How the Budget Allocation for Fiji Roads Authority Will Be Spent

Similar documents
Sub Projects Listing

Re: Situation Report No. 8 as at 1600 Hours Thursday 18 th October 2018

SECTOR ASSESSMENT (SUMMARY): TRANSPORT Sector Performance, Problems, and Opportunities

AIM. An overview of the Disaster Risk Management Arrangement for Fiji

Re: TD04F Situation Report No. 18 as at 1200 Hours Tuesday 20 December 2016

NATIONAL EMERGENCY OPERATION CENTER TROPICAL DEPRESSION 04F SITUATION REPORT 9 of 18/12/2016

GENERAL SITUATION. Satellite Image: Marine Bulletin A moist easterly windflow prevails over the group.

Report. Recommendation: Mayor and Councillors. To: District Engineer and Roading Manager. From: Date: 11 th April 2012

MAKE THE DIFFERENCE. BUY FIJIAN MADE!

29 June Eastern Region 15/16 Program Presentation

NLTF 2020/21 ($000) Funding Priority NLTF 2018/19 ($000) NLTF 2019/20 ($000)

Concord Road Interchange. Standard hours of work

Basic Project Information

Commissioning Director - Environment. Officer Contact Details Jane Shipman;

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

$244 $45 OVERVIEW National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Rail /Trail Service Plan & Infrastructure Upgrade Project 14 April 2018

Major Scheme Business Case Summary Report for Programme Entry

Northern Beaches Transport Action Plan

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Policy Transport. Policy highlights. Our plan

Japan 18S. Fiji AUSTRALIA. New. Antarctica

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

Town Centre Improvements Plan

INDUSTRY ADVICE. Date : 12Jan15 FATN: 021/15 FIJI AIRWAYS NETWORK BAGGAGE ALLOWANCE & EXCESS BAGGAGE POLICY INTERNATIONAL BAGGAGE POLICY

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

Research Briefing Flood and Coastal Erosion Risk Management in Wales

Part four. In this part you will find: The next steps to deliver the master plan

Australian Capital Territory South Australia New South Wales Tasmania Northern Territory Victoria Queensland Western Australia Domestic

Lonely Planet Publications Pty Ltd. Behind the Scenes

Transit s forecasts of expenditure in Waikato for the next 10 years are set out in Table WK1.

Clackamas County Development Agency

Further details on interventions and funding are available within each Local Area Implementation Plan.

CITY OF MELBOURNE 10 Year Financial Plan People s Panel Report. 8 November 2014

Jim O Sullivan Chief Executive

City of Sydney (COS) Bridges - an Overview & Current Asset Management Practices

LOCAL GOVERNMENT ROADS AND TRANSPORT STRATEGY

FIJI 2015/16 HOTEL REVIEWS PROVIDED BY

Fuller/Fuller Heights Road Improvements

Transportation TRANSPORTATION PROJECTS

State Road Upgrades Southern Region

HARBOUR EDGE STITCH. Uniting the Waterfront with the City Centre

Fiji 2018 SUPPLEMENT.

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

Draft APPENDIX C CAPITAL PROGRAM

Part 005 Implementation Strategy _

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

Tranche 3

Operations Committee. District Engineer and Roading Manager

Town Centre Master Plan Sub-Committee Meeting 27/04/2017

Tasmanian Budget

Launceston City Council. Kings Meadows Traffic Management Report for Public Consultation

Spending round 2013: The case for investment in transport. Mayor s Office, May 2013

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

SECTOR ASSESSMENT (SUMMARY): TRANSPORT

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

Steve Randall FIHE Technical Manager HW Martin (Traffic Management) Ltd

2017 OPERATIONS PERFORMANCE REVIEW. Daniel Best, Director, Projects Department Caribbean Development Bank Conference Centre February 7, 2018

Rangitikei District Council

Port Macquarie-Hastings Pedestrian Access and Mobility Plan. Working Paper COMMUNITY ENGAGEMENT

Brevard County Utility Services Department

State Road Upgrades Northern Region

Roads, Transportation and Safety

PERTH-ADELAIDE CORRIDOR STRATEGY

AGENCY NAME TRANSPORTATION

Markham Multi-use Pathway (MUP) (16 th Avenue to Bob Hunter Memorial Park) Development Services Committee. January 27, Schollen & Company Inc.

