1 SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 2 AUGUST 20 TH - AUGUST 25 TH Suite 600, Ave. SW Calgary, AB, Canada T2R 0K1 T F
2 1. PURPOSE OF THIS REPORT The report is a weekly summary of the daily reports submitted by the Aboriginal Monitors that are working on spread two. The social and cultural findings have been tabulated with locations and mitigation measures below. A summary of the construction activities has been summarized for August 20 th August 25 th Matrix Solutions Inc.
3 Field Observation Social and Cultural Features # of occurrences Description and Mitigation Measures Mitigation Status Further Action Required (Yes/No) Traditional Use Area (hunting, fishing, gathering, trapping) Rock Formations (rocks of significance, tipi rings, etc.) Artifacts Bones Potential Gravesites. Field Observation Medicinal or Cultural Plants Environmental Features # of occurrences Description and Mitigation Measures Mitigation Status Further Action Required (Yes/No) Aquatic Life Animal Observations or Burrows Bird Nests Trees (Red Willow) 3 Matrix Solutions Inc.
4 Wetlands Watercourse Crossing Yes 4 Matrix Solutions Inc.
5 Additional Observations and Summary of Activities or Concerns Attended daily safety meetings and discussed daily scopes each morning with the Contractor Liaison Dean Pooyak, and/or the Senior Construction monitor Drayton Kasokeo. Weekly activities included spot-checking km 147, 149, , , 165, 172, 175, 176, 178,183,186,189,196, , , and shoofly 91-93, 97, 101, 102, 105, 106, 107,113,111, , 124, 129, 132, 138, 139,140, 141, 142,160,162. On August 20, the daily safety theme was slips trips and falls. Wear proper footing and be aware of where you step, especially in tall grass and uneven surfaces. The weather forecast was sunny and humid. At SF 142, equipment hasn t been mobbed in, and there was no activity at the location. At SF 139, stripping topsoil in the transition. Clay was ripped so that rig mats can be placed to build the access approach at km At SF 129, stripping clay and topsoil for access. Geo tec was placed on the shoulder of the ditch and secured on the ground. At SF 118, bridge was being set up. Later, the bridge was set on screw piles and the welder was securing it to the piles before the access ramp and road could be completed. AT SF 124, access ramp was being constructed over NAL Resource (km ) and Sask energy line crossing (km ). Topsoil was stripped on the south side of the hotline crossing. Mats were set up over the hotline and the ramp was being covered with dirt. At km , hydro vac was daylighting the NAL Resources line crossing. At SF 113, dozer and excavator were stripping topsoil from the boundary of the agricultural land and native Prairie land. At km , four excavators were stripping the topsoil and a rare plant species is located in the area (km ). At km , three dozers were pushing dirt to the wetland. Two dozers were working from km to km The heritage area was swept and mowing hasn t started at km August 21, the safety theme was defensive driving. Always keep a safe distance between vehicles, especially when following. Take extra precaution when driving on the grid roads. Weather forecast was sunny and humid. Excavators were digging bell holes at SF 91 and km Stripping occurred at the wetland to the heritage sensitive area at km Pumps and swamp weights were being dropped off at the above location. Dozers and hoes returned to SF 92. Stripping and grading started at the heritage sensitive area. Before entering SF 93, equipment was mobbed in and washed at the wash bay. Access approach is being constructed at SF 105. At SF 106, the crew was bulking in seconds on the access approach. Topsoil was stripped at the hotline crossing (Sasktel km to 533). An access ramp was built over the hotline crossing. AT SF 106, crews were stripping topsoil in the Native Prairie, from km to , to the drainage crossing. AT SF 107, crews were building a second access approach, there was a Sasktel line crossing in the area. August 23, the daily safety theme was wearing proper PPE. The weather forecast was sunny and clear skies. At SF 140, mower was parked on the ROW. It was cutting grass between km to 295. Grass was cut before fencing and mobbing in. The fencing crew was parked at SF 139. The existing fence was taken down, and a new one 5 Matrix Solutions Inc.
