Austin-Bergstrom International Airport Master Plan Update

Similar documents
Airport Master Plan Update

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

AIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI

Merritt Island Airport

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

City of Monett, Missouri. Pride and Progress. Airport Master Plan Update. for the Monett Municipal Airport

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

PUBLIC SCOPING MEETING APRIL 2018

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

Table of Contents. Overview Objectives Key Issues Process...1-3

Public Review Draft South County Airport Master Plan Report. County of Santa Clara San Martin, California

MASTER PLAN UPDATE GRANT NUMBER

Office of Commercial Space Transportation: Notice of Availability, Notice of Public

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

Feasibility Study Federal Inspection Service Facility at Long Beach Airport

Chapter 1: Introduction Draft

Chapter 1: Introduction

MASTER PLAN GEORGE BUSH INTERCONTINENTAL AIRPORT/HOUSTON. Houston Airport System Houston, Texas DRAFT TECHNICAL REPORT.

The San Diego Region s Air Transportation Future

Update on the Aspen/Pitkin County Airport Improvements

City of Austin Department of Aviation Austin Bergstrom International Airport 2040 Master Plan. Public Workshop #2 April 19, 2018

Airport Master Plan Update June 15, 2017

FAA RECORD OF DECISION. Appendix D FINAL EIS ADDENDUM DOCUMENTS

EXHIBIT A. LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project #

Master Plan Update Technical Advisory Committee Meeting


Airport Master Plan Update June 15, 2017

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

What is the ABIA 2040 Master Plan?

Forecast of Aviation Activity

Chapter 1 Introduction and Project Overview

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Forecast and Overview

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

CHAPTER FIVE ENVIRONMENTAL CONSEQUENCES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

ENVISIONING AUSTIN s Airport of the Future

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1: INTRODUCTION

Partnership for Quieter Skies Report

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Alternatives Development and Evaluation Report

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

BNA Master Plan Update Community Advisory Committee Meeting No. 5

Chapter 1 Introduction and Project Overview

Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

Partnership for Quieter Skies Report

Ted Stevens Anchorage International Airport

Partnership for Quieter Skies Report

Ted Stevens Anchorage International Airport

and Forecast Review and Approval Process

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012

Connecting People Building Opportunities BRISBANE AIRPORT 2014 MASTER PLAN

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

RNO Master Plan Approved Alternatives, Financial Analysis, and Facilities Implementation Plan

Partnership for Quieter Skies Report

BNA Master Plan Update Public Meeting No. 2

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Recommended Performance Measures

Planning, Development and Environment Committee

Chapter 1 EXECUTIVE SUMMARY

Lake Tahoe Airport Master Plan

I-3 DFW Extension Public Hearing. June 2, 2011

CatExes vs. EAs When and How to Prepare

Las Vegas McCarran International Airport. Capacity Enhancement Plan

Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM

Greater Orlando Aviation Authority Board Meeting. Wednesday, January 17, 2018

Welcome to the Boise Airport Master Plan Update Open House

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Welcome Land Use Element... LU-1

Toronto Pearson Master Plan Greater Toronto Airports Authority October 4, 2017

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

FORECASTING FUTURE ACTIVITY

Sam Imperati Facilitator

Airport Planning at the. Local and National Levels. Presented to: ICAO Airport Planning Workshop for the SAM Region

Master Plan Update Executive Summary. Photos Courtesy of Houston Airport System

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

AIRPORT WITH NO RUNWAYS IS A MALL

AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA

Chapter 9: Financial Plan Draft

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #1 September 24, Peter O. Knight Airport

Introduction DRAFT March 9, 2017

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Draft Palo Alto Airport Master Plan Report County of Santa Clara, California October 2005

Finance and Implementation

Norfolk International Airport

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

US 83 Relief Route. City of La Joya City of Peñitas Hidalgo County. November 15, 2012

STUDY WORK GROUP MEETING No. 3. November 29, 2016

July 21, Mayor & City Council Business Session KCI Development Program Process Update

Transcription:

FINAL REPORT Prepared for: City of Austin Department of Aviation 3600 Presidential Boulevard Austin, Texas 78719 Prepared by: P&D Aviation A Division of P&D Consultants, Inc. 999 Town & County Road, 4 th Floor Orange, California 92868 (714) 835-4447 October 2003

The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration as provided under the Airport and Airways Improvement Act of 1982. The contents of this report reflect the views of P&D Aviation, a Division of P&D Consultants, which is responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the views or policy of the FAA. Acceptance of this report by the FAA does not in any way constitute a commitment on the part of the United States to participate in any development depicted therein, nor does it indicate that the proposed development is environmentally acceptable.

