CAMBRIDGESHIRE ROAD WORKS & EVENTS INFORMATION: SOUTH CAMBS

Similar documents
CAMBRIDGESHIRE ROAD WORKS & EVENTS INFORMATION: SOUTH CAMBS

Dial-a-Ride Schemes Page Volunteer Car Schemes Minibus Hire Shopmobility Schemes Taxicard Schemes

Visit for up-to-date copies of this document and leaflets covering neighbouring districts.

CAMBRIDGESHIRE ROAD WORKS & EVENTS INFORMATION: HUNTS

Proposed End Date. Proposed Start Date. 18-Oct Oct-2016 Skip. 19-Oct Nov-2016 SKIP

P/S/I/J/ F/M Type Area Sep-11 Sep-12 Sep-13 Sep-14 Sep-15 Sep-16 Sep-17 Sep-18 Comment/ School

TIP Scheme List Cambridge and South Cambridgeshire

Highway and Street Works Bulletin

1a TIP Scheme List 2017 Cambridge and South Cambridgeshire Category: C=Cycling, W=Walking, P=Public transport, T=Traffic S=Safety

Appendix 6 Fulbourn Greenway Review

Draft Transport Strategy for Cambridge and South Cambridgeshire

CAMBRIDGESHIRE LOCAL ACCESS FORUM

Appendix 8 Sawston Greenway Review

216CSP offers state of the art business space and the opportunity to occupy a striking new HQ.

Road Closures for w/c 13 th February 2016

In the absence of Cllr Bathmaker. and Vice-Chairman Cllr Wiltshire. the meeting was chaired by Cllr Pipe pm PARISH COUNCIL MEETING

Town Centre Improvements Plan

COMMUNICATIONS. Cambridge

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

ACCOMMODATION. Park New bike storage compound New internet connectivity New landscaping Electric car charger

MALDON DISTRICT LOCAL HIGHWAY PANEL Approved Works Programme September 2018 Update

D L R C C T R A F F I C N E W S

Histon Road Local Liaison Forum (HR LLF) Minutes

Ermine Street Environmental Enhancements

Hertfordshire Highways WATFORD - Active Works Bulletin - July 2011

Updated May 2017 Description of FIXED ASSET Identification Date of Acq Purchase Cost Market Value

Growth Area Funding (Northstowe)


Appendix 9 Melbourn Greenway Review

Event Title - Isle of Wight Festival MEMBERS BRIEFING June 2011

Archant is one of the most respected and trusted names in local and regional media in the UK

MALDON DISTRICT LOCAL HIGHWAY PANEL Approved Works Programme June 2018 Update

Minutes of the Cambridgeshire Local Access Forum (LAF) Meeting Held on Tuesday 17 May 2016 at 7 pm at The Monkfield Arms, Cambourne

Monitoring Report No. 278


D L R C C T R A F F I C N E W S

OFFICES CAMBRIDGE RESEARCH PARK OFFICE Z1 30,000 FT 2 OFFICE Z2 25,000 FT 2 FOR SALE / TO LET COMPLETION MID Working for Science and Business

Shallow IC of 5

Updated April Ref No. Deeds at Lloyds TSB, Sydney Street, Cambridge Deeds at Lloyds TSB, Sydney Street, Cambridge

TENDER NO. T WESTDALE ROAD SANITARY SEWER UPGRADE ADDENDUM NO. 1

HILGAY PARISH COUNCIL

Shopping Park. The. All open now. Biggleswade, SG18 8NE. 85% pre-let/open Last remaining units 2 x 7,500 sq ft and 1 x 5,500 sq ft

Little Abington Parish Council Minutes February 2019

D L R C C T R A F F I C N E W S

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05

JOINT TRANSPORTATION BOARD. 10 June Non-key. That subject to the views of the Board,

