1 CALDECOTT FOURTH BORE TOUR Article by Bob Fracolli Photos by Mark Huston On Friday, February 22 nd, fifteen members and guests of the Northern California Region met in Lafayette for a presentation and site visit on the Caldecott Tunnel 4 th Bore project. We first met off-site and combined everyone into four cars (we ended up in two Lincolns, a Cadillac and a GMC-all non-classics). Parking was very limited where we were headed, and the destinations were not a good fit for Full Classics, even though it was a nice sunny day. At 10:00 am, we met with Senior Project Manager Ivy Morrison at the Fourth Bore Construction Office in Lafayette. In a large conference room, she gave a PowerPoint presentation on the history, funding and construction of the Oakland to Orinda Fourth Bore tunnel. With all of Our Tour Organizer Bob Fracolli our questions and subsequent discussions, the normally one- hour presentation stretched to two and a half hours! Before leaving, we were given hardhats, construction vests, safety glasses and boots to wear at the construction site. Next, we were off carpooling to the East Portal for the site visit. We parked in a heavy gravel lot with a significant incline, and then walked up a way to the construction office where we signed in. Single file, we walked back through the gravel lot and down a trail through large construction equipment. We continued down two long flights of temporary wooden stairs, finally reaching the East Portal. There, we had a close-up view of the East Portal and inside the tunnel. The site was quite busy with construction vehicles and workers going in and out of the tunnel. In the tradition of mining, each worker entering the tunnel had to have two numbered brass tags; one was left on a board outside the tunnel and the other one was carried inside by the worker. In an emergency, one could tell exactly how many workers were inside the tunnel and account for each as they came out. Although we had a spectacular view, we were not allowed to actually enter the tunnel for safety reasons. The East entrance to the Fourthbore of the Caldecutt Tunnel After hiking back to the cars, we carpooled through the Third Bore to the West Portal. Unfortunately, there was no parking so we weren t able to view the construction from that side. Back through the First Bore, 8

2 we drove to the Europa Hofbrau in Orinda for lunch. Taking over a section of the restaurant, we ate and talked during a leisurely paced lunch. After lunch, the protective clothing was returned to the construction office and people were driven back to their cars. All who attended saw local history in the making and learned a great deal about the history and construction of the Caldecott Forth Bore Tunnel. Ivy Morrison, giving the attendees all they needed to know, background and construction of the Caldecott Forth Bore Tunnel HISTORY AND BACKGROUND The first tunnel from Oakland to Contra Costa County was the Kennedy Tunnel, built in It was also known as the Broadway or Upper Broadway Tunnel, and finally closed in The tunnel is now filled in, but a plaque can be found memorializing it near its west portal off Tunnel Road. In 1937, the Lower Broadway, or First and Second Bores of the Caldecott Tunnel, were completed. The Work Progress Administration (WPA) funded their construction during the Great Depression. In 1964, the Third Bore of the Caldecott Tunnel was completed. Right-of way for the Fourth Bore was purchased at the same time. The rock where the tunnels are is comprised of vertical strata, which is folded. The Orinda side is made up of younger rock, and was an ancient riverbed. During the Fourth Bore construction, a paleontologist was required to be on-site. Among things discovered during the excavation were a camel tooth, three-toed horse leg bone and bones from giant sloths. The Oakland side was a deep marine environment. Fish and clam fossils have been recovered from that side. There were many Fourth Bore construction challenges. Different types and densities of rocks were located next to one another, making the excavation difficult. Due to trace levels of methane, the Fourth Bore was designated as a Gassy Tunnel, requiring specialized ventilation during construction. The City of Oakland sued the project, resulting in a $9-million dollar settlement and mitigation measures to the Oakland side residents including the largest temporary sound wall in California, the installation of nine sound level monitors (monitored throughout the day), and strict restrictions on times dynamite could be used (making its use impractical). The completed Fourth Bore will have two 12-foot lanes, a 10-foot shoulder and an emergency pedestrian walkway. The tunnel interior will be covered with a water proofing membrane, a concrete reinforced steel rebar cage, and a thin outer lining. There will be 20 jet fans capable of exhausting air in multiple directions. Seven emergency crosspassages have been dug between the Fourth and Third Bores. The tunnel can survive an earthquake up to a magnitude of 7.2 and a 2200-degree fire for two hours. The final roadway will be two-feet above the excavation line to address groundswell effects. Bores Three and Four will share a radio re-broadcast system. While there were multiple fatalities in 1937 construction and one in 1964, there have been none in Fourth Bore construction. 9

