Project A: Revetment Scale: 1 = 10. 3/7 Revision: Benchmarks. Eroding Parking Area. View from Above. Locklies Creek. Ebb.

Similar documents
City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance

ORDINANCE NO. C-16- WHEREAS, the proposed minimum seawall elevation exceeds the current maximum by 0.7 feet (8.4 inches); and

5 September 9, 2015 Public Hearing

Aid to Local Ports FY19 Requests

Crew Chief: Start Date: Completion Date: T & A Code:

New Orleans Municipal Yacht Harbor

Indiana Department of Natural Resources / Division of Water

Header i

Northern Rail Extension, Phase One

HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA

GARFIELD BRIDGE. Building A Bridge to No-Where

COATING AND STRUCTURAL CONCRETE COATING (ANTI-GRAFFITI) 1'-3" FINISHED GRADE 1'-3" 3" VENEER ALLOWANCE LEDGER W/ MECHANICAL ANCHOR BOLT

The Galveston Seawall

THAT the Board approve the final proposed concept plan for the Jericho Marginal Wharf site as shown in Figure C-4 of Appendix C.

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation

Reduction of Wave Runup on a Revetment by Addition of a Berm

Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas

March 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort

SECTION SPECIFICATIONS PART 1 GENERAL

Application for Permit to Develop in a Floodplain Area

WAIMAKARIRI DISTRICT COUNCIL REPORT. Craig Sargison, Manager Community and Recreation

On Pistakee Bay At 1222 Old Bay Road Near McHenry In Unincorporated McHenry County, Illinois (Section 19, T45N, R9E)

Crew Chief: Start Date: Completion Date: T & A Code:

Community Development

AND PERMITTEE DATE LOCATION OF WORK

May 2002 Replacement of Existing Rip Leisure Village Association Rap on the Northwestern

INSTALLATION INSTRUCTIONS for folding arm awnings

Design and Construction of Berm Breakwaters

MINUTES OF MEETING OF WAREHAM CONSERVATION COMMISSION

Staff Report on Brevard County Area Projects (See pages 32-60) Staff will present a report on District Projects in the Brevard County area.

Danvers River Committee Thursday April 20, 2017 Meeting Minutes

SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY

January 19, 2018 Project No C Via

The History & Management of the Atlantic Intracoastal Waterway in Florida

crrv OF DALLAS Memorandum Trinity River Corridor Project Update On Recreation

Figure 7. Dragline at Cape Coral, Figure 8. Cape Coral oblique aerial photograph, 1959.

how it started where we are now what is coming up NEW WESTMINSTER WATERFRONT PARK THE RIVER THE PAST THE PEOPLE

Mollusk Restoration around Wastewater Treatment Plant (NY) # Progress Report: August 26, 2011

Common Ground Drainage Channel Diversion. Design Report

HARBOR INFRASTRUCTURE INVENTORIES Buffalo Harbor, New York

CHAPTER 16 STREETS, SIDEWALKS AND OTHER PUBLIC PLACES*

VERSION DATE OF ISSUE DESCRIPTION PREPARED CHECKED APPROVED Technical note HHP DKA OYBE

The Charleston Style Awning Charleston Style Awning Frame must be installed on the wall as there is no connecting part between AA and TB

HARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH

New ADA Accessibility Standards for the Attractions Industry

Fee if structure is a boathouse or covered dock. For one structure or one boat $ $ For one structure or one boat $ $110.

The next day we cut, cruise taped and permolated the track from Explorer to the

Contractors and Service Providers Registered to Work on Arrowhead Lake Association Properties April 1, 2018 March 31, 2019

Mountain Valley Pipeline, LLC Mountain Valley Pipeline Project Docket No. CP

ASTM E 1886 and ASTM E 1996 TEST REPORT. Report No.: A Rendered to: CORAL ARCHITECTURAL PRODUCTS Tuscaloosa, Alabama

City of Haslett. City of East Lansing. City of East Lansing

Understanding user expectations And planning for long term sustainability 1

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

DOOR - Single Leaf, Premium Duty, Quick-Acting Model 1430 Features 1

Chesapeake Bay Preservation Area Board

Canal Winchester. Town Hall 10 North High Street Canal Winchester, OH Meeting Minutes. Monday, August 14, :00 PM

HARBOR INFRASTRUCTURE INVENTORIES Duluth-Superior Harbor, Minnesota/Wisconsin

Task Force Meeting #2

Neighborhood Dredging SSD Program. Brief to Beaches & Waterways Commission

ROAD AND TRAIL PROJECT APPROVAL

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

SOL VS.2a, 2b, 2c, 10b

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012

THOMAS AND TALBOT REAL ESTATE A Staunch Supporter of Land Easements

Acquisition in fee simple of approximately one-half acre of property on the shore of Spring Lake to expand the Lakeside Beach Park.

