1 Runway Development Project Owner s Perspective CAPTG Sept 17, 2012

2 Agenda 1.Who We Are 2.Why Do We Need A New Runway? 3.Planning 4.Implementation

3 1. Who We Are? 5,150 Acres 3 Runways (longest at 12,675 ft.) 32 Gates 158,000 m2 Terminal Space 5,800 stall Parkade (P1 & P2)

4 Two airports transferred: YYC 1992 & YBW 1997 Authority is a non-share capital corporation To manage and operate the airports for which we are responsible in a safe, secure and efficient manner To advance economic and community development by means that include promoting and encouraging improved airline and transportation service and an expanded aviation industry All $$ reinvested back into airport facility restoration and improvements (YYC/YBW) The Authority has invested over $1.15B into YYC and paid over $330M in airport rent since 1992 Airport Rent largest single expense

5 2. Why Do We Need A New Runway?

6 Passengers Per Year (in millions) Passengers Per Year (in millions) m 5.0m 4.9m 5.0m 5.6m 5.6m Passengers Per Year Passengers Per Year 1993 to to Total Passengers 12.2 Million -2.7 in % - six years 34,000 Passengers/day 7.1m 7.1m 8.6m 8.6m 8.6m 8.4m 8.2m 8.6m 8.4m 8.0m 7.8m 7.7m 8.2m 8.0m 7.8m 7.7m 9.1m 9.1m 12.3m 12.5m 12.3m 12.5m 12.2m 12.2m 11.3m 11.3m 10.1m 10.1m Economic Impact of YYC Hub for world class carriers WestJet head quarters, Air Canada, KLM, Lufthansa, British Airways 162,000 aircraft movements per year 111,000 tonnes cargo $6B value added GDP

7 Passenger Activity (2011) Total Passengers 12.7 Million 35,000 Passengers/day

8 Two Major Projects International Facilities Project (IFP) Runway Development Project (RDP)

9

10 Primary International Transborder Concourse Total Estimated Cost $1.4 Billion 183,000 square metres 22 gates In-service 2015

11 3. Planning

12 History Location Airport Vicinity Protection Area (AVPA) Regulation

13

14 Runway identified and land reserved back in 1970 s. Federally Registered Airport Zoning in place since AVPA Provincial Airport Vicinity Protection Area Regulation in place since 1979 regulation of land use and heights. YYC Master Plans have shown same alignment and thresholds for 14000ft runway.

15 4. Implementation 36 th St re et ea l i Tra t r po Air nsion e ext st

16 Studies: Airport Master Plan (2004) Parallel Runway Implementation Study (2005) Demand / Capacity Analysis ( ) Calgary Region Airport Systems Study (2008) Communications Plan (2008) Wetlands Strategy (2008) Engineering & Construction Feasibility Report (2008)

17 2008 onward 1 st step 2009 EA and prelim design EA complete / endorsed by Board Nov 2010 Prelim design / cost estimate Aug 2010 May 2014 completion and commencement of operation TEC $620M (includes CDF)

18 EA binders photo

19 Enabling Works Road Upgrades Work Package 1 Site Preparation completed, tendered, and constructed Bluebird Constr /11 Private Utility Relocations 2010/2011 Telus Enmax ATCO Pipeline / ATCO Gas Shaw Cable

20

21

22

23 Barlow Trail closure

24 Site Preparation demolition, relocation Tree Relocation - on-site Tree mulching (all reused off-site) Site Preparation - removals

25

26

27 External Stakeholders Airlines, Transport Canada NAV CANADA City of Calgary, others... The Authority Executive / Board of Directors Peter Rudolf / Joe McNeil RDP Program Director Sig Undheim RDP General Manager Melyssa Trnavskis RDP Project Manager YYC Internal Stakeholders AECOM Program Managers Barry Hawkins - Program Manager AECOM support Airbiz, HMM, Hanscomb Associated Engineering / CH2M Hill Prime Consultant (engineer of record) PCL / Parsons / Dufferin, A Joint Venture Construction Manager

28 QUESTIONS?

Annual General Meeting. April 15, 2010

Annual General Meeting. April 15, 2010 Annual General Meeting April 15, 2010 AGENDA 2009 In Review Activity Levels Financial Overview Performance Measures Key Activities Moving Forward Activity Levels Passenger Activity (2009) Total Passengers

More information

ANNUAL GENERAL MEETING

ANNUAL GENERAL MEETING ANNUAL GENERAL MEETING April 19, 2012 April 19, 2012 AGENDA 1. CORPORATE INTRODUCTION 2. BUSINESS METRICS 3. AIRPORT DEVELOPMENT PROGRAM UPDATE 4. OTHER YYC ACTIVITY IN 2011 5. SPRINGBANK AIRPORT 6. LOOKING