3 The New Austrian tunneling method developed in 1960 s is being used in the construction. This method employs sequential excavation of first the top portion, then lower eight feet. The excavation is in a horseshoe shape. One to one and a half meters are excavated at a time, depending on stability of rock. The excavated area is immediately covered with shotcrete, a mix of concrete and fiberglass-type material. Three-quarters of work was been done from the east side. This is because the rock is more stable, it is downhill, it is away from residents living nearby, and there is room for staging equipment. On the Orinda side, a Roadheader was used. It is a machine with a huge drill head, designed and manufactured in Austria. The Roadheader drills in circular pattern. It is electrically powered and remotely operated. The machine spits out rock onto a conveyer, which is then loaded into muck trucks and removed. For the Oakland side and for most of the bottom level, a Caterpillar 330 Excavator was used. The dirt was designated as clean or dirty. Dirty dirt had traces of methane gas and was taken to landfills. Clean dirt was taken to Treasure Island. Groundbreaking of the Fourth Bore was in January of The upper lever excavation broke through November 29, By August 8, 2012, the excavation was completed. Currently, they are installing electrical and drainage systems (water treated and piped to Lake Temescal), façade work (including portals and retaining walls) and the actual roadway. The Fourth Bore is scheduled to open in late The cost of the project is $402.1 million, which includes design, administration, construction and final freeway traffic alignment modifications. Of that, $180 million came from federal stimulus funds and only $11 million from state funds. Contra Costa County funding includes $123 million from Measure J and $50.3 million from other regional measures. Alameda County contributed no money toward the project. Left: Leaving the pre Tunnel Tour presentation in Lafayet for the construction site Lower Left: Andy Campbell & Anne Steele waiting to get started Below: Ed Gunther and Bob Fracolli 10

4 Top Right & Left: Checking in at the construction office Left: Lining up to cross Fish Camp Road to the Tunnel construction site. Below: From the top of the New Tunnel Bore looking east. Duck!!!! This is an active construction site the hard hats are required with good reason as shown here. 11

5 Above, Top & Center: An active construction site. With lots of dangerous areas. Now we understand why the Contractor was so picky about the shoes we wore on site.. 12 Above: Visiting after Lunch at the Eupoa Hofbrow in Orinda

6 Thank You all who Attended! Paul Borgwardt Andy Campbell Peter Frazier Ed Gunther Ed Holloway Soo-Yin Holloway Mark Huston Gordon Johnson Dean Scott Sheila Scott Jim Serwer Anne Steele Elaine Zinzer Maike Zinzer Thank You to Bob Fracolli for arranging the visit!! 13

REPORT ON TRAIN DERAILMENT IN PITTSBURGH TUNNEL WEDNESDAY OCTOBER 10, 2001 By Thomas Edward Fox

REPORT ON TRAIN DERAILMENT IN PITTSBURGH TUNNEL WEDNESDAY OCTOBER 10, 2001 By Thomas Edward Fox REPORT ON TRAIN DERAILMENT IN PITTSBURGH TUNNEL WEDNESDAY OCTOBER 10, 2001 By Thomas Edward Fox During the early morning hours of Wednesday, October 10, 2001, twelve hopper rail cars traveling on the Wheeling

More information

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018 BUILD C O N ST R U C T I O N Update August 2018 In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4 AVENUE 12 CEDAR VIADUCT A VIEW FROM ROAD 27 ABOVE HSR CONSTRUCTION FRESNO

More information

2019 DAY HIKE AT IRON MOUNTAIN SATURDAY, JANUARY 19

2019 DAY HIKE AT IRON MOUNTAIN SATURDAY, JANUARY 19 WHERE? In Google Maps, paste the following coordinates for Iron Mountain: 32.978215,-116.972593 or CLICK ON THIS LINK. I. Purpose of the Day Hike A. THE WBC Day Hike is a relatively short trail hike to

More information

Mason Street Bike/Pedestrian Trail Project

Mason Street Bike/Pedestrian Trail Project Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits

More information

BALLAST CLEANING TO IMPROVE DRAINAGE IN METROLINK S VALLEY SUBDIVISION TUNNEL 25

BALLAST CLEANING TO IMPROVE DRAINAGE IN METROLINK S VALLEY SUBDIVISION TUNNEL 25 Number of Words: 3,527 ABSTRACT BALLAST CLEANING TO IMPROVE DRAINAGE IN METROLINK S VALLEY SUBDIVISION TUNNEL 25 Tim Harris Track Maintenance Engineer 2704 North Garey Ave. Pomona, CA 91767 213/494-1215

More information

Finally it was unloaded from the power carrier and moved into place using rock bars and brute strength.

Finally it was unloaded from the power carrier and moved into place using rock bars and brute strength. The Longest Mile It has been many years since work first began on this rugged and remote one-mile segment of the MCCT between Patti s Point and the Lower Log Boom on Pardee Watershed. EBMUD mounted patrolmen

More information

MANITOBA METIS FEDERATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING

MANITOBA METIS FEDERATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING MANITOBA METIS FEDERATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 9 SEPTEMBER 17 TH TO SEPTEMBER 22 ND Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R

More information

& CONSTRUCTION TUNNEL DESIGN THE ATS SHORT COURSE 2015

& CONSTRUCTION TUNNEL DESIGN THE ATS SHORT COURSE 2015 Short Course 7-8 October 2015, Marriott Hotel, Brisbane, Australia Tunnelling Applications Workshop 9 October 2015, Mount Coot-tha Quarry, Brisbane Program For further information visit: www.engineersaustralia.org.au/ats2015

