ASBU-Bloc0 Moroccan achievements and planned activities
|
|
- Diane Maxwell
- 6 years ago
- Views:
Transcription
1 Moroccan Civil Aviation Authority ASBU-Bloc0 Moroccan achievements and planned activities KINGDOM OF MOROCCO Ministry of Equipment, Transport and Logistics Civil Aviation Authority Tunis, March
2 Plan Introduction. Bloc-0 implementation activities. Bloc-0 planned activities. Recommendations
3 INTRODUCTION
4 Introduction Ministry of Equipment, Transport and Logistics Civil Aviation Authority DGAC MAROC - Approval of regulation. - Approval of National Civil aviation Strategy - Elaborate regulation. - Ensure compliance with national and international civil aviation requirements. - ANSP/Company Safety Oversight. - Air personnel licence - Aircraft document provision ANSP ONDA - Airports Management. - Air Navigation Service Provision
5 Introduction
6 Introduction Air Navigation aids and Survaillance systems : 22 CVOR + 01 DVOR 19 ILS 43 DME 03 PSR 10 SSR 03 ADS-B
7 Global coverage Introduction Radars ADS-B Radar sharing
8 Introduction 17 international airports; 06 national airports; 01 ACC : Casablanca; Implementation of the second ACC is in progress. Casablanca and Marrakech airports have the major part of the passenger traffic with 68 %
9 Introduction Principaux flux aériens marocains internationaux
10 Introduction Morocco strengthened its cooperation with the EU by signing the Euro- Mediterranean Air Agreement, signed with the European Union in 2006 in Brussels For the first time since 1957, the European Community, as a regional group, signed a comprehensive air agreement with a non-european country
11 Introduction Agreement of 2007 between Morocco and Eurocontrol relating to ATFM: Integration in the IFPS Zone Integration in the CFMU area
12 Introduction Comprehensive agreement signed between Morocco and Eurocontrol on 29 April 2016: Morocco shall partipates in all Eurocontrol activities: Participate in the performance of Eurocontrol. Morocco may participate,without voting rights,in the meetings of the Eurocontrol permanent commission and provisional council as well as meetings of the following advisory and consultative bodies
13 Introduction Comprehensive agreement signed between Morocco and Eurocontrol on 29 April 2016: Morocco shall partipates in all Eurocontrol activities: Receive assistance from Eurocontrol in Air traffic,flow management and in the planning and provision of air navigation services and equipment. Morocco may benifit from training as all Eurocontrol member states
14 Introduction Moroccan PBN Plan: Plan developed in consultation with stakeholders in the field of civil aviation in Morocco (DGAC, FRA, air operators) Its aim is to define the outline for the implementation of PBN concept in Morocco. Short term (2013/2017); Medium term (2018/2022), and Long-term (2023 and beyond)
15 BLOC-0 IMPLEMENTATION ACTIVITIES
16 Performance Improvement Area 1: Airport Operations B0-APTA /NAV10 :Implement APV procedures On-going project was issued for implementing new PBN procedures including APV/Baro in major airports (2018): Casablanca airport : Runway 17L/R 35L/R Rabat airport : Runway 21 Benslimane airport : Runway 14/32 Moroccan PBN Plan includes the phasing of implementation of APV/Baro procedures for all runway Thresholds
17 Performance Improvement Area 1: Airport Operations B0-SNET: Implement ground based safety nets. The STCA,APW and MSAW functions are implemented since
18 Performance Improvement Area 2: Globally Interoperable Systems and Data B0-DATM :Ensure quality of aeronautical data and aeronautical information. Quality management system (QMS) is fully implemented. A new digital system for the management of aeronautical information will be installed from mid-2017 till end of The whole data for Morocco will be filled in the future database for completeness, consistency, data quality requirements, resolution and integrity analysis (end of 2020)
19 Performance Improvement Area 2: Globally Interoperable Systems and Data B0-FICE :Implementation of ground-ground automated co-ordination processes. The OLDI system links Morocco s ACC to those at Canary, Seville and Lisbon. An OLDI link will be established with ALG FIR. New aeronautical messaging protocols such as FMTP and OLDI over IP will be established as the successor of the classic OLDI(x25)
20 Performance Improvement Area 3: Optimum Capacity and Flexible Flights B0-FRTO :Implement Advanced Airspace Management The implementation of FUA is planned in the AREA-M project. CDRs are implemented throughout the Moroccan ENR map
