1 CALDECOTT FOURTH BORE TOUR Article by Bob Fracolli Photos by Mark Huston On Friday, February 22 nd, fifteen members and guests of the Northern California Region met in Lafayette for a presentation and site visit on the Caldecott Tunnel 4 th Bore project. We first met off-site and combined everyone into four cars (we ended up in two Lincolns, a Cadillac and a GMC-all non-classics). Parking was very limited where we were headed, and the destinations were not a good fit for Full Classics, even though it was a nice sunny day. At 10:00 am, we met with Senior Project Manager Ivy Morrison at the Fourth Bore Construction Office in Lafayette. In a large conference room, she gave a PowerPoint presentation on the history, funding and construction of the Oakland to Orinda Fourth Bore tunnel. With all of Our Tour Organizer Bob Fracolli our questions and subsequent discussions, the normally one- hour presentation stretched to two and a half hours! Before leaving, we were given hardhats, construction vests, safety glasses and boots to wear at the construction site. Next, we were off carpooling to the East Portal for the site visit. We parked in a heavy gravel lot with a significant incline, and then walked up a way to the construction office where we signed in. Single file, we walked back through the gravel lot and down a trail through large construction equipment. We continued down two long flights of temporary wooden stairs, finally reaching the East Portal. There, we had a close-up view of the East Portal and inside the tunnel. The site was quite busy with construction vehicles and workers going in and out of the tunnel. In the tradition of mining, each worker entering the tunnel had to have two numbered brass tags; one was left on a board outside the tunnel and the other one was carried inside by the worker. In an emergency, one could tell exactly how many workers were inside the tunnel and account for each as they came out. Although we had a spectacular view, we were not allowed to actually enter the tunnel for safety reasons. The East entrance to the Fourthbore of the Caldecutt Tunnel After hiking back to the cars, we carpooled through the Third Bore to the West Portal. Unfortunately, there was no parking so we weren t able to view the construction from that side. Back through the First Bore, 8
2 we drove to the Europa Hofbrau in Orinda for lunch. Taking over a section of the restaurant, we ate and talked during a leisurely paced lunch. After lunch, the protective clothing was returned to the construction office and people were driven back to their cars. All who attended saw local history in the making and learned a great deal about the history and construction of the Caldecott Forth Bore Tunnel. Ivy Morrison, giving the attendees all they needed to know, background and construction of the Caldecott Forth Bore Tunnel HISTORY AND BACKGROUND The first tunnel from Oakland to Contra Costa County was the Kennedy Tunnel, built in It was also known as the Broadway or Upper Broadway Tunnel, and finally closed in The tunnel is now filled in, but a plaque can be found memorializing it near its west portal off Tunnel Road. In 1937, the Lower Broadway, or First and Second Bores of the Caldecott Tunnel, were completed. The Work Progress Administration (WPA) funded their construction during the Great Depression. In 1964, the Third Bore of the Caldecott Tunnel was completed. Right-of way for the Fourth Bore was purchased at the same time. The rock where the tunnels are is comprised of vertical strata, which is folded. The Orinda side is made up of younger rock, and was an ancient riverbed. During the Fourth Bore construction, a paleontologist was required to be on-site. Among things discovered during the excavation were a camel tooth, three-toed horse leg bone and bones from giant sloths. The Oakland side was a deep marine environment. Fish and clam fossils have been recovered from that side. There were many Fourth Bore construction challenges. Different types and densities of rocks were located next to one another, making the excavation difficult. Due to trace levels of methane, the Fourth Bore was designated as a Gassy Tunnel, requiring specialized ventilation during construction. The City of Oakland sued the project, resulting in a $9-million dollar settlement and mitigation measures to the Oakland side residents including the largest temporary sound wall in California, the installation of nine sound level monitors (monitored throughout the day), and strict restrictions on times dynamite could be used (making its use impractical). The completed Fourth Bore will have two 12-foot lanes, a 10-foot shoulder and an emergency pedestrian walkway. The tunnel interior will be covered with a water proofing membrane, a concrete reinforced steel rebar cage, and a thin outer lining. There will be 20 jet fans capable of exhausting air in multiple directions. Seven emergency crosspassages have been dug between the Fourth and Third Bores. The tunnel can survive an earthquake up to a magnitude of 7.2 and a 2200-degree fire for two hours. The final roadway will be two-feet above the excavation line to address groundswell effects. Bores Three and Four will share a radio re-broadcast system. While there were multiple fatalities in 1937 construction and one in 1964, there have been none in Fourth Bore construction. 9