Regulatory Committee

D L R C C T R A F F I C N E W S

CRAWLEY PARISH COUNCIL

COTTENHAM PARISH COUNCIL ACCOUNTS FOR THE YEAR ENDED 31ST MARCH 2014

First time sewerage scheme from

Sawston Village College s Termly Magazine SPRING 2012 ISSUE 40

Chapter 12 Route window W15 Dog Kennel bridge. Transport for London

MINUTES OF PARISH COUNCIL MEETING HELD IN THE VILLAGE HALL, TROTTISCLIFFE ON THURSDAY 7 TH FEBRUARY 2013

Over Parish Council. TO RECEIVE AND ACCEPT APOLOGIES FOR ABSENCE County Cllr Mr P Hudson

Litter Pick (p9) Fri 13 th Oct. Sat 14 th Oct. Sun 22 nd Oct Songs of Praise, GM church 3 pm (p10)

Construction Open Evening

HENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September Chock Lane Traffic Calming scheme Monitoring Report

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Unlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe

Railfuture East Anglia Whittlesford Parkway station audit

Chapter 7 Route Window C6 Farringdon station. Transport for London

Chapter 21 Route window W6 West Ealing station. Transport for London

Royal Burgh of Crail and District Community Council

Ladbrokes Head Office Imperial House, Imperial Drive Rayners Lane, Harrow Middlesex HA2 7JW, UK

12. Sowter Road Introduction Christchurch Court

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

Passive Level Crossings. Crossings where users are in control of their actions

Day and night work: Hills M2 Motorway tunnel portals and Coral Tree Drive electrical substation

EPPING FOREST DISTRICT COUNCIL WITH ESSEX COUNTY COUNCIL LOCAL HIGHWAY PANEL 2 nd JULY 2018 REPORT 1 APPROVED SCHEMES UPDATE

Lent 2002 Termcard. In addition to our walks this term, we look forward to seeing you at our Formal Hall at St. John's!

N11 Arklow / Rathnew & N7 Newlands Cross PPP Contract. Kieran Kelly

Adoption and Maintenance of Sustainable Drainage Systems in South Cambridgeshire. Council Policy. Published by South Cambridgeshire District Council

ELECTRICAL PROPERTIES PVC FILLER NOMINAL VOLTAGE 0,6/1 kv CLOURS CORES CLOURS

Chapter 9 Route Window C8 Whitechapel station. Transport for London

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

Minutes of Parson Drove Parish Council Meeting held in the Cage on Wednesday 14 th February 2018.

West End State School - Stage 1

The bypass is west of the current crossing, leaving only local traffic using the existing road.

25 th Avenue Grade Separation. September 13, 2017

D L R C C T R A F F I C N E W S

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Minutes of a meeting of the Planning Committee held on Wednesday, 7 March 2018 at 9.30 a.m.

Member-led Review of Cycling Infrastructure

COLCHESTER LOCAL HIGHWAYS PANEL MINUTES AND ACTIONS

ENVIRONMENT & TRANSPORTATION DEPARTMENT TRAFFIC NEWS

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Construction Staging Area 197 Redpath Avenue

CAMBRIDGESHIRE LOCAL ACCESS FORUM

Astoria Boulevard ADA and Station Renewal Track Improvements. January 30, 2019

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

Felixstowe Branch Line FAQ

Community Liaison Group

Firestop Maintenance

Shotgate Parish Council

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

33/17 MINUTES OF A MEETING OF EAST WILLIAMSTON COMMUNITY COUNCIL HELD ON THURSDAY 7 TH SEPTEMBER 2017 AT THE EAST WILLIAMSTON COMMUNITY HALL AT 7.