PLANNING THE SUNBURY GROWTH CORRIDOR

CAPITAL IMPROVEMENT PLAN

JOBS FOR DARLING DOWNS

Launceston and Tamar Valley Traffic Vision

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

Brentsville Courthouse

THE SOLO TRAVELLER'S GUIDE TO ISLAND GETAWAYS

Fuller Road/Fuller Heights Road Improvements

Threats to possible orbital light-rail in outer London from the current Brent Cross planning application...

M6 CORRIDOR. Strategic Infrastructure Prospectus

CHAPTER- IV TOURISM DEVELOPMENT STRATEGIES FOR PLANNING AND MANAGEMENT IN MALDIVES AND FIJI

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Queen Elizabeth II Diamond Jubilee Herne Bay Coastal Park Action Plan. Kings Hill slopes, Beacon Hill, The Downs, Bishopstone Glen and Reculver

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

South East Traffic Solution

RW Bruhn Bridge and Approaches Project

MALDON DISTRICT LOCAL HIGHWAY PANEL Approved Works Programme June 2018 Update

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

CIVIL AVIATION AUTHORITY

Current Corridor Characteristics

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

2017 POLICY DOCUMENT. M1 Action Plan. Putting Queenslanders First

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.00 pm on 29 NOVEMBER 2012

Figure 3: Global Sydney. Draft Metropolitan Strategy for Sydney. North Sydney CBD. Second Harbour Crossing. Walsh Bay Arts Precinct.

West of England. Priority Places Requiring Public Investment

Ermine Street Environmental Enhancements

Selattyn and Gobowen Parish Council Action Plan Rolling Programme of Projects

SAFETY IMPROVEMENT OF A DANGEROUS FOUR-LEG, STOP CONTROLLED INTERSECTION IN AFRAGOLA, ITALY

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)

PUBLIC SAFETY. FY 2015 BUDGET Prince William County CIP-PUBLIC SAFETY 551

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019

Transcription:

How the 2018-2019 Budget Allocation for Fiji Roads Authority Will Be Spent The total allocation to the Fiji Roads Authority (FRA) in the 2018-2019 Budget is $563.1 million, comprising of $29.6 million for operating costs and $533.4 million for capital expenditures. The detailed breakdown of the programmes under the Capital Budget can be found within this informational booklet. Maintenance Programme $69,538,801 This programme carries out maintenance on the overall road network. The breakdown of the 2018-2019 budget is shown below. Central Western Northern Highways Suva Sub-Division Nadi Sub-Division Labasa Sub-Division Sealed Roads 4,500,000 Roads 2,000,000 Roads 2,000,000 Footpaths 1,000,000 Footpaths 300,000 Footpaths 500,000 Drainage 1,000,000 Drainage 300,000 Drainage 500,000 Navua Sub-Division Nadi Sub-Division Savusavu Sub-Division Sealed Roads 500,000 Roads 1,980,000 Roads 750,000 Footpaths 200,000 Footpaths 400,000 Footpaths 400,000 Drainage 200,000 Drainage 500,000 Drainage 200,000 Korovou Sub-Division Ba Sub-Division Nabouwalu Sub-Division Sealed Roads 500,000 Roads 1,000,000 Roads 500,000 Footpaths 250,000 Footpaths 200,000 Footpaths 100,000 Drainage 100,000 Drainage 200,000 Drainage 50,000 Rewa Sub-Division Rakiraki Sub-Division Taveuni Sub-Division Sealed Roads 1,500,000 Roads 500,000 Roads 300,000 1

