 21, Subpart I Special Flight Permits.

This advisory circular relates specifically to Civil Aviation Rule Part 21, Subpart I Special Flight Permits. Advisory Circular AC21-9 Revision 0 Special Flight Permits 2 October 2014 General Civil Aviation Authority advisory circulars contain information about standards, practices and procedures that the Director

More information

Policy PL Date Issued February 10, 2014

Policy PL Date Issued February 10, 2014 Subject RENEWABLE ENERGY ON CROWN LAND Compiled by Renewable Energy Program, Biodiversity Branch Replaces Policy Directives Waterpower Site Release Crown Land Onshore Windpower Development - Crown Land

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION CXA La Paloma, LLC ) ) v. ) Docket No. EL18-177-000 ) California Independent System ) Operator Corporation ) MOTION FOR LEAVE TO

More information

Whitefish Range Partnership Tentatively Approved by WRP 11/18/2013!Rec. Wilderness Page 1

Whitefish Range Partnership Tentatively Approved by WRP 11/18/2013!Rec. Wilderness Page 1 Whitefish Range Partnership Tentatively Approved by WRP 11/18/2013!Rec. Wilderness Page 1 Recommended Wilderness Background The Whitefish Range has a long management and legislative history associated

More information

Plans and Design Calculations for the Alder Creek Diversion Fish Screen

Plans and Design Calculations for the Alder Creek Diversion Fish Screen TECHNICAL MEMORANDUM Plans and Design Calculations for the Alder Creek Diversion Fish Screen El Dorado Irrigation District 2890 Mosquito Road Placerville, CA 95667 Alder Creek Diversion Fish Screen Plans

More information

FINAL APPLICATION FOR LICENSE OF MAJOR UNCONSTRUCTED PROJECT EXHIBIT E ENVIRONMENTAL REPORT

FINAL APPLICATION FOR LICENSE OF MAJOR UNCONSTRUCTED PROJECT EXHIBIT E ENVIRONMENTAL REPORT FINAL APPLICATION FOR LICENSE OF MAJOR UNCONSTRUCTED PROJECT EXHIBIT E ENVIRONMENTAL REPORT Section 7 Report on Recreational Resources LAKE ELSINORE ADVANCED PUMPED STORAGE PROJECT FEDERAL ENERGY REGULATORY

More information

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington

More information

White Mountain National Forest Saco Ranger District

White Mountain National Forest Saco Ranger District United States Department of Agriculture Forest Service White Mountain National Forest 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950 Date: February 26,

More information

Madison Metro Transit System

Madison Metro Transit System Madison Metro Transit System 1101 East Washington Avenue Madison, Wisconsin, 53703 Administrative Office: 608 266 4904 Fax: 608 267 8778 TO: FROM: SUBJECT: Plan Commission Timothy Sobota, Transit Planner,

More information

DEVIL CANYON PROJECT RELICENSING FERC PROJECT NUMBER TRANSPORTATION SYSTEM MANAGEMENT PLAN November 2018

DEVIL CANYON PROJECT RELICENSING FERC PROJECT NUMBER TRANSPORTATION SYSTEM MANAGEMENT PLAN November 2018 DEVIL CANYON PROJECT RELICENSING FERC PROJECT NUMBER 14797 TRANSPORTATION SYSTEM MANAGEMENT PLAN November 2018 State of California California Natural Resources Agency DEPARTMENT OF WATER RESOURCES Hydropower

More information

COMMENT PERIOD. August 2, 2017 to September 1, 2017 INTRODUCTION

COMMENT PERIOD. August 2, 2017 to September 1, 2017 INTRODUCTION DATE: July 31, 2017 TO: FROM: RE: Interested Persons Scott Johnson, Associate Planner Community Development Department NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT FOR THE SACRAMENTO CONVENTION

More information

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service Bradley Brook Relocation Project United States Department of Agriculture Forest Service Scoping Notice White Mountain National Forest February 2011 For Information Contact: Jenny Burnett White Mountain