3 The New Austrian tunneling method developed in 1960 s is being used in the construction. This method employs sequential excavation of first the top portion, then lower eight feet. The excavation is in a horseshoe shape. One to one and a half meters are excavated at a time, depending on stability of rock. The excavated area is immediately covered with shotcrete, a mix of concrete and fiberglass-type material. Three-quarters of work was been done from the east side. This is because the rock is more stable, it is downhill, it is away from residents living nearby, and there is room for staging equipment. On the Orinda side, a Roadheader was used. It is a machine with a huge drill head, designed and manufactured in Austria. The Roadheader drills in circular pattern. It is electrically powered and remotely operated. The machine spits out rock onto a conveyer, which is then loaded into muck trucks and removed. For the Oakland side and for most of the bottom level, a Caterpillar 330 Excavator was used. The dirt was designated as clean or dirty. Dirty dirt had traces of methane gas and was taken to landfills. Clean dirt was taken to Treasure Island. Groundbreaking of the Fourth Bore was in January of The upper lever excavation broke through November 29, By August 8, 2012, the excavation was completed. Currently, they are installing electrical and drainage systems (water treated and piped to Lake Temescal), façade work (including portals and retaining walls) and the actual roadway. The Fourth Bore is scheduled to open in late The cost of the project is $402.1 million, which includes design, administration, construction and final freeway traffic alignment modifications. Of that, $180 million came from federal stimulus funds and only $11 million from state funds. Contra Costa County funding includes $123 million from Measure J and $50.3 million from other regional measures. Alameda County contributed no money toward the project. Left: Leaving the pre Tunnel Tour presentation in Lafayet for the construction site Lower Left: Andy Campbell & Anne Steele waiting to get started Below: Ed Gunther and Bob Fracolli 10
4 Top Right & Left: Checking in at the construction office Left: Lining up to cross Fish Camp Road to the Tunnel construction site. Below: From the top of the New Tunnel Bore looking east. Duck!!!! This is an active construction site the hard hats are required with good reason as shown here. 11
5 Above, Top & Center: An active construction site. With lots of dangerous areas. Now we understand why the Contractor was so picky about the shoes we wore on site.. 12 Above: Visiting after Lunch at the Eupoa Hofbrow in Orinda
6 Thank You all who Attended! Paul Borgwardt Andy Campbell Peter Frazier Ed Gunther Ed Holloway Soo-Yin Holloway Mark Huston Gordon Johnson Dean Scott Sheila Scott Jim Serwer Anne Steele Elaine Zinzer Maike Zinzer Thank You to Bob Fracolli for arranging the visit!! 13
REPORT ON TRAIN DERAILMENT IN PITTSBURGH TUNNEL WEDNESDAY OCTOBER 10, 2001 By Thomas Edward Fox
REPORT ON TRAIN DERAILMENT IN PITTSBURGH TUNNEL WEDNESDAY OCTOBER 10, 2001 By Thomas Edward Fox During the early morning hours of Wednesday, October 10, 2001, twelve hopper rail cars traveling on the Wheeling
More informationBUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018
BUILD C O N ST R U C T I O N Update August 2018 In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4 AVENUE 12 CEDAR VIADUCT A VIEW FROM ROAD 27 ABOVE HSR CONSTRUCTION FRESNO
More information2019 DAY HIKE AT IRON MOUNTAIN SATURDAY, JANUARY 19
WHERE? In Google Maps, paste the following coordinates for Iron Mountain: 32.978215,-116.972593 or CLICK ON THIS LINK. I. Purpose of the Day Hike A. THE WBC Day Hike is a relatively short trail hike to
More informationMason Street Bike/Pedestrian Trail Project
Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits
More informationBALLAST CLEANING TO IMPROVE DRAINAGE IN METROLINK S VALLEY SUBDIVISION TUNNEL 25
Number of Words: 3,527 ABSTRACT BALLAST CLEANING TO IMPROVE DRAINAGE IN METROLINK S VALLEY SUBDIVISION TUNNEL 25 Tim Harris Track Maintenance Engineer 2704 North Garey Ave. Pomona, CA 91767 213/494-1215
More informationFinally it was unloaded from the power carrier and moved into place using rock bars and brute strength.
