AIRPORTS AUTHORITY OF INDIA REGIONAL CONNECTIVITY SCHEME (RCS) / UDAN SCHEME VERSION 2.0 RESPONSES TO QUERIES

Size: px
Start display at page:

Download "AIRPORTS AUTHORITY OF INDIA REGIONAL CONNECTIVITY SCHEME (RCS) / UDAN SCHEME VERSION 2.0 RESPONSES TO QUERIES"

Transcription

1 AIRPORTS AUTHORITY OF INDIA REGIONAL CONNECTIVITY SCHEME (RCS) / UDAN SCHEME VERSION 2.0 RESPONSES TO QUERIES 18 September 2017 Pursuant to the pre-bid meeting held on 5 th September 2017 and the stakeholder responses received, the Ministry has undertaken a detailed assessment of the queries submitted by various bidders. Based on the assessment, the responses to the queries are provided below. S.N. Query/ Recommendation Response Sep is the date for pre-bid meeting with the prospective bidders. Our questions are : i) Is it necessary for us to input the routes in e- portal before this meeting - for us to participate in the pre-bid meeting. ii) If we have input the routes, can we delete, amend and add the routes after the meeting 2. With regard to the initial proposals, could we have the following clarifications : i) For an RCS airport YYY, Airline A has given initial proposal with routing (say) BOM-YYY with VGF and Airline B also gives initial proposal for the same route (BOM-YYY) but without VGF. In this case : Will counter proposal be invited for both proposals i.e. with no VGF as well as with VGF If the counter proposal is invited only against the no VGF scenario, then can airline A give counter proposal for the route with no VGF. ii) Suppose Airline A has not submitted initial proposal for the route CCU-XXX (XXX being RCS airport). Can airline A give counter proposal for CCU-XXX even if no initial proposal was made by the Airline A for this route. It is not necessary for Applicants to input the routes in e-portal before the pre-bid meeting scheduled on 5 Sep As per the timelines shared in the public domain, the last date for the submission of request for stage length/ flight duration (input of routes) is 27 Sep The Applicants may request for this information for multiple RCS Routes, but only the RCS Routes (Individual Route Proposal / Network Proposal) for which the Technical Bid and Financial Bid are submitted shall be considered for further evaluation by the Implementing Agency. Please refer Section 8 and Section 9 under the NIP document for further details. i) In the case as illustrated above in point i), it is understood that one Initial Proposal asks for VGF and the other Initial Proposal for the same RCS Route (Individual Route Proposal) does not ask for any VGF. Kindly note that both the proposals are for the same RCS Route and hence, the Counter Proposals shall not be invited separately for the same Individual Route Proposal. The proposal with No VGF shall be preferred and details as per the Clause of RCS Version 2.0, shall be published for inviting Counter Proposals with No under VGF requested column. Further, as per the Clause of RCS Version 2.0, the Implementing Agency will provide a defined period (to be specified separately) to all other interested airline operators to submit Counter Proposals against an Initial Proposal. This would mean that the Applicant cannot submit a Counter Proposal against a proposal, for which it has submitted an Initial Proposal in first place. Therefore, in the event as illustrated in the query above, the airline A cannot submit the Counter Proposal for the RCS Route BOM- YYY. ii) With reference to Clause of RCS Version 2.0, the Applicants/ airline operators can submit Counter Proposals for all proposals 1

2 3. Suppose multiple airlines bid for routes to/from an unserved RCS airport - with all routes being different from one another, but the total flights combined under all proposal amount to (say) 35 flights per week to/from that RCS airport, will all routes be allowed? 4. Is the following understanding correct for the number of flights that can be proposed by any single airline: - For Unserved airport: To/from NON-Priority RCS Airport: Maximum of 14 flights/week, with only 7 on any individual route To/from Priority RCS Airport: Maximum of 28 flights/week, with only 7 on any individual route - For Underserved airport : To/from NON-Priority RCS Airport: Maximum of (14 minus no. of flights, already operating) from that airport To/from Priority RCS Airport: Maximum of (28 minus no. of flights, already operating) from that airport 5. An airline bids a network proposal on A-B-C route where A-B is an RCS route with RCS flight capacity of 30 seats (15 VGF 15 non- VGF) and B-C is a non-rcs flight route. If the airline operates a 70 seater aircraft between A-B-C, how many seats can the airline sell as commercial seats between A-C? (Individual Route Proposals/ Network Proposals) for which they have not submitted Initial Proposals. Therefore, in the query above, Airline A shall be allowed to submit a Counter Proposal for the RCS Route CCU-XXX, provided there is an Initial Proposal by some other bidder for the RCS Route CCU-XXX. If multiple airlines bid for routes to/from an unserved RCS airport, all the RCS Routes bid under the Scheme, which satisfy the definition of RCS Route as mentioned in Clause of RCS Version 2.0 at the time of bidding, will be considered eligible under the Scheme in that bidding round. Please note that as per the Clause of RCS Version 2.0, a Selected Airline Operator will be required to meet the following Minimum Performance Specifications with respect to the number of RCS Flight operations per week. For Priority RCS Routes, the number of RCS Flights to be operated in a week with VGF shall be a minimum of three (3) and a maximum of fourteen (14) departures per week from the same RCS Airport such that the RCS Flights are operated on at least three (3) days of the week. For RCS Routes other than Priority RCS Routes, the number of RCS Flights to be operated in a week with VGF shall be a minimum of three (3) and a maximum of seven (7) departures per week from the same RCS Airport such that the RCS Flights are operated on at least three (3) days of the week. Therefore, irrespective of the existing number of departures per week from an Underserved Airport, a Selected Airline Operator can propose number of departures ranging between 3 to 14 per week for a Priority RCS Route and 3 to 7 departures per week for an RCS Route other than Priority RCS Route as per its market assessment/ commercial operations plan. Bidders may refer the corrigendum issued by MoCA/ AAI in this regard. 2

3 6. An airline is awarded an RCS route at an RCS flight capacity of 70 seats, with a frequency of 3 flights/week. In case the airline increases the frequency of flight operation between the same route from 3 frequency to 6 frequency per week, then can the airline divide the declared RCS capacity between 2 flights i.e. 35 seats in 1 flight and the remaining 35 in other flight on the same day? 7. If an airline is awarded 4 frequency/ week on an RCS route, then can these 4 frequencies per week be operated as 2 flights per day on 2 days of the week? 8. An airline is awarded with network proposal on A-B-C-D-E route. Is the airline allowed to operate A-B-C with one aircraft and C-D-E with another aircraft of same aircraft type? 9. An airline is awarded with network proposal of A-B-C-D-E route. Is the airline allowed to operate A-B-C with one flight number and C- D-E with another flight number? Please note that the RCS Flight Capacity as per the Clause is defined as the maximum number of passenger seats per RCS Flight offered on an RCS Route, wherein an RCS Flight should satisfy Minimum Performance Specifications as per the Clause 3.3. Further, as per the Clause , the Selected Airline Operator (SAO) is allowed to increase the no. of flights on RCS Route to any number such that the number of RCS Flights can be a maximum of 14 departures/ week and 7 departures/ week for Priority RCS Routes and for RCS Routes other than Priority RCS Routes respectively. Therefore, in consideration to the above mentioned provisions, for the case as exemplified in the query, the SAO cannot split the capacity and shall need to ensure RCS Flight Capacity of 70 seats on each of the 6 flights. Bidder may note that as per the Section of the scheme, the Selected Airline Operator must operate RCS Flights on at least three (3) days of the week. The airline operator may use separate aircraft for A-B-C and C-D-E, provided both are of same aircraft type (and same RCS Flight Capacity) and the same number of flights per week are operated on A-B-C and C-D-E as submitted at the time of bidding. Provided further, that while undertaking operations on the network, the sequence of RCS Routes as submitted as part of Network Proposal is maintained and are operated in a single day. By way of illustration, the operations on C-D-E cannot take place before A-B-C to ensure that the sequence of RCS Routes of network A-B-C-D-E is maintained. The bidder may refer Clauses and for more details. As per the Clause 3.5.3, the Selected Airline Operator needs to ensure that all the RCS Routes in a Network Proposal are connected using the same aircraft type through the same number of flights per week. Further, the sequence of routes while operations should be maintained as submitted as part of the Network Proposal. Therefore, as per the current illustration of a network proposal A-B-C-D-E, the airline may need to have one flight number for the complete Network Proposal. Additionally, bidder is requested to refer the corrigendum issued with respect to RCS Flight Capacity. 3