More information

Attachment 1. Case 3:15-cv RBL Document 41-1 Filed 07/31/15 Page 1 of 23

Attachment 1. Case 3:15-cv RBL Document 41-1 Filed 07/31/15 Page 1 of 23 Case 3:15-cv-05150-RBL Document 41-1 Filed 07/31/15 Page 1 of 23 Attachment 1 FINAL ORDER & JUDGMENT APPROVING CLASS ACTION SETTLEMENT - 018 Case 3:15-cv-05150-RBL Document 41-1 Filed 07/31/15 Page 2 of

More information

112th CONGRESS. 1st Session H. R. 113 IN THE HOUSE OF REPRESENTATIVES

112th CONGRESS. 1st Session H. R. 113 IN THE HOUSE OF REPRESENTATIVES HR 113 IH 112th CONGRESS 1st Session H. R. 113 To provide for additions to the Cucamonga and Sheep Mountain Wilderness Areas in the Angeles and San Bernardino National Forests and the protection of existing

More information

Wilderness Areas Designated by the White Pine County bill

Wilderness Areas Designated by the White Pine County bill Wilderness Areas Designated by the White Pine County bill SEC. 321. SHORT TITLE. This subtitle may be cited as the `Pam White Wilderness Act of 2006'. SEC. 322. FINDINGS. Congress finds that-- The White

More information

AGENDA ITEM _C2 TAMPA WATER. Completion Date

AGENDA ITEM _C2 TAMPA WATER. Completion Date TAMPA WATER Supply'mfl Water To The Region AGENDA ITEM _C2 DATE: February 6, 2007 TO: J err y L. Maxwell, General Manager FROM: Donald J. Polmann, Director of Science and Engineering SUBJECT: New Water

More information

Temporary Campground Plan Review Application

Temporary Campground Plan Review Application Procedure to obtain a Temporary Campground Permit Step #1 At least fifteen (15) days prior to the opening of the temporary campground, operators should complete the plan review application (Page #2 to

More information

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017 Thornton Water Project Larimer County Route Study and Project Update September 12, 2017 Purpose of Meeting Provide information on the Thornton Water Project Present the results of the pipeline routing

More information

Wallowa Falls Hydroelectric Project FERC Project No. P-308 Proposed Study Plans - Recreation August 2011

Wallowa Falls Hydroelectric Project FERC Project No. P-308 Proposed Study Plans - Recreation August 2011 Wallowa Falls Hydroelectric Project FERC Project No. P-308 August 2011 Prepared by: PacifiCorp Energy Hydro Resources 825 NE Multnomah, Suite 1500 Portland, OR 97232 For Public Review Wallowa Falls Hydroelectric

More information

SEGMENT ASSESSMENT REPORT

SEGMENT ASSESSMENT REPORT 2017 SEGMENT ASSESSMENT REPORT SEGMENT 3: MT ROSE / TAHOE MEADOWS TO SPOONER SUMMIT REPORT SUMMARY This report is a compilation of information collected on the Tahoe Rim Trail during assessments performed

More information

Wilderness Process #NP-1810: Your letter ID is NP September 5, 2018

Wilderness Process #NP-1810: Your letter ID is NP September 5, 2018 Wilderness Process #NP-1810: Your letter ID is NP-1810-2602-96 September 5, 2018 RE: GMUG Wilderness Evaluation Revised Evaluation Criteria and Draft Report Forest Revision Planning Team: The Continental

More information

ACTION: Notice of a new task assignment for the Aviation Rulemaking Advisory Committee

ACTION: Notice of a new task assignment for the Aviation Rulemaking Advisory Committee This document is scheduled to be published in the Federal Register on 09/18/2015 and available online at http://federalregister.gov/a/2015-23433, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION

More information

Minnesota Power Renewable Energy (& Engineering) for the 21 st Century

Minnesota Power Renewable Energy (& Engineering) for the 21 st Century Minnesota Power Renewable Energy (& Engineering) for the 21 st Century The Prairie River Project Some background info about me Attended UMD EE (2000 grad) Started with MP as intern supporting hydro and

