The Capstone Experience

Similar documents
Certification of Rotorcraft and FHA Process

Civil Aircraft System Safety and Electromagnetic Compatibility

Surveillance and. Program Status. Federal Aviation Administration Broadcast Services. To: By:

Federal Aviation Administration. Summary

Civil Aviation Authority of Israel; Composite Certification Activities

Surveillance and Broadcast Services Capstone Statewide Plan

Federal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004

NIGHT VISION. Requirements, Approvals, Maintenance. Federal Aviation Administration IMAGING (NVIS)

Cirrus Air Air r c a r ft Company Overview

Breaking the Accident Chain

Unmanned Systems Certification

December 8, Dear Ms. Baker:

Human Factors Considerations for Rotorcraft

Nall Report General Aviation Accident Trends and

Office of Research and Engineering Safety Study Report: Introduction of Glass Cockpit Avionics into Light Aircraft Study Overview Joseph Kolly

FAA Capstone Program, Phase II Baseline Report Southeast Alaska

Policy Letter (PL) Global Positioning System (GPS) Equipment and Installation Approval

ADS-B (Automatic Dependent Surveillance-Broadcast) Rotorcraft Options

EASA Proposed CM-AS-007 Issue 01

L3 Aviation Products: As Diverse as Aviation Itself

Surveillance and Broadcast Services

Surveillance and Broadcast Services

Advanced Transition Training

Cirrus Transition Training

OVERVIEW OF THE FAA ADS-B LINK DECISION

Revisions to this AML must be coordinated between the STC holder and the responsible Aircraft Certification Office (ACO), and require FAA approval.

Certification of UAS. A Risk-Based Approach. Date: April 20, Federal Aviation Administration. Federal Aviation Administration

EUROCOPTER FRANCE

Federal Aviation Administration. Part 23 Synthetic Vision Approval Approach

Advanced Rating Study Guide

LESSONS LEARNED LOSS OF CONTROL AEROSPACE DESIGN WORKSHOP BEIJING, CHINA 30.NOV.2016

SERVICE ADVISORY. NO.: 0608 Revision A. All Garmin Aviation Service Centers

Christchurch, New Zealand, April 2015

Safety Enhancement SE ASA Design Virtual Day-VMC Displays

FAA/Industry Parts Forum. Ric Peri Vice President of Government & Industry Affairs Aircraft Electronics Association

Cargo Certification Process

Date: (11/10/15) Initiated By: AIR-100

Analyzing Risk at the FAA Flight Systems Laboratory

RTCA/DO-200A List of Applicable Avionics Systems November 2, 2017

For a 1309 System Approach of the Conflict Management

Operational Benefits, Affordability and Availability

Applicability / Compatibility of STPA with FAA Regulations & Guidance. First STAMP/STPA Workshop. Federal Aviation Administration

GA ACCIDENT SCORECARD GA ACCIDENT SCORECARD

CHALLENGES TO INSTALLATION OF NEW TECHNOLOGY IN ROTORCRAFT

Kentucky Aviation Conference 2013

TERMS OF REFERENCE (Revision 9) Special Committee (SC) 213 Enhanced Flight Vision Systems/Synthetic Vision Systems

Advisory Circular (AC)

Implementation of Terrain Awareness and Warning System (TAWS) Final Report to CAST. Hop Potter, AFS-210,

Surveillance and Broadcast Services

Approach 15 Australasian PBN Forum. Flight Deck Equipage to Enable CNS/ATM

Dave Burr - AFS-260. Steve Gibbs AFS-300

2017 Infrastructure Summit WRAP-UP

4/29/13 FY13 THIRD QUARTER EDITORIAL UPDATES CHG 224 VOLUME 3 GENERAL TECHNICAL ADMINISTRATION CHAPTER 18 OPERATIONS SPECIFICATIONS

Harris Experience in the U.S. Surveillance Broadcast Systems (SBS)

United States Aircraft Certification Standards and Guidance on ADS-B

RNP AR APCH Approvals: An Operator s Perspective

TABLE OF CONTENTS 1.0 INTRODUCTION...