More information

Fiberglass 80 meter Vertical BASE

Fiberglass 80 meter Vertical BASE Fiberglass 80 meter Vertical - Revised: 2015-11-06 One antenna in use at K0MPH is a fiberglass 80 meter vertical. The supporting structure is made of fiberglass tubing but the radiation is from a wire

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

Day and night work: Hills M2 Motorway tunnel portals and Coral Tree Drive electrical substation

Day and night work: Hills M2 Motorway tunnel portals and Coral Tree Drive electrical substation T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 2 July 2018 Ref: N0202 Day and night work: Hills M2 Motorway tunnel portals and Coral Tree

More information

Fabulous Residential Development Site on the Peninsula

Fabulous Residential Development Site on the Peninsula 500 SYLVAN AVENUE SAN BRUNO, CALIFORNIA Fabulous Residential Development Site on the Peninsula ED STEPHENS Broker Associate calbre # 00462186 Page 1 Cell: (650) 208-1301 EdStephensRealEstate@gmail.com

More information

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley

More information

SLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule

SLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule SLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule Two sky bridges will connect the parking garage to the second level of the terminal, while an elevated roadway for depa will access

More information

Site Formation Works of the Kai Tak Cruise Terminal Project

Site Formation Works of the Kai Tak Cruise Terminal Project Site Formation Works of the Kai Tak Cruise Terminal Project Presented by Ian Muir MIEAust, CPEng Maritime Business Unit Head Asia Pacific and Deputy Project Director for the Kai Tak Cruise Terminal Site

More information

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 28 April 2017 Ref: N0075M Night work update: and westbound on ramp at Dear resident, NorthConnex

More information

Santa Clara Valley s Railroad Lines

Santa Clara Valley s Railroad Lines Smith-Layton Archive Charlene Duval, Executive Secretary cduval@sourisseauacademy.org Leilani Marshall, Archivist lmarshall@sourisseauacademy.org Phone: 408 808-2064 Santa Clara Valley s Railroad Lines

More information

Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route

Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route February 2015 Valley ine-stage 1 RT EISA Update FINA REPORT Page A1 Memorandum AECOM ConnectEd Transit Partnership 10235

More information

Long water shutdown scheduled for Tuesday, September 18

Long water shutdown scheduled for Tuesday, September 18 Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility

More information

Revitalization of the previous Marine Police Headquarters in Tsim Sha Tsui

Revitalization of the previous Marine Police Headquarters in Tsim Sha Tsui Revitalization of the previous Marine Police Headquarters in Tsim Sha Tsui The former Marine Police Headquarters was constructed in 1884, comprises a main building, a stable block and signal tower. The

More information

ì<(sk$m)=beicea< +^-Ä-U-Ä-U

ì<(sk$m)=beicea< +^-Ä-U-Ä-U Fascinating Facts The Nile River in Egypt is the world s longest river, but the Amazon River in Brazil moves the most water. The world s largest freshwater lake is Lake Baikal in Russia. The highest temperature

More information

SGS MUSCOWPETUNG ABORIGINAL CONSTRUCTION MONITORING

SGS MUSCOWPETUNG ABORIGINAL CONSTRUCTION MONITORING SGS MUSCOWPETUNG ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 4 JANUARY 29 TH TO FEBRUARY 4 TH, 2018 Page 1 of 14 Social and Cultural Features Field Observation # of occurrences Description

More information

Chocolate Bar GOLD Mining Claim Oro Grande, California 92368

Chocolate Bar GOLD Mining Claim Oro Grande, California 92368 Gold Mining Claim 20 Acres Chocolate Bar GOLD Mining Claim Oro Grande, California 92368 Sale Highlights Formerly: Branch Gold Mine Heavy GOLD & Silver Concentrations: Remaining 300' Horizontal Tunnel with

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project Pattullo Bridge Overview This document will: Explain the challenges facing the Pattullo Bridge today Share how we propose moving forward translink.ca PAGE 1 History By Order of the Lieutenant Governor

More information

SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY

SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY WEEK ENDING FEBRUARY 1, 2019 SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY Contractor: Independence Excavating Inc. 1. Work Shift Day shift (M-F), with Saturday as a makeup day. 2. Traffic The new

More information

PRODUCT SPECIFICATION

PRODUCT SPECIFICATION PRODUCT SPECIFICATION Brand C.K Magma Product Range Premium storage and PPE Catalogue number Date 03/10/2016 Range Description A range of tool carrying equipment designed to offer the complete solution

More information

BUILDING BETTER COMMUNITIES

BUILDING BETTER COMMUNITIES BUILDING BETTER COMMUNITIES AS FEATURED IN AUSTRALIAN CONSTRUCTION FOCUS BUILDING BETTER COMMUNITIES BUILDING BETTER ABERGELDIE COMPLEX INFRASTRUCTURE COMMUNITIES ABERGELDIE COMPLEX COMPLEX INFRASTRUCTURE

More information

DINING. Please Note: Ticket prices do not include processing fee of $12.00 per ticket per day or shipping fee of $25 per order.