4 10. An airline bids a network proposal on A-B-C route where B-C is RCS route with an RCS capacity of 30 seats and A-B is a non-rcs route. If the airline operates a 70 Seater aircraft, how many seats can the airline sell as commercial seats (over and above the RCS capacity) on A-C route? Also, can the airline start selling A-C route even before B-C route is filled up? 11. Can an airline declare RCS flight capacity between A-B different from RCS flight capacity between B-A? For Example: For A-B route declared 25 seats as RCS flight capacity and for B-A route declared 35 seats as RCS flight capacity. 12. In the first round of UDAN Scheme,Destination like CSI Airport Mumbai an Non- RCS Route is available for bidding. But in the second round of UDAN Scheme how can I connect RCS route to Non-RCS route and other 13. If an airline is awarded a proposed network as A-B-C route where A-B and B-C are both an RCS route with declared RCS flight capacity of 70 seats respectively. Then, how many seats can the airline sell as commercial seats between A-C? 14. If an airline is awarded 6 frequency/ week on an RCS route A-B, then can these 6 frequencies per week be operated as 2 flights (frequency) per day on 3 days of the week? 15. It is observed that in NleP at Annexure III (Technical Bid information), it is mentioned that stage flight duration (in minutes) of flying path declared by AAI shall be calculated based on the shortest permissible route length between origin and destination helipads of an RCS route. However it is submitted that the helicopters have been permitted to fly on RCS routes in North East Region, hilly states of Himachal, Uttarakhand and J&K and helicopters will take circuitous routes to fly between any such RCS sectors in the hilly areas. Thus, stage flight duration (in minutes) of flying for helicopters cannot be calculated based on the shortest distance between any two points. Further, the flight duration time for each route need to also consider time required for start up /taxi/line up /Take off/approach/landings/switch off of helicopter depending on the helipad/heliport/airport. As the flight duration (in minutes) in the RCS Bidders may refer the corrigendum issued by MoCA/ AAI in this regard. Bidder may note that under the Scheme the airline operators are not allowed declare different RCS Flight Capacity on different RCS Routes of the same Individual Route Proposal/ Network Proposal. Bidder may note that airports such as CSI Airport Mumbai, etc. have been excluded from the second round of bidding under RCS. Bidders may refer the corrigendum issued by MoCA/ AAI in this regard. As per the Clause of the Scheme, the Selected Airline Operator needs to ensure that the RCS Flights are operated on at least 3 days of the week. Therefore, it is permissible to operate 6 flights per week over 3 days of the week. The Ministry has considered the submission. Bidders may refer to the corrigendum as issued in this regard. 4

5 scheme has the bearing on the viability of route, therefore it is requested that for helicopters, stage flight duration based on the circuitous route submitted by bidder may be accepted. In case, the bidder's circuitous route is not acceptable, please clarify what methodology will be adopted to finalize the stage flight duration for helicopters. 16. As per clause (a), to ensure integrity of the scheduled flights on routes proposed i.e. if it fails to operate 70 percent of the scheduled flights. In this case, if any airline out of its 30 scheduled frequency in a month cancels its 17 frequency on the day of operation in the same month, due to bad weather (which is more than 70percent failed ops) and the booked passengers were taken care by flying them to nearest airport of the destination airport and then taken by local road transportation to the final booked destination. Then can the airline claims its VGF amount for the passengers taken to destination airport? 17. As per clause of the Regional Connectivity Scheme, in the event that the airline operator, for any of the reasons mentioned therein, offers the non RCS seats on an RCS flight at or below the airfare cap prescribed for such RCS route under the Scheme, the VGF payable to the airline operator for such RCS route shall be deemed to have been distributed across all seats sold at or below the airfare cap so prescribed. It is not clear from the language of the Scheme as to the purpose of this clause. We request further clarification as to the necessity of the inclusion of the same in the Scheme. 18. In response to an airline operator s query in respect of compensation to said operator to mitigate the adverse impact of volatility in prices of ATF, it was stated that the VGF shall be revisited and revised on a quarterly basis to address the same. To this effect, clause of the Scheme provides for the indexation of VGF to the change in Consumer Price Index Industrial Workers as published by the Government of India, the change in ATF prices, and the change in the rate of the US Dollar to the Indian Rupee. However, with regard to airline operators who do not opt for VGF, the manner in which such operators will be compensated for adverse impacts of volatility in ATF prices is not stated. Bidder may note that to provide flexibility to SAO to ensure the integrity of scheduled operations, (as per the Clause 15.1 a) of the Selected Airline Operator Agreement) the SAO needs to operate at least seventy percent (70%) of the flights scheduled by the DGCA continuously for a period of 3 (three) months or for an aggregate period of 4 (four) months within a continuous period of 6 (six) months, failure of which shall be considered as the Event of Default. On account of bad weather conditions, if the Selected Airline Operator (SAO) re-routes the flight, and ensures the transfer of passengers from Origin (O) to Destination (D), AAI may consider such a flight for VGF, provided adequate documents/ evidences are submitted to prove the diversion of flight and transfer of passengers from O to D. Bidders may note that the VGF shall be disbursed only for the number of committed/ offered RCS Seats as per the Selected Airline Operator Agreement (SAOA). No VGF shall be disbursed for the Non-RCS Seats which are sold at or below Airfare Cap (Maximum Airfare, as applicable), Therefore, the VGF per RCS Flight shall be limited to the product of RCS Seats committed/ offered and VGF per RCS Seat as per the SAOA. Bidders to note that since the bidder has quoted a zero VGF, no quarterly indexation to VGF shall be undertaken for such proposals and the VGF amount shall remain zero. The indexation in such cases shall only happen to the Airfare Caps as per the formula specified in the Scheme document. 5

6 19. Per clause , the annual VGF payable to any airline operator shall not exceed 30% of the total inflow of funds into the Regional Connectivity Fund. This seems to suggest that in the event the airline operator s VGF eligibility is in excess of such annual VGF limits, such VGF payouts will be restricted to the limits specified herein. It is to be understood as to whether there is proposed to be implemented any mechanism to cover the airline operator s losses arising out of such restriction on VGF. 20. Further to above, in the event that the airline operator s VGF eligibility exceeds such VGF cap of 30% as specified under clause , and the payout of VGF is restricted to the latter, it is to be understood as to whether the operator will be allowed to adjust inventory deployed on its RCS routes in such manner as to ensure that no financial losses are incurred on account of the restriction of VGF payout. 21. As per clause 2.7.1, ASKMs on RCS seats will not be available for set off under the Route Dispersal Guidelines. How is the capacity deployed on RCS seats to be shown under RDG? 22. Under sections 2.3 and 2.5, on a quarterly basis, airfare caps and VGF funding respectively shall undergo revision as per the formulae specified under the Scheme. In the event that the airline operator opts for a maximum airfare / VGF funding that is lower than the current ceilings prescribed under the Scheme in its bid, in a subsequent quarter, does such airline operator revise its maximum airfare / VGF in proportion to the change in airfare caps / VGF caps, or shall the airline operator be afforded the option to adopt the revised airfare caps / VGF caps as its revised maximum airfare / VGF funding? 23. In the event that a seat sold under RCS is cancelled, is the airline operator required to resell the seat at the maximum airfare under the Scheme, or can the same be sold at prevalent regular fares? As per the Clause of the Scheme, the total VGF approved for a particular airline shall be capped to an annual limit of 30% of the estimated inflows in the RCF subject to the region-wise allocation cap. The proposal(s) which breach such cap shall not be awarded to the Selected Airline Operator and hence, shall be dropped from the respective bidding round. Please refer to the above response. As per Section 2.7 in the Scheme, ASKMs generated on RCS Seats shall not be allowed for set-off/ trading under RDG guidelines. However, ASKMs generated on remaining passenger seating capacity of the aircraft, i.e., Non-RCS Seats and passenger seating capacity other than RCS Flight Capacity, if any, shall be allowed to set-off/ trade under RDG guidelines as per the existing DGCA rules. For the indexation of Airfare Cap and VGF Cap under the Scheme, the formulae as specified in Annexure 4 and Annexure 5 in the Scheme, shall be applied to the Maximum Airfare and VGF per RCS Seat quoted by the Selected Airline Operator on a quarterly basis. As per the Clause , the Selected Airline Operator (SAO) shall sell RCS Seats first before selling Non-RCS Seats on an RCS Flight. In an event of cancellation of RCS Seat(s), i.e., the seat(s) sold below the applicable Airfare Cap/ Maximum Airfare, the SAO shall be required to resell such cancelled RCS Seat(s) prior to the sale of further Non-RCS Seat(s) from the time RCS Seat(s) get available on account of cancellation. However, as per the Clause , if certain passengers cancel their RCS Seats before the flight departure such that it 6

7 does not provide sufficient time to a Selected Airline Operator to resell such RCS Seats, such seats shall be considered as sold. 24. Clause refers to award of simultaneous proposals to more than one bidder leading to joint exclusivity over the route. Under this clause, is it possible that a route may be awarded to more than one airline operator? 25. In the event that the airline operator identifies a route between airports not mentioned under the Scheme, but which meets the criteria of unserved / underserved airports as defined under the Scheme, can the airline operator claim the benefits on operating such a route that are available under the Scheme? 26. We understand that the Delhi Indira Gandhi International Airport is contemplating replacing all turboprop aircraft operations with narrow-body aircraft. In this case will the slots that free up after such transition be reserved for connections with RCS Airports under the Scheme for operations using narrow-body aircraft? 27. While RCS Route connections (and slots) from Delhi and Mumbai to RCS Airports were provided during the 1st round, we understand that connections to RCS Airports from Delhi and Mumbai will no longer be made available or allocated for this 2nd round of bidding. This is discriminatory to the airlines participating in the 2nd round and also not commensurate to furthering the objective of the Scheme of enhancing regional connectivity, as there are several unserved/underserved airports in proximity to Delhi and/or Mumbai that remain unconnected. Minimally, carriers should have the opportunity to use their own existing slots for RCS routes if they wish to. If certain airlines already have the required infrastructure and capability as opposed to other bidders they should have the flexibility to deploy such capability in generating regional connectivity. We do not believe that allowing airlines to utilize their additional capability in any manner As per the Clause , the Selected Airline Operator(s) for Simultaneous Proposals will jointly have exclusivity of operations (for a period of 3 years) for the overlapping RCS Routes. Hence, such overlapping RCS Routes may be operated by more than one airline operator as selected under the Scheme. Bidders may note that the list of Underserved Airports and Unserved Airports (Annexure -1A and Annexure -1B) provided in the Scheme document is indicative in nature. In an event, the bidder identifies an airport which is Unserved/ Underserved but not available in the Annexure - 1A or Annexure -1B or in the RCS e-portal (while bidding), the bidders are requested to bring the same to the notice of Implementing Agency for validation and accordingly, enable the bidding for the same in the system. The airline operators/ bidders are expected to undertake their own due-diligence and manage the slots on their own via undertaking slot related discussions separately with the airport operator. No change has been contemplated by the Ministry / AAI in this regard. 7

