1 REVIEW OF HPP ZHUR FEASIBILITY STUDY INCLUDING PREPARATION OF PRELIMINARY EIA AND PRELIMINARY SA REPUBLIKA E KOSOVËS REPUBLIKA KOSOVA REPUBLIC OF KOSOVO Ministria e Energjisë dhe Minierave Ministarstvo energije i rudarstva Ministry of Energy and Mining LPTAP Project Office
2 THE TASKS Task 1: Task 2: Task 3: Task 4: Task 5: Review and update the existing hydrological, hydro technical, and geological data for necessary for development of HPP Zhur. Review, update and optimize plant installed capacity and update/complete the existing preliminary engineering design of the HPP Zhur; Review and update/complete the existing financial and economic feasibility of the HPP Zhur, including analysis of financing options; Prepare a preliminary EIA (Environmental Impact Assessment), including trans boundary impacts, impact on downstream irrigation and dam safety associated international requirements; Prepare a preliminary SA (Social Assessment), including a draft Resettlement Action Plan.
3 preliminary SA general PRELIMINARY SOCIAL ASSESSMENT analysis with a DRAFT RESETTLEMENT ACTION PLAN is based: on the respective World Bank Policies and Operation Manual (2006) (especially on the article 4, 1 12) on the current legal documents of the Kosova law (Expropriation Law) (2009) on the IFC Performance Standard 5 on the materials gathered from respective ministries on the field work research material CONTENTS: 1. Preliminary Social Assessment 2. Draft Resettlement Action Plan
4 preliminary SA introduction Findings of the preliminary social assessment analysis of the Zhur Hydroelectric Power Plant are based on the following data and documentation: existing materials, meetings held with: LPTAP Project Office members in Prishtinë, representatives of the Dragash/Sharr and Prizren Municipality (3 November 2008), representatives of the Ministry of Environment and Spatial Planning, the Republic of Kosova (4 November 2008), and with representatives of the Ministry of Culture, Youth and Sports, Ministry of Agriculture, Forestry and Rural Development, and Ministry of Labor and Social Welfare (14 November 2008), two official and general meetings held with the executives and public representatives held in Prizren and in the Dragash/Sharr Municipality on 12 and 13 December 2008, findings of two focus group research meetings held in the Dragash/Sharr (29 persons) and in Prizren Municipality (19 persons) on 26 and 27 January 2009, several field (unofficial) interviews held in the respected area to be affected by the construction of the Zhur Hydroelectric Power Plant,
5 preliminary SA introduction professional insights and perceptions gathered on several occasions during the visits to the potentially affected areas on 3, and 15 November 2008, and 26 January 2009 datafrom The Cultural Heritage Office Ministry of Culture of Kosova provided on 29 December 2008 dataon the Motorway Vërmicë Prizren Prishtinë Merdar provided on 18 February 2009, data collection regarding the HPP Zhur Municipal Assembly provided by the Dragash Municipality on 28 January 2009 otherrelevant materials (Operational Manual, Bank Policies, 2006; relevant Kosova Laws and articles concerning the issues of involuntary resettlement issues) Prizren, 12 Dec 2008 Dragash/Sharr, 12 Dec 2008 Dragash/Sharr, 26 Jan 2009 Prizren, 27 Jan 2009
6 preliminary SA introduction Major problems faced during the work on this project include: incomplete data, vague data or complete lack of data lack of land planning documentation analysis had to be based on the existing data and findings with new insights and data collected in two focus group meetings
7 preliminary SA areadescription Prizren Municipality Village Dobrushtë Zhur The Zhur majority HPP is Zhur the of largest population II powerhouse village is 25 in has the 35 been Prizren years of planned Municipality age to be and located one of in the largest vicinity villages of the in village Kosova Dobrushtë (whole region the comprises left bank also of of the approx. 500 inhabitants of Zhur are Drini several i Bardhë smallerriver. villages such as Vermicë, employed abroad, either permanently or Shkoze, Dobrushtë, Murademe, Velashnje temporarily Since the alternative I is selected in Task 2 and Kobaje) Report, there is no need for the The an resettlement HPP old village Zhur plan dating does of existing not back have to population. 14th direct century impact in the village of Zhur. The HPP Zhur According Albanian I powerhouse to population the Final and Road is dominant switchyard Design in Report Zhur are (Design Section A) Motorway Vërmicëplanned major migration to be built happened in the in vicinity the village but Prizren Prishtinë Merdar, 2005 and out Vermica of the due village to the land territory expropriation towards for preliminary HPP Zhur Study results, there the is west, construction the of undeveloped a reservoir for and the HPP unused Fierza no conflict between these two projects in land Albania during where the construction potential environmental and exploitation (there impact today is (2009) is min minimum. 20 Zhur m distance has Due more to in then elevation) that, 1400 there is no buildings need and for structures resettlement of different action kinds plan for this the village existing has the population. highest density in the area with approx. 10,000 inhabitants, while the whole region accounts for approx. 15,000 inhabitants EVIEW OF HPP ZHUR FEASIBILITY STUDY
8 preliminary SA areadescription New HPP Zhur I powerhouse site at the foothill Location of HPP Zhur I discharge system HPP Zhur II conveyance system