Mount Rainier National Park November 2006 Flood Damage

Staff Report. Re: National Park Service Ferry Landing Facilities at Piers 31, 31½ and 33 Joint Meeting with BCDC Design Review Board

BEAVER LAKE ACCESS AREA SUMMARY 2017 Edition


Installation Instructions Traditional Awnings in a box Classic Awnings in a Box

Water Space. A development opportunity at the Canting Basin, Pacific Quay, Glasgow

Chair and Members of Harbour East - Marine Drive Community Council. Brad Anguish, Director, Parks and Recreation

AJW. Athletic Series Lockers. Architectural Products ONE TIER TWO TIER THREE TIER FOUR TIER FIVE TIER SIX TIER

Required Showing for Route 205 Mattox Creek Bridge Replacement F07 Contract Project Number: , C501 - UPC Thursday January 16, 2014

PRELIMINARY STAFF PLANNING REPORT TO THE WALWORTH COUNTY ZONING AGENCY X CONDITIONAL USE

Marine Exchange of Alaska Port of Juneau Navigation Study

WHATCOM COUNTY PLANNING & DEVELOPMENT SERVICES PERMITS RECEIVED. 12/1/2016 to 12/31/2016

DAMAGE ASSESSMENT OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC

MEETING OF JUNE 27, 2016 OF THE TRUSTEES OF THE FREEHOLDERS AND COMMONALTY OF THE TOWN OF EAST HAMPTON

Porter Fk. #1. All unauthorized items removed as per FS & Rec Res guidelines. Footbridge may be needed for wheel chair access and for safety

Chicago Style Awning

Galveston Bay Estuary Program. Carla G. Guthrie, Ph.D. Galveston Bay Council Member Texas Water Development Board

02 Aug 2002 PUBLIC NOTICE

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

Crossing the Keweenaw Waterway in an Emergency with a U.S Army Floating Bridge

Executive Summary of Urgent Field Survey of Earthquake and Tsunami Disasters by the 2011 off the Pacific coast of Tohoku Earthquake

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

NORTH HEMPSTEAD BEACH PARK MASTER PLAN

BRAND-OGRAPHY. Katarina Baumann

Everett Riverwalk Life style explore

Proposed Project 1: Kimble Loop East Horse Trail Reroute (1). Horse Trail Reroute: March 14, 2012

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

SUMMARY OF THE MEETING OF THE WOODS HOLE, MARTHA S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY. September 25, 2018

Weekly Bid Results. Friday, January 20, Broadway Storm Drain, 400 North to 700 North - T. CRL Litter Fence - Casper

Hydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E.

Bostonian style (DOME) Awning ASSEMBLY AND INSTALLATION INSTRUCTIONS

BIRD RIVER COTTAGE OWNERS ASSOCIATION Annual General Meeting September 1, 2013 Executive Members in Attendance: Wally Stewart

Transcription:

Project A: Revetment Scale: 1 = 10 View from Above Floating Dock 3/7 Revision: Benchmarks 34 Locklies Creek Ebb Flood E. 18x8 Floating Dock Channelward of Vegetation 30 Class A1A Rip Rap MLW MHW 57 1 4 Bottom Width Salt Bush 36 1.5 2.5 E. B.H. 3.5 6.5 3 Eroding Bank @46 @16 @36 Concrete @0 @26 @6 54 10 MLW MHW Parking Area Cedar Applicant: Regent Point Marina, Inc. Proj. Address: 317 Regent Point Drive, Topping, VA County: Middlesex Proposed: Revetment, Pier Extensions, Breakwater Tax Map: 30 7 8A1 Waterway: Locklies Creek Agent: Michelle Meredith Date: February 10, 2011 Page: 1 of 5

