Link Union Station (LINK US)

Similar documents
SCOPING INFORMATION PACKET

November 9, Society of American Military Engineers

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

Master Commercial Developer Industry Forum

Union Station Queens Quay Transit Link Study

STUDY WORK GROUP MEETING No. 4. July 12, 2017

Item # 28. Chief Capital Management Officer Report. November 20, 2008

Measure R Program Update

THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE

Executive Summary. See Figure ES-5 on page 9. Figure ES-6: Typical At-Grade Alignment. Figure ES-7: Typical Underground Alignment

Restoration of Historic Streetcar Services in Downtown Los Angeles

Overview. ECO RAPID TRANSIT Meeting April 8, 2015 Don Sepulveda, P.E. Executive Officer Regional Rail

TORONTO TRANSIT COMMISSION REPORT NO.

Why we re here: For educational purposes only

9 VIVA DIRECT UNDERGROUND CONNECTION TO THE TORONTO-YORK SPADINA SUBWAY EXTENSION AT THE VAUGHAN METROPOLITAN CENTRE

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018

LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions. Board of Airport Commissioners February 5, 2013

FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING

REAL ESTATE TRANSACTION ADVISORY SERVICES

Chicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014

TORONTO TRANSIT COMMISSION REPORT NO.

Scoping Meeting LAX Landside Access Modernization Program

Claremont Project Background and Update Community Meeting September 11, 2017

Director, Community Planning, Toronto and East York District

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

Hartsfield Jackson Update prepared for:

South Bay Metro Green Line Extension

The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension

Los Angeles County Metropolitan Transportation Authority. Metro Rail Gold Line Eastside Extension - Operations

Northwest Corridor LRT Line to Irving/DFW

DRAFT PLAN & DRAFT EIR

Welcome. Sign in Pick up comment form Visit stations to learn more Submit your comment form

Aloha Stadium Conceptual Redevelopment Report. April 5, 2017

Northwest Corridor LRT Line to Irving/DFW

Building the transportation network we need for the future in Niagara Region

Feasibility Study Federal Inspection Service Facility at Long Beach Airport

KCI New Terminal Update. Airport Committee Thursday, August 16, 2018

BOARD OF LOS ANGELES CONVENTION & TOURISM DEVELOPMENT and LOS ANGELES CONVENTION & EXHIBITION CENTER AUTHORITY JOINT COMMISSION MEETING MINUTES

Industry briefing NOVEMBER 2017

Metro Green Line to LAX. January, 2012

Transportation Supporting Dulles Airport

Silver Line Rail Project Update

South Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings

Quality of Life Study

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis

Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport

US 380 FEASIBILITY STUDY

Bonita to Bridgeport January 24, 2019

South Bay Light Rail Extension Summer/Fall 2017 Project Briefing

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

COMMENT PERIOD INTRODUCTION

AIRPORT DEVELOPMENT PLAN. Design-Build Institute of America September 8, 2015

BOARD ITO Aide REPORT TO THE AIRPORT COMMISSIONERS

Update on Monarch Bay Shoreline Development Project. City Council Work Session October 9, 2017

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

Metro. Board Report. File #: , File Type: Informational Report Agenda Number: 25

395 Express Lanes Project Update

5 Rail demand in Western Sydney

LAX Specific Plan Amendment Study (SPAS) Update. December 3, 2012

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

Now Available. Urban Rail Transport. in India Urban Bus Transport. in India India Infrastructure Research.

Caroline County / King George County Transit Studies. Meeting November 1, 2017

Railway Master Plan in Tokyo (2016)

Hampton Roads Passenger Rail Task Force. February 29, 2012

DEMOGRAPHICS AND EXISTING SERVICE

Metrolink Service Expansion Program

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014

Presentation to the DRCOG Board August 16, 2017

Birmingham Airport 2033

2018 Service Implementation Plan Executive Summary

FLINDERS STREET STATION DESIGN COMPETITION STATEMENT OF KEY OBJECTIVES

Welcome. Share information on the new investments and funding proposed for the Phase Two Plan

Lessons Learned from Rebuilding the Muni Subway Schedule Leslie Bienenfeld

CITY OF VANCOUVER POLICY REPORT DEVELOPMENT AND BUILDING

Creating Sustainable Communities Through Public Transportation

State Route 189 Project and Draft Resolution of Support. November 2014

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

Central Broward Transit (CBT) Phase 1 Public Open House January 21, 2016

III. ENVIRONMENTAL SETTING

SECTION 106 ACTIVITIES ANNUAL REPORT

METRO Green Line ridership has already exceeded expectations in its first month.