The Longest Mile It has been many years since work first began on this rugged and remote one-mile segment of the MCCT between Patti s Point and the Lower Log Boom on Pardee Watershed. EBMUD mounted patrolmen
More informationMANITOBA METIS FEDERATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING
MANITOBA METIS FEDERATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 9 SEPTEMBER 17 TH TO SEPTEMBER 22 ND Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R
More information& CONSTRUCTION TUNNEL DESIGN THE ATS SHORT COURSE 2015
Short Course 7-8 October 2015, Marriott Hotel, Brisbane, Australia Tunnelling Applications Workshop 9 October 2015, Mount Coot-tha Quarry, Brisbane Program For further information visit: www.engineersaustralia.org.au/ats2015
More informationFiberglass 80 meter Vertical BASE
Fiberglass 80 meter Vertical - Revised: 2015-11-06 One antenna in use at K0MPH is a fiberglass 80 meter vertical. The supporting structure is made of fiberglass tubing but the radiation is from a wire
More informationA. CONCLUSIONS OF THE FGEIS
Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300
More informationDay and night work: Hills M2 Motorway tunnel portals and Coral Tree Drive electrical substation
T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 2 July 2018 Ref: N0202 Day and night work: Hills M2 Motorway tunnel portals and Coral Tree
More informationFabulous Residential Development Site on the Peninsula
500 SYLVAN AVENUE SAN BRUNO, CALIFORNIA Fabulous Residential Development Site on the Peninsula ED STEPHENS Broker Associate calbre # 00462186 Page 1 Cell: (650) 208-1301 EdStephensRealEstate@gmail.com
More informationEXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015
EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley
More informationSLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule
SLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule Two sky bridges will connect the parking garage to the second level of the terminal, while an elevated roadway for depa will access
More informationSite Formation Works of the Kai Tak Cruise Terminal Project
Site Formation Works of the Kai Tak Cruise Terminal Project Presented by Ian Muir MIEAust, CPEng Maritime Business Unit Head Asia Pacific and Deputy Project Director for the Kai Tak Cruise Terminal Site
More informationNight work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road
T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 28 April 2017 Ref: N0075M Night work update: and westbound on ramp at Dear resident, NorthConnex
More informationSanta Clara Valley s Railroad Lines
Smith-Layton Archive Charlene Duval, Executive Secretary cduval@sourisseauacademy.org Leilani Marshall, Archivist lmarshall@sourisseauacademy.org Phone: 408 808-2064 Santa Clara Valley s Railroad Lines
More informationSpencer Environmental Appendix A: Alternative Analysis for Construction Access Route
Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route February 2015 Valley ine-stage 1 RT EISA Update FINA REPORT Page A1 Memorandum AECOM ConnectEd Transit Partnership 10235
More informationLong water shutdown scheduled for Tuesday, September 18
Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility
More informationRevitalization of the previous Marine Police Headquarters in Tsim Sha Tsui
Revitalization of the previous Marine Police Headquarters in Tsim Sha Tsui The former Marine Police Headquarters was constructed in 1884, comprises a main building, a stable block and signal tower. The
More informationì<(sk$m)=beicea< +^-Ä-U-Ä-U
Fascinating Facts The Nile River in Egypt is the world s longest river, but the Amazon River in Brazil moves the most water. The world s largest freshwater lake is Lake Baikal in Russia. The highest temperature
More informationSGS MUSCOWPETUNG ABORIGINAL CONSTRUCTION MONITORING
SGS MUSCOWPETUNG ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 4 JANUARY 29 TH TO FEBRUARY 4 TH, 2018 Page 1 of 14 Social and Cultural Features Field Observation # of occurrences Description
More informationChocolate Bar GOLD Mining Claim Oro Grande, California 92368
Gold Mining Claim 20 Acres Chocolate Bar GOLD Mining Claim Oro Grande, California 92368 Sale Highlights Formerly: Branch Gold Mine Heavy GOLD & Silver Concentrations: Remaining 300' Horizontal Tunnel with
More informationPattullo Bridge Replacement Project
Pattullo Bridge Overview This document will: Explain the challenges facing the Pattullo Bridge today Share how we propose moving forward translink.ca PAGE 1 History By Order of the Lieutenant Governor
More informationSECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY
WEEK ENDING FEBRUARY 1, 2019 SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY Contractor: Independence Excavating Inc. 1. Work Shift Day shift (M-F), with Saturday as a makeup day. 2. Traffic The new
More informationPRODUCT SPECIFICATION
PRODUCT SPECIFICATION Brand C.K Magma Product Range Premium storage and PPE Catalogue number Date 03/10/2016 Range Description A range of tool carrying equipment designed to offer the complete solution
More informationBUILDING BETTER COMMUNITIES
BUILDING BETTER COMMUNITIES AS FEATURED IN AUSTRALIAN CONSTRUCTION FOCUS BUILDING BETTER COMMUNITIES BUILDING BETTER ABERGELDIE COMPLEX INFRASTRUCTURE COMMUNITIES ABERGELDIE COMPLEX COMPLEX INFRASTRUCTURE
More informationDINING. Please Note: Ticket prices do not include processing fee of $12.00 per ticket per day or shipping fee of $25 per order.