MASTER PLAN UPDATE FINAL REPORT TABLE OF CONTENTS Page CHAPTER 1 INTRODUCTION Purpose and Scope of Study...1-1 Airport Location and Role...1-1 Key Issues...1-3 Goals and Objectives...1-4 The Planning Process...1-7 Study Documentation...1-7 Public Involvement...1-8 DOA Workshops...1-9 Peer Review...1-9 Population and Area Economy...1-10 Historical Aviation Activity...1-12 Effects of September 11...1-16 CHAPTER 2 EXISTING CONDITIONS Introduction...2-1 Airside Facilities...2-1 Passenger Terminal Building...2-9 Ground Access Facilities...2-13 Other Airport Facilities...2-19 Existing Site Utilities...2-23 CHAPTER 3 AVIATION DEMAND FORECASTS Introduction...3-1 Planning Levels...3-2 Description of Air Service Area...3-3 Passenger Forecast...3-3 Air Cargo Forecast...3-9 Forecast of Based General Aviation Aircraft...3-11 Forecast of Aircraft Operations...3-12 Surface Transportation Forecasts...3-16 i

CHAPTER 4 FACILITY REQUIREMENTS TABLE OF CONTENTS (Continued) Introduction...4-1 Airside Requirements...4-1 Terminal Building Requirements...4-6 Ground Access Requirements...4-10 Other Airport Requirements...4-16 Site Utility Requirements...4-22 CHAPTER 5 PASSENGER TERMINAL COMPLEX DEVELOPMENT ALTERNATIVES Introduction...5-1 Overview of Alternatives Process...5-1 Initial Development Alternatives...5-2 Final Development Alternatives...5-22 Concept A-07A, The Preferred Alternative...5-38 CHAPTER 6 ENVIRONMENTAL EVALUATION Introduction...6-1 Noise...6-1 Compatible Land Use...6-4 Social Impacts...6-6 Induced Socioeconomic Impacts...6-9 Air Quality...6-10 Water Quality...6-12 Department of Transportation Act, Section 4(f)...6-14 Historic, Archeological and Cultural Resources...6-15 Biotic Communities...6-17 Endangered and Threatened Species...6-18 Wetlands...6-18 Floodplains...6-21 Coastal Zone Management Program and Coastal Barriers...6-23 Wild and Scenic Rivers...6-23 Farmland...6-24 Energy Supply and Natural Resources...6-24 Light Emissions...6-27 Solid Waste Impacts...6-27 Construction Impacts...6-29 Summary of Findings...6-30 ii

TABLE OF CONTENTS (Continued) CHAPTER 7 IMPLEMENTATION PLAN AND SCHEDULE Introduction...7-1 Role of the Airport...7-1 Airport Plans...7-2 Terminal Expansion Plan...7-18 Phased Development Program...7-43 Phased Development Costs...7-62 Continuous Planning Process...7-63 APPENDIX A APPENDIX B APPENDIX C APPENDIX D GLOSSARY AND ABBREVIATIONS WETLANDS ASSESSMENT COST ESTIMATE FINANCIAL FEASIBILTY iii

MASTER PLAN UPDATE FINAL REPORT LIST OF TABLES Page CHAPTER 1 INTRODUCTION Table 1-1 Major Employers in the Austin Area...1-11 Table 1-2 Austin SMSA Employment by Sector in 2000...1-12 Table 1-3 Enplaned Passenger Trends RMMA and Austin International Airport: 1981-2000...1-13 Table 1-4 Enplaned Air Cargo by Type: 1995-2000 Austin-Bergstrom International Airport...1-15 Table 1-5 Historic Aircraft Operations at RMMA and ABIA: 1980-2000...1-16 CHAPTER 2 EXISTING CONDITIONS Table 2-1 Runway Weight Bearing Capacities...2-3 Table 2-2 Wind Coverage...2-9 Table 2-3 Summary of Passenger Terminal Floor Areas...2-12 Table 2-4 Breakdown of Passenger Terminal by Functional Area...2-13 Table 2-5 Existing Air Cargo Facilities...2-20 CHAPTER 3 AVIATION DEMAND FORECASTS Table 3-1 Future Planning Levels...3-3 Table 3-2 High Growth Passenger Enplanement Forecast Austin-Bergstrom International Airport...3-6 Table 3-3 Range of Passenger Forecasts Austin-Bergstrom International Airport...3-7 Table 3-4 Passenger Peaking Characteristics High Growth Passenger Forecast Austin-Bergstrom International...3-7 Table 3-5 High Growth Hub Scenario Enplaned Passenger Forecast Austin-Bergstrom International Airport...3-8 Table 3-6 High Growth Forecast of Enplaned Air Cargo by Type Austin-Bergstrom International Airport...3-10 Table 3-7 Range of Air Cargo Forecasts Austin-Bergstrom International Airport...3-10 Table 3-8 High Growth Forecast of General Aviation Based Aircraft at Austin Bergstrom International Airport...3-11 Table 3-9 Summary of High Growth Aircraft Operations Forecast Austin-Bergstrom International Airport...3-14 Table 3-10 High Growth Peak Hour Aircraft Operations in the Average Day of the Peak Month Austin-Bergstrom International Airport...3-16 Table 3-11 High Growth Surface Transportation Forecasts for the Average Day Peak Month...3-17 iv