More information

David Lewis Entergy Arkansas Corporate Communications Pager #2284

David Lewis Entergy Arkansas Corporate Communications Pager #2284 Date: March, 5, 2003 For Release: March, 5, 2003 Contact: Terry Payne City of Hot Springs 501-321-6806 News Release David Lewis Entergy Arkansas Corporate Communications 501-377-3560 dlewis1@entergy.com

More information

April 10, Mark Stiles San Juan Public Lands Center Manager 15 Burnett Court Durango, CO Dear Mark,

April 10, Mark Stiles San Juan Public Lands Center Manager 15 Burnett Court Durango, CO Dear Mark, Mark Stiles San Juan Public Lands Center Manager 15 Burnett Court Durango, CO 81301 Dear Mark, We are pleased to offer the following comments on the draft San Juan Public Lands Center management plans

More information

One East First Street Reno, NV

One East First Street Reno, NV AECOM City Hall Tower, 16th Floor One East First Street Reno, NV 89501 www.aecom.com 775.337.9565 tel 916.414.5850 fax Mr. David Whalen, P.E. City of Fernley Public Works 595 Silverlace Blvd. Fernley,

More information

Guide to the L. F. Manis Papers on Boulder Dam

Guide to the L. F. Manis Papers on Boulder Dam This finding aid was created by Joyce Moore on February 28, 2019. Persistent URL for this finding aid: http://n2t.net/ark:/62930/f1f88x 2019 The Regents of the University of Nevada. All rights reserved.

More information

RV Parking Rights Hand Book

RV Parking Rights Hand Book RV Parking Rights Hand Book http://www.goodsamclub.com Residential RV parking rights are under attack in a growing number of communities across America. And more often than not, RV owners find the task

More information

RANCHO VISTA - APPROVED 29 LOT FINAL MAP WITH BONDS POSTED

RANCHO VISTA - APPROVED 29 LOT FINAL MAP WITH BONDS POSTED RANCHO VISTA - APPROVED 29 LOT FINAL MAP WITH BONDS POSTED SAN DIMAS DRIVE - OCEANSIDE, CA 16.87 Gross Acres 4 Miles to the Beach Views from all Lots 3,458-6,448 SF Average Lot Sizes 2,126, 2,357, 2,462

More information

Decision Memo Ice Age Trail Improvement (CRAC 37)

Decision Memo Ice Age Trail Improvement (CRAC 37) Decision Memo Ice Age Trail Improvement (CRAC 37) U.S. Forest Service Chequamegon-Nicolet National Forest, Medford-Park Falls Ranger District Taylor County, Wisconsin T32N, R2W, Town of Grover, Section

More information

[Docket No. FAA ; Directorate Identifier 2005-NM-056-AD; Amendment ; AD ]

[Docket No. FAA ; Directorate Identifier 2005-NM-056-AD; Amendment ; AD ] [Federal Register: June 7, 2006 (Volume 71, Number 109)] [Rules and Regulations] [Page 32811-32815] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr07jn06-3] DEPARTMENT OF

More information

[Docket No. FAA ; Product Identifier 2017-SW-004-AD] Airworthiness Directives; Airbus Helicopters Deutschland GmbH (Type Certificate

[Docket No. FAA ; Product Identifier 2017-SW-004-AD] Airworthiness Directives; Airbus Helicopters Deutschland GmbH (Type Certificate This document is scheduled to be published in the Federal Register on 11/03/2017 and available online at https://federalregister.gov/d/2017-23201, and on FDsys.gov [4910-13-P] DEPARTMENT OF TRANSPORTATION

More information

Wednesday, August 2, :00 PM Commission Chambers 100 N 5 th Street Leavenworth, Kansas AGENDA

Wednesday, August 2, :00 PM Commission Chambers 100 N 5 th Street Leavenworth, Kansas AGENDA Leavenworth Preservation Commission Wednesday, August 2, 2017 5:00 PM Commission Chambers 100 N 5 th Street Leavenworth, Kansas 1. Call to order, determine a quorum AGENDA 2. Approval of Minutes: June