More information

The Calgary Airport Authority. Parallel Runway Project. Public Consultation Meetings April 30 th, May 2 nd & May 4 th

The Calgary Airport Authority. Parallel Runway Project. Public Consultation Meetings April 30 th, May 2 nd & May 4 th The Calgary Airport Authority Parallel Runway Project Public Consultation Meetings April 30 th, May 2 nd & May 4 th 1 Welcome AGENDA The Airport Authority The Project The Environmental Assessment Process

More information

2006 ANNUAL GENERAL MEETING

2006 ANNUAL GENERAL MEETING 2006 ANNUAL GENERAL MEETING Address by Garth F. Atkinson President and Chief Executive Officer April 19, 2006 Thank you Peter and good morning ladies and gentlemen and invited guests. Before proceeding

More information

2008 Annual General Meeting. YYC & YBW Airports in Motion

2008 Annual General Meeting. YYC & YBW Airports in Motion 2008 Annual General Meeting YYC & YBW Airports in Motion April 16, 2008 AGENDA 2007 In Review Activity Levels Financial Overview Performance Measures Key Activities Moving Forward Ten Year Development

More information

INTRODUCTION YYC LOOKING AHEAD

INTRODUCTION YYC LOOKING AHEAD APRIL 21, 2016 INTRODUCTION 2015 @ YYC LOOKING AHEAD Introduction Across Canada Airports Drive the Economy 150,000 on-airport jobs 135 million passengers per year $25 billion infrastructure investment

More information

Agenda. Introduction YYC. Looking Ahead in 2014

Agenda. Introduction YYC. Looking Ahead in 2014 Agenda Introduction 2013 @ YYC Looking Ahead in 2014 Introduction The Airport Transfer Process in Canada From coast to coast: A Canadian success story $20 billion infrastructure investment Canadian airports

More information

2005 ANNUAL GENERAL MEETING

2005 ANNUAL GENERAL MEETING 2005 ANNUAL GENERAL MEETING Address by Garth F. Atkinson President and Chief Executive Officer April 20, 2005 Before proceeding with my formal remarks, it is my great pleasure to introduce the other members

More information

INTRODUCTION YYC LOOKING AHEAD

INTRODUCTION YYC LOOKING AHEAD APRIL 21, 2016 INTRODUCTION 2015 @ YYC LOOKING AHEAD Introduction Across Canada Airports Drive the Economy 150,000 on-airport jobs 135 million passengers per year $25 billion infrastructure investment

More information

Edmonton International Airport Master Plan Open House Display Boards April 16, 2011

Edmonton International Airport Master Plan Open House Display Boards April 16, 2011 Edmonton International Airport Master Plan Open House Display Boards April 16, 2011 Welcome to the EIA Master Plan Open House We invite your feedback about our plans for the next 25 years. Please sign

More information

Mayor Dave Bronconnier cc: All City of Calgary Alderman. Eastbound Extension of Airport Trail and Related Works

Mayor Dave Bronconnier cc: All City of Calgary Alderman. Eastbound Extension of Airport Trail and Related Works May 7, 2009 Mayor Dave Bronconnier cc: All City of Calgary Alderman The City of Calgary Mr. John Hubbell, GM Transportation 700 Macleod Trail SE Calgary AB T2P 2M5 Re: Eastbound Extension of Airport Trail

More information

COMOX VALLEY AIRPORT. Strategic Plan Summary. October 2010

COMOX VALLEY AIRPORT. Strategic Plan Summary. October 2010 COMOX VALLEY AIRPORT Strategic Plan 2011-2015 Summary October 2010 COMOX VALLEY AIRPORT Introduction History The Comox Airport was constructed by the Department of National Defence in 1942. The Comox Airport

More information

Refer to available hard-copy materials and that the full annual report will be available on yyc.com once the meeting concludes

Refer to available hard-copy materials and that the full annual report will be available on yyc.com once the meeting concludes Thank Mel Belich and welcome guests in attendance Self-introduction Introduce the Executive team members that are present Refer to available hard-copy materials and that the full annual report will be

More information

Chapter 1: Introduction Draft

Chapter 1: Introduction Draft Chapter 1: Draft TABLE OF CONTENTS 1... 4 1.6.1 Stakeholder Engagement Plan... 10 Chapter 1 Page 2 TABLE OF EXHIBITS Exhibit 1.1-1 ABIA Annual Growth Since 1993... 5 Exhibit 1.4-1: ABIA Location Map...