LIST OF TABLES (continued) CHAPTER 4 FACILITY REQUIREMENTS Page Table 4-1 Summary of Airside Facility Requirements...4-2 Table 4-2 Hourly Demand Versus Capacity...4-3 Table 4-3 Comparison of Selected FAA Benchmarks with ABIA...4-4 Table 4-4 Annual Demand Versus Capacity...4-4 Table 4-5 Summary of Terminal Area Requirements for Austin-Bergstrom International Airport...4-9 Table 4-6 Summary of Ground Access and Parking Requirements for Austin-Bergstrom International Airport...4-11 Table 4-7 Summary of Public Parking Requirements Considering Off-site Parking Facilities...4-15 Table 4-8 Projected All-Cargo Facility Requirements for Austin-Bergstrom International Airport...4-17 Table 4-9 Summary of Land Area Requirements Cargo and Other Support Facilities...4-18 Table 4-10 Summary of General Utility Requirements...4-23 CHAPTER 5 PASSENGER TERMINAL COMPLEX DEVELOPMENT ALTERNATIVES Table 5-1 Evaluation Matrix...5-21 Table 5-2 Passenger Terminal Complex Evaluation Matrix For Final Two Alternatives...5-37 Table 5-3 Summary of Order of Magnitude Costs Concepts A-06A and A-07A...5-38 CHAPTER 6 ENVIRONMENTAL EVALUATION Table 6-1 Long Range Forecasts of FAR Part 150 and s...6-3 Table 6-2 Summary of Environmental Evaluation...6-31 CHAPTER 7 IMPLEMENTATION PLAN AND SCHEDULE Table 7-1 Estimated Requirements for Ultimate Airport Development...7-17 Table 7-2 Summary of Estimated Construction Costs by Planning Level...7-62 Table 7-3 Continuous Planning Monitoring Matrix...7-64 Table 7-4 Planning Trigger Points...7-67 v

MASTER PLAN UPDATE FINAL REPORT CHAPTER 1 INTRODUCTION LIST OF FIGURES Page Figure 1-1 Location Map...1-2 CHAPTER 2 EXISTING CONDITIONS Figure 2-1 Existing Airport...2-2 Figure 2-2 ABIA Terminal Area Airspace...2-7 Figure 2-3 Existing Passenger Terminal...2-11 Figure 2-4 Regional Access...2-14 CHAPTER 3 AVIATION DEMAND FORECASTS Figure 3-1 Air Service Area Austin-Bergstrom International Airport...3-4 CHAPTER 5 PASSENGER TERMINAL COMPLEX DEVELOPMENT ALTERNATIVES Figure 5-1 Concept A-01...5-3 Figure 5-2 Concept A-02...5-5 Figure 5-3 Concept A-03...5-6 Figure 5-4 Concept A-04...5-7 Figure 5-5 Concept A-05...5-8 Figure 5-6 Concept A-06...5-10 Figure 5-7 Concept A-07...5-11 Figure 5-8 Concept B-01...5-12 Figure 5-9 Concept B-02...5-14 Figure 5-10 Concept B-03...5-15 Figure 5-11 Concept A-06A...5-23 Figure 5-12 Concept A-07A...5-29 CHAPTER 6 ENVIRONMENTAL EVALUATION Figure 6-1 FAR Part 150 2019 Noise Contours...6-2 Figure 6-2 Land Acquisition...6-5 Figure 6-3 Wetlands...6-19 Figure 6-4 Floodplains...6-22 vi

LIST OF FIGURES (continued) Page CHAPTER 7 IMPLEMENTATION PLAN AND SCHEDULE Figure 7-1 Airport Layout Plan...7-4 Figure 7-2 Recommended Land Use Plan...7-8 Figure 7-3 Conceptual Layout of West Side Cargo Area...7-10 Figure 7-4 Recommended North Terminal Expansion...7-19 Figure 7-5 South Passenger Terminal Departure Level...7-21 Figure 7-6 South Passenger Terminal Arrival Area...7-22 Figure 7-7 South Passenger Terminal Ground Transportation Level...7-23 Figure 7-8 South Passenger Terminal Cross Sections...7-24 Figure 7-9 Ground Access and Parking Improvements...7-29 Figure 7-10 Utility Corridors...7-42 Figure 7-11 Phasing Plan Facilities...7-44 Figure 7-12 Phasing Plan Roadways...7-45 vii