More information

Rockin River Ranch State Park

Rockin River Ranch State Park Rockin River Ranch State Park Public Meeting No. 3 August 16 th, 2017 Arizona State Parks and Trails (ASPT) Welcome Executive Director Sue Black Park budget = $4 million Balance of recreation uses, environment,

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 174 METEOROLOGICAL SERVICES FOR AVIATION Published by Air Safety Support International Ltd Air Safety Support International Limited 2017 First Issue

More information

MINUTES OF THE OAK CREEK PLAN COMMISSION MEETING TUESDAY, NOVEMBER 8, 2011

MINUTES OF THE OAK CREEK PLAN COMMISSION MEETING TUESDAY, NOVEMBER 8, 2011 MINUTES OF THE OAK CREEK PLAN COMMISSION MEETING TUESDAY, NOVEMBER 8, 2011 Mayor Bolender called the meeting to order at 7:00 p.m. The following Commissioners were present at roll call: Commissioner Dickmann,

More information

BELL HELICOPTER TEXTRON (BELL)

BELL HELICOPTER TEXTRON (BELL) Page 1 2013-03-16 BELL HELICOPTER TEXTRON (BELL) Amendment 39-17339 Docket No. FAA-2013-0098; Directorate Identifier 2011-SW-39-AD PREAMBLE (a) Applicability This AD applies to Model 204B, 205A, 205A-1,

More information

Trail Assessment Report

Trail Assessment Report Trail Assessment Report Trail Options for the Bear Creek Canyon located in Pikes Peak Ranger District, Pike National Forest and on Colorado Springs Utility Lands Due to the presence of a unique species

More information

Docket No. CP Responses to Data Requests issued January 27, 2017

Docket No. CP Responses to Data Requests issued January 27, 2017 625 Liberty Avenue, Suite 1700 Pittsburgh, PA 15222 844-MVP-TALK mail@mountainvalleypipeline.info www.mountainvalleypipeline.info February 22, 2017 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory

More information

VARIOUS RESTRICTED CATEGORY HELICOPTERS

VARIOUS RESTRICTED CATEGORY HELICOPTERS Page 1 2012-14-11 VARIOUS RESTRICTED CATEGORY HELICOPTERS Amendment 39-17125 Docket No. FAA-2012-0739; Directorate Identifier 2012-SW-044-AD. PREAMBLE (a) Applicability This AD applies to Arrow Falcon

More information

A Presentation for the Disaster Recovery Alliance Presented by Alexandra Coombs, Shelter Readiness Specialist American Red Cross of Orange County

A Presentation for the Disaster Recovery Alliance Presented by Alexandra Coombs, Shelter Readiness Specialist American Red Cross of Orange County Community Partnerships During Disaster Response: Sheltering with the American Red Cross A Presentation for the Disaster Recovery Alliance Presented by Alexandra Coombs, Shelter Readiness Specialist American

More information

Sheraton Centre Toronto Hotel Motor Court - Relocation of Taxi Facilities

Sheraton Centre Toronto Hotel Motor Court - Relocation of Taxi Facilities Sheraton Centre Toronto Hotel Motor Court - Relocation of Taxi Facilities (City Council on July 4, 5 and 6, 2000, adopted the following recommendation: It is recommended that the report dated June 6, 2000,

More information

OFFICIAL MEDIA & PRESS KIT Updated November 2014

OFFICIAL MEDIA & PRESS KIT Updated November 2014 OFFICIAL MEDIA & PRESS KIT Updated November 2014 This information packet will be useful in learning more about the Palmdale Water District. For further information, please visit our website at http://www.palmdalewater.org/

More information

[Docket No. FAA ; Directorate Identifier 2016-CE-026-AD; Amendment. AGENCY: Federal Aviation Administration (FAA), DOT.

[Docket No. FAA ; Directorate Identifier 2016-CE-026-AD; Amendment. AGENCY: Federal Aviation Administration (FAA), DOT. This document is scheduled to be published in the Federal Register on 05/25/2017 and available online at https://federalregister.gov/d/2017-10407, and on FDsys.gov [4910-13-P] DEPARTMENT OF TRANSPORTATION

More information

The type rating of test pilots having flown the aircraft for its development and certification needs to be addressed as a special case.