21 Performance Improvement Area 3: Optimum Capacity and Flexible Flights B0-FRTO :Implementation of P-RNAV. DME-DME study conducted to assess the feasibility of RNAV5 specification implementation. DME-DME study conducted to assess the feasibility of RNAV1 specification implementation RNAV1/RNP1 procedures have been implemented in all major airports The implementation of RNAV5 routes in Casablanca UIR is in progress. Further following actions include the migration to RNAV5 specification for all routes in upper airspace. Safety case studies are done on a project
22 Performance Improvement Area 3: Optimum Capacity and Flexible Flights B0-NOPS:Implement enhanced tactical flow management. FSA messages are provided by Moroccan ATM system since The provision of CPR messages to the ETFMS is planned for 2017/
23 Performance Improvement Area 3: Optimum Capacity and Flexible Flights B0-ASUR:Surveillance performance and interoperability. Mode-S since ADS-B for en route since ADS-B as a back-up in some airports (Marrakech, Fes, Tangier, Agadir, Oujda) since
24 Performance Improvement Area 4: Efficient Flight Paths B0-TBO:Initial ATC air-ground data link services above FL-285 Air ground data link services (ADS-C / CPDLC) is in progress
25 BLOC-0 PLANNED ACTIVITIES
26 Bloc-0 planned activities. B0-SURF:Implement Advanced Surface Movement Guidance and Control System (A-SMGCS) Level1 and Level 2 Planned for Casablanca and Marrakech airports. Target date : 2020 B0-RSEQ:Implement AMAN/DMAN tools The implementation is planned in the new system of Casablanca ACC and in some airport. Tools acquisition is planned in
27 Bloc-0 planned activities. B0-CDO: Implement Continuous Descent Operations (CDO) techniques for environmental improvements Implementation of new PBN procedures including CDOs is planned. First CDO procedure designed for Marrakech airport is under validation
28 RECOMMENDATIONS
29 Recommendations. Alignment of the National Air Navigation Plan to the GANP by Categorizing / Prioritizing the Modules; A national air navigation committee containing the different stakeholders should be implemented. This committee will be in charge of the follow-up of the effective implementation of ASBU blocks. The support of ICAO Regional Offices,EUROCONTROL and ACAC is highly desirable to assist states in conducting assessments of the effective implementation of ASBU blocks in their Civil Aviation Systems
30
APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION
RASG-EUR/03 Summary of Discussions L-1 APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE REGION ST1- Improvement of the accident rate in commercial air transport Safety Target: Reduce by
More informationMorocco ASBU Implementation
Morocco ASBU Implementation Air Traffic policy Liberalization of air traffic sector; Integration of Morocco in the European single sky (agreement in 2006); Effects of air traffic Liberalization Significant
More informationThird Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia
Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July 2018 Saudi Arabia Outline High Level Plan Overall Progress in ASBU Implementation (Priority 1) Success Story(ies)/Initiatives
More informationATFM/CDM ICAO s Perspective
ATFM/CDM ICAO s Perspective Elie El Khoury ICAO Regional Officer, ATM/SAR Middle East Office, Cairo Cairo/3-4 April 2016 Outline Traffic Growth in the MID Region What is ATFM/CDM Main Objectives ICAO Guidance
More informationMID Region Air Navigation Strategy
MID Region Air Navigation Strategy Mohamed Smaoui ICAO Deputy Regional Director Middle East Office, Cairo Cairo/23 26 November 2015 Outline Background Strategy Main Objectives MID ASBU Block 0 Modules
More informationASBU ACTIONS UNDERTAKEN BY THE ALGERIAN CIVIL AVIATION AUTHORITY IN AIR NAVIGATION FIELD
اجلمهوریة اجلزائریة الدمیقراطیة الشعبیة RÉPUBLIQUE ALGÉRIENNE DÉMOCRATIQUE ET POPULAIRE وزارة االشغال العمومیة و النقل MINISTÈRE DES TRAVAUX PUBLICS ET DES TRANSPORTS ASBU ACTIONS UNDERTAKEN BY THE ALGERIAN
More informationWorkshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont
Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework Dakar, Senegal, 18-22 September 2017 presented by Emeric Osmont The Aviation Community Indra 2 The Aviation Community
More informationSecond Meeting of the Air Navigation System Implementation Group (ANSIG/2)
Second Meeting of the Air Navigation System Implementation Group (ANSIG/2) Cairo, Egypt, 6 8 December 2016 The United Arab Emirates Presented by Hamad Al Belushi Outline Brief on the UAE National ASBU
More informationNACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014
17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014 Agenda Item 3 Follow-up on the NAM/CAR Regional Performance-Based Air
More informationRussian Federation ATM modernization program
Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development
More informationBlock 0 to Block 1 Vaughn Maiolla
Block 0 to Block 1 Vaughn Maiolla Dakar, Senegal, September 2017 Objective To show Block 1 threads as an operational evolution from Block 0 threads. 23 September 2017 2 Flight plan - Vision - ASBUs - Evolution.
More informationINTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU
ASBU WORKSHOP WI/20/09//2017 Day n 3: STRATEGY ASBU STATUS OF IMPLEMENTATION OF ICAO ASBU [Presented by the Agency for the Safety of Air Navigation in Africa and Madagascar] Executive Summary The purpose
More informationICAO ASBU Implementation Monitoring Questionnaire. Reference period 2017
ICAO ASBU Implementation Monitoring Questionnaire Reference period 2017 V.5 20/10/2017 Please fill in the information highlighted in yellow. For those objectives that are reported Ongoing (Partially Completed)
More informationBits to Blocks Aviation System Block Upgrades (ASBU)
Bits to Blocks Aviation System Block Upgrades (ASBU) A.K. Dutta General Manager (ATM) Airports Authority of India 21 st October, 2011 We are here... Bits Russia Canada Australia India China 2 We Can make
More information(Presented by United States) EXECUTIVE SUMMARY
NACC/WG/5 IP/07 27/04/17 Fifth North American, Central American and Caribbean Working Group Meeting (NACC/WG/5) Port of Spain, Trinidad and Tobago, 22-26 May 2017 Agenda Item 3 Implementation on Air Navigation
More informationAviation System Block Upgrades (ASBU), Blocks 0 and 1
ATC Global Federal Aviation Aviation System Block Upgrades (ASBU), Blocks 0 and 1 Presented by: B. Bagstad, FAA ATO International Date: September, 2014 Aviation System Block Upgrades (ASBU) ASBU is a systems
More informationNORTH ATLANTIC (NAT) AIR NAVIGATION PLAN
NORTH ATLANTIC (NAT) AIR NAVIGATION PLAN VOLUME III 29 June 2018 ENDORSED BY NAT SPG/54 NAT ANP, Volume III June 2018 Page i TABLE OF CONTENTS PART 0 Introduction... 0-1 PART I - General Planning Aspects
More informationWelcome to AVI AFRIQUE IFEANYI Ogochukwu, Chief Technology Strategist; Debbie Mishael Group
Welcome to AVI AFRIQUE 2017 IFEANYI Ogochukwu, Chief Technology Strategist; Debbie Mishael Group Debbie Mishael Group Technology, Human Capital, Aviation, Management and Security Consulting and Implementation
More informationAsia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific
Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific Yoshiki Imawaka Deputy Director - ICAO Asia and Pacific Office Global Ministerial Conference Riyadh, Saudi Arabia, 29 31 August
More informationImplementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14
of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14 Julio Garriga, RO/TA International Civil Aviation Organization North American,
More informationSAMPLE TEMPLATE APPENDIX 3.5C-1
APIRG/19 Appendix 3.5 C1-C3 SAMPLE TEMPLATE APPENDIX 3.5C-1 AIR NAVIGATION REPORT FORM (ANRF) ASBU METHODOLOGY Regional and National planning for all ASBU Modules REGIONAL/NATIONAL PERFORMANCE OBJECTIVE
More informationWORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the
INTERNATIONAL CIVIL AVIATION ORGANIZATION WORLD METEOROLOGICAL ORGANIZATION MET/14-WP/64 18/7/14 Meteorology (MET) Divisional Meeting (2014) Commission for Aeronautical Meteorology Fifteenth Session Montréal,
More informationICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016
ICAO ATFM SEMINAR Dubai, UAE, 14 December 2016 ICAO ATFM Seminar Session 2.2: ATFM Sub-regional and Regional Solutions Brian Flynn EUROCONTROL Network Manager Directorate 12 th December 2016 Central Flow
More informationPENS Symposium How to join PENS
PENS Symposium How to join PENS Speaker Organisation Date and venue Jacky POUZET Head of Communications and Frequency Coordination EUROCONTROL 17 th October 2012, Brussels The European Organisation for
More informationICAO GANP Requirements and Evolution
ICAO GANP Requirements and Evolution Olga de Frutos Brussels/October 2017 Flight Plan Context Current GANP Role in ICAO Next edition: AMET, DATM, FICE and SWIM The future ATM system To achieve an interoperable
More informationHome LIST OF ACRONYMS
LIST OF ACRONYMS 6. List of s A/G A-CDM ADS-C AF AFP/ACH AFUA AMAN ANSP AOP APCH APV ARES ASBU ASM A-SMGCS ATC ATCO ATFCM ATM ATM MP ATN ATSP AU CBA CCO CDM CDO CEF CPDLC CPs CTM CTOT DCB DCT DL DLS DMAN