6 was built on the Native Prairie. At SF 139, crews continue to strip topsoil, the hill was being cut on the side so that there s access to the road (km to ). At SF 160, the access crew was working in the area; topsoil was being stripped to build an access approach. Labourers were taking down barbwire off of the fences at km to ). At SF 97, the aqua dam was visited. Stripping occurred in the Native Prairie from km to 800; and km to 600, was graded and stripped. Bell hole digging was taking place at SF 102 and a CAT was pushing dirt from the bell hole to the spill pile located at km Dirt was being pushed at SF 106 and track bore was digging bell hole bay at SF 115 and km August 24, the safety theme was driving, during dusk and dawn and for long hours. Also, always sign on the crew s field level hazards assessment, to find out the hazards and how to mitigate them before entering an area. The weather forecast was hot and humid. At SF 92, the aqua dam was visited and monitored. The excavator was digging in the bell hole at km The Native Prairie was monitored from km to Borehole digging was taking place at SF 102, the crew was moving in track bore equipment from SF 101 to be set up in the bore bay. Crews were digging in bore bays; as an excavator dug, another was stock piling clay, at SF 115. At km 178, a dozer was bulking dirt over the access ramp that was leading to the Enbridge plant. At SF 111, crews were prepping equipment to be set up in the bore bay. Topsoil was being striped from SF 114 to 115. One excavator and four dozers were crossing at SF 116, and then started to strip at SF 117. At SF 118, bridge construction was in place, the crew had retaining walls built, and geotec laid. Dirt ramps were built to cross over the bridge. At SF 141, the fencing crew moved east and started to build a fence in the heritage sensitive area. On August 25, the safety theme was driving in the town; watch out for school zones and children. The weather forecast was cloudy and windy. At 93, mechanics were servicing dozers, and meridian survey was on location. At km , crews were washing equipment. Bore crew was monitored at km At SF 102, track bore crew were welding in second pipe and auger. The crew was going to bore the access road later. At km 174, bore bays were being dug at Plains Midstream Pipeline crossing; there were four line crossings to bore under. At km to 631, fence crew built a fence at the heritage sensitive area. Bore bays were being dug for the slip bore machine. The hydro vac was working at km Dozer was pushing dirt at km The ROW was being constructed from km to , in the Native Prairie. Access crew was working east to west at SF 139. Ramp was built over the wetland to the end of the Native Prairie section at km Stripping for vehicle access was observed at SF 138; and, mats were being set down by an excavator at SF 160. Two dozers were pushing dirt at km Excavator was stripping at km and discing was taking place at km At SF 132, topsoil was being stripped, geo tec was laid, and crews were waiting to bulk clay on the geo tec to build the access approach. The location of these features was documented and photos were collected (see below). No additional cultural or environmental features were observed within the scanned areas. 6 Matrix Solutions Inc.
7 Photos of Sites Visited & Topics Discussed This Week Excavator stripping topsoil km Aug 20, 2018 Rare plant, sensitive area km Aug 20, 2018 Access crew stripping topsoil - Km Aug 20, 2018 Access ramp built of NAL resource and Sasktel line Aug 20, 2018 Excavator digging bell hole- Km Aug 21, 2018 Digging slip bore pit km Aug 21, Matrix Solutions Inc.
8 Sasktel line crossing access ramp - Aug 21, 2018 Excavator stripping for drainage to be built km , Aug 21, 2018 Southside of aquadam km Aug 22, 2018 Heritage sensitive area Km Aug 22, 2018 Fueling equipment SF 124 Aug 22, 2018 Excavators stripping topsoil km Aug 22, Matrix Solutions Inc.
9 Hill being cut km Aug 23, 2018 Excavator stripping topsoil SF 160 Aug 23, 2018 Aqua dam - km Aug 23, 2018 Excavator digging bell hole - km Aug 23, 2018 Aqua dam S.E km Aug 24, 2018 Excavator digging bellhole km Aug 24, Matrix Solutions Inc.
10 Bore bay digging SF 115 Aug 24, 2018 Heritage area being fenced in km Aug 24, 2018 Dozer pushing dirt into valley km Aug 25,2018 Excavator placing rig mats km Aug 25, 2018 Washing equipment km Aug 25, 2018 Equipment crossing Aug 25, Matrix Solutions Inc.
11 Excavators digging bore bays Aug 25, 2018 Access crew grading hill km Aug 25, Matrix Solutions Inc.
12 APPROVALS Drayton Kasokeo Senior Construction Monitor August 31, 2018 Date Daniel Tober Senior Environmental Scientist August 31, 2108 Date 12 Matrix Solutions Inc.
SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING
SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 2 AUGUST 13 TH - AUGUST 18 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606
More informationSAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING
SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 2 SEPTEMBER 4 TH - SEPTEMBER 8 T H Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606
More informationSAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING
SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 2 FEBRUARY 5 TH TO FEBRUARY 10 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606
More informationSAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING
SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 2 DECEMBER 11 TH TO DECEMBER 16 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606
More informationSAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING
SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 2 DECEMBER 4 TH TO DECEMBER 9 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606
More informationSAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING
SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 1 OCTOBER 30 TH TO NOVEMBER 5 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606
More informationMANITOBA METIS FEDERATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING
MANITOBA METIS FEDERATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 9 AUGUST 20 TH TO AUGUST 25 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1
More informationMANITOBA METIS FEDERATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING
MANITOBA METIS FEDERATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 9 SEPTEMBER 17 TH TO SEPTEMBER 22 ND Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R
More informationMANITOBA METIS FEDERATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING
MANITOBA METIS FEDERATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 9 AUGUST 7 TH TO AUGUST 11 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T
More informationSGS MUSCOWPETUNG ABORIGINAL CONSTRUCTION MONITORING
SGS MUSCOWPETUNG ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 4 JANUARY 29 TH TO FEBRUARY 4 TH, 2018 Page 1 of 14 Social and Cultural Features Field Observation # of occurrences Description
More informationSOLUT SPREAD 9 30 TH. Calgary, AB, Canada T2R 0K1
MANITOBA METIS FEDER ATION MATRIX SOLUT IONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 9 SEPTEMBER 24 TH TO SEPTEMBER 30 TH Suite 600, 214 11 Ave. SW Calgary, AB, Canada
More informationETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7
ETOBICOKE CREEK NORTH TRAIL PROJECT May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 1 Purpose of Open House The purpose of today s open house is to present the design
More informationWhat are you getting into?
Overnight Camping What are you getting into? You will be hiking with your gear to a campground about ½ mile away and spending 1 night camping You will help to prepare a meal over an open flame You will
More informationAppendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan
Appendix C Tenderfoot Mountain Trail System Road and Trail Rehabilitation Plan All rehabilitation work would be under the direction of the District Fisheries Biologist, the Forest Hydrologist, and/or the
More informationKP Lasnaya 1 River
KP 370.2 Lasnaya 1 River The Lasnaya 1 River crossing is protected by Reno mattings and a gabion wall on the north bank (Photo 1). The south bank consists of natural river gravel deposits on top of Reno
More informationBoatswain bay biodiversity reserve
Boatswain bay biodiversity reserve March 2003 1 1. Plan and description 1.1. Geographic location, boundaries and dimensions The plan of the proposed Boatswain bay biodiversity reserve and its location
More informationThird Parties/Crossing
Third Parties/Crossing Presentation by Bill Scheers Canadian Association of Petroleum Land Administration Surface Land Administration Advisory Committee November 29, 2011 Agenda EAPUOC Guide for Working
More informationMason Street Bike/Pedestrian Trail Project
Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits
More informationPeace Project Water Use Plan
Peace Project Water Use Plan Williston Reservoir Trial Tributaries Implementation Year 5 Reference: GMSWORKS-19 6 Mile 2016 Engineering Inspection Report Study Period: 2016 KERR WOOD LEIDAL Site Inspection
More informationAGAWAM CONSERVATION COMMISSION April 26, 2018
MEMBERS PRESENT: Henry A. Kozloski, Chairman Sheryl Becker S. Page Fallon Frank Meagher MEMBERS ABSENT: Magda Galiatsos Jill Messick ALSO PRESENT: Pamela R. Kerr AGAWAM CONSERVATION COMMISSION Mr. Kozloski
More informationTRAILS WHERE TO FIND TRAILS IN NOVA SCOTIA
TRAILs SIGNAGE Know the Signs............................ 44 WHERE YOU CAN RIDE Roads and Highways........................ 46 Designated Trails........................... 47 Established Trails...........................
More informationLong water shutdown scheduled for Tuesday, September 18
Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility
More informationINSTRUCTION MANUAL (0)
CANVAS BELL TENT INSTRUCTION MANUAL SETTING up YOUR CANVAS BELL TENT 1 3 Unpack the bell tent and lay out on the tent with the groundsheet down. Find the door and rotate the tent. so it s facing the desired
More informationSummary of prescribed fires in Prince Albert National Park 2015
Summary of prescribed fires in Prince Albert National Park 2015 Prince Albert National Park conducted four controlled fires in spring 2015, plus an additional fire in October. Fuel Management for Hazard
More informationBUNKHOUSE ASSESSMENT REPORT
FEBRUARY 2014 EXECUTIVE SUMMARY As a response to the need to provide temporary shelters for the victims of Typhoon Haiyan, the Philippine government through the DSWD and the DPWH decided to build bunkhouses.
