Atlanta NextGen PBN Activities

Similar documents
Honeywell.com PBN Concepts Krakow, Poland

Near Term Potential for System Capacity Gains from RNP and RNAV Procedures

Operational Demonstration of a Performance-Based Separation Standard at The Hartsfield-Jackson Atlanta International Airport

Required Navigation Performance (RNP) in the United States

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

Implementation challenges for Flight Procedures

A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures

NextGen Priorities: Multiple Runway Operations & RECAT

Name of Customer Representative: Bruce DeCleene, AFS-400 Division Manager Phone Number:

Título ponencia: Introduction to the PBN concept

RNP AR RWY 16 in Vienna Schwechat (LOWW) PBN based Noise Abatement

ENRI International Workshop on ATM/CNS

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

Learning Objectives. By the end of this presentation you should understand:

RNP AR APCH Approvals: An Operator s Perspective

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

Navigation at the. Federal Aviation Administration Crossroads

NextGen. Accomplishments. Federal Aviation Administration

RNP AR and Air Traffic Management

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

ICAO Activities. IFPP work on the Manual for Continuous Descent Operations. Federal Aviation Administration

EASA RNP (AR) Workshop The Landscape Working Together

NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Appendix E NextGen Appendix

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Challenges in Complex Procedure Design Validation

Final Approach Operations Symposium

EXPLANATION OF TPP TERMS AND SYMBOLS

RNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement.

PBN Implementation in the UK

LONG BEACH, CALIFORNIA

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

Contextual note SESAR Solution description form for deployment planning

KSFO RNAV TO GLS DEMONSTRATION

PBN Implementation inside Italian Airspace Status update Summer 2013

Next Generation Airspace Developments: Key Operational Trends and Enablers

LAX Community Noise Roundtable Work Program A1 Review of SoCal Metroplex Proposed Procedures and Suggestions for Comment Letter.

APAC PBN UPDATE Slide 1 of xx

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

PBN Operational Approval Continental En Route Navigation Specifications

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

Optimized Profile Descents A.K.A. CDA A New Concept RTCA Airspace Working Group

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

TWELFTH AIR NAVIGATION CONFERENCE

Continuous Descent? And RNAV Arrivals

Air Navigation Bureau ICAO Headquarters, Montreal

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

Safety Enhancement RNAV Safe Operating and Design Practices for STARs and RNAV Departures

Think the solution, experience the change

DSNA NAVIGATION STRATEGY

Chapter 6. Nonradar. Section 1. General DISTANCE

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy

Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

(RN R A N V A V & & RN R P N

Aviation Noise and Emissions Reduction Symposium (ANERS): Panel on Performance-Based Navigation (PBN) Implementation

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

ILS/MLS Approaches to Parallel Runways

Wake Vortex R&D. Status Briefing. NBAA Convention. Federal Aviation Administration. By: Steve Lang Date: September 2007

Updates to Procedures at St. John s International Airport

AERONAUTICAL INFORMATION CIRCULAR 18/18

Dubai contest LIDAR in Dubai DANS Wake Vortex campaign DXB Operations Dependent Diagonal Approach implementation Phase RPAT Approach concept

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

European Aviation Safety Agency

Advisory Circular. Radius to Fix (RF) Path Terminator

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

Optimization of Airspace and Procedures in the Metroplex

Have Descents Really Become More Efficient? Presented by: Dan Howell and Rob Dean Date: 6/29/2017

Understanding Required Navigation Performance (RNP) and Area Navigation (RNAV)Operations

FAA GBAS Program Update January 29, 2010

Instrument Proficiency Check Flight Record

APPENDIX F AIRSPACE INFORMATION

AREA NAVIGATION RNAV- MANAGEMENT

A Pilot s perspective

2 Purpose and Need. 2.1 The Need for the Proposed Action Description of the Problem

Implementation of PBN in Armenian airspace

IFR SEPARATION WITHOUT RADAR

Crosswind-based wake avoidance system approved by the FAA for operational use. Clark Lunsford (MITRE) & Dr. Edward Johnson May 15-16, 2013

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Wide Area Augmentation System (WAAS) and Local Area Augmentation System (LAAS) Update

B Glossary of Terms. Copyright National Academy of Sciences. All rights reserved. Above Ground Level (AGL)