9 preliminary SA areadescription Dragash/Sharr Municipality Village Brezna Zym/Qollopek there population impounding due to are construction approx. of of Brezna one 650 petrol of consists inhabitants, the station HPP of Zhur, 2,450 on approx. the two 73 inhabitants road reservoirs households, Zhur Dragash, will and be 10 they created, people close are mostly to permanently the the Brezna intersection engaged small employed, with Reservoir the family road close 7 economic persons to to village the working village activities Brezna Brezna abroad (agriculture, with the cattle there highest impounding breeding) is impact a primary of on and two the school approx. mechanical village, ( % and grade) shops a smaller of in the the inhabitants village (automobile Plavë Reservoir with are 61 service) pupils, working that will and abroad. bring the pupils about continue the their impounding primary primary of school education the village (1 4 grades) in Qollopek the with primary approx. school 200 in impounding These the pupils village influences exists Bellobrad/Gastil of one primary in and the impacts village, are located school in and the approx. the village continuation 2 following kilometers Brezna (registered from (1 4 of the Zym grade) primary in this study): education (5 8 grade) only impounding Qollopek is provided of village one for school in is the affected nearby playground by primary the impounding of approx. 200 family houses school HPP about one kilometer far from the in impounding Zhur project the village Brezna of a implementation. nearby and Hani football The Plavë i Llopushnikut playground Reservoir village that is also planed serves in this the area needs and of around the 23 pupils impounding houses from from the of nearby the approx. Qollopek villages 550 ha village Buçe of and are expected impounding of 2 3 buffets Plavë agricultural to land be resettled. of different The quality water in supply system Brezna impounding field pipelines (Fusha of major will e Llopushnikut) also roads be affected the main road in the village is paved, sewage impounding approx. system 60% of of and the all drinking agricultural field area of that Hani water is located land i are will be downstream impounded partially Llopushnikut provided from or Brezna the village field several housing the buildings and one primary school impounding dam site the village Brezna, of location some if forests, for the Plavë construction springs of and the local Reservoir HPP impounding Zhur roads is situated in the valley with minimum is impact completed of one forest aggregate as planned, and with screening will no be impact exposed plant impounding in on Hani to local major i of Llopushnikut infrastructure. three changes cemeteries EVIEW OF HPP ZHUR FEASIBILITY STUDY
10 preliminary SA areadescription Talking to local population View of the Plavë Reservoir houses to be impounded. BelIobrad/Gastil settlement in the back
11 preliminary SA areadescription Cultural historical monuments The Kosova Cultural Monuments Protection Institute has not legally protected any cultural heritage locality so far. Cemetery at the reservoir site Some monuments were recorded at the area under consideration. Facilities and Industry in Zym/Qollopek, Brezna and Buçe villages there are no major industrial facilities except the car service shop mentioned previously
12 preliminary SA areadescription School in Brezna School in Hani i Llopushnikut Aggregate screening plant near Hani i Llopushnikut Auto services at the Zhur-Dragash road near the road turn to Brezna
13 preliminary SA project impact assessment In Fusha e Llopushnikut or Brezna Field approx. 500 ha of agricultural land will become unusable due to the impoundment. This represents a permanent influence. In village Qollopek about 60% (49 ha) of all agricultural land will be impounded. The loss of suitable land (grazing land) will be permanent and with potential severe consequences for well being of population there. There is a danger that many inhabitants of Brezna and Qollopek villages will become impoverished. If the municipality provides new land, it should be in the vicinity (Vlaqi?).
14 preliminary SA project impact assessment BREZNA RESERVOIR EXPROPRIATION COSTS Private ownership Type of cost Unit Quantity Price per unit [EUR] Price [EUR] 1 Family house pcs , ,000, Small business units pcs , ,000, Meadows and grazing land ha , ,500, Arable land ha 70 20, ,400, Non arable land ha 15 5, , Private ownership total 14,975,000.00
15 preliminary SA project impact assessment BREZNA RESERVOIR EXPROPRIATION COSTS Type of cost Unit Quantity Public ownership Price per unit [EUR] Price [EUR] 1 School in Brezna m , , School in Hani i Lloupshnikut m , , Health center in Hani i Lloupshnikut m , , Sport playgrounds m 2 6, , Water supply systems Water pipelines km 5 40, , Pumping station pcs 1 30, , Roads km , ,500, Cemeteries ha , , Relocation of power transmission line km , , Public property total 6,415,000.00
16 preliminary SA project impact assessment PLAVË RESERVOIR EXPROPRIATION COSTS Private ownership Type of cost Unit Quantity Price per unit [EUR] Price [EUR] 1 Family house pcs 25 50, ,250, Meadows and grazing land ha 34 10, , Arable land ha 11 20, , Forests ha 2 30, , Non arable land ha 2 5, , Private property total 1,880, major infrastructural facilities in this area: drinking water supply system for the village Zym with 3 km of pipelines in total value of 120,000.00, platforms for the powerhouses of the HPP Zhur ask for 870, and another 1,062, for the conveyance system for Lumi Brod.
17 preliminary SA project impact assessment EXPROPRIATION COSTS SUMMARY Private property Price [EUR] Public property 1 Brezna Reservoir 14,975, ,415, Plavë Reservoir 1,880, , Powerhouse HPP Zhur I and conveyance system HPP Zhur II 870, Conveyance system for Lumi Brod river 1,062, Total ,787, ,535, ,322, Temporary damages and leaseholds 500, Contingencies (10%) 2,582, Total (Land Acquisition and housing) 28,404,200.00
18 preliminary SA rap Focus groups conclusions: a general readiness of the population to accept the HPP Zhur project construction the local residents show their preparedness to accept the changes in their style of living, but with different demands The acceptance of social benefits is prevailing! The resettlement draft plan we present here consists of major steps we suggest to be followed in the second phase of the project.