More informationBloomsbury Children s Books An imprint of Bloomsbury Publishing Plc 50 Bedford Square London WC1B 3DP UK
To the children and staff of Churchfield Primary School Bloomsbury Children s Books An imprint of Bloomsbury Publishing Plc 5 Bedford Square London WC1B 3DP UK wwwbloomsburycom BLMSBURY and the Diana logo
More informationAPPENDIX F List of Commitments
APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators
More informationMt. Hood National Forest
United States Department of Agriculture Forest Service Mt. Hood National Forest Zigzag Ranger District 70220 E. Highway 26 Zigzag, OR 97049 503-622-3191 Fax: 503-622-5622 File Code: 1950-1 Date: June 29,
More information2009 Muskoka Airport Economic Impact Study
2009 Muskoka Airport Economic Impact Study November 4, 2009 Prepared by The District of Muskoka Planning and Economic Development Department BACKGROUND The Muskoka Airport is situated at the north end
More informationBear Creek Habitat Improvement Project
06/10/10 Bear Creek Habitat Improvement Project El Paso County, Colorado Pike National Forest and Colorado Springs Utilities Owned Land Report prepared by: Eric Billmeyer Executive Director Rocky Mountain
More informationAPPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS
Atlantic Sunrise Project PA DEP Chapter 105 Joint Permit Application Transcontinental Gas Pipe Line Company, LLC Lancaster County APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS Atlantic Sunrise Project
More informationWater safety box leader s notes page 1
Water safety box leader s notes page 1 How to use these notes These notes provide you with ideas for using the contents of the water safety box with small groups of children. You can use all or some of
More informationBackpacking and Hiking LEAVE NO TRACE
Backpacking and Hiking LEAVE NO TRACE Activity Plan Hiking Series ACTpa014 Project Skills: Learn the seven principles of Leave No Trace (LNT) Develop a skit that demonstrates LNT principles Life Skills:
More informationPhotographic Log Client: Project Number: Site Location: Site Name: Photograph ID: Date: Location: Direction: Comments: Photograph ID:
Photograph ID: 1 west View of one of the monitoring well and the large parking lot on the south side of Center Street. Photograph ID: 2 Monitoring well located in the middle of the parking lot located
More informationYard Creek Provincial Park. Management Plan
Yard Creek Provincial Park Management Plan Draft January 2010 Yard Creek Provincial Park Management Plan Approved by: telàlsemkin/siyam/chief Scott Benton Bill Williams Squamish Executive Director ation
More informationAdvisory Circular CT
(CAA logo, name of the country, etc.) Advisory Circular CT-42-009 SUBJECT: Airport Movement Area and Related Facilities Maintenance DATE: MM/YYYY ASSOCIATED RULES According with (name of the country) Civil
More informationMeeting Notes Public Open House
Meeting Notes Public Open House, 5:30-8:00 pm Fairbanks Pipeline Training Center, 3605 Cartwright Court, Fairbanks, Alaska= Agenda: Open House: 30 minutes Presentation: 45 minutes Question and Answers:
More informationFire and Emergency New Zealand Southern District Fire Season Burning Conditions Zone A
Fire and Emergency New Zealand Southern District Fire Season Burning Conditions Zone A Fire Type Hangi, umu, barbeques (solid fuel) Traditional Maori, Pacific Island or Pakeha form of cooking food outdoors.
More informationDRAFT. Dorabelle Campground Rehabilitation
DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section
More informationSite Formation Works of the Kai Tak Cruise Terminal Project
Site Formation Works of the Kai Tak Cruise Terminal Project Presented by Ian Muir MIEAust, CPEng Maritime Business Unit Head Asia Pacific and Deputy Project Director for the Kai Tak Cruise Terminal Site
More informationSDTrucksprings. Arkansas Off-roading/4x4 Guide Copyright 2015 We Specialize In:
SDTrucksprings Arkansas Off-roading/4x4 Guide Copyright 2015 We Specialize In: Helper Springs Air Bags Leaf Springs Body Lift Kits Coil Springs Timbren Kits Hellwig Springs Lift Blocks And More! Visit
More informationNakina Moraine Provincial Park. Interim Management Statement. Ontario. Ministry of Natural Resources
Nakina Moraine Provincial Park Interim Management Statement Ontario Ministry of Natural Resources 1999, Queen's Printer for Ontario Printed in Ontario, Canada Additional copies of this publication can
More informationBrador hills biodiversity reserve
Brador hills biodiversity reserve September 2003 1. Plan and description 1.1. Geographic location, boundaries and dimensions The plan of the proposed Brador hills biodiversity reserve and its location
More informationCoastal Gas Link Project of Trans Canada Pipelines. Community Profile of Stellat en First Nation
Coastal Gas Link Project of Trans Canada Pipelines Community Profile of Stellat en First Nation What is the Coastal Gas Link Project? Trans Canada Pipeline is planning to build a 650 Km. natural gas pipeline
More informationWollaton Hall and Deer Park is located to the west of Nottingham City Centre within a designated conservation area.