Project A: Revetment Cross Sectional: Average 2:1 Slope Existing Grade Filter Cloth 4 2 H MLW MHW Applicant: Regent Point Marina, Inc. Proj. Address: 317 Regent Point Drive, Topping, VA County: Middlesex Proposed: Revetment, Pier Extensions, Breakwater Tax Map: 30 7 8A1 Waterway: Locklies Creek Agent: Michelle Meredith Date: February 10, 2011 Page: 2 of 5

Project B: Pier Extensions A Dock: 4 Additional Slips B Dock: 2 Additional Slips C Dock: 2 Additional Slips D Dock: 2 Additional Slips Total: 10 Additional Slips Locklies Creek Project B: Pier Extension Total after add. = 146.4 Total after add. = 212 Total after add. = 205.9 Total after add. = 163.9 3/7 Revision: MLW & MHW Flood Ebb Rappahannock River Project C: Breakwater MHW MLW Project A: Revetment MLW MHW Applicant: Regent Point Marina, Inc. Proj. Address: 317 Regent Point Drive, Topping, VA County: Middlesex Proposed: Revetment, Pier Extensions, Breakwater Tax Map: 30 7 8A1 Waterway: Locklies Creek Agent: Michelle Meredith Date: February 10, 2011 Page: 3 of 5

Project B: Pier Construction Pier constructed of 2x8 rough cut timber, 30 35 foot 10 inch butt pilings and 8 inch top pilings. Pilings are placed 8 foot on center and deck boards are dressed. A Dock: 15x40 Slip 15x40 Slip Materials: 1. Lumber to be salt treated 2. All screws, bolts and hardware to be galvanized. Project C: Breakwater 15x40 Slip 15x40 Slip 6x36 Dock Two 3x22 Finger Piers Two 3x40 Finger Piers Mooring Piling B, C, D Dock: 15x40 Slip 15x40 Slip 6x18 Dock Two 3x40 Finger Piers Rappahannock River Locklies Creek Applicant: Regent Point Marina, Inc. Proj. Address: 317 Regent Point Drive, Topping, VA County: Middlesex Proposed: Revetment, Pier Extensions, Breakwater Tax Map: 30 7 8A1 Waterway: Locklies Creek Agent: Michelle Meredith Date: February 10, 2011 Page: 4 of 5

Project C: Breakwater 20 72 Existing Pier & Timber Groin 144 3/7 Revision: Benchmarks Scale: 1 = 25 4 3 6 5 8 7 9 8 10 9 MHW MLW Build Breakwater 4 above MHW 20 MHW MLW Class A1 Base over Filter Cloth Class II and III Outer Layer Cross Sectional: 24 42 Base 8 14 Height with a 2/1 Slope Filter Cloth Note: Pier is the only structure within a 500 vicinity, therefore, benchmarks are from the pier MHW 10 MLW 6 View from Above: 144 Pier and Timber Groin 4 4 off the E. Groin Locklies Creek 4 4 24 Base 36 Base Rappahannock River 42 Base Applicant: Regent Point Marina, Inc. Proj. Address: 317 Regent Point Drive, Topping, VA County: Middlesex Proposed: Revetment, Pier Extensions, Breakwater Tax Map: 30 7 8A1 Waterway: Locklies Creek Agent: Michelle Meredith Date: February 10, 2011 Page: 5 of 5

