Peterborough. Bedford. Stevenage. Luton. St Albans. Finsbury Park. Kentish Town. St Pancras International. Farringdon. London Blackfriars

Similar documents
GTR 2018 timetable proposals

GTR December 2015 timetable consultation

GTR 2018 Timetable Consultation Results (phase one) Date issued: Monday 26 June 2017

Govia Thameslink Railway consultation on December 2015 timetable - APTU response

GTR 2018 Timetable Consultation Phase 3 weekends & late night trains ( )

To provide the best possible service during the Thameslink construction work at London Bridge;

BRENT CROSS THAMESLINK

Southeastern contingency timetable Issue 1

First Thameslink trains arrive on Great Northern

London Bridge station opens upgrade works

Modern air-conditioned trains take over King s Lynn route as Great Northern services are doubled at Ely

Update on the Thameslink programme

Our stakeholder newsletter features business updates, news from our local communities and performance analysis.

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

Thameslink Consortium 21 January Q&A 2. Department for Transport 3. Network Rail 4. First Capital Connect

Dear Member. Treasurer s Note Subscriptions

campaigning by the Railway Development Society Limited

MARCH 2017 NEWSLETTER

UNLOCKING THE BRIGHTON MAINLINE

Improvements to East Coastway train services from May 2018

JUNE 2015 NEWSLETTER

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

METROBUS ENVIRONMENTAL & SOCIAL REPORT 2005

ONECROYDON. Offices To Let In Croydon s Most Iconic Building

RAIL HUB FOR HEATHROW?

FLOORS 17, 18 & 19 NOW LET TO FLOORS 16 & 15 UNDER OFFER CROWN AGENTS BANK SUTTON 6,200 43,400 SQ FT OFFICES THE QUADRANT SUTTON SURREY SM2 5AS

Bartlett Square Welcome. Investment Framework. London Airport Ltd

London and South East Route Utilisation Strategy (RUS) Rail User Group Meeting - Saturday 11 July 2009

Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013

Kent Route Utilisation Strategy consultation by Network Rail. A response from London TravelWatch

eureka park ASHFORD KENT M20 J9

Profile west. Impressive modern office environment. Excellent national and international access.


Thameslink 2000 Environmental Statement

22 nd February Proposed changes to Govia Thameslink Railway Ticket Offices and introduction of Station Hosts

Association of Public Transport Users

CROYDON. 5,000-31,000 sq ft Landmark Offices To Let

PROPOSALS FOR MEDIUM AND LONG TERM DEVELOPMENT

EXHIBIT LIST. No Exhibit Name Page. 1 R391 HS2 Residents Charter.pdf (R391) R392 Response to Select Committee

Croydon. 5,000-31,000 sq ft Landmark Offices To Let

London TravelWatch response to the consultation on the combined Thameslink, Southern and Great Northern franchise

School Transport & Travel Guide

Transport and Works Act The Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2006

Delivering a better railway for a better Britain Network Specification 2016 South East Route

East West Rail Consortium

TRANSPORT UPDATE. September/October 2018

Response from West Sussex Rail Users Association to the DfT consultation on Thameslink franchise.

Summary of questions and discussion

SOUTHEASTERN ENVIRONMENTAL & SOCIAL REPORT 2007

ONECROYDON. Offices To Let In Croydon s Most Iconic Building

Agenda Item 5: Rail East Midlands Rail Franchise Consultation

NR is also currently conducting two other studies, those for the Cambridgeshire Corridor and for Ely Area Capacity Enhancements.