NCC EVENT SAFETY RISK ASSESSMENT WOLLATON PARK SITE OVERVIEW Wollaton Hall and Deer Park is located to the west of Nottingham City Centre within a designated conservation area. At the Centre of the Park
More informationHealth and Safety Tenant/User
Health and Safety Tenant/User INTRODUCTION. This manual is to outline the policy and implementation for Health and Safety at Whangarei Airport. This is for the following reasons... We want to provide a
More informationPLANNING BOARD MINUTES March 13, 2017 CASCO COMMUNITY CENTER 7:00 P.M. MEMBERS PRESENT: Stan Buchanan, Ray Grant & Lynne Potter Bob Barnes, Ted
PLANNING BOARD MINUTES March 13, 2017 CASCO COMMUNITY CENTER 7:00 P.M. MEMBERS PRESENT: Stan Buchanan, Ray Grant & Lynne Potter MEMBERS ABSENT: Bob Barnes, Ted Beckner & Jim Macklin STAFF PRESENT: James
More informationTRAIL MAINTENANCE AND CONSTRUCTION MANUAL
TRAIL MAINTENANCE AND CONSTRUCTION MANUAL MAINTAINING THE TRAIL CORRIDOR GENERAL MAINTENANCE Debris and Obstacles Remove dangerous obstacles that riders may fall on - logs and branches one-half inch in
More informationChapter 51 DIGGING TOOLS
Chapter 51 DIGGING TOOLS HOW TO CHOOSE AND USE THEM The Types and Uses section provides you with a list of some of the types of digging tools. These pages should help you select the right digging tool
More informationMungarlu Ngurraunkatja Rirraunkatja. Birriliburu Indigenous Protected Area. Birriliburu Vision for Country
Mungarlu Ngurraunkatja Rirraunkatja Birriliburu Indigenous Protected Area Birriliburu Vision for Country JUNE 2012 What Martu want for country? What Martu say... Culture has to be strong We gotta learn
More informationDR LEAF & LAWN VACUUM
DR LEAF & LAWN VACUUM OPTIONAL VAC HOSE & MULCH DISCHARGE ACCESSORIES SAFETY & OPERATING INSTRUCTIONS FOR MODELS WITH SERIAL NUMBER LLV34602 AND GREATER Serial No. Order No. Original Language DR Power
More informationList of Our Ongoing Noise and Vibration Monitoring Projects
List of Our Ongoing Noise and Vibration Monitoring Projects Project 1: Name of Project: Geotechnical Instrumentation and Monitoring Plan- Segment 1- Keelesdale Station Client: Metrolinx-Eglinton Crosstown
More informationMCARTHUR SWAMP PLANNING UNIT Pit-McCloud River Watershed
Existing Conditions & Uses Overview Spring-fed lake and rivers; valuable grazing lands and important waterfowl area Planning unit provides the only public access to Ahjumawi Lava Springs State Park 7,596
More informationicleanzone A Clean Environment is A Safe Environment With icleanzone Cleaning System keeps your Workplace Clean and Safe
Made in USA icleanzone.com A Clean Environment is A Safe Environment With Cleaning System keeps your Workplace Clean and Safe icleanzone.com icleanzone Removes and Contains Dirt in its Place Off your Floors!