The type rating of test pilots having flown the aircraft for its development and certification needs to be addressed as a special case. FLIGHT TESTING: COMMENTS ON NPA 2008-17,PILOT LICENSING FCL.700 Circumstances in which class or type ratings are required Subparagraph (b) (b) Notwithstanding paragraph (a), in the case of flights related

More information

RIM TRAIL EXTENSION PROJECT

RIM TRAIL EXTENSION PROJECT DECISION MEMO For RAINBOW RIM TRAIL EXTENSION PROJECT Located on National Forest System Lands USDA Forest Service, Southwest Region Kaibab National Forest - North Kaibab Ranger District T.35 N, R.1 E,

More information

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report STAFF REPORT ACTION REQUIRED 3741 3751 Bloor Street West Rezoning Application for a Temporary Use By-law Final Report Date: June 12, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

[Docket No. FAA ; Directorate Identifier 2006-CE-38-AD; Amendment ; AD ]

[Docket No. FAA ; Directorate Identifier 2006-CE-38-AD; Amendment ; AD ] [Federal Register: March 7, 2007 (Volume 72, Number 44)] [Rules and Regulations] [Page 10049-10052] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr07mr07-4] DEPARTMENT OF

More information

The Aviation Rulemaking Committee is changing. how airworthiness directives are developed and implemented.

The Aviation Rulemaking Committee is changing. how airworthiness directives are developed and implemented. The Aviation Rulemaking Committee is changing how airworthiness directives are developed and implemented. industry efforts to improve Airworthiness Directive implementation and Compliance The Airworthiness

More information

Daisy Dean Trail 628/619 ATV Trail Construction

Daisy Dean Trail 628/619 ATV Trail Construction Background and Purpose and Need The Daisy Dean ATV Trail Construction Project is located in the Little Belt Mountains, Musselshell Ranger District, Lewis and Clark National Forest approximately 32 miles

More information

RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan, Preliminary Ideas and Concepts

RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan, Preliminary Ideas and Concepts September 30, 2016 Superintendent Yosemite National Park Attn: Wilderness Stewardship Plan P.O. Box 577 Yosemite, CA 95389 RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan,

More information

WORKSHEET 1 Wilderness Qualities or Attributes Evaluating the Effects of Project Activities on Wilderness Attributes

WORKSHEET 1 Wilderness Qualities or Attributes Evaluating the Effects of Project Activities on Wilderness Attributes WORKSHEET 1 Wilderness Qualities or Attributes Evaluating the Effects of Project Activities on Wilderness Attributes Date: 3/7/2017 Roadless Area: Ruby South Description of Project Activity or Impact to

More information

Airworthiness Criteria: Special Class Airworthiness Criteria for the FlightScan

Airworthiness Criteria: Special Class Airworthiness Criteria for the FlightScan This document is scheduled to be published in the Federal Register on 11/16/2017 and available online at https://federalregister.gov/d/2017-24866, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION

More information

White Mountain National Forest Saco Ranger District

White Mountain National Forest Saco Ranger District United States Department of Agriculture Forest Service White Mountain National Forest Saco Ranger District 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950

More information

CAR AIR CONTINUING AIRWORTHINESS (GENERAL AVIATION OPERATIONS)

CAR AIR CONTINUING AIRWORTHINESS (GENERAL AVIATION OPERATIONS) CONTINUING AIRWORTHINESS (GENERAL AVIATION OPERATIONS) FOREWORD CONTENTS REVISION RECORD LIST of EFFECTIVE PAGES This Page Intentionally Left Blank FOREWORD The Civil Aviation and Maritime Navigation Authority