PRESENT: COMMITTEE: Mr Webb (Chairman), Mr Hallett, Mr Freeman, Mr McInulty, Mr Geraghty, Mr Clarke, Mr Timms Members of the Public: 0

Minutes of Bures Hamlet Parish Council Meeting Monday 20 th March 2017 at the Garrad Room, Bures Community Centre, Nayland Road

CALA HOMES AT GREAT KNEIGHTON CAMBRIDGE CALA HO ME S

Working Party News. The big news this month is that the major part of the work at Compasses Bridge has been successfully

Transcription:

KEY: Organisation/Contractor Road Locality Traffic LITLINGTON ROAD ABINGTON PIGOTTS ROAD CLOSURE 07-Aug-2017 28-Aug-2017 Connections Projects:NEW INDIVIDUAL SUPPLY::350m of road& verge to install new low voltage cable for BT cabinet 07-Aug-2017 20-Aug-2017 Traffic Counter CAMBRIDGESHIRE WEST WICKHAM ROAD BALSHAM SOME C/W CAMBRIDGESHIRE WALNUT TREE CLOSE BASSINGBOURN CUM SOME C/W KNEESWORTH CAMBRIDGESHIRE ROAD WORKS & EVENTS INFORMATION: SOUTH CAMBS 1st-15th August 2017 For further information on the below please contact 0345 045 5212 Not all road works are included in the list below as some are issued at very short notice due to emergencies or very small works which don't require a long period of notice. The Police can also close roads for safety reasons. :denotes Road Closure 01-Aug-2017 07-Aug-2017 Connections Highway OF COLUMN L2NAX BT SPRING LANE BASSINGBOURN CUM SOME C/W KNEESWORTH CAMBRIDGESHIRE CLARKES WAY BASSINGBOURN CUM SOME C/W KNEESWORTH 01-Aug-2017 04-Aug-2017 1,Install 1m of 2 poly ducts in Verge 15-Aug-2017 21-Aug-2017 Connections Highway OF COLUMN L4NAY CAMBRIDGESHIRE BARTLOW ROAD CASTLE CAMPS ROAD CLOSURE 07-Aug-2017 09-Aug-2017 Replace Roadmarkings Cambridge Water Company SCHOOL LANE CONINGTON SOME C/W CAMBRIDGESHIRE LONG DROVE COTTENHAM SOME C/W Cambridge Water Company COSSINGTON CLOSE COTTENHAM MULTI-WAY Cambridge Water Company HISTON ROAD COTTENHAM MULTI-WAY HIGH STREET COTTENHAM TWO-WAY 03-Aug-2017 07-Aug-2017 New connection to main, fit meter and lay supply 04-Aug-2017 17-Aug-2017 2 Counters 08-Aug-2017 11-Aug-2017 Traffic lights only. Work is on Histon Road 08-Aug-2017 11-Aug-2017 New connection to main, fit meter and lay supply 14-Aug-2017 25-Aug-2017 Connections Projects:NEW SUPPLY SCHEME: (APPROX DEPTH 450mm- 600mm):excavate to lay and connect new low voltage cable