DINING. Please Note: Ticket prices do not include processing fee of $12.00 per ticket per day or shipping fee of $25 per order. CLUBHOUSE ACCESS: TRACKSIDE **NEW FOR 2019** Located on the 1st floor of the Clubhouse, the newly renovated dining level places you right at the rail. Situated by the first turn and finish line, there

More information

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program December 2012 Update I-95 New Haven Harbor Crossing Corridor Improvement Program Prepared by: Connecticut Department of Transportation District 3A 424 Chapel Street New Haven, CT 06511 Prepared for: South

More information

Suggested Day Hikes. Mount Greylock State Reservation 3, 4 1, 2. Take a Hike! Things to remember:

Suggested Day Hikes. Mount Greylock State Reservation 3, 4 1, 2. Take a Hike! Things to remember: Suggested Day Hikes Mount Greylock State Reservation Take a Hike! This guide offers suggested day hike routes in two parts: 1) Year-round Hikes and 2) Seasonal Hikes (late-may to Nov.1). Use this guide

More information

Young people in North America10

Young people in North America10 Young people in North America10 some facts and figures about the USA and Canada. how to understand an American accent. how to summarize a text in which people describe how they live. to write a short text

More information

AVIATION PLANNING AND DEVELOPMENT Oakland International Airport 530 Water Street Oakland, CA 94607

AVIATION PLANNING AND DEVELOPMENT Oakland International Airport 530 Water Street Oakland, CA 94607 AVIATION PLANNING AND DEVELOPMENT Oakland International Airport 530 Water Street When Do I Need to File an FAA Form 7460-1? Objects Affecting Navigable Airspace (14CFR77) June 2013 Background The Federal

More information

DAY 1: Circular Quay to Greenwich Wharf

DAY 1: Circular Quay to Greenwich Wharf DAY 1: Circular Quay to Greenwich Wharf Total Distance: 14km Time: Approximately 5 hours Walk Notes in Six Sections Section Name Length Time 1:1 Circular Quay to Milsons Point Station 2.5km 50mins 1:2

More information

Acadia National Park. Waterman Fund Grant Report 2016 Cadillac Mountain South Ridge Trail Rehabilitation. Acadia National Park

Acadia National Park. Waterman Fund Grant Report 2016 Cadillac Mountain South Ridge Trail Rehabilitation. Acadia National Park Acadia National Park National Park Service U.S. Department of the Interior Natio n alpar kser vic e U. S. Depar tm en t o f the In ter io r Waterman Fund Grant Report 2016 Cadillac Mountain South Ridge

More information

Re Keying R1200RT Cases Re Keying R1200RT R1200ST K1200GT Cases Created 29/01/ Amended 04/09/2012

Re Keying R1200RT Cases Re Keying R1200RT R1200ST K1200GT Cases Created 29/01/ Amended 04/09/2012 Re Keying R1200RT Cases Re Keying R1200RT R1200ST K1200GT Cases Created 29/01/2007 - Amended 04/09/2012 This walkthrough describes re-keying the large 49L top case for the BMW R1200RT / ST & K1200GT, but

More information

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 2 AUGUST 20 TH - AUGUST 25 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606

More information

Born June 4th, 1922 to Charles Manning Jaquette and Aura Louise Smith

Born June 4th, 1922 to Charles Manning Jaquette and Aura Louise Smith Life Story of FRANK JAQUETTE (Part I - 1920 s - early 1940 s) By Opal Jaquette Born June 4th, 1922 to Charles Manning Jaquette and Aura Louise Smith Jaquette, fifth and final child born to this union.

More information

KATHY S BIRTHDAY TRIP BY PRIVATE RAIL CAR 2013 After a somewhat uncomfortable trip to Portland on another rail car in June, Kathy and I were

KATHY S BIRTHDAY TRIP BY PRIVATE RAIL CAR 2013 After a somewhat uncomfortable trip to Portland on another rail car in June, Kathy and I were KATHY S BIRTHDAY TRIP BY PRIVATE RAIL CAR 2013 After a somewhat uncomfortable trip to Portland on another rail car in June, Kathy and I were discussing going on the Silver Lariat private railcar once again.

More information

Designing Built-in Animal Enrichments

Designing Built-in Animal Enrichments Designing Built-in Animal Enrichments 2017 Zoo Design Conference, Wrocław, Poland Mariusz Bleszynski AIA, Exhibit Designer PGAV Destinations, St. Louis U.S.A. 1 Enrichment Choices Keeper-Initiated Spontaneously

More information

Installation Instructions

Installation Instructions Installation Instructions Hex Sierra TopTec Products, LLC 7061 Highway 221 Moore, SC 29369 Phone: (800) 845-2830 Fax: (800) 921-7750 e-mail: sales@toptecproducts.com www.toptecproducts.com 2004 TopTec

More information

DINING Please Note: Ticket prices do not include processing fee of $12.00 per ticket per day or shipping fee of $25 per order.