More informationTown of Lake Lure Request for Proposals to Provide Beach, Marina and Tour Boat Operations
Town of Lake Lure Request for Proposals to Provide Beach, Marina and Tour Boat Operations Questions asked during September 1, 2017 Site Visit and Meeting 1. Please provide a breakdown of the number of
More informationTOOLS TO SUPPORT DISASTER DEBRIS COMMUNICATION
TOOLS TO SUPPORT DISASTER DEBRIS COMMUNICATION COLLECT INFORMATION DISSEMINATE INFORMATION VOADs for vulnerable popula ons GIS mapping for disaster prone areas Debris planning mee ngs Coordina on with
More informationSpecification for Grip blocking using Peat Dams
Technical Guidance Note 1 Specification for Grip blocking using Peat Dams 1. Introduction Moorland drains (grips) have been dug across much of the Yorkshire upland peatlands. Many of these grips have become
More informationBINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016
BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016 P: 08 91722341 E: binbirricontracting@hotmail.com ABN: 42 151 996 913 PO Box 2233 South Hedland WA 6722 Binbirri Contracting was established in 2010
More informationFinn Creek Park. Management Direction Statement Amendment
Finn Creek Park Management Direction Statement Amendment November 2013 Management Direction Statement Amendment Approved by: Jeff Leahy Regional Director, Thompson Cariboo BC Parks November 12, 2013 Date
More informationCHURCH FARM STOW BARDOLPH RISK ASSESSMENT FOR VISITORS
CHURCH FARM STOW BARDOLPH RISK ASSESSMENT FOR VISITORS At Church Farm visitors are expected to understand and accept that there are risks when visiting a farm and play area. We endeavour to reduce these
More informationSample Estimate Reports Estimate Reports were created in XL-Pro Software
Sample Estimate Reports Estimating Pro Software Estimate Reports were created in XL-Pro Software / TIME EQUIP.. COST* AMOUNT - 1 GENERAL REQUIREMENTS 1.00 LSUM - INSURANCE - general liability 1.00 lsum
More informationSeptember 5, 2013 Volume 3, Issue 9
L E W I S R I V E R G A Z E T T E September 5, 2013 Volume 3, Issue 9 Winding down SPECIAL POINTS OF INTEREST: Winding down. What s Happening? Brick Tipi Contact info: Making painting Les & Karen Sundstrom
More informationSection 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft
Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations Section: Page 32.A General... 32-1 32.B Aircraft... 32-4 32-i THIS PAGE INTENTIONALLY LEFT BLANK 32-i SECTION 32 Airfield and Aircraft Operations
More informationBradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service
Bradley Brook Relocation Project United States Department of Agriculture Forest Service Scoping Notice White Mountain National Forest February 2011 For Information Contact: Jenny Burnett White Mountain
More informationCITY COUNCIL MARCH 15, 2016 CEDAR LAKE AND LAKE OLATHE PARKS MASTER PLAN. Lake Olathe and Cedar Lake Parks Olathe, Kansas OLATHE PARKS AND RECREATION
CITY COUNCIL MARCH 15, 2016 MASTER PLAN TEAM STAFF: MICHAEL MEADORS PARKS DIRECTOR MICHAEL LATKA PROJECT MANAGER BRAD CLAY DEPUTY DIRECTOR LISA DONNELLY PARK PROJECT PLANNER PAUL KRUEGER OLATHE PARKS CITY
More informationLEASE FOR CBC BUILDING Broad Street Regina, SK
FOR LEASE CBC BUILDING 2440 Broad Street Regina, SK 40,717 SQUARE FEET of studio & office space...... in a one-of-a-kind working environment nestled in Wascana Park in proximity to several amenities parks,
More informationMoose River Consolidated (MRC) Project Community Liaison Committee (CLC) Meeting. Meeting Minutes
Moose River Consolidated (MRC) Project Community Liaison Committee (CLC) Meeting Meeting Minutes 9am-12pm. June 24, 2017 Ausenco Office on Atlantic Gold Touquoy Gold Mine Site IN ATTENDANCE CLC Members
More informationPoly Shelters. Instruction Manual. Sunblocker Shade House 10' Wide x 30' Long SKU #1030SPC. Note: Photo may be of a different but similar model
Poly Shelters Note: Photo may be of a different but similar model Instruction Manual Sunblocker Shade House 10' Wide x 30' Long SKU #1030SPC 2004 ClearSpan TM All rights reserved. Reproduction prohibited
More information10 ft / 3m 10 ft / 3m INSTANT CANOPY ITM. /ART ASSEMBLY INSTRUCTIONS IMPORTANT, RETAIN FOR FUTURE REFERENCE: READ CAREFULLY
10 ft / 3m 10 ft / 3m INSTANT CANOPY ITM. /ART. 966761 ASSEMBLY INSTRUCTIONS IMPORTANT, RETAIN FOR FUTURE REFERENCE: READ CAREFULLY Please check with your local regulations prior to purchasing this item.