HISTON ROAD COTTENHAM MULTI-WAY 15-Aug-2017 21-Aug-2017 Connections Small Service:NEW 600mm):7m road crossing, 5m verge trench and joint bay excavations to install new service TM: 3 WAY LIGHTS, TEMP WALKWAY, UKPN TO PARK WITHIN TM 09-Aug-2017 15-Aug-2017 New connection to 3" main and lay supply 01-Aug-2017 14-Aug-2017 Skip Cambridge Water Company PARK LANE DRY DRAYTON TWO-WAY CAMBRIDGESHIRE ST JOHNS STREET DUXFORD SOME C/W ANGLIAN WATER TEASEL WAY FULBOURN ROAD CLOSURE 07-Aug-2017 07-Aug-2017 Excavate and reinstate to repair manhole in carriageway GAMLINGAY FOOTPATH 9 GAMLINGAY GIVE & TAKE 07-Aug-2017 18-Aug-2017 Network Operations Distribution:INSTALL/REPLACE/REMO VE/DISCONNECT UNDERGROUND SERVICE CABLES:OLD OVERHEAD CONDUCTORS ARE TO BE REMOVED& REPLACED WITH NEW UNDERGROUND LOW VOLTAGE Cadent Gas Limited HUNTINGDON ROAD GIRTON LANE CLOSURE 10-Aug-2017 CABLES 10-Aug-2017 SELF DEFECT- Rectify remedial work in Carriageway 01-Aug-2017 03-Aug-2017 Install 1x 100m of cable into existing duct 01-Aug-2017 04-Aug-2017 Renew lead supply and connect to new pipe STATION ROAD GREAT SHELFORD ROAD CLOSURE 03-Aug-2017 04-Aug-2017 Level Crossing Inspection and maintenance throught level crossing 03/08/2017 at 00.30 until 03/08/2017 at 05.00 and 04/08/2017 at 00.30 until 04/08/2017 at 05.00 BT MILL WAY (C201) GRANTCHESTER TWO-WAY Cambridge Water Company HINTON WAY GREAT SHELFORD TWO-WAY NETWORK RAIL - PROMOTERS NATIONAL CAMBRIDGESHIRE CHURCH STREET GREAT SHELFORD ROAD CLOSURE 14-Aug-2017 16-Aug-2017 Patch carriageway as marked from outside no 5 through to bridge over river - 250m2 HIGH STREET GREAT WILBRAHAM MULTI-WAY CAMBRIDGESHIRE FOX HILL GUILDEN MORDEN SOME C/W 07-Aug-2017 04-Sep-2017 Network Operations Maintenance:OVERHEAD TO UNDERGROUND::Lay electric cable underground to facilitate the removal of low overhead cables. 03-Aug-2017 16-Aug-2017 Skip

CAMBRIDGESHIRE POTTON ROAD GUILDEN MORDEN SOME C/W 07-Aug-2017 06-Sep-2017 Hoarding CAMBRIDGESHIRE CHURCH STREET HARSTON MULTI-WAY 07-Aug-2017 30-Mar-2018 Permit for traffic management only CAMBRIDGESHIRE STATION ROAD HARSTON MULTI-WAY 07-Aug-2017 30-Mar-2018 Permit for traffic management only CAMBRIDGESHIRE HIGH STREET HARSTON MULTI-WAY 07-Aug-2017 30-Mar-2018 To construct a shared use footway on the western side of road through village. To include provision of new signalised pedestrian crossing between Church Street and Station Road. CAMBRIDGESHIRE ROYSTON ROAD HARSTON MULTI-WAY 07-Aug-2017 30-Mar-2018 To construct a shared use footway on the western side of road through village. To include provision of new signalised pedestrian crossing between Church Street and Station Road. ORCHARD CLOSE HARSTON SOME C/W 14-Aug-2017 24-Aug-2017 Connections Small Service:NEW 600mm):PUBLIC DIG 4DAYS DIGGING - (NEW SERVICE) 2XJOINT HOLE TARMAC FOOTWAY 1X60METER TRENCH TARMAC FOOTWAY 1X15METER TRENCH TARMAC FOOTWAY TM TM FOOTWAY CLOSUE DIVERT PREDESTRIANS AT SAFE CROSSING POINTS ROAD PLATES FOR DRIVEWAYS LETTER Cambridge Water Company ACCESS ROAD TO HISTON ROAD CLOSURE 07-Aug-2017 WHOLE STREET 11-Aug-2017 Renew lead supply in tarmac road. HISTON COUNTY JUNIOR SCHOOL FROM THE GREEN Cambridge Water Company STATION ROAD HISTON GIVE & TAKE 07-Aug-2017 11-Aug-2017 New connection to 6" main, fit meter and lay supply Cadent Gas Limited STATION ROAD HISTON TWO-WAY 08-Aug-2017 11-Aug-2017 LAY 5.5M NEW DOMESTIC SERVICE FROM THE MAIN IN THE MIDDLE OF THECARRIAGEWAY