More informationScreening Chapter 14 Transport. Single European Sky (SES) 18 December Transport
Screening Chapter 14 Single European Sky (SES) 18 December 2014 SINGLE EUROPEAN SKY OBJECTIVES: INCREASE SAFETY, EFFICIENCY, CAPACITY & PERFORMANCE Reduce fragmentation and complexity of ATM in Europe
More informationICAO ASBU Implementation/ Surveillance and ATS Automation
Session 1 ICAO SARPS, DOCUMENTATION AND GLOBAL AND REGIONAL PLANS REGARDING THE IMPLEMENTATION OF AERONAUTICAL SURVEILLANCE AND AUTOMATED SYSTEMS FOR ATS OPERATIONS ICAO ASBU Implementation/ Surveillance
More informationGANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation
GANP 2019/ASBUs Olga de Frutos Technical Officer Air Navigation Marrakesh/10 th December 2018 Agenda Background information GANP 2019 Global Strategic level Global Technical level BBB and ASBU framework
More informationOverview of the Aviation System Block Upgrades (ASBUs) Concept and PBN
Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN Vince Galotti Deputy Director, Safety Standardization & Infrastructure Air Navigation Bureau International Civil Aviation Organization
More informationPerformance Framework for MID Region Air Navigation Planning and Implementation MEAUSE SURVEYS. (Presented by IATA and CANSO) SUMMARY
8/9/ International Civil Aviation Organization MIDANPIRG CNS/ATM/IC Sub-Group (CNS/ATM/IC SG) Seventh Meeting (Cairo, Egypt, 7-9 October ) Agenda Item : Performance Framework for MID Region Air Navigation
More informationATC automation: facts and steps ahead
ATC automation: facts and steps ahead Objectives Context Stating the problem Current solution Steps ahead Implementation constraints ATC automation: facts and steps ahead Objectives Understand why ATC
More informationAIR NAVIGATION SYSTEM IMPLEMENTATION PLAN FOR THE AFI REGION
INTERNATIONAL CIVIL AVIATION ORGANIZATION AIR NAVIGATION SYSTEM IMPLEMENTATION PLAN FOR THE AFI REGION Communications, Navigation and Surveillance Version 1.0 September 2013 - 2 - TABLE OF CONTENTS Chapter
More informationAPAC AIR NAVIGATION PLAN VOLUME III
APAC AIR NAVIGATION PLAN VOLUME III APAC ANP, Volume III November 2016 Page i TABLE OF CONTENTS PART 0 Introduction... 0-1 PART I General Planning Aspects (GEN)... I-1 Table GEN III-1 Implementation Indicator(s)
More informationASBU Block 0 Implementation and Regional ANPs
ASBU Block 0 Implementation and Regional ANPs For: Joint ACAO/ICAO ASBU Symposium for EUR/NAT and MID Region Prepared by: Midori Tanino, FAA, ATO International Global ATM Program Manager Date: December
More informationRECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES
RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES Abbreviations ACI ADS ADS-B ADS-C AFTN AIDC AIP ANSP AMHS APAC APANPIRG ASBU ASIOACG ATFM ATM ATS AUSEP CHG CNL CPDLC CPL DARP DLA EOBT FAA FIR FIRBX
More informationDate Planned/Implemented December Status Developing. Date Planned/Implemented Before May Status Implemented
PIA 1 Block - Module B0 - ACDM Date MAY, 2017 Module Description: To implement collaborative applications that will allow the sharing of surface operations data among the different stakeholders on the
More informationATM processes automatization for Runway (Airport) Throughput Enhancement
ATM processes automatization for Runway (Airport) Throughput Enhancement Paris, France, 25-26 January 2018, ICAO/EUROCONTROL Runway Throughput Enhancement Solutions Workshop About the Company Azimut is
More informationASBU IMPLEMENTATION. ASBU industry consideration. Date 16/08/2017. Edson Fagundes Gomes
ASBU IMPLEMENTATION ASBU industry consideration Date 16/08/2017 Edson Fagundes Gomes GOAL To present to the attendants of this workshop the industry considerations for ASBU modules. In this sense, we will
More informationUSE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR
BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference
More informationORGANISER HOST LEAD SPONSOR
ORGANISER HOST LEAD SPONSOR ASBU and Implementation Challenge Juliana Barros Gonçalves ATC Programme Manager, Atech ASBU IMPLEMENTATION Date 05/12/2017 ASBU industry consideration Juliana Barros Gonçalves
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT
EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE
More informationDRAFT AGREEMENT BETWEEN THE EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION (EUROCONTROL) AND THE KINGDOM OF MOROCCO
DRAFT AGREEMENT The European Organisation for the Safety of Air Navigation, hereinafter referred to as EUROCONTROL, acting through its Permanent Commission and represented by its Director General, Mr.
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization 16/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based operations
More informationDIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY
DGCA/06-IP/41 17/3/06 English only DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY Montréal, 20 to 22 March 2006 Theme 2: Improving aviation safety Topic 2.2: Management
More informationWorkshop Exercise, EGYPT Air Navigation Plan 10 /12/2010
Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010 INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR
More informationNAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office
NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office Outline NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP)
More informationThe ICAO Global Air Navigation Plan and the monitoring of ASBU implementation
The ICAO Global Air Navigation Plan and the monitoring of ASBU implementation EUROCONTROL LSSIP Kick Off Event 2016 EUROCONTROL, Brussels, Belgium, 11 12 October 2016 11 October 2016 Page 1 ICAO European
More informationPackaging Tomorrow s Aviation System
International Civil Aviation Organization Second Briefing on ICAO s Aviation System Block Upgrades Issued: July 2012 The 30 000 Feet View Air traffic growth expands two-fold once every 15 years Growth
More informationPROPOSED AMENDMENT OF THE RPBANIP. (Prepared by Canada and United States) EXECUTIVE SUMMARY
NACC/WG/5 WP/32 21/04/17 Fifth North American, Central American and Caribbean Working Group Meeting (NACC/WG/5) Port of Spain, Trinidad and Tobago, 22-26 May 2017 Agenda Item 3: Implementation on Air Navigation
More informationSingapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2
Singapore s Journey to Implement ASBU B-0 & B-1 Modules in Scope Introduction Strategy for Implementation of ASBU AIDC Implementation Plan (B0-FICE) AIM-SG (B0-DATM) Aeronautical Meteorology (B0-AMET)
More informationB0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions
B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions Seboseso Machobane RO ATM/SAR ICAO ESAF Regional Office, Nairobi Elie El Khoury RO ATM/SAR ICAO MID Regional Office, Cairo
More informationUK Implementation of PBN
UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization 19/3/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 (Presented by the Secretariat) EXPLANATORY NOTES ON THE AGENDA ITEMS The
More informationAFI AIR NAVIGATION SYSTEM IMPLEMENTATION ACTION PLAN FOR THE AFRICA-INDIAN OCEAN (AFI) REGION
APIRG/19 APPENDIX 30A INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI AIR NAVIGATION SYSTEM IMPLEMENTATION ACTION PLAN FOR THE AFRICA-INDIAN OCEAN (AFI) REGION Version 1.0 October 2013 TABLE OF CONTENTS
More informationMET/SG REPORT FOR THE PREPARATION OF THE MET RELATED AFI REGIONAL AIR NAVIGATION IMPLEMENTATION ACTION PLAN
MET/SG REPORT FOR THE PREPARATION OF THE MET RELATED AFI REGIONAL AIR NAVIGATION IMPLEMENTATION ACTION PLAN 1. Introduction 1.1 The ICAO Council approved the fourth edition of the Global Air Navigation
More informationORGANISER HOST LEAD SPONSOR