Dawn Fleming From: Woodward, Jay (MRC) [Jay.Woodward@mrc.virginia.gov] Sent: Friday, April 01, 2011 10:35 AM To: htmpermits@aol.com; Howell, Beth (MRC); d.kretz@co.middlesex.va.us Cc: wagnerj12@aol.com; WETLANDS Subject: RE: Permit #11-0259 Attachments: IMG_0689.JPG Thank you Michelle. We will withdraw this portion of the project from out review of the application. Accordingly, VMRC will only be authorizing the additional pier and slips requested at this time and that portion of the the riprap revetment in the cove portion that will extend channelward of mean low water. The intertidal portion of the revetment will need to be authorized by the Middlesex Wetlands Board first, and it will be up to the Board if they do or don't want to regulate the new pier and slip additions (no direct wetland impacts, but a commercial project that could have indirect impacts to the shoreline from additional boat traffic, etc.). In addition, during my on-site, Mr. Wagner indicated a willingness to have the timber piles (see picture) removed from the shoreline adjacent to the floating dock, though this is not specifically shown in the drawings, and any piles that may extend beyond (west) of the proposed riprap. VMRC would not object to this, nor would we believe that this removal and "restoration" of the area, require formal Board authorization. Again, we would leave that to the Board's decision, but I feel that would only enhance the project, the site, provided there is no excavation of the substrate, merely cutting and removing the old piles that are exposed currently. All that said, per our policy, the State will not act on our portion of the project until the Wetlands Board acts on theirs. Have a good weekend...think SUN...SPRING!?? Jay Jay Woodward Environmental Engineer, Sr. Virginia Marine Resources Commission Habitat Management Division 2600 Washington Ave., 3rd Floor Newport News, VA 23607 (757)247-8032 From: htmpermits@aol.com [mailto:htmpermits@aol.com] Sent: Friday, April 01, 2011 9:52 AM To: Howell, Beth (MRC); Woodward, Jay (MRC); d.kretz@co.middlesex.va.us Cc: wagnerj12@aol.com Subject: Permit #11-0259 Good morning, In speaking to Mr. Wagner of Wagner Holdings, we have decided that it is best at this time to remove the Breakwater portion of his permit from the application. With the possibility of royalties and a design change, we feel that it may hold up the approval proceedings for the revetment and pier extentions. Mr. Wagner and I will pursue the breakwater portion with a new permit at a later date. If you have any questions or concerns about this removal, please do not hesitate to contact me at 804-370-9163. 1

Best regards, Michelle Meredith 2

Project A: Revetment Scale: 1 = 10 View from Above Floating Dock 3/7 Revision: Benchmarks 34 Locklies Creek Ebb Flood E. 18x8 Floating Dock Channelward of Vegetation 30 Class A1A Rip Rap 57 MLW MHW 1 4 Bottom Width Salt Bush 36 1.5 2.5 E. B.H. 3.5 6.5 3 Eroding Bank @46 @16 @36 Concrete @0 @26 @6 54 10 MLW MHW Parking Area Cedar Applicant: Regent Point Marina, Inc. Proj. Address: 317 Regent Point Drive, Topping, VA County: Middlesex Proposed: Revetment, Pier Extensions Tax Map: 30 7 8A1 Waterway: Locklies Creek Agent: Michelle Meredith Date: February 10, 2011 Page: 1 of 4

Project A: Revetment Cross Sectional: Average 2:1 Slope Existing Grade Filter Cloth 4 2 H MLW MHW Applicant: Regent Point Marina, Inc. Proj. Address: 317 Regent Point Drive, Topping, VA County: Middlesex Proposed: Revetment, Pier Extensions Tax Map: 30 7 8A1 Waterway: Locklies Creek Agent: Michelle Meredith Date: February 10, 2011 Page: 2 of 4

Project B: Pier Extensions A Dock: 4 Additional Slips B Dock: 2 Additional Slips C Dock: 2 Additional Slips D Dock: 2 Additional Slips Total: 10 Additional Slips Locklies Creek Project B: Pier Extension Total after add. = 146.4 Total after add. = 212 Total after add. = 205.9 Total after add. = 163.9 3/7 Revision: MLW & MHW Flood Ebb Rappahannock River MHW MLW Project A: Revetment Applicant: Regent Point Marina, Inc. Proj. Address: 317 Regent Point Drive, Topping, VA County: Middlesex Proposed: Revetment, Pier Extensions Tax Map: 30 7 8A1 Waterway: Locklies Creek Agent: Michelle Meredith Date: February 10, 2011 Page: 3 of 4

Project B: Pier Construction Pier constructed of 2x8 rough cut timber, 30-35 foot 10 inch butt pilings and 8 inch top pilings. Pilings are placed 8 foot on center and deck boards are dressed. A Dock: 15x40 Slip 15x40 Slip Materials: 1. Lumber to be salt treated 2. All screws, bolts and hardware to be galvanized. 15x40 Slip 15x40 Slip 6x36 Dock Two 3x22 Finger Piers Two 3x40 Finger Piers Mooring Piling B, C, D Dock: 15x40 Slip 15x40 Slip 6x18 Dock Two 3x40 Finger Piers Applicant: Regent Point Marina, Inc. Proj. Address: 317 Regent Point Drive, Topping, VA County: Middlesex Proposed: Revetment, Pier Extensions Tax Map: 30 7 8A1 Waterway: Locklies Creek Agent: Michelle Meredith Date: February 10, 2011 Page: 4 of 4