Rehabilitation and development of navigation on the Sava river

Similar documents
Project Data Sheet BASIC PROJECT DATA. Rehabilitation and Development of Transport and Navigation on the Sava River Waterway. Full project title:

Overview. Sava River Basin. Sava River Basin. Sava River Basin

Project Fiche MASTER PLAN FOR DEVELOPMENT OF THE NAUTICAL TOURISM IN THE SAVA RIVER BASIN

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN

Sava Commission Activities. DANUBE SKILLS KICK OFF EVENT, February 21, 2017, Bucharest

Stability Pact for SEE. Working Table II. Sava River Basin Initiative

Terms of Reference (ToR) for a Short-Term assignment

Sava Commission Activities. KICK-OFF MEETING DANTE, February 17, 2017, Budapest

Framework Agreement on the Sava River Basin and its implementation

International Sava River Basin Commission - An example of EU/non EU country cooperation in water management

14 th Sava PEG RBM Meeting REPORT 1 Zagreb, Croatia September 29 th

Doc. No. 1S-26-O-11-4/2-2 STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN

Project Data Sheet BASIC PROJECT DATA

REPUBLIC OF CROATIA MINISTRY OF MARITIME AFFAIRS, TRANSPORT AND INFRASTRUCTURE AGENCY FOR INLAND WATERWAYS

REPORT from the 11 th Special Session of the International Sava River Basin Commission

Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of

EU Strategy for the Danube Region framework for development of inland navigation

REPORT from the 47 th Session of the International Sava River Basin Commission

Project Data Sheet BASIC PROJECT DATA. Improvement of the systems for navigation and topo-hydrographic measurements on the Danube River

Public Seminar 30 October 2018, Lisbon. Water sector in B&H

Common Principles and Technical Requirements for Pan-European River Information Services (RIS)

Presentation from 2015 World Water Week in Stockholm. The authors, all rights reserved. SIWI siwi.org

Permanent Expert Group for Navigation

The Danube Experience

REPORT on implementation of the FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN and work of International Sava River Basin Commission in the period April

!"# $%&!! ' (! ) * )! +, '! -.#!! * ,&! ' % - /,&! ' % %,!

Regional Cooperation on Flood Management in the Sava River Basin

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

Towards practical Guidance for Sustainable Sediment Management using the Sava River as a showcase

ACTIVITIES ON FLOOD RISK MANAGEMENT AND CLIMATE CHANGE ADAPTATION IN THE SAVA RIVER BASIN

DaHar Danube Inland Harbour Development

12th Sava PEG FP Meeting REPORT 1 Zagreb, Croatia October 20-21, 2009

NATIONAL PLAN FOR IWW MAINTENANCE IN THE REPUBLIC OF CROATIA

NATIONAL PLAN FOR IWW MAINTENANCE IN THE REPUBLIC OF SERBIA

AMENDMENTS TO THE DECISION 14/12 ON ADOPTION OF CLASSIFICATION OF THE SAVA RIVER WATERWAY

COMMISSION IMPLEMENTING REGULATION (EU)

PCN Annex: GEF Data Sheet

We are IntechOpen, the world s leading publisher of Open Access books Built by scientists, for scientists. International authors and editors

Ministry of Communications and Transport

Management of a Large The Danube. Mr. Mitja Bricelj ICPDR President Perth,13 October 2010

112 SYSTEM IN BOSNIA AND HERZEGOVINA

CO-OPERATION IN DANUBE RIVER BASIN - THE ROLE OF SHMI SLOVENSKÝ HYDROMETEOROLOGICKÝ ÚSTAV

Basic criteria: Final HMWB designation for the Danube River

Government of Montenegro. Ministry of Transport and Maritime Affairs. Podgorica, April 2013

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data

Transboundary River Management in the Danube Basin

Implementation of the Water Convention, including its complementary role to the EU Water Framework Directive