Top specification with an excellent BREEAM rating. High sustainability

5,000-40,000 sq ft Landmark Offices To Let

East Sussex Rail Strategy Shaping Rail in East Sussex and Action Plan

Premier Inn, Windsor. Welcome

London TravelWatch response to the Southeastern franchise extension consultation

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager

Version 1.3. Last updated 11th November NB All cup slots are TBC until the first round and subsequent draws are made

ONECROYDON. Offices To Let In Croydon s Most Iconic Building

356,500 people commuted to jobs in the City of London. 40 per cent from inner London, 29 per cent from outer London, 31 per cent from outside London

FREEHOLD FOR SALE Prime Residential Development Opportunity

EAST GRINSTEAD POUNDLAND & POUNDSTRETCHER LONDON ROAD, RH19 1AG HIGH STREET RETAIL INVESTMENT OPPORTUNITY

Abbey Chesterton bridge Questions & Answers

Images Revealed: Proposed HS4Air will create new transport hubs boosting regional economies and slash journey times beyond London.

London TravelWatch has commissioned two pieces of research on this issue. These can be found at :-

RESIDENTIAL DEVELOPMENT SITE FOR SALE. Imber Court Orchard Lane East Molesey KT8 0BY ENTER

Quarterly Progress Report

COUNTY OAK RETAIL PARK

The Future for Rail TravelWatch NorthWest. Chris Green, Railway Forum

J1A M25. exceptional new office accommodation at crossways business park. a new direction for business

GATWICK AND WANDSWORTH

East West Rail Bedford to Cambridge Route Option Consultation

TO LET READY Q DEMOLITION COMPLETED

Appendix A Hosted Station These stations are all in the London TravelWatch area

Strategic Transport Group

SOUTHERN ENVIRONMENTAL & SOCIAL REPORT 2006

HELENA HOUSE HIGH STREET SUTTON, SURREY, SM1 1PX FREEHOLD OFFICE INVESTMENT/DEVELOPMENT OPPORTUNITY

waterview connection Completing the Western Ring Route the Waterview Connection

Economic Development Sub- Committee

CAPELLA COURT. you ve arrived. Peer Group PLC SOUTH CROYDON

HIGGS INDUSTRIAL ESTATE Welcome to our public exhibition

M621. Junctions 1 to 7 Improvement scheme. Share your views

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

Lacuna Place HAVELOCK ROAD, HASTINGS TN34 1BP LONG LET TOWN CENTRE INVESTMENT SECURED AGAINST THE DEPARTMENT OF WORK AND PENSIONS & TESCO

A NEW COMMUNITY OF 3,000 HOMES IN WELLINGBOROUGH, NORTHAMPTONSHIRE

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Tel:

Rail Fares Explained

Canterbury. 24 St Margaret s Street, Canterbury, CT1 2TH Prominent South East High Street Retail Investment

Kent AND GATWICK. THRIVING TOGETHER.

Govia Thameslink Railway Sustainability Report 2015 STRONGER TOGETHER

Appendix C Stage 1 Road Safety Audit

M54 to M6/M6 Toll Link Road Public consultation

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

May 2019 Timetable. Highlights and Response to Feedback

Road Traffic Implications of a second runway at Gatwick Airport. Gatwick in perspective I. Prepared by a Senior Highway Engineer NUMBER 8

Felixstowe Branch Line FAQ

LISTED BUILDING AND FIRE STATION CENTRAL SITE WHITGIFT STREET OLD PARADISE GARDENS

Connecting People, Connecting Business

Transcription:

The big picture King s Lynn Key Today In order to improve train services to and through London, we are investing 5.5bn in new and longer trains (new rolling stock), new track and new stations. This scheme, known as the Thameslink Programme, will mean new direct cross- London trains from destinations on the Great Northern Route. Bedford Luton St Albans Kentish Town Peterborough Stevenage Finsbury Park Cambridge From March 2009 From December 2015 Note: Major stations only identified on map. Exact timetable and calling patterns to be specified. This map shows an indicative route network. The final Thameslink train service will be delivered under a new franchise that will become operational from December 2015. As is normal practice, a public consultation on that franchise and the routes it will serve will take place during 2013. St Pancras International These new longer trains require modern maintenance facilities and railway sidings that are long enough to accommodate them. Farringdon London Blackfriars Elephant & Castle London Bridge New Cross Catford Dartford Following a careful site selection process, carried out by ARUP, two new depots are planned. One near Hornsey and the other in Three Bridges. Wimbledon Herne Hill Sutton East Croydon Bromley South Orpington Sevenoaks Tonbridge Swanley Ashford Gatwick Airport Three Bridges East Grinstead Wivelsfield Horsham Guildford Preston Park Littlehampton Brighton Eastbourne