DINING Please Note: Ticket prices do not include processing fee of $12.00 per ticket per day or shipping fee of $25 per order. CLUBHOUSE ACCESS: TRACKSIDE **NEW FOR 2019** Located on the 1st floor of the Clubhouse, the newly renovated dining level places you right at the rail. Situated by the first turn and finish line, there

More information

Wild Pacific Trail Society

Wild Pacific Trail Society Wild Pacific Trail Society Section H Completion Report January 24, 2014 Project Manager: Tel: Email: Jim Martin 250-726-7565 oysterjim@hotmail.com Project Report: Tel: Email: Heather Grimshire 250-266-2053

More information

Henderson Mountain Avalanche Accident Two riders caught, one partially buried, one fully buried

Henderson Mountain Avalanche Accident Two riders caught, one partially buried, one fully buried Henderson Mountain Avalanche Accident Two riders caught, one partially buried, one fully buried Custer-Gallatin National Forest 28 November 2014 Synopsis A group of 6 or 7 snowmobilers (part of a larger

More information

ì<(sk$m)=beicdd< +^-Ä-U-Ä-U

ì<(sk$m)=beicdd< +^-Ä-U-Ä-U Fascinating Facts The Nile River in Egypt is the world s longest river, but the Amazon River in Brazil moves the most water. The world s largest freshwater lake is Lake Baikal in Russia. The highest temperature

More information

Missing Mount Isa mine worker: Update

Missing Mount Isa mine worker: Update News Search... Business (/) Missing Mount Isa mine worker: Update June 20, 2014, 6:26 p.m. LATEST POLICE have confirmed the search for missing Mount Isa Mines worker Brett Kelly is now in recovery mode.

More information

Crossing the Keweenaw Waterway in an Emergency with a U.S Army Floating Bridge

Crossing the Keweenaw Waterway in an Emergency with a U.S Army Floating Bridge Crossing the Keweenaw Waterway in an Emergency with a U.S Army Floating Bridge Photo: John Kiefer William Leder, Adjunct Professor (Ret.) Department of Civil and Environmental Engineering Contributions

More information

Seven Wonders of the Modern World

Seven Wonders of the Modern World Seven Wonders of the Modern World A Reading A Z Level S Leveled Reader Word Count: 1,279 LEVELED READER S Written by Jane Sellman Visit www.readinga-z.com for thousands of books and materials. www.readinga-z.com

More information

Guide to the L. F. Manis Photographs

Guide to the L. F. Manis Photographs This finding aid was produced using ArchivesSpace on February 29, 2016. English 2016 The Regents of the University of Nevada. All rights reserved. University of Nevada, Las Vegas. University Libraries.

More information

Axes. The information below will assist the Scout in obtaining their Forester badge.

Axes. The information below will assist the Scout in obtaining their Forester badge. Axes The information below will assist the Scout in obtaining their Forester badge. Axes can come in different shapes and sizes, the two axes that are of most relevance to any Scout Troop will be the HANDAXE

More information

AGENDA ITEM I-6 Public Works

AGENDA ITEM I-6 Public Works AGENDA ITEM I-6 Public Works STAFF REPORT City Council Meeting Date: 8/6/2018 Staff Report Number: 18-150-CC Informational Item: Update on the Willow Road and highway 101 interchange construction, upcoming

More information

Mountaineers Gear List: Winter Presidential Traverse

Mountaineers Gear List: Winter Presidential Traverse The following gear list for Backpacking is for the winter Presidential Traverse. Based on temperatures at night, Warmer than -10 degrees. You are the final decision maker and if there are items that should

More information

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS NORTH CENTRAL CAC AREA LITTLE VALLEY ROAD TO JUG HANDLE CREEK PLANNING AREA This planning area includes Cleone, Noyo,

More information

Cycling Across Peru...Details for the 2019 Tour

Cycling Across Peru...Details for the 2019 Tour Cycling Across Peru...Details for the 2019 Tour Pampamarca, Peru. Elevation: 14,000 feet. Population: 100. Temperature: 28F degrees, Heat: none. It takes a strong person to roll over in bed when covered

More information

Day 2 Parque Nacional de los Glaciares As many of you already know this area is declared by UNESCO as a world heritage site and is the number 1

Day 2 Parque Nacional de los Glaciares As many of you already know this area is declared by UNESCO as a world heritage site and is the number 1 Patagonia Because of this beautiful vacation we came up with the idea with the Via Via team members to tell all our travelling fans about this trip and spectacular destination Calafate. With the foreigners

More information

Spiral staircases. Practical staircase solutions, outside and indoors

Spiral staircases. Practical staircase solutions, outside and indoors Spiral staircases Practical staircase solutions, outside and indoors 2 www.weland.se +46 (0) 371-344 00 Spiral staircases represent in most cases a very useful staircase solution Architecturally attractive

More information

Guide to the L. F. Manis Photographs

Guide to the L. F. Manis Photographs This finding aid was created by Lindsay Oden on February 27, 2018. Persistent URL for this finding aid: http://n2t.net/ark:/62930/f1vk60 2018 The Regents of the University of Nevada. All rights reserved.