FRAMEWORK LAW ON THE PROTECTION AND RESCUE OF PEOPLE AND PROPERTY IN THE EVENT OF NATURAL OR OTHER DISASTERS IN BOSNIA AND HERZEGOVINA

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

Danube Commission. 70th anniversary of the. Ship waste management along the Danube. 7 th ASEM Sustainable Development Dialogue

Implementation of ESPOO Convention in Republic of Serbia

National and Regional Activities, Needs and Expectations

5 th CO-WANDA NEWSLETTER AUGUST 2014

The Danube A Stream of Energy

ICAO PLAN OF ACTION FOR KAZAKHSTAN

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

Development of RBMP s In Republic of Macedonia

ICAO PLAN OF ACTION FOR KAZAKHSTAN

Brexit Preparedness seminar on transport. Council Working Party (Article 50 Format) 29/11/2018

Danube River Basin District

ACI EUROPE POSITION. on the revision of. EU DIRECTIVE 2002/30 (noise-related operating restrictions at community airports)

ACI EUROPE POSITION. on the revision of. EU DIRECTIVE 2002/30 (noise-related operating restrictions at community airports)

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY

Terms of Reference: Introduction

TA Round 19 WBIF Steering Committee Paris, 18 June 2018

INTERNATIONAL CIVIL AVIATION ORGANIZATION

ARTWEI ARTWEI ARTWEI

IPA Project Building Resilience to Disasters in Western Balkans and Turkey. Enhancing hydrological data management and exchange procedures

EU Strategy for the Danube Region

Standard Summary Project Fiche centralised programmes Project Fiche: 5

Proposal for a COUNCIL DECISION

The role of Serbia in the security of supply in Europe

The Strategic Commercial and Procurement Manager

2014 floods in Serbia

Contribution to the implementation of the EUSDR's Action Plan. Priorities for the year 2013 Ministry of Infrastructure of Ukraine

The Sava and Drina River Corridor Initiative. Water Day European Commission/World Bank Brussels January 23, 2018

Assessment of Environmental Impacts of the proposed Sectoral Operational Programme for Tourism and Spa Industry

ENVIRONMENTAL SECTOR IN BOSNIA AND HERZEGOVINA -Institutions, Legislation, UNECE TEIA-

Danube River Basin. a source for transboundary cooperation. Exploring the Results and Potential for Transboundary Water Management Cooperation

Official Journal of the European Union L 7/3

Catchment and Lake Research

WORKSHOP ON THE TRANSPOSAL AND IMPLEMENTATION OF THE EU URBAN WASTE WATER TREATMENT DIRECTIVE (UWWTD 91/271/EEC) IN SERBIA

ICAO Universal Security Audit Programme (USAP) ICAO Regional Aviation Security Audit Seminar

Transboundary coopration on water management

Paper 87 - INTERNATIONAL COLLABORATION CONCERNING THE USE OF THE DANUBE RIVER IN ROMANIA

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region

Water Management in Serbia

Recommendations on Consultation and Transparency

Transboundary Water Management in Republic of Macedonia

OBČINA BOVEC. A3-NET project team. Colleges from Ministry of Economy of the Herzegbosnian Canton

IONIAN ADRIATIC PIPELINE IAP

ICAO Assembly achieves historic consensus on sustainable future for global civil aviation

Project References Kosovo

Great Barrier Reef Ports Strategy Have your say

EANPG PROGRAMME COORDINATING GROUP (COG) PERFORMANCE BASED NAVIGATION IMPLEMENTATION TASK FORCE (PBN TF)

The UNDP/GEF Danube Regional Project

DESTIMED PROJECT CALL FOR EXPRESSION OF INTEREST FOR THE IMPLEMENTATION OF ECOTOURISM PILOT ACTIONS IN CROATIAN MPAS

THE REPUBLIC OF SERBIA MINISTRY OF ENVIRONMENTAL PROTECTION DEVELOPMENT OF THE ECOLOGICAL NETWORK IN SERBIA

Transcription:

Rehabilitation and development of navigation on the Sava river 3rd Joint Statement Implementation Meeting, Vienna, April 5-6, 2011

Background of the project Recognized as a priority project in the framework of the Sava Initiative (process of drafting and concluding the FASRB) Framework Agreement on the Sava River Basin (FASRB) signed in 2002, entered into force in 2004 Joint Statement of the ministers of the Sava countries responsible for transport Brčko, December 13, 2005 Strategy on Implementation of the FASRB adopted by the ISRBC in 2008 Commitment reconfirmed during the 1. and 2. Meeting of the Parties to the FASRB, held in Zagreb on 1 June 2007 and Belgrade on 1 June 2009 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 2

Objectives The main objective of the project is rehabilitation and development of the Sava River waterway infrastructure and provision of an appropriate economic and organizational framework for restoring trade and navigation (cargo and passengers) on the Sava, with an aim to: improve the waterway infrastructure up to class IV between Sisak and Brčko and class Va between Brčko and Belgrade through training and other works; improve public and private investments into transport on the Sava River, in accordance with adequate economic and financial analysis; apply an integrated approach considering water management, energy production, flood control and environmental aspects in the basin. 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 3

Preparatory activities Prefeasibility Study 2007 Transport Demand and Institutional, Policy and Legal Framework Study 2007 Feasibility Study 2008 Restoration of the marking system 2009 Emergency maintenance works on two critical stretches shared by Croatia and B&H 2009 EIA Study sector Brčko Sisak - 2010 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 4

Feasibility Study Recommendations SAVA RIVER Zagreb Sisak S. Brod Samac Sr Mitrovica Belgrade Brezice (Posavje Region) Rugvica B. Brod Brcko Sabac TOURISM Uncertain City, sport, Recreation, Nature & wellness City, sport & recreation Nature& recreation City City, nature& recreation City, sport & recreation TOURISM ACTIVITIES (Recreational navigation) COMMERCIAL TRAFFIC(Class Va) Tourism activities& occasional recreational navigation 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 5

Interventions and costs Identified need for improvements: - Training works and dredging (19 locations); - River bend improvements (20 locations); - Bridges (3 locations); - Sunken vessels (2 locations); - River Information Services. Estimated construction costs (rkm 0-rkm 594) - Class IV: 80,7 mil. EUR; and - Class Va: 86,4 mil. EUR. 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 6

Action Plan - General lines HIGH PRIORITY MEDIUM PRIORITY LOW PRIORITY DETAILED DESIGN STUDY UPGRADING TO CLASS Va STUDY OF CONDITIONS FOR CONTAINER TRANSPORT INFRASTRUCTURE DEVELOPMENT FOR CONTAINER TRANSPORT ENVIRONMENTAL STUDIES MASTER PLAN FOR ENVIRONMENTAL USE OF SAVA RIVER ENVIRONMENTAL USE DEVELOPMENT OF SAVA RIVER MASTER PLAN FOR TOURISM USE OF SAVA RIVER TOURISM DEVELOPMENT IN SELECTED AREAS OF SAVA RIVER 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 7

Decisions of the Sava Commission Decision Nr. 21/09 - Defines parameters of fairway for detailed design (rkm. 0 rkm. 234 class Va and rkm. 234 rkm 594 class IV); - Defines responsibility for developing detailed design; - Although Feasibility Study recommends development of the whole waterway on the class Va, taking into account environmental concerns, the SC decided on the class IV for the upper and middle Sava; - For the same reason the Preliminary Design recommends the one way traffic in the sharp bends to avoid crosscutting of the river bends 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 8