CLUBHOUSE ACCESS: TRACKSIDE **NEW FOR 2019** Located on the 1st floor of the Clubhouse, the newly renovated dining level places you right at the rail. Situated by the first turn and finish line, there
More informationDecember 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program
December 2012 Update I-95 New Haven Harbor Crossing Corridor Improvement Program Prepared by: Connecticut Department of Transportation District 3A 424 Chapel Street New Haven, CT 06511 Prepared for: South
More informationSuggested Day Hikes. Mount Greylock State Reservation 3, 4 1, 2. Take a Hike! Things to remember:
Suggested Day Hikes Mount Greylock State Reservation Take a Hike! This guide offers suggested day hike routes in two parts: 1) Year-round Hikes and 2) Seasonal Hikes (late-may to Nov.1). Use this guide
More informationYoung people in North America10
Young people in North America10 some facts and figures about the USA and Canada. how to understand an American accent. how to summarize a text in which people describe how they live. to write a short text
More informationAVIATION PLANNING AND DEVELOPMENT Oakland International Airport 530 Water Street Oakland, CA 94607
AVIATION PLANNING AND DEVELOPMENT Oakland International Airport 530 Water Street When Do I Need to File an FAA Form 7460-1? Objects Affecting Navigable Airspace (14CFR77) June 2013 Background The Federal
More informationDAY 1: Circular Quay to Greenwich Wharf
DAY 1: Circular Quay to Greenwich Wharf Total Distance: 14km Time: Approximately 5 hours Walk Notes in Six Sections Section Name Length Time 1:1 Circular Quay to Milsons Point Station 2.5km 50mins 1:2
More informationAcadia National Park. Waterman Fund Grant Report 2016 Cadillac Mountain South Ridge Trail Rehabilitation. Acadia National Park
Acadia National Park National Park Service U.S. Department of the Interior Natio n alpar kser vic e U. S. Depar tm en t o f the In ter io r Waterman Fund Grant Report 2016 Cadillac Mountain South Ridge
More informationRe Keying R1200RT Cases Re Keying R1200RT R1200ST K1200GT Cases Created 29/01/ Amended 04/09/2012
Re Keying R1200RT Cases Re Keying R1200RT R1200ST K1200GT Cases Created 29/01/2007 - Amended 04/09/2012 This walkthrough describes re-keying the large 49L top case for the BMW R1200RT / ST & K1200GT, but
More informationSAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING
SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 2 AUGUST 20 TH - AUGUST 25 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606
More informationBorn June 4th, 1922 to Charles Manning Jaquette and Aura Louise Smith
Life Story of FRANK JAQUETTE (Part I - 1920 s - early 1940 s) By Opal Jaquette Born June 4th, 1922 to Charles Manning Jaquette and Aura Louise Smith Jaquette, fifth and final child born to this union.
More informationKATHY S BIRTHDAY TRIP BY PRIVATE RAIL CAR 2013 After a somewhat uncomfortable trip to Portland on another rail car in June, Kathy and I were
KATHY S BIRTHDAY TRIP BY PRIVATE RAIL CAR 2013 After a somewhat uncomfortable trip to Portland on another rail car in June, Kathy and I were discussing going on the Silver Lariat private railcar once again.