8 restricts level playing field, as all bidders will have some or the other advantage over the others in certain sectors. For example, bidders which own smaller aircraft or aircraft which are capable of flying to higher altitudes will have an advantage over bidders which own bigger aircraft when bidding on Routes which service smaller airports or destinations located at higher altitudes. 28. If slots for any airport which is a part of the network/individual proposal (either RCS or NON RCS part of the network) are not provided to an airline that is successful in a bid for an RCS Route/Network, we trust that the selected operator s performance guarantee/additional performance guarantee will not be encashed and the operator will not be liable in any manner for not operationalizing such route/network or the remainder of the routes on that network/individual proposal? Kindly confirm our understanding. 29. To facilitate quicker decision making on part of the bidders and an efficient bidding process the Ministry should provide a detailed list of all proposed RCS airports specifying the airports technical capabilities with the runway length / width, airport compatibility for different types of aircraft, fire-fighting capability, nearby airports. Also the Ministry must specify, if the airport requires an investment of INR 5 crores or more for developing them to service RCS operators and an estimated period of time that will be required for such development. 30. Currently there are several governmental and other entities which will be required to coordinate with each other in order to ensure that an RCS Route allocated to a selected bidder is operational as per the terms of the Scheme. Will AAI as the Implementing Agency undertake the responsibility of ensuring that each of such entities, such as the relevant State Government or the Central Government, the DGCA and AAI itself will fulfil all their obligations under the Scheme? Since the parties will only be entering into the Selected Airline Operator Agreement ( SAOA ) with the The airline operators/ bidders are expected to undertake proper due-diligence and manage the slots on their own via undertaking slot related discussions separately with the airport operator. However, in an event, the Selected Airline Operator (SAO) is not able to commence operations on RCS Route(s) as part of Individual Route Proposal/ Network Proposal due to unavailability of slots, the Performance Guarantee or Additional Performance Guarantee shall not be encashed, provided the SAO submits the supporting evidences to prove the same. Applicants are required to undertake their own due diligence and assess the suitability of airports for RCS Flight operations. Bidders may refer the Clause in this regard. The airline operators/ bidders are expected to undertake proper due-diligence and address any coordination issues themselves. Further, AAI is not liable for any compensation to Selected Airline Operators under similar events as specified in the query. Consequently, no change has been contemplated by the Ministry / AAI in this regard. 8

9 Implementing Agency and not each of the other Governmental bodies, the Implementing Agency should take full responsibility to oversee that all other governmental instrumentalities fulfil their obligations and in case they fail to do so, AAI should be liable to provide adequate compensation and to require specific performance of obligations of such entities. 31. How much is the scope of negotiation on the draft SAOA, as several provisions in the current draft are one sided and very favorable towards the Authority? 32. We need clarification on the understanding conveyed to us during the orientation for the online portal that the remaining capacity over and above the RCS Flight Capacity cannot be sold on the sector for which we have bid. We don t understand the benefit to the bidder or the consumer of restricting capacity on RCS sectors. We suggest the following formulation: a) The concept of RCS Flight Capacity should be retained. b) There should not be any selling restrictions on any seats on the RCS flight - neither the RCS Seats nor the non-rcs or passenger seats. As demand for origin destination and connecting traffic will be dynamic, the airline should be allowed to cater to both segments simultaneously, and fill up the airplane on a first come first serve basis. c) To prevent any airline from bidding too less a number as RCS Seats, we suggest that the minimum number of seats to be offered as RCS Seats for Category 2 and Category 3 Aircraft should be either nine seats or 20% of the aircraft capacity, whichever is higher. d) The existing cap of maximum 40 RCS Seats on a RCS flight should continue. 33. Currently the process requires us to enter all planned networks and routes prior to 26th Sep 17, and once entered, these are frozen. We should be allowed to build networks after the AAI has validated sectors and their stage lengths, as the distance given by AAI will impact the applicable VGF and airfare cap, and in turn our operating economics and bid thereon. Hence the operator should be given a flexibility to provide and construct the network details along with the technical bid process. Bidder is requested to raise queries/ submit its views on specific provisions of SAOA for MoCA/ AAI's consideration. The Ministry has considered the submission. Bidders may refer to the corrigendum as issued with reference to the Regional Connectivity Scheme Version 2.0 The Ministry has considered the submission. Bidders may refer to the corrigendum as issued with reference to the Regional Connectivity Scheme Version 2.0 9

10 34. The documentation requirement for bidding Air Operator Certificate ( AOC ) Holders is unnecessarily elaborate; for example, memorandum and article of association, etc. are already provided to DGCA at the time of applying for the AOC. Given the timelines within which the bidding is required to be completed, the documentation requirement could be simplified and documents which have already been provided or are provided to the Ministry from time to time as a regulatory requirement should be excluded. 35. Currently the Scheme contemplates that a separate bank guarantee or additional bank guarantee (if required) is to be provided for each RCS Route allotted to a bidder. We request the Ministry to consider accepting a consolidated bank guarantee, for all our RCS routes allotted to an individual selected operator for operational convenience. Such bank guarantee shall guarantee the entire outstanding liability for all routes (and any routes for which additional guarantee is required) and as and when appropriated (if required), can be replenished with additional amounts as may be required. 36. As per point one departure is considered as A to B to A. Clarification is required for the following case: Airport A is Non RCS, Airport B is RCS Priority airport,airport C is priority RCS airport. How many departure will be considered per airport if the following route is followed. A to B, B to C, C to B, B to A flown twice a day. 37. Is CocoIsland airport (VYCI) is an RCS airport in the priority area? 38. Clarification regarding the applicable bank guarantee for a company having NOC for Schedule Commuter operator and in the process of obtaining SCO permit from DGCA. It is requested that bank guarantee for this case to be considered as 5 lakh rupees. 39. We are the NSOP holder and presenty our recertification is going on as per the new rules of DGCA, our NSOP is expired due to that. In case the certification is not completed and the NSOP is not renewed before the due date. Then can we submit the proposal security of Rs. 5,00,000/- or Rs. 20,00,000/- will be applicable to us as per the requirement for NOC holders of scheduled commuter operations. No change has been contemplated by the Ministry/ AAI in this regard. Bidder may note that the Performance Guarantee (as applicable) and Additional Performance Guarantee, if any are required to be furnished for each proposal, irrespective of it being an Individual Route Proposal or a Network Proposal. Further, no change has been contemplated by the Ministry/ AAI in this regard. Bidder may note that in the case as exemplified in the query, the number of departures shall be as follows: A to B: 1 departure from Airport 'A' B to C: 1 departure from Airport 'B' C to B: 1 departure from Airport 'C' B to A: 1 departure from Airport 'B' Total Departures (Flown twice a day): From A: 2 From B: 4 From C: 2 The set of islands as highlighted do not fall under Indian territory and hence shall not be considered as RCS airport in priority area. No change has been contemplated by the Ministry/ AAI in this regard. Bidder may note that the Applicants which do not have a valid AOP but which have applied for an initial No Objection Certificate (NOC) to MoCA, for obtaining Air Operator Certificate (AOC) for Scheduled Commuter Air Transport Services or Scheduled Operator Permit (SOP) before the last date of Submission of Initial Proposals of the respective bidding cycle have to furnish a Proposal Security for an amount of Rs. Twenty 10

11 Lakhs. Bidder may refer Clause 14.1 of the NIP document. 40. As per RCS 2.0, ( )min of 3 and max of 14 flights per week is mandated for priority areas. Helicopters will invariably operate in the priority areas without any facilities for instrument landing, All the helipads are VFR which makes weather a very important part of flight operations. Its possible that weather may not allow any flights to operate in a week. These causes of non-operation of flights are beyond the control of the operator. How does the policy address this issue? 41. As per minimum performance specifications given in RCS 2.0 a helicopter operator must provide a defined number of seats for RCS. However, unlike fixed wing, the number of passengers carried in a helicopter may not be constant and may vary each day depending upon temperature, altitude and weather. How does the RCS address this issue? 42. Two bidders have bid a route with zero VGF and zero max airfare. What is the selection criteria in such case? 43. In the counter-bid process, a bidder wins a route quoting zero VGF and lower max airfare than the other. Will the winner get route rights in such case? 44. One bidder has bid Pt A- Pt B as individual route, another has bid same Pt A Pt B but as part of network route. Are these two routes treated distinct for the purpose of counter bid? In other words can the network bidder counter bid against the individual route bidder or viceversa? As per the Clause 15.1 a) of the Selected Airline Operator Agreement, failure by the Selected Airline Operator (SAO) to operate at least seventy percent (70%) of the flights scheduled by the DGCA continuously for a period of 3 (three) months or for an aggregate period of 4 (four) months within a continuous period of 6 (six) months shall only be considered as the Event of Default. Such a provision is likely to accommodate non-operation of flights on account of unsuitable weather conditions. Bidder may note that as per the Clause of RCS Version 2.0, in such an event, the RCS Flight Capacity for the purposes of calculation of RCS Seats, disbursement of VGF and compliance with the terms and conditions of the Selected Airline Operator Agreement, shall be considered as the actual deployed capacity on such RCS Flight based on DGCA orders/guidelines. With reference to the Clause of RCS Version 2.0, in an event, two Applicants quote zero VGF for the same RCS Route, the Applicant quoting the maximum number of RCS Seats shall be preferred. However, if both the Applicants offer same number of RCS Seats, the Applicant quoting the lowest Maximum Airfare for RCS Seats shall be identified as Selected Airline Operator. In the event that both Applicants quote same Maximum Airfare, the bidder may note that the Implementing Agency shall specify a separate procedure for breaking the tie at that stage. The Applicant once identified as the Selected Airline Operator for an RCS Route shall be granted exclusivity for operations on that route for a period of 3 years. An Individual Route Proposal with say RCS Route A-B and a Network Proposal (satisfying the provisions as mentioned in Section 3.5 of RCS Version 2.0) with one of RCS Routes as A- B shall be considered distinct and if eligible, counter proposals shall be invited for both the proposals. Further, with reference to Clause of RCS Version 2.0, the Applicants can submit Counter Proposals for all proposals (Individual Route Proposals/ Network Proposals) for which they have not submitted Initial Proposals. Hence, in 11