19 preliminary SA rap The resettlement action plan must be very detailed, all households should be visited and any misunderstanding avoided i.e. every structure, household, land, meadow, grazing land, etc. that will be impounded must be registered. Compenzations due to resettlement must be firstly and thoroughly registered through interview with local population and for each case separately. The time schedule of resettlement assumes that houses, schools, health center, small business units, land and cemeteries must be organized prior to the beginning of any construction activity. Construction and relocation of roads, solution of problems with water supply and relocation of the transmission line could be carried out in parallel with the project construction activities, but have to be completed prior to the reservoir impoundment.
20 preliminary SA rap the categories of people who must be compensated under Kosova legislation are narrower than those defined under OP 4.12 or IFC PS 5 (people entitled to compensation are only those with registered property rights, and registered identity documentation)! these criteria could exclude some of the poorest and vulnerable people! there is no specific mention of compensation for commercial businesses and loss of profit due to economic displacement! the absence of legal title to land by such groups should not be a bar to compensation. (OP 4.12, 7) In addition to compensation for losses of land and productive assets, OP4.12 requires also that: resettled people should be assisted with their move and supported during their transition period at the resettlement site; and, assisted in their efforts to improve their former living standards, income earning capacity and production levels or at least to restore them
21 preliminary SA rap due to the nature of activities of the locals (agriculture, cattle breeding) a problem of adequate land to be given in exchange for the impounded land was registered, the negotiations with peoples must take into account their demands and individual situations very carefully. the resettlement does not concern only housing units, but also the whole infrastructure of settlements, as well as individual plans, situations and contexts. compensation of the affected population is seen in different ways for example: land exchange by replacement with suitable land, exchange of property housing lots or even houses, money (cash) reimbursement, in some cases (Brezna village) a collective resettlement (all inhabitants should be resettled to a new place location) was asked for and should be discussed. the Resettlement Action Plan should be based on the existing Kosova legislation (Property Expropriation Bill still not promulgated) as well as World Bank Procedures
22 preliminary SA conclusions The Kosova state role is to develop and provide: 1. urban and spatial plans for the region; construction activities regulation (ban) on the future reservoir sites is recommended, 2. inclusion of the EU funds for future spatial developments, 3. plans for compensation of different kinds, 4. programs, regulations, laws that will stimulate Kosova Diaspora to be motivated to engage financially and organizationally in development of the HPP Zhur area, 5. social programs for the population that will be placed outside of normal possibilities of life in the area, 6. clear procedural regulations concerning the potential future concession rights of the HPP Zhur plant, 7. plans for community development
23 preliminary SA conclusions General conclusions: general approval of the construction of the planned HPP Zhur was registered in the project region: better future of the state, more energy, more development Kosova State is seen as a guarantee for the successful accomplishment of the project representatives of local communities ask for more information concerning the project activities
1. TITLE OF THE PROJECT HYDROPOWER SYSTEM UPPER HORIZONS. 2. SECTOR Energy
1. TITLE OF THE PROJECT HYDROPOWER SYSTEM UPPER HORIZONS 2. SECTOR Energy 3. LOCATION The term Upper Horizons means the undeveloped part of the hydropower system Trebišnjica, which is located above the
More informationPolicy PL Date Issued February 10, 2014
Subject RENEWABLE ENERGY ON CROWN LAND Compiled by Renewable Energy Program, Biodiversity Branch Replaces Policy Directives Waterpower Site Release Crown Land Onshore Windpower Development - Crown Land
More information1 st US - Kosovo Trade Forum New York, New York
Republic of Kosova Ministry of Economy and Finance 1 st US - Kosovo Trade Forum New York, New York Presentation By Lorik Fejzullahu Head of Public Private Partnership Unit October 27 2010 Presentation
More informationStatus with Nature Protected Areas Management and Inspection (legislation in place, enforcement) in Kosovo
Republika e Kosovës Republika Kosova - Republic of Kosovo Qeveria Vlada - Government Ministria e Mjedisit dhe Planifikimit Hapësinor Ministarstvo Sredine i Prostornog Planiranja Ministry of Environment
More informationARTWEI ARTWEI ARTWEI
Protection / Management Plans for Natura 2000 areas and Maritime Spatial Plan for internal sea waters - including the Szczecin Lagoon Szczecin, 7th May 2011 Andrzej Zych Inspectorate of Coast Protection
More informationDastid Pallaska, Attorney at Law
Dastid Pallaska, Attorney at Law Law on Foreign Investments Improvements in Business Registration Procedures Reforms in the Judiciary Other Relevant Considerations Key Definitions Key Protections Resolution
More informationMinistry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of
Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of environment, mining and spatial planning Department of project
More information1. International Conventions 2. South African Legislation 3. Swaziland Legislation
A. Legal context WATER FOR EVER 1. International Conventions 2. South African Legislation 3. Swaziland Legislation B. Evolution of KOBWA 1. Treaties 2. Evolution Stages 3. Main Objectives 4. Need for Bi-national