More information

PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #4 MASTER PLAN ADVISORY COMMITTEE (MPAC) - MEETING #4

PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #4 MASTER PLAN ADVISORY COMMITTEE (MPAC) - MEETING #4 MASTER PLAN ADVISORY COMMITTEE (MPAC) - MEETING #4 MASTER PLAN ADVISORY COMMITTEE (MPAC) MEETING #4 AGENDA & ACTION ITEMS Date/Time: Location: Monday, March 19, 2018 from 1:30-3:30 p.m. Thun Field Airport

More information

MISSION TRAILS REGIONAL PARK CITIZENS ADVISORY COMMITTEE MINUTES OF THE MEETING OF MAY 3, 2016

MISSION TRAILS REGIONAL PARK CITIZENS ADVISORY COMMITTEE MINUTES OF THE MEETING OF MAY 3, 2016 MISSION TRAILS REGIONAL PARK CITIZENS ADVISORY COMMITTEE MINUTES OF THE MEETING OF MAY 3, 2016 ATTENDANCE Members Present Frank Bathrick, City of Santee Richard Gadler, City of El Cajon Dorothy Leonard,

More information

Present for the meeting was: Commissioners Jordon Stoddard, Lee Miller and Bill Baxter

Present for the meeting was: Commissioners Jordon Stoddard, Lee Miller and Bill Baxter FREMONT COUNTY COMMISSIONERS PUBLIC HEARING ROAD VALIDATION/ VACATION HEARING FOR NORTHEAST SAGEHEN DRIVE/MORNING DEW DR HELD AT THE FREMONT COUNTY ANNEX December 18, 2017 7:00PM Present for the meeting

More information

- Tents larger than 10 x 12 require a permit from Santa Rosa Island Authority and may require a permit from Escambia County, for inquiry.

- Tents larger than 10 x 12 require a permit from Santa Rosa Island Authority and may require a permit from Escambia County, for inquiry. - Tents larger than 10 x 12 require a permit from Santa Rosa Island Authority and may require a permit from Escambia County, 850.595.1810 for inquiry. - Completed application must be submitted at least

More information

National Association of Rocketry Level 3 High Power Certification Requirements

National Association of Rocketry Level 3 High Power Certification Requirements National Association of Rocketry Level 3 High Power Certification Requirements 1.0 Flyer Requirements 1.1 Any individual attempting NAR Level 3 Certification must be a Level 2 high power certified NAR

More information

Grade Crossing Regulations

Grade Crossing Regulations Grade Crossing Regulations An Overview of Municipal Roles and Responsibilities at Federally Legislated Grade Crossings March 21, 2017 presentation to Alberta Municipal Supervisor Association, Edmonton,

More information

Roadless Forest Protection

Roadless Forest Protection Roadless Forest Protection On January 12, 2001, after nearly three years of analysis and the greatest public outreach in the history of federal rulemaking, the U.S. Forest Service adopted the Roadless

More information

Okanogan Borderlands Historical Society : ;:!

Okanogan Borderlands Historical Society : ;:! Okanogan Borderlands Historical Society : ;:! 1210 Ironwood Street Orovllle, WA 98844 ~.'.'.-f:'e~i'" "k :... November 18, 2008 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First

More information

IRELAND SAFETY REGULATION DIVISION

IRELAND SAFETY REGULATION DIVISION NOTICE TO AIR NAVIGATION SERVICE PROVIDERS IRELAND SAFETY REGULATION DIVISION NR S.016 ISSUE 1 DATE 03.03.10 IRISH AVIATION AUTHORITY AVIATION HOUSE HAWKINS STREET DUBLIN 2 Tel +353 1 6718655 Fax +353

More information

Notes from April 2014 USCIS Texas Service Center Open House

Notes from April 2014 USCIS Texas Service Center Open House Notes from April 2014 USCIS Texas Service Center Open House These notes were taken by a member of NAFSA s ISS-RP Regulatory Ombuds Subcommittee and have not been reviewed by the government officials who