More informationUganda operational logistics INTERIM RESULTS Tullow Oil plc Uganda Analyst Visit October 2007 Slide 1
Uganda operational logistics INTERIM RESULTS - 06 Tullow Oil plc Uganda Analyst Visit October 2007 Slide 1 Lake Albert Remote Location Remote from oil industry services Equipment mobilisation Availability
More informationAnthony Wayne. Pit Lake Trek Deer Hollow Trek. Mastodon Trek POKAGON - KEKIONGA TRAILS NOTICE ANTHONY WAYNE RESERVATION
ANTHONY WAYNE RESERVATION POKAGON - KEKIONGA TRAILS NOTICE Send to: This form must be filed with the Trail Committee Pokagon - Kekionga Trails Inc. at least five (5) days in advance of hike. P.O. Box 192
More informationDecision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation
for Salt Lake County, Utah Uinta-Wasatch-Cache National Forest Salt Lake Ranger District 1. Background The present location of the Desolation Trail (#1159) between Mill D and Desolation Lake follows old
More informationConservation Area Management Statement
Conservation Area Management Statement Miller Creek Wildlife Area Resolution #: Approval: Issue Date: Date of Last Revision: Table of Contents 1. Purpose....... 1 2. Property Description...... 1 2.1. Legal
More informationSAND HILL RIVER WATERSHED DISTRICT November 1, 2016
SAND HILL RIVER WATERSHED DISTRICT November 1, 2016 1. Attendance: Chairman Stuart Christian called the November 1, 2016 meeting to order at 8:10 AM at the District Office. Other managers present were
More informationPacifiCorp North Umpqua Hydroelectric Project FERC Project No VOLUME 1 EXHIBITS
PacifiCorp North Umpqua Hydroelectric Project FERC Project No. 1927 A VOLUME 1 EXHIBITS TMP and SA Implementation Summary B Settlement Agreement (Section 15) C D E F G H I J K L M N O P Q R S T U Rolling
More informationMarch 18 th. All Ramp Service Personnel LGA Work Schedule Bid April 11 th July 3 rd
March 18 th To: RE: All Ramp Service Personnel LGA Work Schedule Bid April 11 th July 3 rd The work schedule bid for the above mentioned period is posted and will be a call in bid held in the TWU Office.
More informationAboriginal Traditional Knowledge
Aboriginal Traditional Knowledge Manitoba Hydro recognizes the unique relationship Aboriginal communities have with their areas of use and is appreciative to all the communities who took time to share
More informationMaggie s Activity Pack
Maggie s Activity Pack Name Date Puffin Olympics If the animal world held its own Olympics, puffins would win many medals! Puffins might wear gold medals for swimming, diving, and flying. They might even
More informationPutting up a Deluxe Bell Tent
Hello, and thanks for buying one of our Bell Tents. Here is the best way to put up your Bell Tent. One person is shown doing this but the more people there are, the faster it goes up (our current record
More informationCALDECOTT FOURTH BORE TOUR Article by Bob Fracolli Photos by Mark Huston
CALDECOTT FOURTH BORE TOUR Article by Bob Fracolli Photos by Mark Huston On Friday, February 22 nd, fifteen members and guests of the Northern California Region met in Lafayette for a presentation and
More informationThe National Path Demonstration Site
The National Path Demonstration Site at Battleby an introductory guide Good paths are essential if people are to enjoy the outdoors. Thoughtful path design really opens up access but there s more to building
More informationGOLDEN BACKCOUNTRY RECREATION ADVISORY COMMITTEE (GBRAC)
GOLDEN BACKCOUNTRY RECREATION ADVISORY COMMITTEE (GBRAC) MINUTES from November 1, 2006 Meeting Attending: Sector / Stakeholder GBRAC Commercial Aerial Motorized Sector GBRAC Habitat Protection; Sport Fishing
More informationSUPPORT TO WATER RESOURCES MANAGEMENT IN THE DRINA RIVER BASIN DRAFT ROOF REPORT INTRODUCTION AND GENERAL APPROACH
SUPPORT TO WATER RESOURCES MANAGEMENT IN THE DRINA RIVER BASIN DRAFT ROOF REPORT INTRODUCTION AND GENERAL APPROACH Nadja Zeleznik, REC Public Concultation Beograd, Serbia, 4 July 2017 1 1. Introduction
More informationNew Jersey Department of Transportation
Administration, Organization, Records Management & Information Requests 16:1A-4.4(a) Copying fees - Records Page 1 10: $0.75 per page Page 11 20: $0.50 per page Over 20 pages - $0.25 per page 16:1A-4.5(c)
More informationGruyere Gold Project Update