Russian Federation ATM modernization program

Operational Demonstration of a Performance-Based Separation Standard at The Hartsfield-Jackson Atlanta International Airport

New York Aviation Management Association Conference

NextGen for Airports Resources and Guidebooks. Wednesday, May 24, :00pm to 3:30pm ET

Performance Based Navigation Implementation of Procedures

Initiated By: AFS-400

Next Generation Air Transportation System. Edward L. Bolton, Jr. Assistant Administrator for NextGen 17 November 2015

U.S. Next Generation Air Transportation System

Continuous Descent Arrivals (CDA) Workshop #2

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

Charlotte - Douglas International

FLIGHT OPERATIONS PANEL

Transcription:

Atlanta NextGen PBN Activities Presentation to: Name: Date: EWG Ops SC Meeting Jim Arrighi RNAV/RNP Group Jim Allerdice A80 May 18, 2010 0 0

Atlanta Performance Based Navigation Project Planning Seven elements to Atlanta PBN projects: 1. RNAV/RNP Dependent and Independent Approaches to Parallel Runways 2. RNAV Visual Approaches to all runways 3. RNAV Standard Instrument Departures (SIDs) + option 4. RNAV Standard Terminal Arrivals (STARs) 5. RNAV/RNP Radius to a Fix (RF) turns to Final Approach Course 6. RNAV/RNP Transitions to Instrument Landing System (ILS) Final Approach Courses 7. RNP Radius to a Fix (RF) Special SID 1

Atlanta Performance Based Navigation Project Planning RNAV/RNP Dependent and Independent Approaches to Parallel Runways Allows use of public RNAV and RNP instrument approach procedures for parallel dependent and simultaneous independent ILS/MLS operations. Each runway at Hartsfield-Jackson Atlanta International Airport is served by an ILS, ILS/PRM, RNAV (GPS) Y, and an RNAV (RNP) Z SAAAR approach, but cannot use them in combination Key TF5 PBN functionality needed for operations throughout the National Airspace System as backup to the ILS or stand alone approach. Previously approved at Houston-Bush Intercontinental via waiver for use with RNP SAAAR procedures. A proposed change, modeled after the Houston Waiver to allow use with public procedures, would implement the change to FAA Order JO 7110.65, Air Traffic Control. This change would allow air traffic control personnel to use any combination of ILS, RNAV (GPS/RNP) approaches for parallel dependent and simultaneous independent operations to the dual/triple parallel runways. Additional consideration was given to LPV approaches as well. The Document Change Proposal (DCP) to allow parallel dependent and simultaneous independent approaches with all combinations of ILS/RNAV/RNP with vertical guidance was sent to the field for comment on April 30, 2010. 2

Atlanta Performance Based Navigation Project Planning RNAV Visual Approaches to all runways Developed per Order 8260.55, Special Area Navigation Visual Flight Procedures For use only by pilots of aircraft equipped with instrument flight rules (IFR)- approved RNAV systems. The procedures are not public in nature, but are approved via a process similar to that of special instrument approach procedures (IAP). RVFP are not special IAPs by definition but rather are simply considered special procedures. A lead operator may design RVFP, through oversight by the Flight Standards Service (AFS) of the FAA. Others may become signatory. DAL is the lead carrier Concept is preparatory for development of RNP AR with RF legs Ground tracks will mirror the RNP AR with RF proposal 3

Atlanta Performance Based Navigation Project Planning RNAV Standard Instrument Departures (SIDs) Plan will use additional tracks to allow for triple RNAV OTG departures Currently approved SID tracks do not allow for triple departures due to 15-degree divergence requirements. When in triple departure configuration departures are radar vectored. Requires switching back/forth between RNAV and RV departures. The RNAV SID plan will establish additional ground tracks, but will require a waiver for reduced divergence. Requires 10- and 11-degrees in a west flow configuration Requires 6- and 13-degrees in an east flow configuration Divergence is immediate, and standard separation is achieved NLT 11.5 NM, as compared to DFW where departures can remain 6200 feet apart until divergence at 11 NM AFS450, Flight Simulation and Analysis Branch, is completing analysis of the proposal to support a waiver request. The report was scheduled for delivery the week of May 2. Status? An SRMD, procedure development and submission will follow. Tentative pub date March 2011. 4