More informationStrategic priorities for professional sports infrastructure in Kosova / [presentation given May 16, 2011]
Rochester Institute of Technology RIT Scholar Works Theses Thesis/Dissertation Collections 5-31-2011 Strategic priorities for professional sports infrastructure in Kosova / [presentation given May 16,
More informationProcedures of obtaining the exploitation permit for the utilization of geothermal energy
Procedures of obtaining the exploitation permit for the utilization of geothermal energy Geothermal Energy in South-East Europe Stuttgart, 30 November 2009. Republic of Serbia - Ministry of Mining and
More informationBosnia and Herzegovina
UNCTAD Compendium of Investment Laws Bosnia and Herzegovina Law on the Policy of Foreign Direct Investment (1998) Unofficial translation Note The Investment Laws Navigator is based upon sources believed
More informationIOM Mission in Kosovo
IOM Mission in Kosovo Newsletter, July 2014 In this issue: #MigrationMeans Work - Employment with the help of Assisted Voluntary Return and Reintegration - EU-Return and Reintegration III supports healthy
More informationKosovo s economic and investment potential
Kosovo s economic and investment potential Jane Armitage Country Director US-Kosovo Trade & Investment Forum New York October 27, 2010 1 Topics covered in the presentation Kosovo s economic and investment
More informationProject References Kosovo
Project References Kosovo Name applicant: Arbeiter-Samariter-Bund, Deutschland e.v Project title Improving the Sector: 15150 Strengthening civil society (REGIONAL PROJECT) provision of Social Service Delivery
More informationKOSOVO REGIONAL AND LOCAL ROADS ENVIRONMENTAL AND SOCIAL ASSESSMENT
KOSOVO REGIONAL AND LOCAL ROADS ENVIRONMENTAL AND SOCIAL ASSESSMENT Project: Report: Prepared by: Financed by: Consultant: Kosovo Regional and Local Roads Environmental and Social Assessment Ministry of
More informationIOM KOSOVO NEWSLETTER QUARTERLY EDITION JANUARY MARCH 2018
IOM KOSOVO NEWSLETTER QUARTERLY EDITION JANUARY MARCH 2018 EU RRK V STARTS CONSTRUCTION OF HOUSES UNDER THE PHASE V OF PROJECT The end of March marked initiation of the EU Return and Reintegration in Kosovo
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name Rio Bogota Environmental Infrastructure Region LATIN AMERICA AND CARIBBEAN Sector Sewerage (70%); Flood protection
More informationNATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO *
NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO * Shaban Buza,, PhD, Professor Ramadan Duraku,, MSc, Lecturer KEY NOTES Introduction The Transport S&T system Overview of Transport research activities
More informationFACILITIES INVENTORY SURVEY REPORT
CURRENT PUBLIC TRANSPORT REPORT FACILITIES INVENTORY SURVEY REPORT ZULULAND DISTRICT MUNICIPALITY TABLE OF CONTENTS Page No. 1.... INTRODUCTION... 3 2.... ACKNOWLEDGEMENTS... 3 3.... THE STUDY AREA IN
More informationDraft LAW. ON SOME AMENDAMENTS IN THE LAW No.9587, DATED ON THE PROTECTION OF BIODIVERSITY AS AMENDED. Draft 2. Version 1.
Technical Assistance for Strengthening the Capacity of the Ministry of Environment, Forests and Water Administration in Albania for Law Drafting and Enforcement of National Environmental Legislation A
More informationFrom rail timetables to regional and urban indicators on rail passenger services
From rail timetables to regional indicators on rail passenger services Hugo Poelman Linde Ackermans European Commission DG Regional and Urban Analysis Unit - GIS team Regional ITF statistical meeting,
More informationProf. Dr Željko Vaško Doc. Dr Tihomir Predić MSc Boris Marković
First Interim Meeting of the Regional Expert Advisory Working Group on Areas with Natural Constrains Prof. Dr Željko Vaško Doc. Dr Tihomir Predić MSc Boris Marković 29 th June 01 th July, 2016 Andrevlje,
More informationFRAMEWORK LAW ON THE PROTECTION AND RESCUE OF PEOPLE AND PROPERTY IN THE EVENT OF NATURAL OR OTHER DISASTERS IN BOSNIA AND HERZEGOVINA
Pursuant to Article IV4.a) of the Constitution of Bosnia and Herzegovina, at the 28 th session of the House of Representatives held on 29 April 2008, and at the 17 th session of the House of Peoples held
More informationAZE: Second Road Network Development Investment Program Tranches 1 and 2
Internal Monitoring Report Project No.: 45389 August 2016 AZE: Second Road Network Development Investment Program Tranches 1 and 2 Prepared by Azerbaijan Republic Azeravtoyol OJSC for the Asian Development
More informationReforms in Kosovo s power System
Reforms in Kosovo s power System SABRI LIMARI FIEK University of Kosovo Prishtina, KOSOVO ARMEND YMERI KEKJSC, Gjilan, KOSOVO FEHMI AZEMI TOOB, Univesity Abstract: -Within the South East European Integrations,
More information1. PROJECT TITLE LOWER DRINA HYDROPOWER PLANTS
1. PROJECT TITLE LOWER DRINA HYDROPOWER PLANTS The lower course of the Drina River covers the area downstream from the Zvornik HPP, up to the mouth of the Drina into the Sava. This section of the Drina
More informationADMINISTRATIVE DATA SOURCE FOR ACCOMMODATION STATISTICS IN CROATIA
ADMINISTRATIVE DATA SOURCE FOR ACCOMMODATION STATISTICS IN CROATIA Ivana Brozović 30.11.2016. Content and Aim Data source and methods of data collection in accommodation statistics Yesterday Today Tomorrow
More information2. SECTOR Energy 1. PROJECT TITLE LOWER VRBAS HYDROPOWER PLANTS
1. PROJECT TITLE LOWER VRBAS HYDROPOWER PLANTS. SECTOR Energy 3. LOCATION The lower course of the Vrbas, i.e. the stretch from the city of Banja Luka to the mouth of the Vrbas, is planned to accommodate
More informationCzech Development Cooperation Plan indicative
Czech Development Cooperation Plan 2018 + indicative 2019-2020 Region / country Development Cooperation by the Czech Development Agency (CzDA) ODA PRIORITY COUNTRIES (Gov. Decision No. 631/2016) Sustainable