Decisions of the Sava Commission Decision Nr. 01/10 Completion of development and approval of all necessary documentation for execution of works on rehabilitation and development of the Sava River Waterway from Belgrade to Sisak by end of 2012, at latest...; Provide for the financial assets for execution of works on rehabilitation and development of the Sava River Waterway from Belgrade to Sisak by end of 2012, at latest; Beginning of works on rehabilitation and development of the Sava River Waterway from Belgrade to Sisak by mid 2013, at latest. Decisions on Coordinating Body and on distribution of costs for works - in preparation 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 9

Detailed Design sector Brčko Sisak First phase: IPA IIIa - Operation 2.1.1.-01: TA for review of preliminary documentation for rehabilitation and improvement of Sava River Waterway finished in the beginning of 20011 All existing documentation (preliminary design, feasibility study, EIA) was reviewed Conclusion of consultants: In general it can be concluded that the Feasibility Study, CBA, Preliminary Design and EIA have been prepared in a thorough and professional manner. All required aspects were included and show positive to very positive results. Second phase: based on the conclusions from the first phase, ToR for the Detailed Design was amended and will be sent to the EC for approval 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 10

Detailed Design and other studies Belgrade Brčko Commission Decision C(2010)5308 of 28/07/2010 adopting a IPA National Programme for B&H; Rehabilitation and Development of Transport and Navigation on the Sava River Waterway Detailed Design and other studies are part of the Programme; Joint management European Union World Bank; General Procurement Notice published on March 7, 2011; Tenders expected to be launched for consultants to undertake the detailed design and environmental impact assessment by end April 2011; and Contractors will also be hired to undertake demining of bank of Sava River in Bosnia and Herzegovina. 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 11

Environmental implications Sector Brčko-Sisak EIA for whole sector was done in Croatia, approved trough proper procedure and location permit was issued; Process of approval in B&H ongoing-in final stage; EIA was reviewed by the EU experts/consultants and was generally approved with some recommendations to be done in the further phases; Serbia was formally informed about project in accordance with the relevant international regulations. Sector Belgrade-Brčko EIA/EMP will be done as a part of the IPA project together with the detailed design, and will meet requirements of national legislation, and EU and World Bank policies on social and environmental protection. 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 12

Financing for the Civil Works Sector Brčko-Sisak Costs for this section to be shared between Bosnia and Herzegovina and Croatia; Bosnian share to be financed from a World Bank Credit of US$30 million; and Croatian share provisionally expected to be financed from EU Grants/IFI Loans. Sector Belgrade-Brčko Costs for this section to be shared between Bosnia and Herzegovina and Serbia; Bosnian share to be financed from a World Bank Credit of US$30 million; and Request has been submitted for IPA 2012/2013 for Serbian share. 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 13

RMF3 The World Bank financed project in BiH The WB financed project in BiH will have three components: a) the rehabilitation of the Sava River within Bosnia and Herzegovina (US$ 17 million); b) targeted investments to improve the operational performance of, and access to, the river ports (US$8 million); and c) necessary implementation assistance and institutional support (US$5 million). 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 14

Slide 14 RMF3 Io think we need to also list the works.components under the TF! Maybe a wb225857, 17/03/2011

Components in the World Bank financed project in BiH COMPONENT 1: is provisionally expected to comprise necessary civil works, involving river dredging and training works, riverbank protection and where necessary land acquisition, site clearance, and the placing of rock or braced blocks, or geotextile material, to return the Sava River to Class Va status between Brčko and the international border with Serbia at the confluence of the Drina River and to Class IV status between Brčko and the confluence with the Una River at the point where the border with Croatia diverts from the Sava River; COMPONENT 2: is provisionally expected to comprise targeted investments to improve the operational performance of the river ports, including, but not restricted to, Brčko port, as well as modest investments to improve road and rail access to facilitate plans to concession Brčko port in parallel to the Bank financed project; and COMPONENT 3: is provisionally expected to comprise (i) the procurement of a qualified firm to supervise the civil works in the waterway, and for the access rail and road links in Brčko; (ii) the procurement of a qualified firm to supervise the environmental and social safeguard aspects for the works in the waterway, and for the access rail and road links in Brčko; and (iii) the procurement of consultants to prepare bidding documents to allow the waterway to be maintained using an output and performance based approach after the project. 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 15