Chairman and Members of the Planning and Development Committee. Edward R. Sajecki, Commissioner of Planning and Building

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014

CHAPTER 4 - COMMENTS AND COORDINATION Introduction Comments and Responding to Comments

Southwest LRT Alignment Video Narration

THE WORLD BANK Washington, DC

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University

Resolution of Support for the Ettrick Site as the Future Location of the Tri-Cities Multimodal Station

BNA Master Plan Update Community Advisory Committee Meeting No. 5

First Brainstorm Session Purpose & Need Tampa Bay History Center Tuesday March 7, 2016

TORONTO TRANSIT COMMISSION REPORT NO.

About the Foothill Gold Line

This presentation is available online.

BNA Master Plan Update Public Meeting No. 2

July 21, Mayor & City Council Business Session KCI Development Program Process Update

WATERBORNE TRANSIT. April 21, 2010

Transcription:

Link Union Station (LINK US) Presentation for LAUS Master Commercial Developer Industry Forum October 13 th 2017 Jeanet Owens, PE Senior Executive Officer Program Management / Regional Rail

Project Overview 1. A new expanded passenger concourse with passenger amenities, retail and potential mixed use development 2. Reconfiguration of the throat (station entry tracks), elevation of the rail yard, new run-through tracks and new loop track 3. Accommodation of California HSR and Metro s West Santa Ana Branch LRT 4. New environmental process (DEIS/DEIR)

Project Need - Why Do We Need Link US? 1. LA Union Station (LAUS) is approaching operational capacity 2. Ridership to grow from 110,000 to 200,000 daily passenger trips by 2040 3. Current stub-end (dead end) tracks limit efficiency and station capacity 4. Critical transportation needs due to increase in forecasted ridership

Project Benefits What Will Link US Provide?

Board Approved Alternative 2: 6 RR + 2 HSR Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional Rail Run-Through Tracks 2 HSR Run-Through Tracks (Integrated Design and Phased Construction) 7 Platforms (1 Gold Line, 1 WSAB Line, 1 HSR, 4 Regional Rail) Other Alternatives with 6+4 and 6+0 are being studied in the CEQA and NEPA environmental processes.

New Expanded Passenger Concourse At Grade Passenger Concourse Concept

World Class Transit Station At Grade Passenger Concourse Concept

New Expanded Passenger Concourse Elevator Escalator Restroom Way Finding Sample Images

New Expanded Passenger Concourse Baggage Handing Waiting Area Security Sample Images

Link US- Potential Development At Grade Passenger Concourse Concept View from Alameda Street

Link US- Potential Development View from West Plaza At Grade Passenger Concourse Concept

Link US- Potential Development View from West Plaza At Grade Passenger Concourse Concept

New Expanded Passenger Concourse Metro Life at Union Station Sample Images

New Expanded Passenger Concourse Retail Districts Circulation Diagram At Grade Passenger Concourse Concept

New Expanded Passenger Concourse Passenger Waiting/Arrival Areas Sample Images At Grade Passenger Concourse Concept

New Expanded Passenger Concourse Chef s Corner Sample Images At Grade Passenger Concourse Concept

New Expanded Passenger Concourse Grab-n-Go Sample Images At Grade Passenger Concourse Concept

Link US- Potential Development At Grade Passenger Concourse Concept View from Patsaouras Bus Plaza

New Expanded Passenger Concourse Above Grade Passenger Concourse Concept

New Expanded Passenger Concourse Above Grade Passenger Concourse Concept

New Expanded Passenger Concourse Above Grade Passenger Concourse Concept

Commercial Street Corridor

Commercial Street Corridor Potential Urban Design Opportunities

Commercial Street Corridor Potential Active Transportation Opportunities

Commercial Street Corridor Potential Urban Design Opportunities Sample Images

Commercial Street Corridor Potential Urban Design Opportunities Sample Images

Planned Circulation & Active Transportation Sample Images

Potential River Access Sample Images

Project Phasing

Project Schedule We Are Here Stage I Stage II Stage III Stage IV Notice of Intent/ Notice of Preparation Comment Period and Scoping Meeting Summer 2016 Alternatives Analysis Summer 2016 to Winter 2017 Draft EIR Comment Period Spring 2018 Draft EIS Comment Period Summer 2018 Final EIR Winter 2018 Final EIS and Record of Decision Spring 2019 Public Involvement Tentative Subject to Change

Project Cost and Funding Sources Preliminary Estimate Project Cost range from $1.7 to $2.5 Billion 1. Refining alternatives that reduce project costs including Integrated Design or Phased Construction and Above or Below Grade New Expanded Passenger Concourse. 2. Estimated Project Cost does not include potential mixed use development on the east portal and west plaza. Status of Funding 1. Environmental and Preliminary Engineering Funded 2. Design and Construction Actively Pursuing Funding

Questions?