ASX Announcement 30 July 2018 Gruyere Gold Project Update First gold remains scheduled for the June quarter 2019 Revised Project Final Forecast Capital cost estimate of $621 million (level of accuracy
More informationBRIEF ENVIRONMENT REPORT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PEOPLE COMMITTEE OF HOCHI MINH CITY WORLD BANK HO CHI MINH CITY DEVELOPMENT PROJECT HDP
More informationNortheast Stoney Trail In Calgary, Alberta
aci Acoustical Consultants Inc. 5031 210 Street Edmonton, Alberta, Canada T6M 0A8 Phone: (780) 414-6373, Fax: (780) 414-6376 www.aciacoustical.com Environmental Noise Computer Modelling For Northeast Stoney
More informationELECTION SIGN GUIDELINES
ELECTION SIGN GUIDELINES GUIDELINES FOR THE PLACEMENT OF FREE STANDING ELECTION SIGNS ON CITY OF LETHBRIDGE ROAD RIGHT OF WAY Definition An election sign is a temporary sign announcing or supporting political
More informationRequest for Proposal National Tropical Botanical Garden Lower Limahuli Preserve Emergency Stream Debris Removal
Request for Proposal National Tropical Botanical Garden Lower Limahuli Preserve Emergency Stream Debris Removal I. Summary of Work Bids are solicited for the emergency removal of debris deposited in the
More informationRESPONSIBLE EXPLORATION CHECK LISTS
15.0 Check Lists The following check lists are intended to serve as templates that can be customized for corporate purposes, for specific jurisdictions and for specific geographical areas. We stress that
More informationEducation Programs Duck Mountain Provincial Park
Education Programs Duck Mountain Provincial Park 2018 Programs Bring your class to our outdoor classroom! Guided school programs are offered during the spring in Duck Mountain Provincial Park. Booking:
More informationPersonnel views of Barrie Old one of Peter Lind site engineers Renfrew Bypass (M8) (February 2018).
The Renfrew Bypass (M8) A Personal Look Back To 50 Years + Ago When I reported to the Peter Lind site office on Renfrew Road Paisley (The Old Fire Station) on the 15 th November 1965 aged 20 years, as
More informationCOUNTY OF SAN MATEO Parks Department
COUNTY OF SAN MATEO Parks Department DATE: September 23, 2014 COMMISSION MEETING DATE: October 2, 2014 TO: FROM: SUBJECT: Parks and Recreation Commission Scott Lombardi, Park Superintendent Superintendent
More informationRight beside our school. The National War Memorial Park and the tunnel below
Right beside our school The National War Memorial Park and the tunnel below Your stories are welcome Memorial Park Alliance This booklet is intended as an overview of the National War Memorial Park and
More informationSasagiu Rapids Provincial Park. Draft Management Plan
Sasagiu Rapids Provincial Park Draft Management Plan 2 Sasagiu Rapids Provincial Park Table of Contents 1. Introduction... 3 2. Background and Park Attributes... 3 2.1 Park History.... 3 2.2 Natural Features...
More informationSECTION 32. Airfield and Aircraft Operations
SECTION 32 Airfield and Aircraft Operations 32.A Airfields General. 32.A.01 The following safety requirements shall be in addition to the airfield's safety requirements. When an airfield has safety requirements
More informationAppendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute
Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute I. Proposed Action: This project proposes to reroute approximately 1,800 feet of a 50 inch wide trail, off of private property
More informationExposition Light Rail Transit Project
Exposition Light Rail Transit Project Project Status Update Meeting Culver City Senior Center Wednesday, July 16, 2008 Description 8.6 mile corridor from downtown to Culver City in West Los Angeles 1.3
More informationTHAT the Board approve the final proposed concept plan for the Jericho Marginal Wharf site as shown in Figure C-4 of Appendix C.
Date: January 17, 2012 TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Jericho Marginal Wharf Phase 2 Concept Plan RECOMMENDATION THAT the Board approve the final
More informationANNUAL REPORT DALLAS LOVE FIELD AIRPORT. March 14, 2006
ANNUAL REPORT DALLAS LOVE FIELD AIRPORT March 14, 2006 I. INTRODUCTION On August 20, 2001, the Texas Commission on Environmental Quality (TCEQ) signed and published the final version of the Texas Pollutant