ORGANISER HOST LEAD SPONSOR Data Sharing and ATFM Moderator Francois Delille Director of Business and Product Strategy, ATM, Thales CANSO LATIN AMERICA AND CARIBBEAN CONFERENCE 2017 Challenges of the Air
More informationEUROCONTROL SPECIFICATIONS SYNOPSIS
EUROCONTROL EUROCONTROL SPECIFICATIONS SYNOPSIS n EUROCONTROL Specification of Interoperability and Performance Requirements for the Flight Message Transfer Protocol (FMTP) n EUROCONTROL Specification
More informationATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA
ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA CONTENTS 1 India Civil Aviation Scenario 2 C-ATFM Concepts 3 C-ATFM Implementation 4 4 Road Value Ahead
More information2018 LSSIP Event. ASBU monitoring in the ICAO European Region Using the Master Plan reporting mechanism for ASBU monitoring
2018 LSSIP Event ASBU monitoring in the ICAO European Region Using the Master Plan reporting mechanism for ASBU monitoring Cornelia LUDORF ICAO EUR/NAT Office Ana Paula FRANGOLHO EUROCONTROL/DECMA/ACS/PRM
More informationMyanmar s CNS/ATM Development Master Plan
Myanmar s CNS/ATM Development Master Plan Assistance by JICA Project name Capacity Development on Communication, Navigation, Surveillance/ Air Traffic Management (CNS/ATM) Systems. JICA & DCA signed in
More informationIntroduction of New CANSO Member Simon Li Director General CAD Hong Cong
Introduction of New CANSO Member Simon Li Director General CAD Hong Cong Mr. Simon Li Director-General of Civil Aviation Hong Kong, China 2 Introduction to Civil Aviation Department Embracing New Challenges
More informationInternational Civil Aviation Organization. (Presented by the Arab Civil Aviation Commission- ACAC)
International Civil Aviation Organization 05/02/2017 Middle East Air Navigation Planning and Implementation Regional Group Sixteenth Meeting (MIDANPIRG/16) (Kuwait, 13 16 February 2017) Agenda Item 5.2.2:
More informationTRINIDAD AND TOBAGO PIARCO FIR/NATIONAL ASBU PLAN
TRINIDAD AND TOBAGO PIARCO FIR/NATIONAL ASBU PLAN 1 ICAO ASBU WORKSHOP ANR ROBINSON INTERNATIONAL AIRPORT RUNWAY 11 PRESENTED BY RIAAZ MOHAMMED AND ROHAN GARIB ICAO Regional NAM/CAR Workshop on the Aviation
More informationApproach to implementation Process and checklist
ASBU/SIP/MEXICO/2013-WP/11 Approach to implementation Process and checklist H. Sudarshan Air Navigation Bureau ICAO SIP Workshop on ASBU methodology (Mexico,22-26 July 2013) 9 July 2013 Page 1 From the
More informationSAMPLE TEMPLATE. Regional and National planning for ASBU Modules
SIP/ASBU/MEXICO/2013-WP/20 SAMPLE TEMPLATE 1. AIR NAVIGATION REPORT FORM (ANRF) (This template demonstrates how ANRF to be used. The data inserted here refers to ASBU B0-CDO as an example only) Regional
More informationGUATEMALA State Air Navigation Plan
GUATEMALA State Air Navigation Plan Date: August 07, 2018 Draft Prepared by: DGAC of Guatemala 5 th Edition GANP 2016 1 of 49 Guatemala Document History Record Release Date Author(s)/Comments Draft August
More informationGANP ASBU Symposium 2017
GANP ASBU Symposium 2017 ICAO EUR NAT Office/ACAC Tunisia, 27-30 March 2017 Session 3: ASBU Implementation Monitoring Report Ana Paula FRANGOLHO EUROCONTROL EUROCONTROL DPS/PEPR ASBU Implementation Monitoring
More informationEUR/SAM corridor airspace concept
TWENTYENTH MEETING ON THE IMPROVEMENT OF AIR TRAFFIC SERVICES OVER THE SOUTH ATLANTIC (SAT21) (Lisbon, Portugal, 8 to 10 June, 2016) Agenda Item 2: Air traffic management (ATM) RNP 4 IN THE EUR/SAM CORRIDOR
More informationINTERNATIONAL CIVIL AVIATION ORGANIZATION
APIRG/19 WP16D INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP NINETEENTH MEETING (APIRG/19) (Dakar, Senegal (28 to 31 October 2013) Agenda Item 3 Performance Framework
More informationATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT
AIRPORTS AUTHORITY OF INDIA ATM STRATEGIC PLAN VOLUME I Optimising Safety, Capacity, Efficiency and Environment DIRECTORATE OF AIR TRAFFIC MANAGEMENT Version 1 Dated April 08 Volume I Optimising Safety,