More information

Billy Bishop Toronto City Airport Terminal Upgrade Project

Billy Bishop Toronto City Airport Terminal Upgrade Project Billy Bishop Toronto City Airport Terminal Upgrade Project Community Liaison Committee November 23, 2016 Agenda Project Structure and Companies Rationale for this Upgrade Project Guiding Principles, Rendering,

More information

CALGARY INTERNATIONAL AIRPORT : ARRIVALS LEVEL

CALGARY INTERNATIONAL AIRPORT : ARRIVALS LEVEL CALGARY INTERNATIONAL AIRPORT : ARRIVALS LEVEL 9½"W x 39½"H Column Poster 7"W x 68" H BAGGAGE CAROUSEL ARRIVING INTERNATIONAL AND TRANSBORDER PASSENGERS : Digital 65" LCD Digital Airposter Display Spectaculars

More information

Chapter 1: Introduction

Chapter 1: Introduction Chapter 1: TABLE OF CONTENTS 1... 4 1.1 Master Plan Study Content... 4 1.2 Purpose and Scope of Master Plan Study... 4 1.3 Airport History and Role... 6 1.4 Airport Location and Service Area... 6 1.5 ABIA

More information

CANADIAN ROCKIES INTERNATIONAL AIRPORT

CANADIAN ROCKIES INTERNATIONAL AIRPORT CANADIAN ROCKIES INTERNATIONAL AIRPORT 2018 2022 FIVE YEAR BUDGET PROPOSAL AND 2018 WORK PLAN AIRPORT OVERVIEW Mission: To serve the region by becoming the airport of choice and to provide the City of

More information

SouthwestFloridaInternational Airport

SouthwestFloridaInternational Airport SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom

More information

AIRPORT SUB-COMMITTEE MEETING

AIRPORT SUB-COMMITTEE MEETING AIRPORT SUB-COMMITTEE MEETING May 3, 2018 PURPOSE 1. Introduction 2. Infrastructure 3. Passenger Airline Service 4. Cargo Service 5. Commercial Development 6. Community Impact 7. Growing the Local Economy

More information

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 4 2015 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total

More information

Will it Fit? Preliminary Findings

Will it Fit? Preliminary Findings Will it Fit? Preliminary Findings Presented by John Dickson Airport System Development Committee, Chair Transportation Committee October 24, 2018 Agenda Introduction & overview Airport site planning considerations

More information

Master Plan Update Community Advisory Committee Kick-off Meeting

Master Plan Update Community Advisory Committee Kick-off Meeting Nashville International Airport Master Plan Update Community Advisory Committee Kick-off Meeting September 13, 2018 Agenda Welcome and Introductions Master Plan Objectives Master Plan Process BNA Vision

More information

Toronto Pearson February 2019 Briefing. February 19, 2019

Toronto Pearson February 2019 Briefing. February 19, 2019 Toronto Pearson February 2019 Briefing February 19, 2019 Noise Management Forums UPDATE: The Six Ideas Runway Selection Criteria 2019 Airfield Restoration Program Noise Management Forums Review elements

More information

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10

More information

Fourth Quarter 2013 Community Noise Consortium Meeting Thursday, January 30, 2014

Fourth Quarter 2013 Community Noise Consortium Meeting Thursday, January 30, 2014 Tampa International, Peter O. Knight, Plant City and Tampa Executive Airports Fourth Quarter 213 Community Noise Consortium Meeting Thursday, Agenda Introductions Construction Projects Update Q4 213 Review

More information

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017 REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017 Contact: Chris Wood, Airport General Manager cwood@regionofwaterloo.ca (519) 648-2256 ext. 8502 Airport Master

More information

FY key data Passenger. Cargo. Maintenance. Other. Operating result in m. Revenues in bn -10.4% 78% 11%

FY key data Passenger. Cargo. Maintenance. Other. Operating result in m. Revenues in bn -10.4% 78% 11% Information meeting FY 2009-10 key data Revenues in bn Operating result in m 78% Passenger 16.3-13.6% -918 11% Cargo 2.4-27.8% -436 5% Maintenance 1.0-4.0% +81 6% Other 1.3-12 -10.4% 2 Our industry is

More information

Industry Update. ACI-NA Winter Board of Directors Meeting February 7, 2018 Palm Beach Gardens, FL

Industry Update. ACI-NA Winter Board of Directors Meeting February 7, 2018 Palm Beach Gardens, FL Industry Update ACI-NA Winter Board of Directors Meeting February 7, 2018 Palm Beach Gardens, FL 1Q2007 2Q2007 3Q2007 4Q2007 1Q2008 2Q2008 3Q2008 4Q2008 1Q2009 2Q2009 3Q2009 4Q2009 1Q2010 2Q2010 3Q2010

More information

Master Plan Update Technical Advisory Committee Meeting

Master Plan Update Technical Advisory Committee Meeting Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives

More information

Current and Forecast Demand

Current and Forecast Demand Existing Facilities Jacksonville International Airport (JIA) is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual

More information

AIRFIELD ACCESSIBILITY AND SAFETY INITIATIVE FAQs

AIRFIELD ACCESSIBILITY AND SAFETY INITIATIVE FAQs Q1: What is the Airfield Accessibility and Safety Initiative? AIRFIELD ACCESSIBILITY AND SAFETY INITIATIVE FAQs A1: The Airfield Accessibility and Safety Initiative is a three-year infrastructure project

More information

City of Prince George : 2010 Annual Report

City of Prince George : 2010 Annual Report City of Prince George : 2010 Annual Report Overview Overv ew Chairman s Report 2010 Industry Overview 2010 PGAA s Passenger Activity Telling the PGAA Story in 2010 Hurdles to Cargo/Tech stop Growth 2010

More information

During Construction. Full Resident and Non-Resident Services. Contract Administration and Construction Supervision of Groundside and Airside Projects

During Construction. Full Resident and Non-Resident Services. Contract Administration and Construction Supervision of Groundside and Airside Projects Page 1 of 5 May 21, 2007 HOME PROFILE SECTORS & SERVICES CAREERS SEMINARS & PAPERS LINK airport development Description of Service transportatio services link Airport Developm Pre-Construction Area Development

More information

Construction in Progress Keeping the buzz alive Jody Moseley Director, Corp Com & Mktg

Construction in Progress Keeping the buzz alive Jody Moseley Director, Corp Com & Mktg Construction in Progress Keeping the buzz alive Jody Moseley Director, Corp Com & Mktg Calgary International Airport (YYC) Sits on 5,150 Acres of land Currently has three Runways (the current longest at

More information

Air Canada. Transportation & Aerospace Conference presents at the. Toronto November 20, 2012

Air Canada. Transportation & Aerospace Conference presents at the. Toronto November 20, 2012 Air Canada presents at the Transportation & Aerospace Conference 2012 Toronto November 20, 2012 1 2 Caution Regarding Forward-looking Information Air Canada s public communications may include forward-looking

More information

First Quarter 2013 Community Noise Consortium Meeting Thursday, May 16, 2013

First Quarter 2013 Community Noise Consortium Meeting Thursday, May 16, 2013 Tampa International, Peter O. Knight, Plant City and Tampa Executive Airports First Quarter 213 Community Noise Consortium Meeting Thursday, Agenda Introductions Q1 213 Review Runway 1L-19R Closures Questions

More information

RESPONSE BY THE NATIONAL AIRLINES COUNCIL OF CANADA (NACC) AND THE AIR TRANSPORT ASSOCIATION OF CANADA (ATAC)

RESPONSE BY THE NATIONAL AIRLINES COUNCIL OF CANADA (NACC) AND THE AIR TRANSPORT ASSOCIATION OF CANADA (ATAC) RESPONSE BY THE NATIONAL AIRLINES COUNCIL OF CANADA (NACC) AND THE AIR TRANSPORT ASSOCIATION OF CANADA (ATAC) TO THE PROPOSED FEDERAL BENCHMARK AND BACKSTOP FOR CARBON PRICING INTRODUCTION The National

More information

PREFERRED PLAN Kahului Airport Master Plan and Noise Compatibility Program Update

PREFERRED PLAN Kahului Airport Master Plan and Noise Compatibility Program Update PREFERRED PLAN Kahului Airport Master Plan and Noise Compatibility Program Update AIRPORTS DIVISION DEPARTMENT OF TRANSPORTATION March 13, 2012 AGENDA Introduction Purpose and Meeting Objectives Kahului

More information

AIR TRAVEL AND ITS POTENTIAL FOR DEVELOPMENT OF THE SAARC REGION

AIR TRAVEL AND ITS POTENTIAL FOR DEVELOPMENT OF THE SAARC REGION AIR TRAVEL AND ITS POTENTIAL FOR DEVELOPMENT OF THE SAARC REGION Amal S. Kumarage Professor of Civil Engineering, University of Moratuwa Chairman, National Transport Commission Sri Lanka Seminar, University

More information

Cathay Pacific Airways 2011 Analyst Briefing 23 June 2011

Cathay Pacific Airways 2011 Analyst Briefing 23 June 2011 Cathay Pacific Airways 2011 Analyst Briefing 23 June 2011 1 Airline Strategy Grow our international network, expand frequencies and further develop Hong Kong as one of the world s leading aviation hubs

More information

AIRPORT MASTER PLAN UPDATE

AIRPORT MASTER PLAN UPDATE AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo

More information

Let s Fly. Fort McMurray Airport Authority

Let s Fly. Fort McMurray Airport Authority Let s Fly Fort McMurray Airport Authority The Largest Industrial Project in World History Canada s oil sands are found in three deposits the Athabasca, Peace River and Cold Lake deposits in Alberta and

More information

LOUIS ARMSTRONG NEW ORLEANS INTERNATIONAL AIRPORT For the Period Ending September 30, Enplaned Passengers by Airline

LOUIS ARMSTRONG NEW ORLEANS INTERNATIONAL AIRPORT For the Period Ending September 30, Enplaned Passengers by Airline Domestic Scheduled Enplaned Passengers by Airline Alaska Airlines 7,070 4,331 63.2% 59,552 42,265 40.9% 1.2% 1.0% Virgin America 0 803-100.0% 12,231 803 1423.2% 0.3% 0.0% Allegiant Air 1,333 2,063-35.4%

More information

Results for the First Nine Months of 2007

Results for the First Nine Months of 2007 Results for the First Nine Months of 2007 Flughafen Wien Group 22. August 2006 Mag. Herbert Kaufmann Vorstandssprecher Flughafen Wien AG December 2007 Facts & Activities 16.9 m passengers in 2006 Share

More information

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Public Informational Meetings August 9 & 10, 2017 Draft LTCP Overview Briefing Agenda Airport Role & Context Existing Conditions & Previous Plan

More information

REAL ESTATE PLAN ADOLFO SUÁREZ MADRID-BARAJAS AIRPORT

REAL ESTATE PLAN ADOLFO SUÁREZ MADRID-BARAJAS AIRPORT REAL ESTATE PLAN ADOLFO SUÁREZ MADRID-BARAJAS AIRPORT Adolfo Suárez Madrid-Barajas Airport A landmark airport 53.4 million Passengers +5.9% 387 thousand Operations +2.5% Gateway to Latin America 27 destinations

More information

IMPLEMENTATION OF ADS-B BY NAV CANADA

IMPLEMENTATION OF ADS-B BY NAV CANADA IMPLEMENTATION OF ADS-B BY NAV CANADA Carole Stewart-Green Manager, ATS Regulatory Coordination ABOUT NAV CANADA Private, non-share capital company Second largest ANSP in the world 12 million aircraft

More information

THE GRAND SOLUTION FOR ISTANBUL'S CAPACITY PROBLEM

THE GRAND SOLUTION FOR ISTANBUL'S CAPACITY PROBLEM 38 THE GRAND SOLUTION FOR ISTANBUL'S CAPACITY PROBLEM Mehmet Büyükkaytan Chief Operating Officer at Istanbul Grand Airport As the recent Challenges of Growth report has shown there is a major capacity

More information

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 3 2018 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total

More information

REAL ESTATE PLAN ADOLFO SUÁREZ MADRID-BARAJAS AIRPORT

REAL ESTATE PLAN ADOLFO SUÁREZ MADRID-BARAJAS AIRPORT REAL ESTATE PLAN ADOLFO SUÁREZ MADRID-BARAJAS AIRPORT Adolfo Suárez Madrid-Barajas Airport A landmark airport 53.4 million Passengers +5.9% 387 thousand Operations +2.5% Gateway to Latin America 27 destinations

More information

Macao's aviation strategy and partnership approach

Macao's aviation strategy and partnership approach Macao's aviation strategy and partnership approach Lam Hin San, Kevin Macao SAR, China 31 March 2008 Macao SAR, China Total Area: 28.6 km 2 Macao Peninsula: 9.3 km2 Taipa Island: 6.5 km2 CoTai Area: 5.2

More information

Airport Community Consultative Committee. August 23, 2017

Airport Community Consultative Committee. August 23, 2017 Airport Community Consultative Committee August 23, 2017 AGENDA 6:30 p.m. Welcome & Introductions 6:35 p.m. 2017 Q2 update 6:45 p.m. NMT update 7:00 p.m. Aircraft Noise Management Website 7:10 p.m. NAV

More information

Air China Limited Announces 2009 Annual Results

Air China Limited Announces 2009 Annual Results Air China Limited Announces 2009 Annual Results Record Operating Profit in Complex Market Environment Strengthened Position to Capture Growth Opportunities Hong Kong April 22, 2010 Air China Limited (

More information

Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State. Kurt Beckett Deputy Chief Executive Officer

Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State. Kurt Beckett Deputy Chief Executive Officer Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State Kurt Beckett Deputy Chief Executive Officer WA Ports A Unique Public Agency Mission: Create Jobs through Travel, Trade

More information

air traffic statistics

air traffic statistics September 213 air traffic statistics Prepared by the Office of Finance Department of Internal Controls, Compliance and Financial Strategy Commercial Total Int'l Dom Passengers % Change Air Traffic Summary