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 29, 2009 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF CONCEPTUAL DESIGN

More information

Installing a Drainage Chimney. Written by Nevin Sunday, 28 May :35 - Last Updated Tuesday, 18 July :52

Installing a Drainage Chimney. Written by Nevin Sunday, 28 May :35 - Last Updated Tuesday, 18 July :52 Many, many years ago when we put the first tanks on the back of the garage, the council inspector had said that I needed to put in a rubble drain to take the stormwater from the roof of the garage. This

More information

HB/VS-078 Üssers Barrhorn

HB/VS-078 Üssers Barrhorn HB/VS-078 Üssers Barrhorn Paul HB9DST, August 23, 2015 Summary: This was a HB9SOTA club project, an activation of the highest summit in Europe you can hike up without ropes or other equipment. The headline

More information

SAFETY IN THE EXT EME R

SAFETY IN THE EXT EME R 1 SAFETY IN THE EXT EME R The ORKA range has been designed and developed to meet the global demand for premium quality flame-retardant workwear, capable of performing in the most hostile frontline environments.

More information

ARCHIVES MONTH in Washington!

ARCHIVES MONTH in Washington! ARCHIVES MONTH in Washington! We received an invitation in September from The State Archives to participate in Archives Month : 2014 is the 125th anniversary of Washington reaching statehood. It is a momentous

More information

OPERATOR INSTRUCTION MANUAL INCLUDING REPAIR PARTS FOR MODULAR GENERAL PURPOSE TENT SYSTEM (MGPTS) TYPE I

OPERATOR INSTRUCTION MANUAL INCLUDING REPAIR PARTS FOR MODULAR GENERAL PURPOSE TENT SYSTEM (MGPTS) TYPE I OPERATOR INSTRUCTION MANUAL INCLUDING REPAIR PARTS FOR MODULAR GENERAL PURPOSE TENT SYSTEM (MGPTS) TYPE I Johnson Outdoors Gear, Inc. Eureka! branded tent products 625 Conklin Road Binghamton, NY 13903

More information

American Conservation Experience

American Conservation Experience ACE Project Report For Tonto National Forest, Arizona Trail Association and Arizona State Parks Title of Project: 4 Peaks Trail Maintenance Award Contract Number: ASP NM11021 Project Partner: Paul Burghard

More information

Investigation Report Worker Fatality March 31, 2014

Investigation Report Worker Fatality March 31, 2014 Investigation Report Worker Fatality March 31, 2014 Report No- F-OHS-062228-389D3 March 2015 Page 1 of 6 The contents of this report This document reports s (OHS ) investigation of a worker fatality in

More information

GOLDEN EARS PROVINCIAL PARK

GOLDEN EARS PROVINCIAL PARK GOLDEN EARS PROVINCIAL PARK Trail Information as of October 10 th 2015 Do not underestimate the mountainous wilderness of Golden Ears Provincial Park. The combination of rugged terrain and rapidly changing

More information

The Kitanemuk, members of the Shoshonean Linguistic Group lived in the area between Fairmont and Antelope Buttes: one of the largest and most

The Kitanemuk, members of the Shoshonean Linguistic Group lived in the area between Fairmont and Antelope Buttes: one of the largest and most The Kitanemuk, members of the Shoshonean Linguistic Group lived in the area between Fairmont and Antelope Buttes: one of the largest and most significant archaeological sites in the Antelope Valley Source:

More information

Swiss Instruments Limited

Swiss Instruments Limited Swiss Instruments Limited Your product sourcing partner L o c ke r S o lutio ns www.swissinstruments.com B ro c hure Head Office (Toronto) 1920 Mattawa Avenue Mississauga, Ontario L4X 1K1 BELMAG INC (QC)

More information

Alternative Designs Report Joshua s Jumper

Alternative Designs Report Joshua s Jumper Alternative Designs Report Joshua s Jumper By Elyssa Polomski, Michael Ballintyn, and Tianyi Xu Team # 21 Client: Joshua Bouchard Client Contact: Sue and Ron Bouchard, soupanony@aol.com, (508) 823-6113

More information

The 2 Man Trail Crew

The 2 Man Trail Crew The 2 Man Trail Crew The year was 1972. We had just returned to the mountain town of Field from my work with the Avalanche Research team in Rodgers Pass. Grace and I moved into our small house along side

More information

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 2 SEPTEMBER 4 TH - SEPTEMBER 8 T H Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606

More information

PROJECT UPDATE BETTER TIMES AHEAD ON CLEM7 CLEM JONES TUNNEL. Fast facts AUGUST 2008

PROJECT UPDATE BETTER TIMES AHEAD ON CLEM7 CLEM JONES TUNNEL. Fast facts AUGUST 2008 CLEM JONES TUNNEL PROJECT UPDATE AUGUST 2008 Two kilometres of tunnel has been excavated at Kangaroo Point and tunnel lining work is now under way. BETTER TIMES AHEAD ON CLEM7 Fast facts Road length 6.8

More information

Assembly Instructions. Connecting MultipleYellow Jacket Classic s

Assembly Instructions. Connecting MultipleYellow Jacket Classic s Connecting MultipleYellow Jacket Classic s Connecting End Boots Step 1. Attach the Male End Boot by placing the female connectors of the straight section over the male connectors of the End Boot. Step