12 45. As per Annexure-5 of the Scheme Version.02 August 2017 : For the purpose of above estimation, ATF prices (for Domestic operations) prevailing across four stations (Delhi, Mumbai, Kolkata and Chennai) of oil marketing companies IOCL, BPCL and HPCL - as published on their respective websites2 will be considered. For calculation purposes, for a particular date, the average price of ATF across all the four stations (Delhi, Mumbai, Kolkata and Chennai) will be considered In case the ATF price for a particular date is not available on the website of oil marketing Companies, the ATF price for the previous available date shall be considered. Rate of ATF in INR per kl (IOCL, BPCL and HPCL - as published on their respective websites) on are as below: As per IOCL website : Delhi- 50,020.00; Kolkata-54,416.00; Mumbai-49,383.00; Chennai-52, with effect from 1 st September-2017 As per BPCL website: MUMBAI- 47, : DELHI- 48,110.01: CHENNAI-50, : KOLKATA 52,535.02, with effect from 01 Aug 2017 As per HPCL website: Chennai : Kolkata : Mumbai : New Delhi (Palam) : NewDelhi (T3 Terminal) ; As on Prices are exclusive of Sales Tax and Local levies. How the average price of ATF should be worked out on the particular date i.e ? 46. Bidder Alpha has Pt A Pt B as part of his network and is sequenced at number 5 out of 8 in the network leg. Bidder Bravo has same route Pt A Pt B as part of his network but in this case is sequenced at number 2 out of 7 routes. Both bidders recognize that route A-B is lucrative so Bidder Bravo in counter-bidding bids aggressively and wins. Part 1 of 2 (submitting in two parts due to portal restriction) Part 2 of 2 - This would lead to complete disruption of Bidder Alpha network since he would not be able to ply on A-B because of route right that is gained by Bidder Bravo. How is the network operation of Bidder the case exemplified in the query, the Applicant who submitted the Network Proposal can counter bid against the Individual Route Proposal and the Applicant who submitted the Individual Route Proposal can counter bid against the Network Proposal. Bidder may note that the Implementing Agency shall consider the average price of ATF on a particular date based on the average of ATF price on that day across four stations - Delhi, Mumbai, Kolkata and Chennai from any one website of the oil marketing companies IOCL, BPCL and HPCL and other relevant taxes. The bidder may note that as per the Clause c) of Scheme Version 2.0, Network Proposals, which have one or more but not all common RCS Route(s) shall be considered nonidentical and all such networks shall be bid out as separate proposals. Further, as per the Clause , any Counter Proposal (Network Proposal) shall not be allowed to add/ delete/ propose any new RCS Route(s) other than the RCS Route(s) proposed as part of the Initial Proposal and released by the Implementing Agency. Therefore, in the case as exemplified in the query, during the counter bid stage, Bidder Alpha and Bidder Bravo (if bid) shall be required 12

13 Alpha protected in such a case? Can being outbid on one route lead to complete disruption of an entire network for Bidder Alpha? 47. We have successfully filed our initial bid of one network proposal, now we want to go for another proposal of a network, please; advice 1. do we need to upload again the same documents, uploaded for earlier initial bid...2. Do we have to make another power attorney for another network proposal/ or counter proposal. 48. We have added a Network but want to delete the same immediately. Request you to please guide us how can this be done. 49. Please refer section , where no VGF sought for particular flight (Fixed wing aircraft). As example if taken 301 km stage length flight where Airfare Cap is Rs1920 and VGF cap is Rs in this case if no VGF sought then how much one operator can quote maximum airfare for bidding Rs or Rs5900?? 50. Clause (d) can it be considered that Security and fire services equipment (X-ray machine, EDT etc.) will be provided along with BCAS staff for security for both passenger and Cargo. 51. Clause (a) includes any other charge subsuming a charge for such aspects in future on RCS flights. Based on this can be assume that in all airports connected by RCS flight, the operator will get office space, ticket counter, security for both passenger and cargo without any additional cost. to bid against the complete Initial Proposal (not against their own Initial Proposal) and not just the common RCS Route (A-B). Further, as per the Clause , award of Simultaneous Proposals (Non-identical proposals one or more but not all common RCS Route(s)) is permitted to more than one bidder, which will allow different airline operators to operate on the common RCS Route(s), thus, resulting in loss of exclusivity of operations on such routes for an individual operator. Therefore, with reference to the query, both the Applicants Alpha and Bravo may operate on the common RCS Route A-B, subject to the provisions of Section 3.13 of Scheme Version 2.0. The bidder may also refer the detailed illustration as provided in the Clause Bidder may note that the documents are to uploaded only once, and there is no need upload the same documents again. There is no provision to delete the network once created, in case the bidder wants to modify the network they can add a new network and ignore the old one. There is no compulsion, if a bidder has added a network they may or may not submit the bid for the network. The bidder may note that irrespective of the VGF quoted for an RCS Route, the Maximum Airfare cannot be more than the Airfare Cap as applicable for that RCS Route (based on its stage length). Therefore, the bidder may quote any value equal to or less than the applicable Airfare Cap depending upon its market assessment/ commercial plan. The bidder may note that as per the applicable standards and guidelines, security and fire services (free of cost) shall be provided at respective RCS Airports through appropriately trained personnel and equipment. The bidder may note that the Clause a), refers to the charges associated with Landing and Parking of aircraft (for RCS Flights). Any other charges are not subsumed in this. 13

14 52. This is question in relation to clause which is not clear. Let us assume a company does not want a VGF for a particular RCS route in category I of 300 km (Airfare cap: Rs and VGF cap: Rs. 3,730 Total: Rs. 5,560). The Company does not want to take the VGF. If that is the case the company has to provide an all-inclusive maximum airfare for an RCS Seat for the purpose of bidding. It is not clear what the cap is in that case to qualify under the scheme. The wording in the scheme is 53. Need a clarity on proposal security. Do we need furnish separate security for each route or network? For example if am biding for 3 different routes. 54. Kindly advise is there any restriction on type of aircraft being twin engine or we can submit bid with single aircraft The bidder may note that irrespective of the VGF quoted for an RCS Route, the Maximum Airfare cannot be more than the Airfare Cap as applicable for that RCS Route (based on its stage length). Therefore, the bidder may quote any value equal to or less than the applicable Airfare Cap depending upon its market assessment/ commercial plan. Bidder may note that the proposal security (as applicable with reference to Clause 14.1 of the NIP document) is required to be furnished for each proposal, irrespective of it being an Individual Route Proposal or a Network Proposal. By way of an illustration, if an Applicant is bidding for a Network Proposal with 3 RCS Routes, it shall be required to furnish only one proposal security for the applicable amount, i.e., INR 5 Lakh for a), b) Applicants and INR 20 Lakh for c), d) Applicants of RCS Version 2.0 However, in the event, an Applicant submits 3 proposals for each of the distinct RCS Routes (3 in number), it shall be required to furnish three proposal securities for the applicable amount as stated above. Bidder is requested to refer the CAR guidelines as issued by DGCA pertaining to scheduled operations in the country. 55. Need Clarifty in Reference to serial number 14.5 of NIP, 1) which are the airports falling under this Regional Connectivity Scheme which needs investment of 5 Cr. 56. Can we start flight two times a day morning and evening session because you mention seven flights in a week what about the remaining seven please specify in detail? Applicants on the basis of their own due diligence and assessment of the suitability of airports for RCS Flight operations, are required to bid under the Scheme. Subsequently, AAI shall undertake the detailed assessment of investment requirement for the rehabilitation / upgradation of airport (nonoperational RCS Airport) infrastructure and accordingly, the Applicants shall be apprised of the list of airports requiring investment of INR 5 Crore or more and obligation of Additional Performance Guarantee. Bidder may note that as per the Section of the scheme, the Selected Airline Operator must operate RCS Flights (departure) on at least three (3) days of the week from the RCS Airport. Therefore, it is permissible to operate 6 flights (departure) per week over 3 days of the week and the seventh flight can be operated on any day of the week as per the schedule filed by the 14