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the

More information

AIR CANADA REPORTS 2010 THIRD QUARTER RESULTS; Operating Income improved $259 million or 381 per cent from previous year s quarter

AIR CANADA REPORTS 2010 THIRD QUARTER RESULTS; Operating Income improved $259 million or 381 per cent from previous year s quarter AIR CANADA REPORTS 2010 THIRD QUARTER RESULTS; Operating Income improved $259 million or 381 per cent from previous year s quarter MONTRÉAL, November 4, 2010 Air Canada today reported operating income

More information

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014 CHICAGO DEPARTMENT OF AVIATION AND THE O HARE MODERNIZATION PROGRAM Current Construction Projects May 2, 2014 O HARE INTERNATIONAL AIRPORT CURRENT CONFIGURATION 2 PHASE 1 & COMPLETION PHASE 9L-27R Completed

More information

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m.

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m. AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor 9:30 a.m. Minutes Approval of Minutes: Regular Commission Meeting May 14, 2014 Approval of Minutes: Special

More information

Brisbane Airport Ground Transport Operators Forum Tuesday 25 July, 2pm Brisbane Airport Meeting Room Ground Transport Operators

Brisbane Airport Ground Transport Operators Forum Tuesday 25 July, 2pm Brisbane Airport Meeting Room Ground Transport Operators MEETING MINUTES Event: Date & Time: Venue: Attendees: Brisbane Airport Ground Transport Operators Forum Tuesday 25 July, 2017 @ 2pm Brisbane Airport Meeting Room Ground Transport Operators Agenda Item

More information

Fort Lauderdale Hollywood International Airport

Fort Lauderdale Hollywood International Airport ATLANTA, GEORGIA 1 2 ATLANTA, GEORGIA Fort Lauderdale Hollywood International Airport Master Plan to Master Plan Implementation Jamie McCluskie Director of Aviation Planning & Environmental Broward County

More information

Company Presentation Flughafen Wien AG

Company Presentation Flughafen Wien AG Company Presentation Flughafen Wien AG Results for 2010 March/April 2011 2010 At a glance Total revenue: EBITDA: Net profit : after non-controlling interests Passengers: (European average of +4.2%*) EUR

More information

Update of the Airport Master Plan. Initial Runway & Land Use Alternatives

Update of the Airport Master Plan. Initial Runway & Land Use Alternatives Johannesburg International Airport Update of the Airport Master Plan Initial Runway & Land Use Alternatives 15 February 2006 BACKGROUND JNB current Master Plan Approved by ACSA Board in 1999 20-22 mppa?

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

Savannah / Hilton Head International Airport Master Plan Update

Savannah / Hilton Head International Airport Master Plan Update EXECUTIVE SUMMARY Savannah / Hilton Head International Airport Master Plan Update Prepared for: The Savannah Airport Commission Prepared by: URS Corporation In Association With: RS&H and Ruth and Associates,

More information

Third Quarter 2014 Community Noise Consortium Meeting Thursday, October 23, 2014

Third Quarter 2014 Community Noise Consortium Meeting Thursday, October 23, 2014 Tampa International, Peter O. Knight, Plant City and Tampa Executive Airports Third Quarter 2014 Community Noise Consortium Meeting Thursday, Agenda Introductions Airport Master Plan Update Q3 2014 Review

More information

THE GLOBAL PERSPECTIVE ON GASP/GANP/GASOS

THE GLOBAL PERSPECTIVE ON GASP/GANP/GASOS THE GLOBAL PERSPECTIVE ON GASP/GANP/GASOS Capt. Denis Guindon Deputy Director, Monitoring and Oversight, Air Navigation Bureau International Civil Aviation Organization (ICAO) AFI Aviation Safety Symposium

More information

FY 2018 Rates, Fees, and Charges Year End Reconciliation. Finance Department P.O. Box DFW Airport, Texas

FY 2018 Rates, Fees, and Charges Year End Reconciliation. Finance Department P.O. Box DFW Airport, Texas FY Rates, Fees, and Charges Year End Reconciliation Finance Department P.O. Box 619428 DFW Airport, Texas 75261-9428 Business Units Executive Summary Summary of FY Year-End Reconciliation Landing Fee Terminal

More information

CHAPTER 4: ALTERNATIVES

CHAPTER 4: ALTERNATIVES MSP Long Term Comprehensive Plan Update Metropolitan Airports Commission 4.1 INTRODUCTION CHAPTER 4: ALTERNATIVES Several alternatives were developed and evaluated based on their capability to meet the