More information

Picnic Units A picnic unit is a part of a picnic area

Picnic Units A picnic unit is a part of a picnic area Grab Bars Grab bars are usually provided in buildings to provide stability and allow a person to use his or her arms to assist in movement over short distances. The most common location for grab bars is

More information

MP : the top of the bottom switchback

MP : the top of the bottom switchback MP 237 238: the top of the bottom switchback For reference this section of U S Highway 40 has been called the top of the bottom switchback on the Grand County side of the Pass. It is here that the proposed

More information

MIFACE INVESTIGATION: #02MI106

MIFACE INVESTIGATION: #02MI106 MIFACE INVESTIGATION: #02MI106 SUBJECT: Highway Worker Killed by Passenger Vehicle While Setting Up Highway Work Zone Warning Signal Summary On Friday, August 9, 2002, a 26-year-old technical sales representative

More information

THE BLOCK HOUSE. A time where yesterday is not necessarily the day before today: but a past that no longer exists.

THE BLOCK HOUSE. A time where yesterday is not necessarily the day before today: but a past that no longer exists. THE BLOCK HOUSE Going around in Tell el Eisa, obvious to those who know where to go, you can cross small areas where there are still many relics from the period of the battles of El Alamein. Some of these

More information

In Rural Squirrel, Idaho, a Modern Home

In Rural Squirrel, Idaho, a Modern Home In Rural Squirrel, Idaho, a Modern Home A couple s contemporary retreat on their 290-acre barley farm. By Candace Jackson Oct. 23, 2014 12:04 p.m. ET 1 of 13 fullscreen When Lauri and Doug Siddoway were

More information

waterview connection Completing the Western Ring Route the Waterview Connection

waterview connection Completing the Western Ring Route the Waterview Connection waterview connection MAY 2009 Completing the Western Ring Route the Waterview Connection The NZ Transport Agency (NZTA) has a new proposal to complete the Western Ring Route around Auckland by connecting

More information

Liaison Group Forum. 1. Introduction GE opened the meeting and welcomed members of the public in attendance.

Liaison Group Forum. 1. Introduction GE opened the meeting and welcomed members of the public in attendance. Liaison Group Forum Minutes of meeting: 23 April 2018, 1.00 2.30pm Venue: Bede Hall, Sneaton Castle Centre, Whitby, YO21 3QN Present: Gareth Edmunds (GE) Sirius Minerals (Meeting Chair) Simon Carter (SC)

More information

OWNER'S MANUAL CAMPOUT TABLE OF CONTENTS

OWNER'S MANUAL CAMPOUT TABLE OF CONTENTS OWNER'S MANUAL CAMPOUT RV Before operating the awning, carefully review the Owner's Manual. The manual contains important safety information, detailed operating instructions, common maintenance procedures

More information

Smisco Food Equipment Ltd

Smisco Food Equipment Ltd Smisco Food Equipment Ltd Limerick Road, Mitchelstown, Co.Cork. Ireland. Tel 00353 2584279 Fax 00353 2584888. Email: smisco@eircom.net Web: www.smiscoequip.co.uk 1978 Manufacturing Bespoke Stainless Steel

More information

Spiral Duct. Contents. Introduction 1. Duct & Fitting Range 2. Duct Sizes 3. Fittings 5. Round Duct Connector 7. Installation 8

Spiral Duct. Contents. Introduction 1. Duct & Fitting Range 2. Duct Sizes 3. Fittings 5. Round Duct Connector 7. Installation 8 Contents Introduction 1 Duct & Fitting Range 2 Duct Sizes 3 Fittings 5 Round Duct Connector 7 Installation 8 Celmec International Pty Ltd ACN 005 850 546 Melbourne Tel: +61 3 8552 8200 Fax: +61 3 9555

More information

General Regulations Governing sawmill, lumber, mining and construction camps

General Regulations Governing sawmill, lumber, mining and construction camps SAWMILL, LUMBER, MINING AND 1 General Regulations Governing sawmill, lumber, mining and construction camps Repealed by Chapter P-37.1 Reg 10 (effective December 5, 2002). Formerly Saskatchewan Regulations

More information

Queen Mary Falls Ride. 40ks

Queen Mary Falls Ride. 40ks Queen Mary Falls Ride 40ks The 70k riders had wheeled out of the park at around 10,00am but the 40k riders had another hour to sit around and soak up the day. While we were waiting for kick off some of

More information

Levels & Measuring Tools

Levels & Measuring Tools Levels & Measuring Tools Quick, easy and accurate measurements can mean the difference between a job well done and one that misses the mark. Klein offers a variety of levels and other measuring devices

More information

DINING Please Note: Ticket prices do not include processing fee of $12.00 per ticket per day or shipping fee of $25 per order.