15 57. Suppose we select 24 routes in one network proposal. A-B-C-D-E-F-...X. It won t be possible to connect such a route with 1 Aircraft so can we split the route in 2 aircraft and change the sequence ie. Route 1: A-C-F-X-A AND Route 2: B-D-E-J...-B as per our flight schedule/convenience 58. I have noc for AOP but my AOP permit not yet to be issued can I apply for initial proposal? 59. We intend to participate with a 9 seater Single Engine Cessna Grand Caravan 208B Aircraft. Can we submit our Bid Yes or No.. airline operator according to its commercial operations plan. The bidder may note that the Network Proposal is required to be formed such that it can be operated in a single day. Further, the airline operator may use separate aircraft for different RCS Routes of the same Network Proposal, provided both are of same aircraft type (and same RCS Flight Capacity) and the same number of flights per week are operated on all RCS Routes of the same Network Proposal as submitted at the time of bidding. Provided further, that while undertaking operations on the network, the sequence of RCS Routes as submitted as part of Network Proposal is maintained and are operated in a single day. By way of illustration, the operations on D-E-F cannot take place before A-B-C to ensure that the sequence of RCS Routes of network A-B-C-D-E-F.X is maintained. The bidder may refer Clauses and of RCS Version 2.0 for more details. As per the Clause d) of RCS Version 2.0, entities which do not have a valid AOP at the time of bidding under the Scheme, but which have applied for an initial No Objection Certificate (NOC) from MoCA, as per applicable regulations, for obtaining Air Operator Certificate (AOC) for Scheduled Operator Permit (SOP) or Scheduled Commuter Air Transport Services before the last date of Submission of Initial Proposals of the respective bidding cycle are eligible to bid under the Scheme. Bidder is requested to refer the CAR guidelines as issued by DGCA pertaining to scheduled operations in the country. 60. Are bidders supposed to submit the integrity pact on a stamp paper? 61. Do we have to fill in the blanks given in the integrity pact and SAOA Agreement or just take a print on blank paper and initial the pages There is no need of Stamp Paper for the submission of Integrity Pact. The Applicant is required to fill the requisite information in the template as provided for the Integrity Pact in the NIP document. Whereas, the SAOA is required to be initialed only on each page. 15

Scheme for enhancing air connectivity between Indian states and international destinations

Scheme for enhancing air connectivity between Indian states and international destinations Scheme for enhancing air connectivity between Indian states and international destinations October 2018 Table of Contents 1. Objectives and Guiding Principles... 4 1.1 Background... 4 1.2 Scheme Objective...

More information

Regional Connectivity Scheme (RCS or the Scheme) Ministry of Civil Aviation, Government of India. Version 2.0 August 2017

Regional Connectivity Scheme (RCS or the Scheme) Ministry of Civil Aviation, Government of India. Version 2.0 August 2017 Regional Connectivity Scheme (RCS or the Scheme) Ministry of Civil Aviation, Government of India Version 2.0 August 2017 Contents 1. Scheme Objectives and Guiding Principles... 5 1.1 Background... 5 1.2

More information

Regional Connectivity Scheme (RCS or the Scheme) Ministry of Civil Aviation, Government of India. Version 3.0 October 2018

Regional Connectivity Scheme (RCS or the Scheme) Ministry of Civil Aviation, Government of India. Version 3.0 October 2018 Regional Connectivity Scheme (RCS or the Scheme) Ministry of Civil Aviation, Government of India Version 3.0 October 2018 Contents 1. Scheme Objectives and Guiding Principles... 5 1.1 Background... 5 1.2

More information

No. AV- I 30 1 rl2l201 8-DT(RCS) Government of India Ministry of Civil Aviation DT Section ***

No. AV- I 30 1 rl2l201 8-DT(RCS) Government of India Ministry of Civil Aviation DT Section *** No. AV- I 30 1 rl2l201 8-DT(RCS) Government of India Ministry of Civil Aviation DT Section *** Notice 'B' Block, Rajiv Gandhi Bhawan New Delhi, Dated Au+l**t 2I,2018 0' Draft Scheme Document of International

More information

AIRPORTS AUTHORITY OF INDIA

AIRPORTS AUTHORITY OF INDIA AIRPORTS AUTHORITY OF INDIA Tender id:- 2018_AAI_14354_1 NOTICE INVITING OF FINANCIAL BIDS UNDER EOI (EXPRESSION OF INTEREST) FROM EMPANELLED CA/CMA FIRMS OF SOUTHERN REGION FOR APPOINTMENT OF INDEPENDENT

More information

AIRPORTS AUTHORITY OF INDIA

AIRPORTS AUTHORITY OF INDIA AIRPORTS AUTHORITY OF INDIA Tender id:- 2018_AAI_15216_1 NOTICE INVITING OF FINANCIAL BIDS UNDER EOI (EXPRESSION OF INTEREST) FROM EMPANELLED CA/CMA FIRMS OF SOUTHERN REGION FOR APPOINTMENT OF INDEPENDENT

More information

PHD Aviation Summit: Indian Civil Aviation Benefit Beyond Borders. February 18 th, Presented To:

PHD Aviation Summit: Indian Civil Aviation Benefit Beyond Borders. February 18 th, Presented To: KNOWLEDGE PARTNER PHD Aviation Summit: Indian Civil Aviation Benefit Beyond Borders February 18 th, 2016 Presented To: Shri Ashok Gajapathi Raju Pusapati Hon ble Minister of Civil Aviation Indian aviation

More information

GOVERNMENT OF INDIA AERONAUTICAL INFORMATION SERVICES DIRECTOR GENERAL OF CIVIL AVIATION OPPOSITE SAFDARJUNG AIRPORT NEW DELHI

GOVERNMENT OF INDIA AERONAUTICAL INFORMATION SERVICES DIRECTOR GENERAL OF CIVIL AVIATION OPPOSITE SAFDARJUNG AIRPORT NEW DELHI Telephone No. : 4622495 Telegraphi Address: Commercial : AIRCIVIL NEW DELHI Aeronautical : VIDDYAYX E Mail: dri@dgca.delhi.nic.in Fax 011 24629221 GOVERNMENT OF INDIA AERONAUTICAL INFORMATION SERVICES

More information

PPR REGULATIONS FOR BUSINESS AND GENERAL AVIATION AT EINDHOVEN AIRPORT

PPR REGULATIONS FOR BUSINESS AND GENERAL AVIATION AT EINDHOVEN AIRPORT PPR REGULATIONS FOR BUSINESS AND GENERAL AVIATION AT EINDHOVEN AIRPORT Eindhoven, September 2017 Contents Scope of application p. 3 Definitions p. 3 Capacity p. 3 Distribution of PPRs p. 4 PPR applications

More information

Incentive Discounts Programme for Traffic Development at Sofia Airport 2018

Incentive Discounts Programme for Traffic Development at Sofia Airport 2018 1. General Terms: Incentive Discounts Programme for Traffic Development at Sofia Airport 2018 1.1. This Programme containing Incentive discounts on the airport charges aims at promoting the sustainable

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010 COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) 18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services

More information

CIVIL AVIATION REQUIREMENT SECTION 3 AIR TRANSPORT SERIES C PART I ISSUE IV, 24 th March 2017 EFFECTIVE: FORTHWITH

CIVIL AVIATION REQUIREMENT SECTION 3 AIR TRANSPORT SERIES C PART I ISSUE IV, 24 th March 2017 EFFECTIVE: FORTHWITH GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPPOSITE SAFDARJUNG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENT SERIES C PART I ISSUE IV, 24 th March 2017 EFFECTIVE:

More information

Facilities to be provided to passengers by airlines due to denied boarding, cancellation of flights and delays in flights.

Facilities to be provided to passengers by airlines due to denied boarding, cancellation of flights and delays in flights. GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS AIR TRANSPORT ISSUE I, DATED EFFECTIVE: 01.08.2016 File

More information

NEW AND IMPROVED. ROYAL CARIBBEAN Scope & Changes DEPOSITS AND FINAL PAYMENTS DEFINITIONS, SIZE REQUIREMENTS AND LIMITS

NEW AND IMPROVED. ROYAL CARIBBEAN Scope & Changes DEPOSITS AND FINAL PAYMENTS DEFINITIONS, SIZE REQUIREMENTS AND LIMITS NEW AND IMPROVED G R O U P S Y O U R WAY ROYAL CARIBBEAN Scope & Changes The policies contained in these Groups Your Way Group Policies (the Group Policies ) of Royal Caribbean International ( Royal Caribbean

More information

Abruzzo Airport. Commercial Policy Development Routes

Abruzzo Airport. Commercial Policy Development Routes Abruzzo Airport Commercial Policy Development Routes Abruzzo Airport's main objective is to stimulate the development of air traffic by encouraging carriers to operate new routes and upgrade existing ones,

More information

BILATERAL TEMPLATE AIR SERVICES AGREEMENT

BILATERAL TEMPLATE AIR SERVICES AGREEMENT BILATERAL TEMPLATE AIR SERVICES AGREEMENT Throughout this document: 1) an asterisk is used to indicate that a specific provision within an article is common to each of the traditional, transitional and

More information

EASTERN MILES MEMBERSHIP TERMS AND CONDITIONS

EASTERN MILES MEMBERSHIP TERMS AND CONDITIONS EASTERN MILES MEMBERSHIP TERMS AND CONDITIONS TERMS AND CONDITIONS To protect the rights of the members and frequent flyers program of Eastern Miles, China Eastern Airlines Ltd. constitutes these terms

More information

ACI EUROPE POSITION. A level playing field for European airports the need for revised guidelines on State Aid

ACI EUROPE POSITION. A level playing field for European airports the need for revised guidelines on State Aid ACI EUROPE POSITION A level playing field for European airports the need for revised guidelines on State Aid 16 June 2010 1. INTRODUCTION Airports play a vital role in the European economy. They ensure

More information

Grow Transfer Incentive Scheme ( GTIS ) ( the Scheme )

Grow Transfer Incentive Scheme ( GTIS ) ( the Scheme ) Grow Transfer Incentive Scheme ( GTIS ) ( the Scheme ) 1. Scheme Outline The GTIS offers a retrospective rebate of the Transfer Passenger Service Charge 1 for incremental traffic above the level of the

More information

GUIDANCE MATERIAL CONCERNING FLIGHT TIME AND FLIGHT DUTY TIME LIMITATIONS AND REST PERIODS

GUIDANCE MATERIAL CONCERNING FLIGHT TIME AND FLIGHT DUTY TIME LIMITATIONS AND REST PERIODS GUIDANCE MATERIAL CONCERNING FLIGHT TIME AND FLIGHT DUTY TIME LIMITATIONS AND REST PERIODS PREAMBLE: Guidance material is provided for any regulation or standard when: (a) (b) The subject area is complex