Technical Standard Order

GTN 625/635/650/725/750 and GMA 35 Instructions for Continued Airworthiness as installed in

PACIFIC AEROSTAR L.L.C.

Amateur-Built Aircraft Safety Record Brian Poole

Overview of Satellite Navigation Transition. CAASD Industry Day with Users May 7, 2002

HELI-EXPO Utilities, Patrol, and Construction Committee (UPAC) Meeting. Federal Aviation Administration

PBN IMPLEMENTATION IN INDONESIA

Weather Technology In the Cockpit (WTIC) Research and Initial Findings. Dr. Seth Young PEGASAS Site Director, The Ohio State University

ADS-B (Automatic Dependent Surveillance Broadcast)

ADS-B Rule and Installation Guidance

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION N

INSTRUCTIONS FOR USING THIS SAMPLE FLIGHT MANUAL SUPPLEMENT

Pilot Certification and Qualification Requirements for Air Carrier Operations; Technical

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES

FLIGHT OPERATIONS PANEL

USHST Update. James Viola

S YLLABUS SUITE Ö Ö0),/4Ö%$)4)/.

REPUBLIC of SAN MARINO CIVIL AVIATION AUTHORITY

VFR into IMC. Safety Syllabus

NextGen and GA 2014 Welcome Outline Safety Seminars Safety Seminars

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures

Advisory Circular. Regulations for Terrain Awareness Warning System

Safety Brief. February Keeping Current

FAA TSO Program Initiatives

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Airmen s Academic Examination

Safety Syllabus. VFR into IMC

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization

RAAC/15-WP/14 International SUMMARY REFERENCES. A Safety

National Transportation Safety Board Aviation Accident Final Report

Cockpit Display of Traffic Information (CDTI) Assisted Visual Separation (CAVS)

Safety Enhancement SE 226 Cargo Hazardous Material Fires Enhanced Protection of Occupants and Aircraft

Gleim Airline Transport Pilot FAA Knowledge Test 2014 Edition, 1st Printing Updates May 2014

Navigation 101 Chapter 3 RNP-10

Advisory Circular. Application Guidelines for Helicopter FAA to TCCA Licence Conversion Agreement. Z U Issue No.: 01

During aviation s just-ended

National Transportation Safety Board Aviation Accident Final Report

National Transportation Safety Board Aviation Accident Final Report

Freeing Flight. FAA Moves Ahead with Gulf of Mexico ADS-B

NextGen Equipage Impact on Airlines and MROs April 16, 2013

GACE Flying Club Ground Review Test, 2019 NAME: DATE: SCORE: CORRECTED BY: CFI# DATE:

Airmen s Academic Examination

Transcription:

The Capstone Experience Investment in Safety Presented to: FAA & Industry Rotorcraft Forum By: August Asay, Manager Anchorage Aircraft Certification Office Date:

Overview Alaska Aviation - Before Capstone Capstone Overview Yukon/Kuskokwim Delta Phase I Southeast Alaska Phase II Capstone Process What we learned 2 2

Alaska Operating Environment 3 3

Alaska Operating Environment From 1994 to 1996, there were 112 Air Carrier / Commercial Operator accidents in Alaska resulting in 19 fatalities During the same period, there were 58 business and private aviation accidents resulting in 66 fatalities 4 4

Alaska Operational Environment National Institute for Occupational Safety and Health (NIOSH) Highest Occupational Fatality Rate in Nation (3X) Aviation 2 nd Leading Cause of Death Alaska Pilots 5x (Pilots), 100x (all workers) 5 5

Alaska Operational Environment National Transportation Safety Board 1995 Report Aviation Safety in Alaska Increase IFR Operations Increase GPS Navigation Increase Pilot Situational Awareness 6 6

Capstone Overview Program initiated in 1998 Designed to Improve Aviation Safety in Alaska Deployment of Advanced Avionics System GPS, GPS/WAAS TAWS ADS-B, TIS-B, FIS-B Synthetic Vision Improve Aviation Infrastructure IFR Approaches and Routes (GPS, GPS/WAAS) Weather Reporting Equipment ADS-B Ground Stations Communications MITRE Reports a 47% improvement in Aviation Safety 7 7