More informationASBU Ready Solutions. A Global ATM Solution Provider s Response. Shankar Satish KUMAR Business Development India 20 th October 2014
ASBU Ready Solutions A Global ATM Solution Provider s Response Shankar Satish KUMAR Business Development India 20 th October 2014 2 / 39 TOGETHER, SAFER, EVERYWHERE Thales Group 3 / 39 Profile Collective
More informationTWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4
26/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4 The attached draft report on Agenda Item 4 is presented for approval by the Committee
More informationNAM ASBU Handbook Supporting analysis and implementation reporting of the ICAO ASBU Modules
Supporting analysis and implementation reporting of the ICAO ASBU Modules November 2015 Foreword The NAM ASBU Handbook was created to assist in the application of the Aviation System Block Upgrade (ASBU)
More informationSTRUCTURE. Arnis Muiznieks Ministry of Transport, Latvia
STRUCTURE Arnis Muiznieks Ministry of Transport, Latvia Participants States: Finland Latvia Norway Estonia National Supervisory Authorities (NSAs): Lennuamet Trafi Latvijas civilās aviācijas aģentūra Luftfartstilsynet
More informationOperational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)
International Civil Aviation Organization SAM/IG/22-IP/19 South American Regional Office 12/11/2018 Twenty Second Workshop/Meeting of the SAM Implementation Group (SAM/IG/22) - Regional Project RLA/06/901
More informationInternational Civil Aviation Organization. Fifth Meeting of MID Region AIM Database Task Force Fourth Meeting of MIDANPIRG AIM Sub-Group
International Civil Aviation Organization MIDAD TF/5 & AIM SG/4-WP/9 29/01/2018 Fifth Meeting of MID Region AIM Database Task Force Fourth Meeting of MIDANPIRG AIM Sub-Group MIDAD TF/5 and AIM SG/4 (Cairo,
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization 14/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative
More informationAPIRG/20. Air Navigation System Implementation Action Plan (aligned with ASBU Methodology) Yamoussoukro, Cote d Ivoire 30 November 2 December 2015
APIRG/20 Air Navigation System Implementation Action Plan (aligned with ASBU Methodology) Yamoussoukro, Cote d Ivoire 30 November 2 December 2015 Performance Improvement Areas Airport Operations Globally
More informationPBN Implementation in the UK
PBN Implementation in the UK Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy UK Civil Aviation Authority 06 October 06 October PBN TF/3 1 Presentation Overview UK
More informationTrajectory-Based Operations (TBO)
Trajectory-Based Operations (TBO) SWIM Needs Presented to: ATIEC 2016 By: Stéphane Mondoloni Date: September 20, 2016 2016 The MITRE Corporation. All Rights Reserved. Approved for Public Release; Distribution
More informationICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO
ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS Presented by ICAO APAC RSO Operations in the Context of Aviation Planning & Pre-Flight Post Landing Applicable Operational Improvements
More informationMIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018
Bahrain FIR Presented by Dash Dulabh on behalf of Director Air Traffic Management Bahrain Civil Aviation Affairs 1 Presentation Outline ATS Routes improvements Additional ATS Routes Implemented or planned
More informationINTERNATIONAL CIVIL AVIATION ORGANIZATION
APIRG/18 IP/9 12/2/2012 INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP EIGHTEENTH MEETING (APIRG/18) Kampala, Uganda (27 30 March 2012) Agenda Item 3.4: Communication
More informationREG ASP MIL APO USE INT IND NM
ECAC REG ASP MIL APO USE INT IND NM Subject matter and scope This objective is linked to ATM Functionality 3 of Commission Regulation (EU) No 716/2014 on the establishment of the Pilot Common Project,
More informationObjective. To show how the aviation system block upgrades (ASBUs) can help to improve safety at airport level and some regional initiatives.