Existing Design 5

6

7.6 NM Until Standard Separation Exists @ MPASS Successive Departures 290 True 280 True Aircraft Fly 1.2 NM Before Turning Both Turn Right From 270 Course! 7

Standard Separation exists 13.3 NM From Runway 26L Parallel Departures 281.7 True 270 True ATL 2.5NM DFW 6,200 Feet 280 True 4,400 Feet - 210 True Standard Separation exists at SLAWW 10.5 NM from RWY 27R 8

All other runway/track combinations that are normally used in a West Operation are separated by 15 or more. 9

Successive Departures Standard Separation Exists @ HRSHL 6.73 NM from RWY 8R 67.82 True 080 True Both Turn Left From 090 Course 10

Parallel Departures Standard Separation Exists @ FUELL 11.5NM from RWY 8R 080 True - 4,400 Feet - 5,250 Feet 96.05 True DFW 6,200 Feet ATL 2.5NM 090 True Standard Separation Exists @ GRITZ 7.14NM from RWY 10 11

All other runway/track combinations that are normally used in a East Operation are separated by 15 or more. 12

Single Heading off Rwy 26L/R East Operation remains substantially the same. New Route for South Departures The rest of the West Operation remains substantially the same. Allows Trips West 13

Atlanta Performance Based Navigation Project Planning RNAV Standard Terminal Arrivals (STARs) Expansion of VIKNN RNAV STAR OPD project Developed and tested in 2007/2008 based on the ERLIN RNAV STAR from MEM and BNA Published in 2009 VIKNN is an east operation arrival. Connects to the 9R ILS at VINII Initial VIKNN testing was conducted (mid-night to 6:00 AM?) when in an East Operation AirTran, ASA, Delta and FedEx participants Proved benefits and procedure viability Operational use has been problematic due metering (TMA) limitations and compatibility with the ERLIN RNAV STAR Workgroup convened March/April 2010 to expand ATL OPD effort Target expanded demo of VIKNN use in Oct 2010 TMU work group meeting at ZTL May 2010 to tackle TMA metering challenges Workgroup will reconvene in June 2010 Additional OPD arrivals under discussion; must resolve 24/7 VIKNN use first 14

Atlanta Performance Based Navigation Project Planning 15

Atlanta Performance Based Navigation Project Planning RNAV/RNP Radius to a Fix (RF) turns to Final Approach Course Project will design RF legs to connect the RNAV STARs to the RNP approaches. The RF leg synchronizes the downwind path to the final approach course. This path will be a transition on the PARC WG evaluation of where the aircraft is considered established on the RNP approach is ongoing. The required 1,000 vertical and/or 3nm separation may not apply and thus the aircraft will be allowed to fly a shorter path to the runway. Simultaneous approach separation will be provided by the path containment and on board alerting of RNP coupled with an adjacent aircraft being established on the adjacent approach course. The objective is to increase safety in simultaneous operations, reduce mileage flown, and increase environmental and operational efficiencies. Multiple RF Legs 16

Proposed Atlanta RNP Design Concept West Flow Industry Collaboration Example- Delta Air Lines Proposed Design Concept 17

Proposed Atlanta RNP Design Concept East Flow Industry Collaboration Example- Delta Air Lines Proposed Design Concept 18

Atlanta Performance Based Navigation Project Planning RNP Transitions to Instrument Landing System (ILS) Final Approach Courses Current separation criteria requires 3nm lateral or 1,000 vertical during ILS turn on. Can create final approach segments that are 20-22nm long in a triple ILS operation. Once an aircraft is established on the localizer separation responsibility is transferred to ILS monitor controllers. The objective of this activity is similar to the RNP approach tied to the RNAV STAR, i.e, the aircraft is established on the approach prior to intercepting the ILS localizer. There are challenges associated with transitioning from an RNP procedure to the ILS, e.g., baro VNAV, multiple glideslope intercept points. 19

Atlanta Performance Based Navigation Project Planning RNP Radius to a Fix (RF) Special SID Project will design RF legs on a departure procedure. Delta requested special departure procedure First application of an RNP departure with RF Services heavy aircraft departures to the north and avoids environmentally sensitive areas to the west RNP with RF Leg 20

Questions? 21