More information

FAA/HSAC PART 135 SYSTEM SAFETY RISK MANAGEMENT SAFETY ELEMENT TRAINING OF FLIGHT CREWMEMBERS JOB AID Revision 1

FAA/HSAC PART 135 SYSTEM SAFETY RISK MANAGEMENT SAFETY ELEMENT TRAINING OF FLIGHT CREWMEMBERS JOB AID Revision 1 SAFETY ELEMENT 4.2.3 - TRAINING OF FLIGHT CREWMEMBERS JOB AID Revision 1 The Federal Aviation Administration (FAA) is proactively moving away from compliance based safety surveillance programs to Systems

More information

Notification and Reporting of Aircraft Accidents or Incidents. and Overdue Aircraft, and Preservation of Aircraft Wreckage,

Notification and Reporting of Aircraft Accidents or Incidents. and Overdue Aircraft, and Preservation of Aircraft Wreckage, This document is scheduled to be published in the Federal Register on 12/15/2015 and available online at http://federalregister.gov/a/2015-30758, and on FDsys.gov 7533-01-M NATIONAL TRANSPORTATION SAFETY

More information

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

MEMORANDUM. Lynn Hayes LSA Associates, Inc. MEMORANDUM To: Lynn Hayes LSA Associates, Inc. Date: May 5, 217 From: Zawwar Saiyed, P.E., Senior Transportation Engineer Justin Tucker, Transportation Engineer I Linscott, Law & Greenspan, Engineers LLG

More information

Homeland Security Investigations. IMAGE Form I-9 Training

Homeland Security Investigations. IMAGE Form I-9 Training Homeland Security Investigations IMAGE Form I-9 Training 1 The Employment Eligibility Verification Form I-9 (Form I-9) Immigration Reform and Control Act of 1986 Requires employers to utilize the Form

More information

Update on FAA Standard Operating Procedures (SOP)

Update on FAA Standard Operating Procedures (SOP) Update on FAA Standard Operating Procedures (SOP) SOP 2.0 - Airport Layout Plan (ALP) SOP 3.0 - Exhibit A Airport Property Map Presented to: Association of California Airports (ACA); ACA Annual Conference,

More information

March 25, 1994 To: Re: MEMO TO FILE MINOR AMENDMENT - PINERY PROVINCIAL PARK MANAGEMENT PLAN The following paragraph from page 5 of the Pinery Provincial Park Management Plan (ISBN 0-7729-0290-9) lnsects

More information

Triangle Land Conservancy Conservation Area Monitoring Report Carolina North

Triangle Land Conservancy Conservation Area Monitoring Report Carolina North Triangle Land Conservancy Conservation Area Monitoring Report Carolina North Property Name: Bolin Creek West Conservation Area Date of visit: March 16, 2017 County: Orange Property Type: Restrictive Covenants

More information

January 31, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

January 31, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 . Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: Snohomish County PUD No. 1 Tidal Energy Project Progress Report #2 Deception Pass Tidal

More information

Lake Tahoe Shoreline Plan 03 Policy Topic: Access Issues

Lake Tahoe Shoreline Plan 03 Policy Topic: Access Issues Lake Tahoe Shoreline Plan 03 Policy Topic: Access Issues V9 Last Updated 03.10.2017 1 Brief Description Physical access to the waters of Lake Tahoe is one of the key issues surrounding the Shoreline Plan

More information

DOYLE SPRINGS PLANNING UNIT Kern-Tule River Watershed

DOYLE SPRINGS PLANNING UNIT Kern-Tule River Watershed Existing Conditions & Uses Overview Consists of a mostly forested parcel with small hydropower developments and part of a private recreation cabin development, along with two small transmission line corridor

More information

Foreign Air Carrier Family Support Act. August, 2011

Foreign Air Carrier Family Support Act. August, 2011 Foreign Air Carrier Family Support Act August, 2011 Principles of Family Assistance Deutsche Lufthansa AG d/b/a Lufthansa German Airlines and Lufthansa Cargo AG (hereinafter referred to collectively as

More information

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3 Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus

More information

CHAPTER 6 NOISE EXPOSURE

CHAPTER 6 NOISE EXPOSURE CHAPTER 6 NOISE EXPOSURE FAA requires that the NEM submitted for review represent the aircraft noise exposure for the year of submittal (in this case 2008) and for a future year (2013 for OSUA). However,