More informationDesigning Built-in Animal Enrichments
Designing Built-in Animal Enrichments 2017 Zoo Design Conference, Wrocław, Poland Mariusz Bleszynski AIA, Exhibit Designer PGAV Destinations, St. Louis U.S.A. 1 Enrichment Choices Keeper-Initiated Spontaneously
More informationInstallation Instructions
Installation Instructions Hex Sierra TopTec Products, LLC 7061 Highway 221 Moore, SC 29369 Phone: (800) 845-2830 Fax: (800) 921-7750 e-mail: sales@toptecproducts.com www.toptecproducts.com 2004 TopTec
More informationDINING Please Note: Ticket prices do not include processing fee of $12.00 per ticket per day or shipping fee of $25 per order.
CLUBHOUSE ACCESS: TRACKSIDE **NEW FOR 2019** Located on the 1st floor of the Clubhouse, the newly renovated dining level places you right at the rail. Situated by the first turn and finish line, there
More informationWild Pacific Trail Society
Wild Pacific Trail Society Section H Completion Report January 24, 2014 Project Manager: Tel: Email: Jim Martin 250-726-7565 oysterjim@hotmail.com Project Report: Tel: Email: Heather Grimshire 250-266-2053
More informationHenderson Mountain Avalanche Accident Two riders caught, one partially buried, one fully buried
Henderson Mountain Avalanche Accident Two riders caught, one partially buried, one fully buried Custer-Gallatin National Forest 28 November 2014 Synopsis A group of 6 or 7 snowmobilers (part of a larger
More informationì<(sk$m)=beicdd< +^-Ä-U-Ä-U
Fascinating Facts The Nile River in Egypt is the world s longest river, but the Amazon River in Brazil moves the most water. The world s largest freshwater lake is Lake Baikal in Russia. The highest temperature
More informationMissing Mount Isa mine worker: Update
News Search... Business (/) Missing Mount Isa mine worker: Update June 20, 2014, 6:26 p.m. LATEST POLICE have confirmed the search for missing Mount Isa Mines worker Brett Kelly is now in recovery mode.
More informationCrossing the Keweenaw Waterway in an Emergency with a U.S Army Floating Bridge
Crossing the Keweenaw Waterway in an Emergency with a U.S Army Floating Bridge Photo: John Kiefer William Leder, Adjunct Professor (Ret.) Department of Civil and Environmental Engineering Contributions
More informationSeven Wonders of the Modern World
Seven Wonders of the Modern World A Reading A Z Level S Leveled Reader Word Count: 1,279 LEVELED READER S Written by Jane Sellman Visit www.readinga-z.com for thousands of books and materials. www.readinga-z.com
More informationGuide to the L. F. Manis Photographs
This finding aid was produced using ArchivesSpace on February 29, 2016. English 2016 The Regents of the University of Nevada. All rights reserved. University of Nevada, Las Vegas. University Libraries.
More informationAxes. The information below will assist the Scout in obtaining their Forester badge.
Axes The information below will assist the Scout in obtaining their Forester badge. Axes can come in different shapes and sizes, the two axes that are of most relevance to any Scout Troop will be the HANDAXE
More informationAGENDA ITEM I-6 Public Works
AGENDA ITEM I-6 Public Works STAFF REPORT City Council Meeting Date: 8/6/2018 Staff Report Number: 18-150-CC Informational Item: Update on the Willow Road and highway 101 interchange construction, upcoming
More informationMountaineers Gear List: Winter Presidential Traverse
The following gear list for Backpacking is for the winter Presidential Traverse. Based on temperatures at night, Warmer than -10 degrees. You are the final decision maker and if there are items that should
More informationCHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS
CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS NORTH CENTRAL CAC AREA LITTLE VALLEY ROAD TO JUG HANDLE CREEK PLANNING AREA This planning area includes Cleone, Noyo,
More informationCycling Across Peru...Details for the 2019 Tour
Cycling Across Peru...Details for the 2019 Tour Pampamarca, Peru. Elevation: 14,000 feet. Population: 100. Temperature: 28F degrees, Heat: none. It takes a strong person to roll over in bed when covered
More informationDay 2 Parque Nacional de los Glaciares As many of you already know this area is declared by UNESCO as a world heritage site and is the number 1
Patagonia Because of this beautiful vacation we came up with the idea with the Via Via team members to tell all our travelling fans about this trip and spectacular destination Calafate. With the foreigners
More informationSpiral staircases. Practical staircase solutions, outside and indoors
Spiral staircases Practical staircase solutions, outside and indoors 2 www.weland.se +46 (0) 371-344 00 Spiral staircases represent in most cases a very useful staircase solution Architecturally attractive
More informationGuide to the L. F. Manis Photographs
This finding aid was created by Lindsay Oden on February 27, 2018. Persistent URL for this finding aid: http://n2t.net/ark:/62930/f1vk60 2018 The Regents of the University of Nevada. All rights reserved.