DINING Please Note: Ticket prices do not include processing fee of $12.00 per ticket per day or shipping fee of $25 per order. CLUBHOUSE ACCESS: TRACKSIDE **NEW FOR 2019** Located on the 1st floor of the Clubhouse, the newly renovated dining level places you right at the rail with world-class racing. Situated on the clubhouse

More information

Managing Mobility: Engineering an Express Lane Network

Managing Mobility: Engineering an Express Lane Network Managing Mobility: Engineering an Express Lane Network ITS Bay Area November 20, 2014 Peter Lee, P.E. Principal, Program Delivery Metropolitan Transportation Commission MTC Wears Many Hats Metropolitan

More information

Monday 9th January A day on the coast

Monday 9th January A day on the coast Monday 9th January 2017 - A day on the coast Today was allegedly a rest day after yesterday's big hike, and we certainly had a change of pace, but still did quite a lot of walking, albeit I was wearing

More information

12-9. High Pressure Cleaning Protection

12-9. High Pressure Cleaning Protection 12-9 High Pressure Cleaning Protection Comfort, Function and Safety - ProOperator Until now there has been no adequate protection for High Pressure Cleaning. Nothing that has been adapted to the power

More information

INTERNATIONAL CHILD PASSENGER SAFETY AWARENESS CLASS. June 2018

INTERNATIONAL CHILD PASSENGER SAFETY AWARENESS CLASS. June 2018 INTERNATIONAL CHILD PASSENGER SAFETY AWARENESS CLASS June 2018 1 Welcome Thank you for coming. Introduce yourself and tell us why you are here. What you learn today will prepare you to: Explain how car

More information

OWNER'S MANUAL AWNING EXTEND R TABLE OF CONTENTS

OWNER'S MANUAL AWNING EXTEND R TABLE OF CONTENTS OWNER'S MANUAL AWNING EXTEND R RV Before operating the awning, carefully review the Owner's Manual. The manual contains important safety information, detailed operating instructions, common maintenance

More information

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X ROUTE CLASSIFICATION For use of this form, see ATP 3-34.81/MCWP 3-17.4; the proponent agency is TRADOC. SECTION I 1. SERIAL NUMBER 2. TO 3. FOR INFORMATION 4. DATE/TIME GROUP 5. NUMBER OF SHEETS OR ENCLOSURES

More information

COUNCIL OF CECIL COUNTY, MARYLAND DEPARTMENT OF PUBLIC WORKS ROADS DIVISION ADOPT-A-ROAD

COUNCIL OF CECIL COUNTY, MARYLAND DEPARTMENT OF PUBLIC WORKS ROADS DIVISION ADOPT-A-ROAD COUNCIL OF CECIL COUNTY, MARYLAND DEPARTMENT OF PUBLIC WORKS ROADS DIVISION ADOPT-A-ROAD 1 CECIL COUNTY ADOPT-A-ROAD PROGRAM Please join us in our Adopt-A-Road Program! Contact the Cecil County Roads Department

More information

Uphillsport Socks Specifications

Uphillsport Socks Specifications Uphillsport Socks INNOVATION & QUALITY FROM FINLAND SINCE 1996 UNIQUE MULTI-LAYER STRUCTURE 1. MOISTURE CONTROL Firstly, the inner layer is responsible for transferring moisture away from the skin. This

More information

The temperature is nice at this time of year, but water is already starting to be scarce.

The temperature is nice at this time of year, but water is already starting to be scarce. In March of 2003, Scott Morrison and I went backpacking in the Grand Canyon. The temperature is nice at this time of year, but water is already starting to be scarce. Another issue with this time of year

More information

GENERAL INFORMATION PACKET. BOARDING PARTY PACKAGE: $ $250 for members, $275 for non-members Up to 15 Children (+$15 for each additional child),

GENERAL INFORMATION PACKET. BOARDING PARTY PACKAGE: $ $250 for members, $275 for non-members Up to 15 Children (+$15 for each additional child), GENERAL INFORMATION PACKET G E N E R A L I N F O R M A T I O N P A C K E T C O N T E N T S Pg1 Packages Overview Pg3 Pg4 Pg5 Pg5 Upon Arrival Safety Information What is Provided Host Checklist Add-ons:

More information

COASTAL CONSERVANCY. Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12

COASTAL CONSERVANCY. Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12 COASTAL CONSERVANCY Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12 File No. 11-039-001 Project Manager: Betsy Wilson RECOMMENDED ACTION: Authorization to disburse

More information

Ronda and Grazalema. Monday, May 9, 2011

Ronda and Grazalema. Monday, May 9, 2011 Monday, May 9, 2011 Ronda and Grazalema With us dropping Seville and Granada from our schedule due to traffic considerations, Jan and I have only one goal left. That is to visit Ronda... and maybe Grazalema.

More information

97% MOVING AHEAD LINE TIME ISSUE 34 MARCH ,772 WELCOME FROM ANDREW WOLSTENHOLME 60% WON BY

97% MOVING AHEAD LINE TIME ISSUE 34 MARCH ,772 WELCOME FROM ANDREW WOLSTENHOLME 60% WON BY MOVING AHEAD ISSUE 34 MARCH 2015 WELCOME FROM ANDREW WOLSTENHOLME It s an exciting time for Crossrail, as we continue to build a new railway for London and the South East; safely, on time, and on budget.

More information

Delicate stability. 2 Coat racks

Delicate stability. 2 Coat racks Coat stands Single Product coat overview stands - - coat product stands overview Delicate stability rosconi coat stands combine a delicate appearance with particularly stable construction in timeless design.

More information