More information

Aircraft Maintenance Run Procedures. Date: 1 June 2015 Version: 3.0

Aircraft Maintenance Run Procedures. Date: 1 June 2015 Version: 3.0 Date: 1 June 2015 Version: 3.0 Document Control Version Date Changes Prepared By Approved By 1.0 Jan 2012 Initial P. Fagnano G. Cabral 2.0 Dec 2013 Permitted & Restricted hours P. Fagnano G. Cabral 3.0

More information

Benefits of NEXTT. Nick Careen SVP, APCS. Will Squires Project Manager, Atkins. Anne Carnall Program Manager, NEXTT

Benefits of NEXTT. Nick Careen SVP, APCS. Will Squires Project Manager, Atkins. Anne Carnall Program Manager, NEXTT Benefits of NEXTT Nick Careen SVP, APCS Anne Carnall Program Manager, NEXTT Will Squires Project Manager, Atkins 12 December 2018 1 Our industry continues to grow Our forecasts predict there will be 8.2

More information

Dubai contest LIDAR in Dubai DANS Wake Vortex campaign DXB Operations Dependent Diagonal Approach implementation Phase RPAT Approach concept

Dubai contest LIDAR in Dubai DANS Wake Vortex campaign DXB Operations Dependent Diagonal Approach implementation Phase RPAT Approach concept DANS LIDAR wake vortex data campaign, deployment of Dependent Diagonal approaches and ongoing work to prepare RNP Parallel Approach Transition (RPAT) concept for implementation Roberto Ghidini Dubai contest

More information

Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport

Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport 1 DUBLIN-LONDON 28.4 No.1 +2,200 MILLION PASSENGERS BUSIEST ROUTE IN EUROPE &No. 2 IN THE WORLD

More information

aircargo center Charlotte Charlotte Your Cargo Connection Connecting The Carolinas to the World

aircargo center Charlotte Charlotte Your Cargo Connection Connecting The Carolinas to the World Charlotte aircargo center Connecting The Carolinas to the World Charlotte Looking for an affordable alternative to Atlanta and Washington? Consider Charlotte Air Cargo Center for your cargo connections.

More information

MONTHLY AIRPORT TRAFFIC REPORT February 2014

MONTHLY AIRPORT TRAFFIC REPORT February 2014 MONTHLY AIRPORT TRAFFIC REPORT AIRCRAFT OPERATIONS 2014 2013 Change Domestic Air Carrier 44,741 48,627-7.99% Air Taxi 11,144 13,003-14.30% General Aviation 569 543 4.79% Military 17 15 13.33% Subtotal

More information

NEXTT. Anne Carnall Program Manager, Future Airports. 12 December 2018

NEXTT. Anne Carnall Program Manager, Future Airports. 12 December 2018 NEXTT Anne Carnall Program Manager, Future Airports 12 December 2018 1 NEXTT vision improve and streamline the customer experience through the airport and beyond By means of coordinating the adoption of

More information

MONTHLY AIRPORT TRAFFIC REPORT May 2015

MONTHLY AIRPORT TRAFFIC REPORT May 2015 MONTHLY AIRPORT TRAFFIC REPORT AIRCRAFT OPERATIONS 2015 2014 Change Domestic Air Carrier 60,427 57,339 5.39% Air Taxi 7,825 10,967-28.65% General Aviation 547 635-13.86% Military 135 27 400.00% Subtotal

More information

CIVIL AVIATION AUTHORITY

CIVIL AVIATION AUTHORITY CIVIL AVIATION AUTHORITY INFRASTUCTRE DEVELOPMENT: BOTTLENECKS AND SOLUTIONS IN AVIATION SECTOR by the Presentation to the ICPAU 5 th Economic Director Finance, Civil Aviation Authority, U 20 July Overview

More information

MONTHLY AIRPORT TRAFFIC REPORT January 2018

MONTHLY AIRPORT TRAFFIC REPORT January 2018 MONTHLY AIRPORT TRAFFIC REPORT AIRCRAFT OPERATIONS 2018 2017 Change Domestic Air Carrier 55,461 55,980-0.93% Air Taxi 7,166 7,330-2.24% General Aviation 690 625 10.40% Military 6 11-45.45% Subtotal 63,323

More information

Applewood Heights Community Open House

Applewood Heights Community Open House Applewood Heights Community Open House Agenda TORONTO PEARSON BACKGROUND Toronto Pearson: For you. The World. Our goal: To become North America s premier gateway airport. Our job is to get you better connected

More information

Partnership for Quieter Skies Report

Partnership for Quieter Skies Report Ft. Lauderdale-Hollywood International Airport Prepared by: Broward County Aviation Department August 2007 Partnership for Quieter Skies Report The Partnership for Quieter Skies Report provides an overview