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 29, 2009 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF CONCEPTUAL DESIGN
More informationInstalling a Drainage Chimney. Written by Nevin Sunday, 28 May :35 - Last Updated Tuesday, 18 July :52
Many, many years ago when we put the first tanks on the back of the garage, the council inspector had said that I needed to put in a rubble drain to take the stormwater from the roof of the garage. This
More informationHB/VS-078 Üssers Barrhorn
HB/VS-078 Üssers Barrhorn Paul HB9DST, August 23, 2015 Summary: This was a HB9SOTA club project, an activation of the highest summit in Europe you can hike up without ropes or other equipment. The headline
More informationSAFETY IN THE EXT EME R
1 SAFETY IN THE EXT EME R The ORKA range has been designed and developed to meet the global demand for premium quality flame-retardant workwear, capable of performing in the most hostile frontline environments.
More informationARCHIVES MONTH in Washington!
ARCHIVES MONTH in Washington! We received an invitation in September from The State Archives to participate in Archives Month : 2014 is the 125th anniversary of Washington reaching statehood. It is a momentous
More informationOPERATOR INSTRUCTION MANUAL INCLUDING REPAIR PARTS FOR MODULAR GENERAL PURPOSE TENT SYSTEM (MGPTS) TYPE I
OPERATOR INSTRUCTION MANUAL INCLUDING REPAIR PARTS FOR MODULAR GENERAL PURPOSE TENT SYSTEM (MGPTS) TYPE I Johnson Outdoors Gear, Inc. Eureka! branded tent products 625 Conklin Road Binghamton, NY 13903
More informationAmerican Conservation Experience
ACE Project Report For Tonto National Forest, Arizona Trail Association and Arizona State Parks Title of Project: 4 Peaks Trail Maintenance Award Contract Number: ASP NM11021 Project Partner: Paul Burghard
More informationInvestigation Report Worker Fatality March 31, 2014
Investigation Report Worker Fatality March 31, 2014 Report No- F-OHS-062228-389D3 March 2015 Page 1 of 6 The contents of this report This document reports s (OHS ) investigation of a worker fatality in
More informationGOLDEN EARS PROVINCIAL PARK
GOLDEN EARS PROVINCIAL PARK Trail Information as of October 10 th 2015 Do not underestimate the mountainous wilderness of Golden Ears Provincial Park. The combination of rugged terrain and rapidly changing
More informationThe Kitanemuk, members of the Shoshonean Linguistic Group lived in the area between Fairmont and Antelope Buttes: one of the largest and most
The Kitanemuk, members of the Shoshonean Linguistic Group lived in the area between Fairmont and Antelope Buttes: one of the largest and most significant archaeological sites in the Antelope Valley Source:
More informationSwiss Instruments Limited
Swiss Instruments Limited Your product sourcing partner L o c ke r S o lutio ns www.swissinstruments.com B ro c hure Head Office (Toronto) 1920 Mattawa Avenue Mississauga, Ontario L4X 1K1 BELMAG INC (QC)
More informationAlternative Designs Report Joshua s Jumper
Alternative Designs Report Joshua s Jumper By Elyssa Polomski, Michael Ballintyn, and Tianyi Xu Team # 21 Client: Joshua Bouchard Client Contact: Sue and Ron Bouchard, soupanony@aol.com, (508) 823-6113
More informationThe 2 Man Trail Crew
The 2 Man Trail Crew The year was 1972. We had just returned to the mountain town of Field from my work with the Avalanche Research team in Rodgers Pass. Grace and I moved into our small house along side
More informationSAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING
SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 2 SEPTEMBER 4 TH - SEPTEMBER 8 T H Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606
More informationPROJECT UPDATE BETTER TIMES AHEAD ON CLEM7 CLEM JONES TUNNEL. Fast facts AUGUST 2008
CLEM JONES TUNNEL PROJECT UPDATE AUGUST 2008 Two kilometres of tunnel has been excavated at Kangaroo Point and tunnel lining work is now under way. BETTER TIMES AHEAD ON CLEM7 Fast facts Road length 6.8
More informationAssembly Instructions. Connecting MultipleYellow Jacket Classic s
Connecting MultipleYellow Jacket Classic s Connecting End Boots Step 1. Attach the Male End Boot by placing the female connectors of the straight section over the male connectors of the End Boot. Step
More informationPicnic Units A picnic unit is a part of a picnic area
Grab Bars Grab bars are usually provided in buildings to provide stability and allow a person to use his or her arms to assist in movement over short distances. The most common location for grab bars is
More informationMP : the top of the bottom switchback
MP 237 238: the top of the bottom switchback For reference this section of U S Highway 40 has been called the top of the bottom switchback on the Grand County side of the Pass. It is here that the proposed
More informationMIFACE INVESTIGATION: #02MI106
MIFACE INVESTIGATION: #02MI106 SUBJECT: Highway Worker Killed by Passenger Vehicle While Setting Up Highway Work Zone Warning Signal Summary On Friday, August 9, 2002, a 26-year-old technical sales representative
More informationTHE BLOCK HOUSE. A time where yesterday is not necessarily the day before today: but a past that no longer exists.