More information

TRAIL MAPPING AND MARKING POLICY SANTA FE TRAIL ASSOCIATION Adopted by the Santa Fe Trail Association Board of Directors, April 13, 2002

TRAIL MAPPING AND MARKING POLICY SANTA FE TRAIL ASSOCIATION Adopted by the Santa Fe Trail Association Board of Directors, April 13, 2002 TRAIL MAPPING AND MARKING POLICY SANTA FE TRAIL ASSOCIATION Adopted by the Santa Fe Trail Association Board of Directors, April 13, 2002 INTRODUCTION There are three principle aspects to the marking of

More information

Toronto and East York Community Council. Director, Toronto Building, Toronto and East York District

Toronto and East York Community Council. Director, Toronto Building, Toronto and East York District Sign Variance - 25 Bishop Tutu Blvd STAFF REPORT ACTION REQUIRED Date: February 16, 2009 To: From: Wards: Reference Number: Toronto and East York Community Council Director, Toronto Building, Toronto and

More information

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1 HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1 Feb. 27, 2017 HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Welcome Curtis Robinhold, Port of Portland 1 HILLSBORO

More information

CESSNA AIRCRAFT COMPANY

CESSNA AIRCRAFT COMPANY Page 1 2007-05-10 CESSNA AIRCRAFT COMPANY Amendment 39-14971 Docket No. FAA-2006-25261; Directorate Identifier 2006-CE-38-AD PREAMBLE Effective Date (a) This AD becomes effective on April 11, 2007. Affected

More information

CHECKLIST FOR ATO ANNUAL INSPECTION Personnel Licensing Office

CHECKLIST FOR ATO ANNUAL INSPECTION Personnel Licensing Office Form 4 In the name of God CHECKLIST FOR ATO ANNUAL INSPECTION Personnel Licensing Office DATE OF INSPECTION : INSPECTION AT : INSPECTOR : GENERAL INFORMATION: NAME OF ORGANISATION: Certificate of Approval

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

Redtail Ranch Preliminary Plan and Filing No. 1 Final Plat, Review #2 (SP , SF )

Redtail Ranch Preliminary Plan and Filing No. 1 Final Plat, Review #2 (SP , SF ) COMMISSINERS: DARRYL GLENN (PRESIDENT) MARK WALLER (PRESIDENT PRO TEMPORE) PEGGY LITTLETON LONGINOS GONZALEZ, JR. STAN VANDERWERF COMMUNITY SERVICES DEPARTMENT PARK OPERATIONS ~ PLANNING ~ CSU EXTENSION

More information

Proposed Action. Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties. United States Department of Agriculture

Proposed Action. Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties. United States Department of Agriculture United States Department of Agriculture Forest Service January 2012 Proposed Action Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties Payette National Forest Valley, Adams

More information

Unmanned Aircraft Systems (UAS) 101

Unmanned Aircraft Systems (UAS) 101 Unmanned Aircraft Systems (UAS) 101 Presented to: National Tribal Transportation Conference Presented by: Robert Winn, Aviation Safety Inspector, Unmanned Aircraft Systems Office Date: Overview Unmanned

More information

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline

More information

[Docket No. FAA ; Product Identifier 2018-SW-041-AD; Amendment ; AD ]

[Docket No. FAA ; Product Identifier 2018-SW-041-AD; Amendment ; AD ] [Federal Register Volume 83, Number 175 (Monday, September 10, 2018)] [Rules and Regulations] [Pages 45545-45548] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR

More information

EU ECOLABEL USER MANUAL TOURIST ACCOMMODATION Commission Decision for the award of the EU Ecolabel for tourist accommodation (2017/175/EC)

EU ECOLABEL USER MANUAL TOURIST ACCOMMODATION Commission Decision for the award of the EU Ecolabel for tourist accommodation (2017/175/EC) Check-List This checklist (in blue table) summarises the documentation to be provided for each mandatory criterion. The documentation described below has to be submitted to the Competent Body. Applicant

More information