1 Objective To show how the aviation system block upgrades (ASBUs) can help to improve safety at airport level and some regional initiatives. 2 Vision Background GANP ASBUs Regional initiatives OUTLINE
More informationPLAN. 1. Generalities 2. Current Situation 3. Future Strategy + Actions required 4. Conclusion. Ministry of transport 2013
PLAN 1. Generalities 2. Current Situation 3. Future Strategy + Actions required 4. Conclusion Generalities Generalities Through the Office of Civil Aviation and Airports : OACA A contract between the OACA
More informationFAA: ASBU Deployment Status. ASBU Prepared by: Midori Tanino, ATO International NextGen Lead Date: August, 2016
FAA: ASBU Deployment Status For: ASBU WS @NACC Prepared by: Midori Tanino, ATO International NextGen Lead Date: August, 2016 1 Delivering NextGen Improvements Legacy System Radar Inefficient Routes Voice
More informationTHE UGANDA ASBU PLAN- HIGHLIGHTS ASBU WORKSHOP 18 TH TO 22 RD SEPT, DAKAR
THE UGANDA ASBU PLAN- HIGHLIGHTS ASBU WORKSHOP 18 TH TO 22 RD SEPT, 2017- DAKAR Outline Introduction FIR, ATS routes and Aerodromes Air Navigation Services Current Airline Operators Traffic forecast CNS/ATM
More informationSERVICE DEVELOPMENT ROADMAP
NAT DOC 009 SERVICE DEVELOPMENT ROADMAP North Atlantic Region First Edition - 2013 Prepared by the ICAO European and North Atlantic Office on behalf of the North Atlantic Systems Planning Group (NAT SPG)
More informationEuropean Joint Industry CDA Action Plan
Foreword In September 2008, CANSO, IATA and EUROCONTROL signed up to a Flight Efficiency Plan that includes a specific target to increase European CDA performance and achievement. This was followed in
More informationPBN Implementation. Phil Rakena. PBN Implementation Programme Manager
Implementation Phil Rakena Implementation Programme Manager CANSO APAC Conference - 06 th May 2017 Implementation Scope: What, Why, When? How to? o Needs / Plan o Collaborate o Educate o Regulate o Resource
More informationInternational Civil Aviation Organization. Aviation System Block Upgrade (ASBU) Methodology An Overview
International Civil Aviation Organization Aviation System Block Upgrade (ASBU) Methodology An Overview Outline Today s Challenges Tomorrow s Needs Why ASBU methodology ASBU explanation Global Plan Next
More informationThis Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.
Serial Number: 2017_001_Rev 02 1 Subject: NAT common DLM AIC Originator: NAT SPG Issued: 19 July 2017 Effective: 21 July 2017 The purpose of North Atlantic Operations Bulletin 2017_001_Rev 02 is to provide
More informationICAO provisions on data link implementation
ICAO provisions on data link implementation Crystal Kim Technical Officer, Airspace Management and Optimization Section Secretary of Operational Data Link Working Group (OPDLWG) and Air Traffic Management
More informationEuropean ATM Master Plan Level 3. Implementation View
European ATM Master Plan Level 3 Implementation View Plan 2016 Executive summary Setting the scene This Implementation Plan constitutes the Implementation view or Level 3 of the European ATM Master Plan
More informationCMATS The Civil Military ATM System
CMATS The Civil Military ATM System OneSKY Australia Program Update Michael Berechree National Manager Aviation Meteorological Services Bureau of Meteorology OneSKY Australia program By 2021, Australia
More informationKenya Civil Aviation Authority Air Navigation Services ICAO Seminar/Workshop on Air Traffic Services System Capacity 8-10 June 2016 Nairobi
Kenya Civil Aviation Authority Air Navigation Services ICAO Seminar/Workshop on Air Traffic Services System Capacity 8-10 June 2016 Nairobi 1 Flora K. Wakolo ATM /OPS Objective Share with audience information
More informationAIR NAVIGATION SYSTEMS IMPLEMENTATION GROUP DEVELOPMENTS RELATED TO AIR NAVIGATION CAPACITY AND EFFICIENCY IN OTHER ICAO REGIONS
19/1/2015 International Civil Aviation Organization AIR NAVIGATION SYSTEMS IMPLEMENTATION GROUP First Meeting (ANSIG/1) (Cairo, Egypt, 10 12 February 2015) Agenda Item 3: Air Navigation Global and Regional
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based
More information