More information"ST. KLIMENT OHRIDSKI FACULTY OF GEOLOGY AND GEOGRAPHY
SOFIA UNIVERSITY "ST. KLIMENT OHRIDSKI FACULTY OF GEOLOGY AND GEOGRAPHY APPLICATION OF THE MODEL "DRIVING FORCES PRESSURE STATE - RESPONSE FOR ASSESSMENT OF FLOOD RISK RADOSTINA BORISOVA DOCHEVA Bachelor
More informationKOSOVO INVESTMENT OPPORTUNITIES
KOSOVO INVESTMENT OPPORTUNITIES PRE INVESTMENT SUPPORT National, regional, sectorial, etc. information Study visits to Kosovo G2B and B2B meetings INVESTMENT PHASE SUPPORT Permits, licenses, and administrative
More informationProtection and Promotion of Cultural. Input for Country Report July 2015 Prishtina, Kosovo
July 2015 Prishtina, Kosovo Initiated and supported by the Kosovo Foundation for Open Society s Project Civil Society and Kosovo s European Integration Process Protection and Promotion of Cultural Heritage
More informationDemand perspective: Measuring flows of visitors/ trips/ expenditure and their characterization in each form of tourism
Tourism Statistics: Challenges and Good Practices Regional Workshop for the CIS countries Demand perspective: Measuring flows of visitors/ trips/ expenditure and their characterization in each form of
More informationLATVIA. Report by Janis Garjans, Division of Museums of Ministry of Culture of Latvia. Introduction Key issues
LATVIA Report by Janis Garjans, Division of Museums of Ministry of Culture of Latvia Introduction Key issues Gathering of statistics in Latvia is determined by the Law of Statistics. Its implementation
More informationUses of maritime space and main conflicts related to MSP implementation in Croatia
Uses of maritime space and main conflicts related to MSP implementation in Croatia CROATIA IN FIGURES Basic information (Croatian Bureau of Statistics,211.) Total area: 87 661 km 2 Territorial sea of 12
More informationHYDROELECTRIC POWER PLANTS ON THE LOWER SAVA RIVER
HYDROELECTRIC POWER PLANTS ON THE LOWER SAVA RIVER The construction of a chain of hydroelectric power plants on the lower course of the Sava River is a multi-purpose project that makes a significant contribution
More informationMobility and transport
Mobility and transport Introduction to the Strategy game Transalpin Permanent Secretariat of the Alpine Convention Content The Alps an abstract idea? Our common activities The Alpine Convention Implementation
More informationLand Figures & Spatial Data Infrastructure in KOSOVO
Land Figures & Spatial Data Infrastructure in KOSOVO Idriz SHALA idriz.shala@gmail.com GIS -expert Afrim SHARKU afrim.sharku@gmail.com Land Management - Expert Kick-off meeting of the Regional Expert Advisory
More information2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD
2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD The Transit Committee recommends the following: 1. Receipt of the presentation by Rick Takagi, Manager, Operations, York Region Transit;
More informationProject of E-763 Motorway Construction, Section: Belgrade Ostružnica - Požega Boljare/ Border of Montenegro
Project of E-763 Motorway Construction, Section: Belgrade Ostružnica - Požega Boljare/ Border of Montenegro I Legal Framework: Preparation of design for construction of E-763 motorway, section: Belgrade
More information4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE
4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the following: 1. The presentation
More information2.2 For these reasons the provision of tourist signing will only be considered:
TOURIST SIGNING POLICY 2015 1. DEFINITION 1.1 A tourist destination is defined as a permanently established attraction which attracts or is used by visitors to an area and is open to the public without
More informationThe Inuit and the Aboriginal World 17 th Inuit Studies Conference Université of Québec en Abitibi-Témiscamingue October 28-30, 2010
The Inuit and the Aboriginal World 17 th Inuit Studies Conference Université of Québec en Abitibi-Témiscamingue October 28-30, 2010 NUNAVIK INUIT AND THE NUNAVIK REGION PAST, PRESENT AND FUTURE Presentation
More informationWilderness Areas Designated by the White Pine County bill
Wilderness Areas Designated by the White Pine County bill SEC. 321. SHORT TITLE. This subtitle may be cited as the `Pam White Wilderness Act of 2006'. SEC. 322. FINDINGS. Congress finds that-- The White
More informationTowards Strengthened Governance of the Shared Trans-boundary Natural and Cultural Heritage of the Lake Ohrid Region
Towards Strengthened Governance of the Shared Trans-boundary Natural and Cultural Heritage of the Lake Ohrid Region Zhulieta Harasani, Albania OCTOBER 2015 THE SHARED TRANSBOUNDARY NATURAL AND CULTURAL
More informationTbilisi Railway Bypass Project
Your opinion and comments in the process of project assessment have significant importance Tbilisi Railway Bypass Project The Brochure will introduce you with Tbilisi Railway Bypass project and give a
More information4 Rights and duties in connection with the conduct of petroleum activities
Guidelines for application for Acknowledgment of Compliance (AoC) for mobile facilities intended for use in the petroleum activities on the Norwegian Continental Shelf (Unofficial translation), issued
More informationEgnatia Odos: An axis for development and co-operation
Egnatia Odos: An axis for development and co-operation Egnatia Odos is one of the two Trans-European transport axes (the other being PATHE) which cross through our country and, together with the Eleftherios
More informationRepublic of Kosova Ministry of Economy and Finance. CAPACITY BUILDING CONFERENCE ON PUBLIC PRIVATE PARTNERSHIP (PPPs)
Republic of Kosova Ministry of Economy and Finance Presentation By: Donat Alaj Partnerships Kosovo CAPACITY BUILDING CONFERENCE ON PUBLIC PRIVATE PARTNERSHIP (PPPs) Zagreb, Croatia February, 2011 PRISHTINA
More informationThe Cuban economy: Current Situation and Challenges.