THE BLOCK HOUSE Going around in Tell el Eisa, obvious to those who know where to go, you can cross small areas where there are still many relics from the period of the battles of El Alamein. Some of these
More informationIn Rural Squirrel, Idaho, a Modern Home
In Rural Squirrel, Idaho, a Modern Home A couple s contemporary retreat on their 290-acre barley farm. By Candace Jackson Oct. 23, 2014 12:04 p.m. ET 1 of 13 fullscreen When Lauri and Doug Siddoway were
More informationwaterview connection Completing the Western Ring Route the Waterview Connection
waterview connection MAY 2009 Completing the Western Ring Route the Waterview Connection The NZ Transport Agency (NZTA) has a new proposal to complete the Western Ring Route around Auckland by connecting
More informationLiaison Group Forum. 1. Introduction GE opened the meeting and welcomed members of the public in attendance.
Liaison Group Forum Minutes of meeting: 23 April 2018, 1.00 2.30pm Venue: Bede Hall, Sneaton Castle Centre, Whitby, YO21 3QN Present: Gareth Edmunds (GE) Sirius Minerals (Meeting Chair) Simon Carter (SC)
More informationOWNER'S MANUAL CAMPOUT TABLE OF CONTENTS
OWNER'S MANUAL CAMPOUT RV Before operating the awning, carefully review the Owner's Manual. The manual contains important safety information, detailed operating instructions, common maintenance procedures
More informationSmisco Food Equipment Ltd
Smisco Food Equipment Ltd Limerick Road, Mitchelstown, Co.Cork. Ireland. Tel 00353 2584279 Fax 00353 2584888. Email: smisco@eircom.net Web: www.smiscoequip.co.uk 1978 Manufacturing Bespoke Stainless Steel
More informationSpiral Duct. Contents. Introduction 1. Duct & Fitting Range 2. Duct Sizes 3. Fittings 5. Round Duct Connector 7. Installation 8
Contents Introduction 1 Duct & Fitting Range 2 Duct Sizes 3 Fittings 5 Round Duct Connector 7 Installation 8 Celmec International Pty Ltd ACN 005 850 546 Melbourne Tel: +61 3 8552 8200 Fax: +61 3 9555
More informationGeneral Regulations Governing sawmill, lumber, mining and construction camps
SAWMILL, LUMBER, MINING AND 1 General Regulations Governing sawmill, lumber, mining and construction camps Repealed by Chapter P-37.1 Reg 10 (effective December 5, 2002). Formerly Saskatchewan Regulations
More informationQueen Mary Falls Ride. 40ks
Queen Mary Falls Ride 40ks The 70k riders had wheeled out of the park at around 10,00am but the 40k riders had another hour to sit around and soak up the day. While we were waiting for kick off some of
More informationLevels & Measuring Tools
Levels & Measuring Tools Quick, easy and accurate measurements can mean the difference between a job well done and one that misses the mark. Klein offers a variety of levels and other measuring devices
More informationDINING Please Note: Ticket prices do not include processing fee of $12.00 per ticket per day or shipping fee of $25 per order.