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

Caribbean Tourism Organization (CTO) State of the Industry Conference

Caribbean Tourism Organization (CTO) State of the Industry Conference Caribbean Tourism Organization (CTO) State of the Industry Conference Vijay Bathija Senior Director Network Planning September 16-17, 2011 Welcome to Air Canada s World! 2 Air Canada is North America s

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012 Meeting Presentation Master Plan Update October 30, 2012 Agenda We encourage open discussion during today s meeting Team Goals Background (Airport Master Plans) Areas of Emphasis Schedule Special Concerns

More information

Aruba Airport Full Year. Industry Update

Aruba Airport Full Year. Industry Update Aruba Airport Full Year 2018 Industry Update Airport Traffic Statistics Traffic Results Full Year 2018 Total Departing PAX 1,518,385 +6% Total Seat Cap - Outbound 1,837,202 +3% Departing PAX USA & CAN

More information

MONTHLY AIRPORT TRAFFIC REPORT. April 2014

MONTHLY AIRPORT TRAFFIC REPORT. April 2014 MONTHLY AIRPORT TRAFFIC REPORT AIRCRAFT OPERATIONS 2014 2013 Change Domestic Air Carrier 55,529 55,119 0.74% Air Taxi 11,149 15,077-26.05% General Aviation 639 723-11.62% Military 13 14-7.14% Subtotal

More information

The Civil Aviation Sector as a Driver for Economic Growth in Egypt

The Civil Aviation Sector as a Driver for Economic Growth in Egypt The Civil Aviation Sector as a Driver for Economic Growth in Egypt EDSCA Conference Cairo, November 10, 2013 Agenda 1. Facts and figures 2. Socio-economic impact of the civil aviation sector 3. Options

More information

Partnership for Quieter Skies Report

Partnership for Quieter Skies Report Ft. Lauderdale-Hollywood International Airport Prepared by: March 2008 Partnership for Quieter Skies Report The Partnership for Quieter Skies Report provides an overview of progress of efforts to reduce

More information

GSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT

GSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT About GSP MISSION STATEMENT At Greenville-Spartanburg International Airport (GSP), we begin each day fully committed to finding new ways to achieve our mission to provide the citizens of Upstate South

More information

aircargo center Charlotte Charlotte Your Cargo Connection Connecting The Carolinas to the World

aircargo center Charlotte Charlotte Your Cargo Connection Connecting The Carolinas to the World Charlotte aircargo center Connecting The Carolinas to the World Charlotte Looking for an affordable alternative to Atlanta and Washington? Consider Charlotte Air Cargo Center for your cargo connections.

More information

Steve Smith Director Cargo Supply Chain Management

Steve Smith Director Cargo Supply Chain Management IATA e-freight project status Steve Smith Director Cargo Supply Chain Management Contents 1. Introduction: Vision and Board Mandate 2. Current Performance 3. 2010 progress to increasing e-freight capability:

More information

CVG Overview Connect with CVG March 29, 2017

CVG Overview Connect with CVG March 29, 2017 CVG Overview Connect with CVG March 29, 2017 Launching Point Strategic Plan CVG Launching Point Strategies for 2016 and Beyond Vision: Make travel through CVG and unforgettably positive experience Mission:

More information

The San Diego Region s Air Transportation Future

The San Diego Region s Air Transportation Future The San Diego Region s Air Transportation Future June 22, 2006 1 Ryan N. Hall, Airport System Planner II San Diego County Regional Airport Authority Presentation Overview 1. The law 2. The ballot measure

More information

Birmingham Airport 2033

Birmingham Airport 2033 Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted

More information

Noise Abatement 101. July 13, Regular Board Meeting / August 7, 2014 Hillsborough County Aviation Authority

Noise Abatement 101. July 13, Regular Board Meeting / August 7, 2014 Hillsborough County Aviation Authority Noise Abatement 101 July 13, 2017 1 Objectives Provide context and a better understanding for how and why flights may operate at Tampa International Airport the way they do. Provide an overview of laws,

More information

MONTHLY AIRPORT TRAFFIC REPORT September 2016

MONTHLY AIRPORT TRAFFIC REPORT September 2016 MONTHLY AIRPORT TRAFFIC REPORT AIRCRAFT OPERATIONS 2016 2015 Change Domestic Air Carrier 59,030 59,038-0.01% Air Taxi 7,779 7,201 8.03% General Aviation 704 571 23.29% Military 21 12 75.00% Subtotal 67,534

More information

Cathay Pacific Airways 2012 Analyst Briefing 28 June 2012

Cathay Pacific Airways 2012 Analyst Briefing 28 June 2012 Cathay Pacific Airways 2012 Analyst Briefing 28 June 2012 1 Airline Strategy Grow our international network, expand frequencies and further develop Hong Kong as one of the world s leading aviation hubs

More information