The Cuban economy: Current Situation and Challenges. Prof. Dr. MAURICIO DE MIRANDA PARRONDO, Ph. D. Professor Director Center for Pacific Rim Studies Pontificia Universidad Javeriana Cali, Colombia Hankuk
More informationJill L. Jamieson Senior PPP Advisor, BearingPoint. USAID Workshop on PPP Ain Sokhna, Egypt
Public-Private Private-Partnerships Partnerships The Case for PPP in Kosovo Jill L. Jamieson Senior PPP Advisor, BearingPoint May 25 26, 2008 USAID Workshop on PPP Ain Sokhna, Egypt 1 Kosovo: An unlikely
More informationDate: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council
Date: 11 th January, 2017 From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group To: Plaistow & Ifold Parish Council Re: Neighbourhood Plan Report to Parish Council Meeting 17 Jan 2017 The Steering
More informationSANBI PLANNING FORUM
SANBI PLANNING FORUM SPATIAL PLANNING IN PROTECTED AREAS AND THEIR BUFFERS (South Africa) Ms Jayshree Govender, Dr Mike Knight and Mr Russell Smart 22 June 2017 OUTLINE 1) Introduction 2) Protected areas
More informationThe results of the National Tourism Development Strategy Assessments
The results of the National Tourism Development Strategy Assessments - 2012 (I) The assessment tool In 2012 the Sustainable Tourism Working Group of the CEEweb for Biodiversity prepared a guidance for
More informationCooperation with the Region
Cooperation with the Region Protection of the further development of the most important Infrastructure for the Region of Vienna in social peace Vienna, 15 th October 2015 Franz Jöchlinger, Mediator, Head
More informationCorporate Social Responsibility. Partnerships in Inclusive Development Community Participation and Engagement
Corporate Social Responsibility Partnerships in Inclusive Development Community Participation and Engagement Project Location 110 km northeast of Chiclayo and 700 km northeast of Lima Cañariaco Region:
More informationSTANDARDS OF THE REPUBLIC OF KOSOVO, STANDARDS AGENCY AND THEIR IMPORTANCE IN IMPROVING THE QUALITY
7 th Research/Expert Conference with International Participations QUALITY 2011, Neum, B&H, June 01 04, 2011 STANDARDS OF THE REPUBLIC OF KOSOVO, STANDARDS AGENCY AND THEIR IMPORTANCE IN IMPROVING THE QUALITY
More informationOfficial Journal of the European Union L 7/3
12.1.2010 Official Journal of the European Union L 7/3 COMMISSION REGULATION (EU) No 18/2010 of 8 January 2010 amending Regulation (EC) No 300/2008 of the European Parliament and of the Council as far
More informationThe Timok River Basin in Serbia
The Timok River Basin in Serbia UNECE Workshop on Integrated Transboundary Water Resources Management in SEE, Sarajevo, 18-20 May, 2009 Dragana Ninković, Dipl.-Ing. Dušan Dobričić, Dipl.-Ing. Content 1.
More informationTOURISM & PUBLIC SERVICES RURAL SIGNAGE POLICY
Policy and Procedures Subject Title: Tourism and Public Services Rural Signage Policy Corporate Policy (Approved by Council): X Policy Ref. No.: ROADS-01-07 Administrative Policy (Approved by CAO): By-Law
More informationEvaluation of realized investments in Belgrade s and Danube region
MPRA Munich Personal RePEc Archive Evaluation of realized investments in Belgrade s and Danube region Jonel Subić and Lana Nastić and Marijana Jovanović Institute of Agricultural Economics, Volgina 15,
More informationLand Consolidation in Serbia
Land Consolidation in Serbia Stevan Marošan University of Belgrade, Faculty of Civil Enginering Zoran Knežević Ministry of Agriculture, Forestry and Water Management Marija Marošan Attorney at law Regional
More informationAssessment of Environmental Impacts of the proposed Sectoral Operational Programme for Tourism and Spa Industry
Unofficial translation of the original document produced in Czech language Assessment of Environmental Impacts of the proposed Sectoral Operational Programme for Tourism and Spa Industry Assessment team:
More informationOther Principle Arterials Minor Arterial Major Collector Minor Collector Local
CHAPTER 10 TRANSPORTATION Introduction The system of public roads in East Pikeland Township is decidedly rural in character. Since the 1984, the road network has remained much the same, with the addition
More informationHIGH-END ECOTOURISM AS A SUSTAINABLE LAND USE OPTION IN RURAL AFRICA:
HIGH-END ECOTOURISM AS A SUSTAINABLE LAND USE OPTION IN RURAL AFRICA: THE ROLE OF EMPLOYMENT IN POVERTY REDUCTION & SOCIAL WELFARE Sue Snyman, March 2011 sues@wilderness.co.za INTRODUCTION Rural Communities
More informationState of Conservation of the Heritage Site. City of Potosí (Plurinational State of Bolivia) (ID Nº 420) (ii), (iv) y (vi)) EXECUTIVE SUMMARY
State of Conservation of the Heritage Site City of Potosí (Plurinational State of Bolivia) (ID Nº 420) (ii), (iv) y (vi)) EXECUTIVE SUMMARY 1. State party's response to the decision 39 of the World Heritage
More informationPPIAF Assistance in Swaziland
PPIAF Assistance in Swaziland July 2012 In 2002 PPIAF support was provided to the government of Swaziland to assess the regulatory, legal, and institutional framework necessary to concession Swaziland
More informationMerowe Dam Archaeological Salvage Project (MDASP)