CLUBHOUSE ACCESS: TRACKSIDE **NEW FOR 2019** Located on the 1st floor of the Clubhouse, the newly renovated dining level places you right at the rail with world-class racing. Situated on the clubhouse
More informationManaging Mobility: Engineering an Express Lane Network
Managing Mobility: Engineering an Express Lane Network ITS Bay Area November 20, 2014 Peter Lee, P.E. Principal, Program Delivery Metropolitan Transportation Commission MTC Wears Many Hats Metropolitan
More informationMonday 9th January A day on the coast
Monday 9th January 2017 - A day on the coast Today was allegedly a rest day after yesterday's big hike, and we certainly had a change of pace, but still did quite a lot of walking, albeit I was wearing
More information12-9. High Pressure Cleaning Protection
12-9 High Pressure Cleaning Protection Comfort, Function and Safety - ProOperator Until now there has been no adequate protection for High Pressure Cleaning. Nothing that has been adapted to the power
More informationINTERNATIONAL CHILD PASSENGER SAFETY AWARENESS CLASS. June 2018
INTERNATIONAL CHILD PASSENGER SAFETY AWARENESS CLASS June 2018 1 Welcome Thank you for coming. Introduce yourself and tell us why you are here. What you learn today will prepare you to: Explain how car
More informationOWNER'S MANUAL AWNING EXTEND R TABLE OF CONTENTS
OWNER'S MANUAL AWNING EXTEND R RV Before operating the awning, carefully review the Owner's Manual. The manual contains important safety information, detailed operating instructions, common maintenance
More informationDD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X
ROUTE CLASSIFICATION For use of this form, see ATP 3-34.81/MCWP 3-17.4; the proponent agency is TRADOC. SECTION I 1. SERIAL NUMBER 2. TO 3. FOR INFORMATION 4. DATE/TIME GROUP 5. NUMBER OF SHEETS OR ENCLOSURES
More informationCOUNCIL OF CECIL COUNTY, MARYLAND DEPARTMENT OF PUBLIC WORKS ROADS DIVISION ADOPT-A-ROAD
COUNCIL OF CECIL COUNTY, MARYLAND DEPARTMENT OF PUBLIC WORKS ROADS DIVISION ADOPT-A-ROAD 1 CECIL COUNTY ADOPT-A-ROAD PROGRAM Please join us in our Adopt-A-Road Program! Contact the Cecil County Roads Department
More informationUphillsport Socks Specifications
Uphillsport Socks INNOVATION & QUALITY FROM FINLAND SINCE 1996 UNIQUE MULTI-LAYER STRUCTURE 1. MOISTURE CONTROL Firstly, the inner layer is responsible for transferring moisture away from the skin. This
More informationThe temperature is nice at this time of year, but water is already starting to be scarce.
In March of 2003, Scott Morrison and I went backpacking in the Grand Canyon. The temperature is nice at this time of year, but water is already starting to be scarce. Another issue with this time of year
More informationGENERAL INFORMATION PACKET. BOARDING PARTY PACKAGE: $ $250 for members, $275 for non-members Up to 15 Children (+$15 for each additional child),
GENERAL INFORMATION PACKET G E N E R A L I N F O R M A T I O N P A C K E T C O N T E N T S Pg1 Packages Overview Pg3 Pg4 Pg5 Pg5 Upon Arrival Safety Information What is Provided Host Checklist Add-ons:
More informationCOASTAL CONSERVANCY. Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12
COASTAL CONSERVANCY Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12 File No. 11-039-001 Project Manager: Betsy Wilson RECOMMENDED ACTION: Authorization to disburse
More informationRonda and Grazalema. Monday, May 9, 2011
Monday, May 9, 2011 Ronda and Grazalema With us dropping Seville and Granada from our schedule due to traffic considerations, Jan and I have only one goal left. That is to visit Ronda... and maybe Grazalema.
More information97% MOVING AHEAD LINE TIME ISSUE 34 MARCH ,772 WELCOME FROM ANDREW WOLSTENHOLME 60% WON BY
MOVING AHEAD ISSUE 34 MARCH 2015 WELCOME FROM ANDREW WOLSTENHOLME It s an exciting time for Crossrail, as we continue to build a new railway for London and the South East; safely, on time, and on budget.
More informationDelicate stability. 2 Coat racks
Coat stands Single Product coat overview stands - - coat product stands overview Delicate stability rosconi coat stands combine a delicate appearance with particularly stable construction in timeless design.
More information