Who s Involved? The project is strategically very important and supported by a number of different organisations: Network Rail is responsible for improvements to track and stations as part of the Thameslink Programme and owns the land on which the new depots would be built. The Department for Transport (DfT) is responsible for the rolling stock project and funding the new depots. It is also responsible for choosing the provider of the new rolling stock (trains). This provider would ultimately build the depots. First Capital Connect is one of three current train operators on the Thameslink route who are key partners in delivering the Thameslink Programme. The train operators will run the new trains, which will use the depots. ARUP has been employed by the DfT to carry out the initial design and options report for the depots.

The Site Selection Process An extensive site selection process has identified two sites for the depots in London and the South East. One is at a site near Hornsey. The other is south of Three Bridges. Criteria for site selection Location in relation to Thameslink route and rail connections Ability to handle long trains Availability Local and environmental impact Value for money Impact on local area including current and planned future use Why Hornsey? The site is large enough to accommodate all of the required facilities The site is existing operational railway land Good connections to the Thameslink route Good road access routes to and from the site

How would it be built? Key plan Site plan All of the facilities would be constructed on railway land adjacent to the existing main line railway, carrying trains towards London. The scheme will mean 250+ new jobs and a boost to local shops and other amenities. The new maintenance depot will be located at the northern end of the site on the existing Coronation Sidings, along with important equipment including a train washer, sidings, and an electricity substation. New stabling sidings, an underframe cleaning facility (UFC) and a second train washer will be located at the southern end of the site near the existing train depot which will remain. The work also requires Widening of the embankment to the east of Coronation Sidings and widening of the bridges over Turnpike Lane and New River. Access to the maintenance facilities would be from Hampden Road. An access road would run along the eastern boundary of the site, and parking for approximately 50 vehicles would be provided adjacent to the maintenance depot north of Turnpike Lane. Facilities for cyclists will also be provided.

Design Architectural impression of what the depot may look like Cross-section of proposed maintenance depot building. The design and layout of the maintenance facilities have been carefully considered. The site has been designed to maximise the available operational space while being aware of neighbours and taking into account sustainability measures. Key considerations in the design include: proximity to and impact on neighbours to the railway potential visual impact operational requirements potential noise use of lighting use of sustainable materials Construction of the depot and associated facilities would take 18 months The construction period offers the potential for increased local employment. Further details of such opportunities will emerge during the construction phase. Facilities for cyclists will also be provided.

Managing the environmental impact Cross-section of proposed maintenance depot building. A full Environmental Impact Assessment (EIA) has been undertaken looking at: Air Quality Cultural Heritage Contaminated Land Ecology Visual Impact Noise Socio-Economics Waste Water Where issues have been identified during the Environmental Impact Assessment, measures have been developed to avoid or reduce the effects where possible. A number of mitigation measures have also been proposed: Tree and plant screening to reduce visual impact Green wall alongside Coronation Sidings Acoustic noise barriers where required A Travel Plan to guide travel to work options for staff Sensitive design of buildings, including their lighting

What Happens Next? Visualisations of how the new Thameslink trains might look. Plans to build the two depots are still at an early stage but they are needed by 2012 to help keep the new trains running. Before we progress these plans, we would very much like to hear your views on what you have seen today. If you require further information please speak with one of the representatives present and fill out a feedback card so that we have a record of your views. If you would prefer to speak to Network Rail at a later time, please call our 24 hour helpdesk on 08457 11 41 41 If you would like to find out more about the Thameslink Program please visit: www.networkrail.co.uk/thameslink If you would like to find out more about the plans for new trains on the Thameslink route please visit: www.thameslinkprogramme.co.uk