More information

National Civil Aviation Policy 2016

National Civil Aviation Policy 2016 www.swaniti.in National Civil Aviation Policy 2016 In June 2016, the Union Cabinet approved the National Civil Aviation Policy 2016 as a comprehensive guidance for creating an ecosystem which is conducive

More information

GHANA CIVIL AVIATION AUTHORITY

GHANA CIVIL AVIATION AUTHORITY GHANA CIVIL AVIATION AUTHORITY ADVISORY CIRCULAR AC-08-011-003 Crew Flight Duty & Rest Periods Section 1... 3 1.1 Applicability... 3 1.2 Definitions... 3 1.3 Acronyms... 4 1.4 Knowledge or Suspicion of

More information

Part 121 CERTIFICATION AND OPERATIONS: AIR

Part 121 CERTIFICATION AND OPERATIONS: AIR Ministry of Civil Aviation ECAR Part 121 Egyptian Civil Aviation Authority (ECAA) Part 121 CERTIFICATION AND OPERATIONS: AIR SUBPART Q The Avoidance of Excessive Fatigue in Aircrew 01-Jan-2016 ECAR 121

More information

Working Draft: Time-share Revenue Recognition Implementation Issue. Financial Reporting Center Revenue Recognition

Working Draft: Time-share Revenue Recognition Implementation Issue. Financial Reporting Center Revenue Recognition March 1, 2017 Financial Reporting Center Revenue Recognition Working Draft: Time-share Revenue Recognition Implementation Issue Issue #16-6: Recognition of Revenue Management Fees Expected Overall Level

More information

Black Start Ancillary Service Schedule

Black Start Ancillary Service Schedule 1. Glossary and Interpretation 1.1 Glossary: In this Ancillary Service Schedule, unless the context otherwise requires, the following definitions apply: Availability Fee means the monthly availability

More information

Grow Transfer Incentive Scheme

Grow Transfer Incentive Scheme Grow Transfer Incentive Scheme Grow Transfer Incentive Scheme offers a retrospective rebate of the Transfer Passenger Service Charge for incremental traffic above the level of the corresponding season

More information

INCENTIVE PROGRAM

INCENTIVE PROGRAM LIMAK KOSOVO INT L AIRPORT J.S.C. PRISTINA INTERNATIONAL AIRPORT "ADEM JASHARI" INCENTIVE PROGRAM 2018 2020 (25 March 2018 28 March 2020) 1 ARTICLE 1: OBJECTIVE The objective of the Incentive Program is

More information

General Authority of Civil Aviation (GACA) Customer Protection Rights Regulation

General Authority of Civil Aviation (GACA) Customer Protection Rights Regulation General Authority of Civil Aviation (GACA) Customer Protection Rights Regulation Issued by the Board of Directors of the General Authority of Civil Aviation Resolution No. (20/380) dated 26/5/1438 H (corresponding

More information

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS CIVIL AVIATION AUTHORITY, PAKISTAN Air Navigation Order No. : 91-0004 Date : 7 th April, 2010 Issue : Two OPERATIONAL CONTROL SYSTEMS CONTENTS SECTIONS 1. Authority 2. Purpose 3. Scope 4. Operational Control

More information

CIVIL AVIATION REQUIREMENT SECTION 2 - AIRWORTHINESS SERIES E PART XI

CIVIL AVIATION REQUIREMENT SECTION 2 - AIRWORTHINESS SERIES E PART XI GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, New Delhi CIVIL AVIATION REQUIREMENT SECTION 2 - AIRWORTHINESS SERIES E PART XI DATED 21 st

More information

1. Purpose and scope. a) the necessity to limit flight duty periods with the aim of preventing both kinds of fatigue;

1. Purpose and scope. a) the necessity to limit flight duty periods with the aim of preventing both kinds of fatigue; ATTACHMENT A. GUIDANCE MATERIAL FOR DEVELOPMENT OF PRESCRIPTIVE FATIGUE MANAGEMENT REGULATIONS Supplementary to Chapter 4, 4.2.10.2, Chapter 9, 9.6 and Chapter 12, 12.5 1. Purpose and scope 1.1 Flight

More information

1) SUB: ENVIRONMENT AWARENESS & STRESS MANAGEMENT RETREAT (12 th 14 th AUGUST, 2016)

1) SUB: ENVIRONMENT AWARENESS & STRESS MANAGEMENT RETREAT (12 th 14 th AUGUST, 2016) No. DJA/Acd./Aug.Ret./1053/2016 DELHI JUDICIAL ACADEMY (High Court of Delhi) SECTOR 14, DWARKA NEW DELHI 110078 Phone No.: 011-28036687, Fax No. : 011-28036683, E-Mail: dja@nic.in To All Tour Operator

More information

Aircraft Leasing. United Kingdom Overseas Territories Aviation Circular OTAC Issue 1 7 October Effective: on issue

Aircraft Leasing. United Kingdom Overseas Territories Aviation Circular OTAC Issue 1 7 October Effective: on issue United Kingdom Overseas Territories Aviation Circular OTAC 61-2 119-6 121-4 135-4 Aircraft Leasing Issue 1 7 October 2008 Effective: on issue GENERAL Overseas Territories Aviation Circulars are issued

More information

British Airways PLC. Agreement to Supply Group Nett Rates. Terms and Conditions

British Airways PLC. Agreement to Supply Group Nett Rates. Terms and Conditions British Airways PLC Agreement to Supply Group Nett Rates 1. Group Agreement Terms and Conditions 1.1 This Agreement sets out the Terms and Conditions on which British Airways Plc ( British Airways ) agrees

More information

Revenue Recognition Implementation Issue 2.11 NOTICE

Revenue Recognition Implementation Issue 2.11 NOTICE NOTICE DISCLAIMER. This document has been compiled by the IATA Industry Accounting Working Group (IAWG), which consists of senior finance representatives from IATA member airlines. This working group s

More information

PART XIII - AIR TRANSPORT SERVICES

PART XIII - AIR TRANSPORT SERVICES PART XIII - AIR TRANSPORT SERVICES 134. Scheduled Air Transport Services- (1) No person shall operate any Scheduled air transport service from, to, in, or across India except with the permission of the

More information

important changes to your Altitude Qantas Rewards terms and conditions

important changes to your Altitude Qantas Rewards terms and conditions important changes to your Westpac Altitude Qantas Rewards terms and conditions Effective 17 June 2013 Effective from 17 June 2013, we will be introducing some changes to Altitude Qantas Rewards Program.

More information

Route Support Cork Airport Route Support Scheme ( RSS ) Short-Haul Operations Valid from 1st January Introduction

Route Support Cork Airport Route Support Scheme ( RSS ) Short-Haul Operations Valid from 1st January Introduction Route Support Cork Airport Route Support Scheme ( RSS ) Short-Haul Operations Valid from 1st January 2016 1. Introduction Cork Airport is committed to encouraging airlines to operate new routes to/from

More information

Revisions to Denied Boarding Compensation, Domestic Baggage Liability Limits, Office of the Secretary (OST), Department of Transportation (DOT).

Revisions to Denied Boarding Compensation, Domestic Baggage Liability Limits, Office of the Secretary (OST), Department of Transportation (DOT). This document is scheduled to be published in the Federal Register on 05/27/2015 and available online at http://federalregister.gov/a/2015-12789, and on FDsys.gov 4910-9X DEPARTMENT OF TRANSPORTATION Office

More information

HCSS Travel Guidelines

HCSS Travel Guidelines Version 5 HCSS Travel Guidelines 29 February 2016 1. Introduction This guide is the key reference document for all travel payable by ACC relating to the Home and Community Support Service (HCSS) contract.

More information

Short-Haul Operations Route Support Scheme (RSS)

Short-Haul Operations Route Support Scheme (RSS) Short-Haul Operations Route Support Scheme (RSS) Valid from January 1 st, 2018 1: Introduction: The Shannon Airport Authority is committed to encouraging airlines to operate new routes to/from Shannon

More information

About JetPrivilege + Benefits and Privileges

About JetPrivilege + Benefits and Privileges About JetPrivilege + Benefits and Privileges 5 Membership Tiers Blue: Blue Plus: Elite Tiers: Base tier After accumulation of 5 Tier Points or 7,500 Tier JPMiles in any six month time-frame. Blue Plus

More information

REPUBLIC OF BULGARIA MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS

REPUBLIC OF BULGARIA MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS REPUBLIC OF BULGARIA MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS TO ALL INTERESTED PERSONS IN THE PROCEDURE FOR GRANTING A CONCESSION FOR SERVICE FOR THE OBJECT CIVIL AIRPORT FOR PUBLIC

More information

Seychelles Civil Aviation Authority SAFETY DIRECTIVE. This Safety Directive contains information that is intended for mandatory compliance.

Seychelles Civil Aviation Authority SAFETY DIRECTIVE. This Safety Directive contains information that is intended for mandatory compliance. Safety Directive Seychelles Civil Aviation Authority SAFETY DIRECTIVE Number: OPS SD- 2014/07 Issued: 8 October 2014 Flight Time Limitations - Clarifications This Safety Directive contains information

More information

An advisory circular may also include technical information that is relevant to the rule standards or requirements.