The World Bank financed project in BiH The proposed World Bank financed project in BiH triggers the OP/BP 4.01 on Environmental Assessment and received the EA category A Temporary impacts are expected during the rehabilitation works, such as air pollution and noise from construction equipment, water pollution from river banks vegetation clearing, de-mining and dredging activities, localized impacts on flora and fauna; On site mitigations options considered include management of removal and disposal of debris generated in the course of dredging, construction of temporary embankments to protect the shoreline, use of appropriate construction equipment to reduce emission of diesel particulate matter and other pollutants, replacement of vegetation loss, sediment and storm water management; restriction of works so as will not coincide with fish and birds migrations; overall dredging works undertaken with agreed code of practice; full provisions for resolutions of any cultural resources impact. Possible cumulative impacts will be assessed during the preparation of the ESIA, which will also include aspects such as navigability safety and define specific environmental monitoring actions to ensure use of silt screens, disposal of dredged materials only at approved sites, and compliance with surface water quality standards (e.g., turbidity). Development and implementation of an Emergency Contingency Plan will prevent and manage impacts (e.g., oil spills) due to critical situations such as ship accidents. 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 16

The World Bank financed project in BiH The proposed World Bank financed project in BiH as described in the previous slide will trigger the World Bank Policy for Projects on International Waterways (OP/BP 7.50) because of the proposed investments on the Sava River, an international waterway under said Policy and a right side tributary of the Danube River at Belgrade; Accordingly, the Governments of the three participatory countries, through the ISRBC and within the Framework Convention for the Sava River Basin hereby provides formal notification of the Project; A copy of OP 7.50 is available for download from the World Bank website http://web.worldbank.org/wbsite/external/projects/extpolicies/extop MANUAL/;and In the assessment of Bank staff, the project will not cause appreciable harm to the other riparians, and will not be appreciably harmed by the other riparians possible water use If you have any comments, please kindly send them to us for onward transmission to the World Bank by June 30, 2011. 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 17

RIS development Project Detailed Design and prototype installation for RIS on the Sava River finished. Project financed by Croatia, B&H and Serbia. Detailed design with cost estimate and technical specifications. Three RIS base station in test operation. Objective: fully operational RIS on the Sava in 2013. 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 18

Other infrastructure projects - Ports Port of Sisak Master Plan - IPA financing approved-start is expected in the second half of 2011. Port of Slavonski Brod-Liquid Cargo Terminal - Detailed Design and documentation for construction permits; - IPA financing approved-start is expected in the second half of 2011. Port of Šabac (Free Zone) - Feasibility Study finished financed by USAID. Port of Sremska Mitrovica - Cooperation and development agreement with Port of Rijeka Port of Brčko - Contacts with World Bank financing of the development of the port infrastructure. 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 19

Other activities - Nautical tourism Sava Commission accepted Timeframe for development of the Master Plan for Nautical Tourism in the Sava River Basin Project Fiche for Master Plan finished Coordination with competent authorities from the Sava Countries regarding financing Atlas for nautical tourism in preparation (final stage) 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 20

Sava RBM Plan Sava River Basin Analysis Report Finalized in 2009 Annex on Navigation Issues Dissemination of integral version started (publication, CD, web-site) Sava RBM Plan Supported by an EC-funded project, started in December 2009 Expected to be finalized by the end of 2011 Expected to take account of the Sava Navigation Project 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 21

More information www.savacommission.org 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 22

If there are any comments or clarifications needed please inform the Sava Commission on the zmilkovic@savacommission.org until June 30, 2011 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 23

Thank you for your attention!!! Željko Milković 3rd Joint Statement Implementation Mtg., Vienna, April 5-6, 2011 24