Merowe Dam Archaeological Salvage Project (MDASP) Salah Mohamed Ahmed Introduction The idea of building a dam at the 4 th Cataract of the Nile dates to the period of the Anglo-Egyptian administration in
More informationProtection of Ulcinj Saline
Strasbourg, 25 March 2015 T-PVS/Files (2015) 21 [files21e_2015.docx] CONVENTION ON THE CONSERVATION OF EUROPEAN WILDLIFE AND NATURAL HABITATS Standing Committee 35 th meeting Strasbourg, 1-4 December 2015
More informationReview on Agriculture and Rural Development vol. 2. (1) ISSN
Review on Agriculture and Rural Development 2013. vol. 2. (1) ISSN 2063-4803 137 STATE OF ENVIRONMENT HOTSPOTS FROM MINING AND INDUSTRY SECTOR IN KOSOVO BESA VESELI 1, ILIR KRISTO 2, NEXHAT BALAJ 3 1 Kosovo
More informationRepublika e Kosovës Republika Kosova-Republic of Kosovo Qeveria - Vlada - Government New Kosovo Project
Republika e Kosovës Republika Kosova-Republic of Kosovo Qeveria - Vlada - Government New Kosovo Project March 20, 2018 Bringing Kosovo s energy sector closer to Europe Content of Presentation 1. Project
More informationITA AITES WORLD TUNNEL CONGRESS 2009
ITA AITES WORLD TUNNEL CONGRESS 2009 Budapest, Hungary, May 23 29, 2009 OF SAFE AND EFFICIENT UNDERGROUND URBAN ROAD AND RAIL INFRASTRUCTURES Manuel Arnáiz Ronda PhD. Civil Engineering President of AETOS
More informationHypsometric demography of Kosovo: the distribution of Kosovo population by altitude
DOI 10.1186/s40410-016-0047-8 RESEARCH ARTICLE Open Access Hypsometric demography of Kosovo: the distribution of Kosovo population by altitude Rizah Murseli * and Hazer Dana The original version of this
More informationA. CONCLUSIONS OF THE FGEIS
Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300
More informationExecutive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport
Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche
More informationFOREIGN TRADE OF KOSOVO AND IMPACT OF FISCAL POLICY
FOREIGN TRADE OF KOSOVO AND IMPACT OF FISCAL POLICY Agim Berisha, PHD candidate College of Business, Pristine, Kosovo Abstract Negative trading balance is only one of the economical problems by which Kosovo
More informationPutting Museums on the Tourist Itinerary: Museums and Tour Operators in Partnership making the most out of Tourism
1 of 5 ICME papers 2002 Putting Museums on the Tourist Itinerary: Museums and Tour Operators in Partnership making the most out of Tourism By Clare Mateke Livingstone Museum, P O Box 60498, Livingstone,
More informationREPUBLIC OF KOSOVO Ministry of Trade and Industry. reasons IN KOSOVO
REPUBLIC OF KOSOVO Ministry of Trade and Industry TOP 10 reasons IN KOSOVO 1 Youngest population in Europe With an average age of 25 years, Kosovo has the youngest population in Europe. Albanian and Serbian
More informationICAO SUMMARY REPORT AUDIT OF THE DEPARTMENT OF CIVIL AVIATION OF THE LAO PEOPLE S DEMOCRATIC REPUBLIC
ICAO Universal Safety Oversight Audit Programme ICAO SUMMARY REPORT AUDIT OF THE DEPARTMENT OF CIVIL AVIATION OF THE LAO PEOPLE S DEMOCRATIC REPUBLIC (Vientiane, 22 to 30 April 1999) INTERNATIONAL CIVIL
More informationMEETING CONCLUSIONS. Andean South America Regional Meeting Lima, Peru 5-7 March ECOTOURISM PLANNING
MEETING CONCLUSIONS Andean South America Regional Meeting Lima, Peru 5-7 March 2002 1.0 ECOTOURISM PLANNING 1.1 Protected Areas Ecotourism in Protected Areas is part of an integrated vision of tourism
More informationLATIN AMERICA / CARIBBEAN COIBA NATIONAL PARK PANAMA
LATIN AMERICA / CARIBBEAN COIBA NATIONAL PARK PANAMA WORLD HERITAGE NOMINATION IUCN TECHNICAL EVALUATION COIBA NATIONAL PARK (PANAMA) ID Nº 1138 Bis Background note: Coiba National Park was nominated for
More informationZhulieta Harasani, MBA PhD. Petrit Harasani The shared Transboundary Natural and Cultural Heritage of the Lake Ohrid Region
Zhulieta Harasani, MBA PhD. Petrit Harasani The shared Transboundary Natural and Cultural Heritage of the Lake Ohrid Region The natural and cultural heritage of the Ohrid Region comprises the ancient city
More informationShort Project Summary Cebren & Galiste Hydropower Project Republic of Macedonia
Short Project Summary Cebren & Galiste Hydropower Project Republic of Macedonia A strategic investment opportunity at the heart of South-East Europe s integrated electricity market Outline Macedonian Power
More informationMinimum Requirements References in National Park Service Policy
Minimum Requirements References in National Park Service Policy 2006 NPS Management Policies Chapter 6: Wilderness Preservation and Management 6.3 Wilderness Resource Management 6.3.1 General Policy (in
More informationBehind Your Beach Vacation
Small Island Development States and the Millennium Development Goals Workshop Behind Your Beach Vacation Local and regional Resources Access- Issues and (Zanzibar) Rashid Azzan Zanzibar Tanzania E-mail:
More informationDENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study
DENISON STREET EXTENSION Feasibility Study January 14, 2014 Transportation Committee Markham Transportation Strategic Plan (MTSP) analysis completed in 2012 reviewed transportation requirements to accommodate
More informationNovember 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.