An advisory circular may also include technical information that is relevant to the rule standards or requirements. Advisory Circular AC61-19 Pilot Licences and Ratings Flight Examiner Ratings Revision 13 02 July 2018 General Civil Aviation Authority advisory circulars contain guidance and information about standards,

More information

Policy PL Date Issued February 10, 2014

Policy PL Date Issued February 10, 2014 Subject RENEWABLE ENERGY ON CROWN LAND Compiled by Renewable Energy Program, Biodiversity Branch Replaces Policy Directives Waterpower Site Release Crown Land Onshore Windpower Development - Crown Land

More information

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPPOSITE SAFDRJUNG AIRPORT, NEW DELHI

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPPOSITE SAFDRJUNG AIRPORT, NEW DELHI GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPPOSITE SAFDRJUNG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS SECTION 6 Design Standards & Type Certification

More information

Class F3K Hand Launch Gliders 5.7. CLASS F3K - HAND LAUNCH GLIDERS

Class F3K Hand Launch Gliders 5.7. CLASS F3K - HAND LAUNCH GLIDERS Class F3K Hand Launch Gliders 5.7. CLASS F3K - HAND LAUNCH GLIDERS 5.7.1. General This event is a multitasking contest where RC gliders must be hand-launched and accomplish specific tasks. In principle

More information

INDEMNITY APPLICATION FORM

INDEMNITY APPLICATION FORM INDEMNITY APPLICATION FORM The following forms may only be completed by pilots and aircraft based at Gloucestershire Airport. Operator indemnity refers to all operators and flying schools/clubs that will

More information

AVIATION ENVIRONMENT CIRCULAR 2 OF 2013

AVIATION ENVIRONMENT CIRCULAR 2 OF 2013 GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDURJUNG AIRPORT, NEW DELHI AVIATION ENVIRONMENT CIRCULAR 2 OF 2013 File No. 04-01/2010-AED Dated: 13 th June

More information

Official Journal of the European Union L 186/27

Official Journal of the European Union L 186/27 7.7.2006 Official Journal of the European Union L 186/27 COMMISSION REGULATION (EC) No 1032/2006 of 6 July 2006 laying down requirements for automatic systems for the exchange of flight data for the purpose

More information

OFFICE CIVIL AVIATION AVIATION. 1. Introduction: of aircraft for acquiring applicant. nts. licence. test (skill test). written papers: a) Paper I Air

OFFICE CIVIL AVIATION AVIATION. 1. Introduction: of aircraft for acquiring applicant. nts. licence. test (skill test). written papers: a) Paper I Air GOVERNMENT OF INDIA OFFICE OF THE DIRECTORR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS SECTION 2 - AIRWORTHINESS SERIES 'L', PART II 20 th

More information

CAAV VAR 15 DFR Jan-2011 Version 1.0

CAAV VAR 15 DFR Jan-2011 Version 1.0 CAAV VAR 15 DFR 2011 Vietnam Aviation Regulations (VAR) Part 15 REGULATION ON CREW MEMBER DUTY, FLIGHT AND REST PERIOD OF AOC HOLDER 01-Jan-2011 Version 1.0 Contents Contents... 2 SUBPART A: GENERAL...

More information

TENDER DOCUMENT: B737NG EXPAT PILOTS FOR AICL

TENDER DOCUMENT: B737NG EXPAT PILOTS FOR AICL 1. INTRODUCTION TENDER DOCUMENT: B737NG EXPAT PILOTS FOR AICL Air India Charters Ltd., (AICL) is subsidiary of Air India Ltd., which is fully owned by Government of India and has its registered office

More information

Nepal s Accession to the Montreal Convention and its Applicable

Nepal s Accession to the Montreal Convention and its Applicable Nepal s Accession to the Montreal Convention and its Applicable Liability Regime The Montreal Convention is a completely new treaty which provides a complete package. --BY DEVENDRA PRADHAN On August 23,

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS Question: What is the scope of the Basic Regulation regarding aerodromes foreseen under Art. 4 Para. 3a? Art. 4 of Regulation (EC) No 216/2008 [3a] Aerodromes, including equipment,

More information

VANCOUVER AIRPORT AUTHORITY TARIFF OF FEES AND CHARGES Effective January 1, 2019 Subject to Change PAYMENT TERMS AND CONDITIONS

VANCOUVER AIRPORT AUTHORITY TARIFF OF FEES AND CHARGES Effective January 1, 2019 Subject to Change PAYMENT TERMS AND CONDITIONS PAYMENT TERMS AND CONDITIONS All fees and charges payable by an air carrier under the Tariff will be invoiced by the Airport Authority and invoiced amounts will be payable by the air carrier on the following

More information

GOVERNMENT OF INDIA AERONAUTICAL INFOFUvlAT!ON SERVICES DIRECTOR GENERAL OF CIVIL AVIATION OPPOSITE SAFDARJUNG AIRPORT

GOVERNMENT OF INDIA AERONAUTICAL INFOFUvlAT!ON SERVICES DIRECTOR GENERAL OF CIVIL AVIATION OPPOSITE SAFDARJUNG AIRPORT .. Telephone No '4622495 Te!egraptHc Address Ccrrrnerc1a1 AIRCIV!L NEW DELHI Aeronautical VIODY.tl. YX E Mail: drir.'ildgca.d_

More information

CHG 0 9/13/2007 VOLUME 2 AIR OPERATOR AND AIR AGENCY CERTIFICATION AND APPLICATION PROCESS

CHG 0 9/13/2007 VOLUME 2 AIR OPERATOR AND AIR AGENCY CERTIFICATION AND APPLICATION PROCESS VOLUME 2 AIR OPERATOR AND AIR AGENCY CERTIFICATION AND APPLICATION PROCESS CHAPTER 5 THE APPLICATION PROCESS TITLE 14 CFR PART 91, SUBPART K 2-536. DIRECTION AND GUIDANCE. Section 1 General A. General.

More information

Decision Strategic Plan Commission Paper 5/ th May 2017

Decision Strategic Plan Commission Paper 5/ th May 2017 Decision Strategic Plan 2017-2019 Commission Paper 5/2017 5 th May 2017 Commission for Aviation Regulation 3 rd Floor, Alexandra House Earlsfort Terrace Dublin 2 Ireland Tel: +353 1 6611700 Fax: +353 1

More information

Flight Duty Time and Flight Time Limitations Cabin Crew

Flight Duty Time and Flight Time Limitations Cabin Crew GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, NEW DELHI CIVILAVIATIONREQUIREMENT SECTION 7 FLIGHT CREW STANDARDS TRAINING AND LICENSING

More information

Important Note regarding Peak Season dates for 2014 point 1K in Appendix A - Group Booking Confirmation

Important Note regarding Peak Season dates for 2014 point 1K in Appendix A - Group Booking Confirmation Appendix A - Group Booking Confirmation Important Note regarding Peak Season dates for 2014 point 1K in Appendix A - Group Booking Confirmation British Airways and Iberia are not currently applying a Peak

More information

VAR-501-WECC-3 Power System Stabilizer. A. Introduction

VAR-501-WECC-3 Power System Stabilizer. A. Introduction A. Introduction 1. Title: Power System Stabilizer (PSS) 2. Number: VAR-501-WECC-3 3. Purpose: To ensure the Western Interconnection is operated in a coordinated manner under normal and abnormal conditions

More information

MEMBERSHIP, ENTERING INTO AN AGREEMENT AND RESPONSIBILITIES OF THE COMPANY

MEMBERSHIP, ENTERING INTO AN AGREEMENT AND RESPONSIBILITIES OF THE COMPANY GENERAL These terms and conditions shall apply to the Finnair Corporate Programme (hereinafter Programme ). Apart from these terms and conditions, no other rules are applicable. The Programme is designed

More information

Terms and Conditions of the Carrier

Terms and Conditions of the Carrier Terms and Conditions of the Carrier Article 1 - Definitions The below Conditions of Carriage has the meaning expressed respectively assigned to them where the Carrier reserves the rights to maintain and

More information

PALANGA AIRPORT INCENTIVE SCHEME

PALANGA AIRPORT INCENTIVE SCHEME APPROVED By Order No. 1R-323 11 th November 2015 of the Chief Executive Officer of the State Enterprise Lithuanian Airports PALANGA AIRPORT INCENTIVE SCHEME 1. PREAMBLE State Enterprise Lithuanian Airports

More information

Guidelines for availing LTC

Guidelines for availing LTC Guidelines for availing LTC Eligibilty: Any employee with one year of continuous service on the date of journey performed by him/his family is eligible. Employees whose spouses are working in Indian Railways/National

More information

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013 International Civil Aviation Organization WORKING PAPER 5/3/13 English only WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING Montréal, 18 to 22 March 2013 Agenda Item 2: Examination of key issues

More information

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT 8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated May 27, 2010, from the Commissioner

More information

MU-avtalet. In English

MU-avtalet. In English MU-avtalet In English MU-avtalet AGREEMENT ON ORIGINATORS RIGHT TO COMPENSATION WHEN WORKS ARE SHOWN, AND FOR PARTICIPATION IN EXHIBITIONS ETC. between, on one side, the Swedish government, represented

More information

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJUNG AIRPORT, NEW DELHI

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJUNG AIRPORT, NEW DELHI GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJUNG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS SECTION 6 DESIGN STANDARDS AND TYPE CERTIFICATION SERIES

More information

AGENCY AGREEMENT. The definitions used in this agreement have the same meaning as those used in the ATOL Regulations 2012.