STATION ROAD HISTON SOME C/W 14-Aug-2017 18-Aug-2017 Connections Small Service:NEW 600mm):Excavate and re-instate 2 x Joint holes and 1m trench in Public Tarmac Footpath. TM FOOTWAY CLOSURE TEMP WALKWAY CAMBRIDGESHIRE COOKE WALK IMPINGTON ROAD CLOSURE 05-Aug-2017 05-Aug-2017 Playing Out Scheme - College Road, CAMBRIDGESHIRE MILL ROAD IMPINGTON ROAD CLOSURE 05-Aug-2017 05-Aug-2017 Playing Out Scheme - College Road, CAMBRIDGESHIRE SOUTH ROAD IMPINGTON ROAD CLOSURE 05-Aug-2017 05-Aug-2017 Playing Out Scheme - College Road, CAMBRIDGESHIRE COLLEGE ROAD IMPINGTON ROAD CLOSURE 05-Aug-2017 05-Aug-2017 Playing Out Scheme - College Road, CAMBRIDGESHIRE COLLEGE ROAD IMPINGTON ROAD CLOSURE 05-Aug-2017 05-Aug-2017 Playing Out Scheme - College Road, CAMBRIDGESHIRE HATTONS ROAD LONGSTANTON MULTI-WAY 02-Aug-2017 08-Aug-2017 Connections Highway OF COLUMN S2122 CAMBRIDGESHIRE HIGH STREET LONGSTANTON MULTI-WAY ANGLIAN WATER STATION ROAD LONGSTANTON SOME C/W CAMBRIDGESHIRE STATION ROAD OVER SOME C/W 02-Aug-2017 08-Aug-2017 Connections Highway OF SIGN S2122 08-Aug-2017 11-Aug-2017 INSTALL BULK METER ONTO NEW MAIN LAYED LAST YEAR 02-Aug-2017 04-Aug-2017 Transfer and removal of Street light

NETWORK RAIL - PROMOTERS NATIONAL SAWSTON FOOTPATH 15 SAWSTON ROAD CLOSURE 01-Aug-2017 02-Aug-2017 01/08/2017 at 00.30 until 01/08/2017 at 05:00 and 02/08/2017 at 00.30 until 02/08/2017 at 05:00 Track inspection through level crossing GRANTA ROAD SAWSTON GIVE & TAKE 14-Aug-2017 16-Aug-2017 Network Operations Maintenance:INSTALL / REPLACE LINK BOX: (APPROX DEPTH 450mm):EXCAVATE/REINSTATE LOW VOLTAGE CABLES TO ENABLE LINK BOX REPLACEMENT Cadent Gas Limited THE CHESTNUTS STAPLEFORD GIVE & TAKE 08-Aug-2017 14-Aug-2017 LAY NEW DOMESTIC SERVICE 8.9M FROM MAIN IN FOOTWAY BT HIGH STREET SWAVESEY TWO-WAY 02-Aug-2017 08-Aug-2017 Locate and excavate 1 blockage in existing duct Cambridge Water Company ANDERSON ROAD SWAVESEY MULTI-WAY 07-Aug-2017 18-Aug-2017 Traffic lights only. Work is on Boxworth End Cambridge Water Company BOXWORTH END SWAVESEY MULTI-WAY 07-Aug-2017 18-Aug-2017 Install 2 road crossings consisting of 6m x 250mm HPPE and 6m x 180mm CAMBRIDGESHIRE FULBOURN ROAD TEVERSHAM SOME C/W Cambridge Water Company PEMBROKE AVENUE WATERBEACH MULTI-WAY Cambridge Water Company DENNY END ROAD WATERBEACH MULTI-WAY CAMBRIDGESHIRE ELY ROAD WATERBEACH MULTI-WAY HPPE with 2 main connections. 05-Aug-2017 18-Aug-2017 Skip 10-Aug-2017 18-Aug-2017 Traffic lights only. Work is on Denny End Road 10-Aug-2017 18-Aug-2017 13 x 20m long service connections to 4" main, and lay supply 14-Aug-2017 18-Aug-2017 Connections Highway OF COLUMN L1JBX Cambridge Water Company STREETLY END (C243) WEST WICKHAM TWO-WAY 08-Aug-2017 11-Aug-2017 New connection to 6" main and lay supply