November 11, 2009 Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1 BY E-MAIL Attention: Mr. Don Herweyer Dear Mr. Herweyer: Reference: Abbott-Fernbank
More informationBANKING PERIODIC PUBLICATION OF KOSOVO BANKING ASSOCIATION VOLUME 4 / NUMBER 1
BANKING PERIODIC PUBLICATION OF KOSOVO BANKING ASSOCIATION VOLUME 4 / NUMBER 1 BANKING PERIODIC SUPPORTED BY: www.bankassoc-kos.com CONTENT 04 Introduction 07 05 Loan to Deposit Ratio 08 06 Global Money
More informationSuccesses and Failures of the Policies of Water Supply and Wastewater Services in Argentina
4th World Water Forum, México, 2006 Session FT 3.48: Public Policies for Water and Sanitation Services Convener: Comisión Nacional del Agua, México. Successes and Failures of the Policies of Water Supply
More informationTechnical Explanation Introduction
Technical Explanation Introduction Local population of Volkovo and Orman has objected through their authorised representatives about the location of the North Bypass of Skopje route. The objections are
More informationUNDERSTANDING TOURISM: BASIC GLOSSARY 1
UNDERSTANDING TOURISM: BASIC GLOSSARY 1 Tourism is a social, cultural and economic phenomenon related to the movement of people to places outside their usual place of residence pleasure being the usual
More informationREGIONAL ASPECTS OF AGRICULTURAL INCOME LEVEL IN VOJVODINA PROVINCE IN FUNCTION OF BASIC PRODUCTION FACTORS
REGIONAL ASPECTS OF AGRICULTURAL INCOME LEVEL IN VOJVODINA PROVINCE IN FUNCTION OF BASIC PRODUCTION FACTORS KATARINA ČOBANOVIĆ Faculty of Agriculture Novi Sad, Novi Sad, Serbia. E-mail: katcob@polj.ns.ac.yu
More informationWind Energy in South-east Europe: Seminar III: WIND ENERGY PROJECT DEVELOPMENT. Mostar,
Wind Energy in South-east Europe: Seminar III: WIND ENERGY PROJECT DEVELOPMENT UNIVERSITY OF SPLIT FACULTY OF ELECTRICAL ENGINEERING, MECHANICAL ENGINEERING AND NAVAL ARCHITECTURE Wind Project Development
More informationAlbania Energy Country Profile. Presented By: Mr. Koli Bele General Secretary of Ministry of Energy and Industry August 25, 2014
Albania Energy Country Profile Presented By: Mr. Koli Bele General Secretary of Ministry of Energy and Industry August 25, 2014 Albania Energy Country Profile Albania Energy Country Profile Energy and
More informationThis is an electronic copy. Format and font may vary from the official version. Attachments may not appear. BEFORE THE PUBLIC UTILITY COMMISSION
ENTERED FEB 28 2003 This is an electronic copy. Format and font may vary from the official version. Attachments may not appear. BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON WA 47 In the Matter of the
More informationDegree Date: Degree/ Master : LL.M - Master of Laws Honored - Cum Laude
CURRICULUM VITAE 1. Family Name: Ukaj 2. First Name: Valëza 3. Nationality: Kosovar 4. Date of Birth 13/02/1987 5. Gender: Female 6. Contact details: 7. Education Degree: Email: vukaj@g.clemson.edu; valeza.ukaj@uni-pr.edu;
More informationConnectivity for Urban Tourism Competitiveness
Connectivity for Urban Tourism Competitiveness Mr. Li Baochun Executive Deputy Secretary General World Tourism Cities Federation www.wtcf.org.cn Connectivity 1. The quality or condition of being connected
More informationI-3 DFW Extension Public Hearing. June 2, 2011
1 I-3 DFW Extension Public Hearing June 2, 2011 2 DFW LRT Extension Agenda: Introductions Service Plan Amendment Alignment, Grade Separations, Station, Yard Environmental Assessment Environmental Impacts/Mitigation
More informationProject Fiche MASTER PLAN FOR DEVELOPMENT OF THE NAUTICAL TOURISM IN THE SAVA RIVER BASIN
Project Fiche MASTER PLAN FOR DEVELOPMENT OF THE NAUTICAL TOURISM IN THE SAVA RIVER BASIN 1. Basic information 1.1 Title: Master plan 1.2 Location: Sava River Basin which covers Bosnia and Herzegovina,
More informationBrazil and the international electric integration:
Brazil and the international electric integration: Background, Current Status and Perspectives EEIC 2016 Lisboa Portugal - Fevereiro de 2016 Nivalde de Castro Roberto Brandão Rubens Rosental Paola Dorado