AGENCY AGREEMENT. The definitions used in this agreement have the same meaning as those used in the ATOL Regulations 2012. AGENCY AGREEMENT AGREEMENT BETWEEN [...] AND THE TRAVEL TEAM LTD., ATOL NO. 5838 APPOINTING [...] AS THE TRAVEL TEAM LTD'S AGENT PURSUANT TO ATOL REGULATIONS 12 AND 22 Definitions The definitions used

More information

DGCA Indonesia CASR Part Amendment 8 Flight Time, Duty Time and Rest Requirements

DGCA Indonesia CASR Part Amendment 8 Flight Time, Duty Time and Rest Requirements DGCA Indonesia CASR Part 121 - Amendment 8 Flight Time, Duty Time and Requirements September-2012 Contents Contents... 2 Forward... 3 SUBPART A... 3 121.0 Regulatory Reference... 3 121.1 Definitions and

More information

MISUSE OF SLOTS ENFORCEMENT CODE ANNUAL REPORT 2014/15

MISUSE OF SLOTS ENFORCEMENT CODE ANNUAL REPORT 2014/15 MISUSE OF SLOTS ENFORCEMENT CODE ANNUAL REPORT 214/15 1. Introduction The EU Slot Regulations 24 (1) (Article 14.5) requires Member States to ensure that effective, proportionate and dissuasive sanctions

More information

ANA Traffic Growth Incentives Programme Terms and Conditions

ANA Traffic Growth Incentives Programme Terms and Conditions ANA Traffic Growth s Programme Terms and Conditions 1. Introduction The ANA Traffic Growth s Programme (hereinafter referred to as the Programme) aims to stimulate the growth of commercial air traffic

More information

CIVIL AVIATION REQUIREMENT SECTION 3 AIR TRANSPORT SERIES X PART I 1 June, 2008 Effective : FORTHWITH

CIVIL AVIATION REQUIREMENT SECTION 3 AIR TRANSPORT SERIES X PART I 1 June, 2008 Effective : FORTHWITH Government of India Office of the Director General of Civil Aviation Technical Center, Opposite Safdarjung Airport, New Delhi CIVIL AVIATION REQUIREMENT SECTION 3 AIR TRANSPORT SERIES X PART I 1 June,

More information

The Commission states that there is a strong link between economic regulation and safety. 2

The Commission states that there is a strong link between economic regulation and safety. 2 European Cockpit Association Piloting Safety ECA POSITION ON THE PROPOSAL FOR REGULATION ON COMMON RULES FOR THE OPERATION OF AIR TRANSPORT SERVICES IN THE COMMUNITY - Revision of the Third Package of

More information

Porto Alegre International Airport Salgado Filho Airline Incentive Program

Porto Alegre International Airport Salgado Filho Airline Incentive Program Porto Alegre International Airport Salgado Filho Airline Incentive Program - 2018 Fraport Brasil S. A. Aeroporto de Porto Alegre, the concessionaire and operator of Porto Alegre International Airport Salgado

More information

DGAC Costa Rica. MCAR OPS 1-Subpart Q LIMITATIONS OF FLIGHT TIME AND TIME OF SERVICE AND REST REQUIREMENTS. 30-June-2009

DGAC Costa Rica. MCAR OPS 1-Subpart Q LIMITATIONS OF FLIGHT TIME AND TIME OF SERVICE AND REST REQUIREMENTS. 30-June-2009 DGAC Costa Rica MCAR OPS 1-Subpart Q LIMITATIONS OF FLIGHT TIME AND TIME OF SERVICE AND REST REQUIREMENTS 30-June-2009 Contents Contents... 2 SUBPART Q LIMITATIONS OF FLIGHT TIME AND TIME OF SERVICE AND

More information

AAAE Rates and Charges Workshop Air Service Incentive Programs. Thomas R. Devine KAPLAN KIRSCH & ROCKWELL LLP October 2, 2012

AAAE Rates and Charges Workshop Air Service Incentive Programs. Thomas R. Devine KAPLAN KIRSCH & ROCKWELL LLP October 2, 2012 AAAE Rates and Charges Workshop Air Service Incentive Programs Thomas R. Devine KAPLAN KIRSCH & ROCKWELL LLP October 2, 2012 Overview Airports are under increasing pressure to preserve and enhance air

More information

Aero Expo 2016 Civil Aviation Convention & Exhibition Enhancing Regional & Remote Connectivity. November 18 th, 2016.

Aero Expo 2016 Civil Aviation Convention & Exhibition Enhancing Regional & Remote Connectivity. November 18 th, 2016. KNOWLEDGE PARTNER Aero Expo 2016 Civil Aviation Convention & Exhibition Enhancing Regional & Remote Connectivity November 18 th, 2016 Presented To: Shri Ashok Gajapathi Raju Pusapati Hon ble Minister of

More information

Basic Policies on Operation of National Airports Utilizing Skills of the Private Sector

Basic Policies on Operation of National Airports Utilizing Skills of the Private Sector (TRANSLATION)(for Reference Only) Basic Policies on Operation of National Airports Utilizing Skills of the Private Sector I. The Purpose and Objectives in Operating etc. National Airports etc. by Utilizing

More information

Invitation to participate in the ATOL Reporting Accountants scheme CAP 1288

Invitation to participate in the ATOL Reporting Accountants scheme CAP 1288 Invitation to participate in the ATOL Reporting Accountants scheme CAP 1288 CAP 1288 Invitation to participate in the ATOL Reporting Accountants scheme Invitation to participate in the ATOL Reporting Accountants

More information

COMMISSION DECISION 29/03/2005

COMMISSION DECISION 29/03/2005 C(2005)943 COMMISSION DECISION 29/03/2005 on approving the standard clauses for inclusion in bilateral air service agreements between Member States and third countries jointly laid down by the Commission

More information

Revision of the Third Air Package

Revision of the Third Air Package Not applicable Not applicable Not applicable Revision of the Third Air Package Recitals to note Recital 5 states that, To ensure consistent monitoring of the compliance with the requirements of the operating

More information

Aeronautical Fees and Charges. Ottawa Macdonald-Cartier International Airport

Aeronautical Fees and Charges. Ottawa Macdonald-Cartier International Airport Aeronautical Fees and Charges Ottawa Macdonald-Cartier International Airport Issue date: November 28, 2011 Effective date: February 1, 2012 1 Contents Page 1. Definitions 2-3 2. Fees and Charges 3-6 3.

More information

City of Lafayette. Request for Proposals Municipal Airport Fixed Based Operator

City of Lafayette. Request for Proposals Municipal Airport Fixed Based Operator City of Lafayette Request for Proposals Municipal Airport Fixed Based Operator NOTICE PROPOSERS The City of Lafayette is seeking an experienced, reliable professional to establish and operate a fullservice

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

ORDINANCE NO WHEREAS, Ordinances 8081 requires project labor agreement (PLA s) in City

ORDINANCE NO WHEREAS, Ordinances 8081 requires project labor agreement (PLA s) in City SPONSOR: Janet Venecz Councilwoman at Large ORDINANCE NO. 9227 AN ORDINANCE AMENDING ORD. 8081 AS IT RELATES TO PROJECT WHEREAS, Ordinances 8081 requires project labor agreement (PLA s) in City of Hammond

More information

Criteria for an application for and grant of, or a variation to, an ATOL: fitness, competence and Accountable Person

Criteria for an application for and grant of, or a variation to, an ATOL: fitness, competence and Accountable Person Consumer Protection Group Air Travel Organisers Licensing Criteria for an application for and grant of, or a variation to, an ATOL: fitness, competence and Accountable Person ATOL Policy and Regulations

More information

Advisory Circular. Aircraft Certification Authority Based on Foreign Qualifications

Advisory Circular. Aircraft Certification Authority Based on Foreign Qualifications Advisory Circular Subject: Aircraft Certification Authority Based on Foreign Qualifications Issuing Office: Civil Aviation, Standards Document No.: AC 573-002 File Classification No.: Z 5000-34 Issue No.:

More information

United Kingdom Civil Aviation Authority

United Kingdom Civil Aviation Authority Proposed Changes to CAA Scheme of s United Kingdom Civil Aviation Authority 1 INTRODUCTION 1.1 Details of revisions proposed to apply from 1 April 2017 are shown in red within this Enclosure. Current charges

More information

Sample Regulations for Water Aerodromes

Sample Regulations for Water Aerodromes Sample Regulations for Water Aerodromes First Edition (unedited version) March 2015 Notice to users: This document is an unedited version which is made available to the public for convenience. Its content

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 66 AIRCRAFT MAINTENANCE PERSONNEL LICENSING AND AUTHORISATION Published by Air Safety Support International Ltd Air Safety Support International

More information

Conditions of Carriage

Conditions of Carriage Conditions of Carriage These Conditions of Carriage provide information about us and set out the legal terms and conditions on which we contract with you in relation to the booking by you of air taxi services

More information

GHANA CIVIL AVIATION (ECONOMIC)

GHANA CIVIL AVIATION (ECONOMIC) GHANA CIVIL AVIATION (ECONOMIC) DIRECTIVES, 2017 PART 2 IS: 1-1 This Directive deals with passengers' Rights and Air Operators Obligations to passengers. This Directive addresses consumer protection issues

More information

Safety Regulatory Oversight of Commercial Operations Conducted Offshore

Safety Regulatory Oversight of Commercial Operations Conducted Offshore Page 1 of 15 Safety Regulatory Oversight of Commercial Operations Conducted Offshore 1. Purpose and Scope 2. Authority... 2 3. References... 2 4. Records... 2 5. Policy... 2 5.3 What are the regulatory

More information

7 Instructor Certificates

7 Instructor Certificates Flight Experience Instructor Certificate (HG/PG) 7 Instructor Certificates 7.1 Types and Requirements Hang Gliding and Paragliding Hang Glider and Paraglider Instructor certificates are issued on five

More information

AIR TRANSPORT CIRCULAR NO. 02/2017

AIR TRANSPORT CIRCULAR NO. 02/2017 GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI. AIR TRANSPORT CIRCULAR NO. 02/2017 File No. AV.14027/AAC/2012-AT-1 Dated: 23.08.2017

More information