Capstone Objectives Safety - Improve pilot situational awareness: position - terrain - traffic Improve access to weather and flight information Improve IFR Infrastructure Provide real world data to validate safety benefits expected from modernization 8 8

Phase I Yukon/Kuskokwim Delta Approx. 200 Airplanes/ 1 Helicopter VFR/Transition to IFR Equipment GPS Terrain data ADS-B FIS/AWOS Approaches MITRE Report 47% improvement in Aviation Safety 9 9

Phase II Southeast Alaska Approx. 150 Airplanes/ 50 Helicopter IFR Equipment GPS/WAAS TAWS/HTAWS ADS-B FIS/AWOS Approaches MITRE Report 27% improvement in Aviation Safety 10 10

Industry Council University of Alaska Anchorage ALASKA AIRMEN S ASSOCIATION, INC. 11 11

Capstone Process The Capstone Process leverages near term safety benefits from new and emerging technologies. GPS Terrain data ADS-B FIS AWOS Measurable 12 12

Capstone Avionics Had to improve Situational Awareness and Reduce Pilot Workload. Had to be affordable. 13 13

Improving Situational Awareness Terrain Depictions in Capstone MFD Aerial view of Juneau, Alaska looking down Gastineau Channel to the east 14 14

Improving Situational Awareness Traffic 15 15

Improving Situational Awareness Weather 16 16

Affordable Avionics 1999 RTCA Task Force 4 Certification Reduce Certification Costs Compliance Standards based on Aircraft Type Approved Model List Supplemental Type Certificate Partnership FAA/Industry Reduce Installation Costs Approved Model List Supplemental Type Certificate 17 17

Tiered Compliance Standards Avionics certificated based on intended function and Type of Aircraft VFR/IFR VFR Display IFR Display 18 18

Tiered Compliance Standards Avionics certificated based on intended function and Type of Aircraft Small Single Engine to Transport Category Airplane 19 19

Tiered Compliance Standards Transport Category Airplanes Fatal Accident Rate At Time Of Rule 10-6 Data Showed ~10% Caused By System Failures 10-1 Assume 100 Catastrophic Failure Conditions 10-2 Results In Probability 10-9 Small Single-Engine Airplanes Fatal Accident Rate At Time Of Rule (IN IMC) 10-4 ~10% Caused By System Failures 10-1 Assume 10 Catastrophic Failure Conditions 10-1 Results In Probability 10-6 20 20

Approved Model List STC Capstone 100+ aircraft models Standard Method of Installation 1 STC then Field Approve everything else Was not going to work FAA/Industry resources Time 21 21

Approved Model List STC Needed a better way AML process Based on the Standard Avionics Process (1 STC +Field Approvals) AC 23-22: Guidance for Approved Model List (AML) Supplemental Type Certificated (STC) Approval of Part 23 Airplane Avionics Installations 22 22

What Worked Tiered Certification Transport Category Airplanes Fatal Accident Rate At Time Of Rule 10-6 Data Showed ~10% Caused By System Failures 10-1 Assume 100 Catastrophic Failure Conditions 10-2 Results In Probability 10-9 Small Single-Engine Airplanes Fatal Accident Rate At Time Of Rule (IN IMC) 10-4 ~10% Caused By System Failures 10-1 Assume 10 Catastrophic Failure Conditions 10-1 Results In Probability 10-6 23 23

What Worked Improvement in Aviation Safety MITRE 47 % improvement in Safety (Capstone Phase I) Mitre/CAASD, The Impact of Capstone Phase I Program, September 2005 27 % improvement in Safety (Capstone Phase II) (preliminary) NIOSH 57 % Decrease in Fatal Accidents - Part 135 Mode, Nicolle, O Conner, M., Conway, G.,Hill, R., A Multifaceted Public Health Approach to Statewide Aviation Safety, American Journal Of Industrial Medicine, Dec 2011 Alaska Aviation Prior to Capstone Approx 130 Total Accidents/year Approx 40 Fatalities/year 2011 97 Total Accidents 13 Fatalities 24 24

For More Information August Asay, Anchorage ACO August.Asay@faa.gov (907) 271-2673 25 25