Footpaths 250,000 Footpaths 100,000 Footpaths 100,000 Central Western Northern Drainage 100,000 Drainage 50,000 Drainage 50,000 10,100,000 7,530,000 5,450,000 Unsealed Roads Maintenance (incl. veg, control/signs/railings) Suva Sub-Division 2,000,000 Nadi Sub-Division 2,000,000 Labasa Sub-Division 1,000,000 Navua Sub-Division 2,000,000 Sigatoka Sub-Division 1,000,000 Savusavu Sub-Division 1,000,000 Korovou Sub-Division 1,500,000 Ba Sub-Division 1,000,000 Nabouwalu Sub-Division 500,000 Rewa Sub-Division 2,370,000 Rakiraki Sub-Division 500,000 Taveuni Sub-Division 500,000 7,870,000 4,500,000 3,000,000 Bridge Inspection and Audit Suva Sub-Division 100,000 Nadi Sub-Division 100,000 Labasa Sub-Division 150,000 Navua Sub-Division 100,000 Sigatoka Sub-Division 100,000 Savusavu Sub-Division 100,000 Korovou Sub-Division 100,000 Ba Sub-Division 100,000 Nabouwalu Sub-Division 100,000 Rewa Sub-Division 100,000 Rakiraki Sub-Division 100,000 Taveuni Sub-Division 100,000 Bridge Maintenance Suva Sub-Division 700,000 Nadi Sub-Division 700,000 Labasa Sub-Division 500,000 Navua Sub-Division 200,000 Sigatoka Sub-Division 300,000 Savusavu Sub-Division 200,000 Korovou Sub-Division 200,000 Ba Sub-Division 300,000 Nabouwalu Sub-Division 100,000 Rewa Sub-Division 200,000 Rakiraki Sub-Division 200,000 Taveuni Sub-Division 100,000 1,700,000 1,900,000 1,350,000 Crossing Inspection and Audit Suva Sub-Division 50,000 Nadi Sub-Division 50,000 Labasa Sub-Division 50,000 Navua Sub-Division 50,000 Sigatoka Sub-Division 50,000 Savusavu Sub-Division 50,000 Korovou Sub-Division 50,000 Ba Sub-Division 50,000 Nabouwalu Sub-Division 50,000 Rewa Sub-Division 50,000 Rakiraki Sub-Division 50,000 Taveuni Sub-Division 50,000 Crossing Maintenance Suva Sub-Division 400,000 Nadi Sub-Division 500,000 Labasa Sub-Division 500,000 Navua Sub-Division 400,000 Sigatoka Sub-Division 500,000 Savusavu Sub-Division 500,000 Korovou Sub-Division 400,000 Ba Sub-Division 500,000 Nabouwalu Sub-Division 500,000 Rewa Sub-Division 400,000 Rakiraki Sub-Division 500,000 Taveuni Sub-Division 500,000 1,800,000 2,200,000 2,200,000 Jetty Inspection and Audit Suva Sub-Division 50,000 Nadi Sub-Division 50,000 Labasa Sub-Division 50,000 Navua Sub-Division 50,000 Sigatoka Sub-Division 50,000 Savusavu Sub-Division 50,000 Korovou Sub-Division 50,000 Ba Sub-Division 50,000 Nabouwalu Sub-Division 50,000 Rewa Sub-Division 50,000 Rakiraki Sub-Division 50,000 Taveuni Sub-Division 50,000 Jetty Maintenance Suva Sub-Division 500,000 Nadi Sub-Division 500,000 Labasa Sub-Division 100,000 Navua Sub-Division 400,000 Sigatoka Sub-Division 500,000 Savusavu Sub-Division 100,000 Korovou Sub-Division 400,000 Ba Sub-Division 500,000 Nabouwalu Sub-Division 100,000 Rewa Sub-Division 400,000 Rakiraki Sub-Division 500,000 Taveuni Sub-Division 100,000 1,900,000 2,200,000 600,000 2

Electrical Inspection and Audit Central Western Northern Suva Sub-Division 100,000 Nadi Sub-Division 100,000 Labasa Sub-Division 100,000 Navua Sub-Division 100,000 Sigatoka Sub-Division 100,000 Savusavu Sub-Division 100,000 Korovou Sub-Division 100,000 Ba Sub-Division 100,000 Nabouwalu Sub-Division 100,000 Rewa Sub-Division 100,000 Rakiraki Sub-Division 100,000 Taveuni Sub-Division 100,000 Electrical Maintenance Suva Sub-Division 700,000 Nadi Sub-Division 700,000 Labasa Sub-Division 700,000 Navua Sub-Division 300,000 Sigatoka Sub-Division 700,000 Savusavu Sub-Division 500,000 Korovou Sub-Division 200,000 Ba Sub-Division 200,000 Nabouwalu Sub-Division 100,000 Rewa Sub-Division 200,000 Rakiraki Sub-Division 100,000 Taveuni Sub-Division 100,000 1,800,000 2,100,000 1,800,000 Total 25,170,000 20,430,000 14,400,000 Rollover Projects from 2017-2018 - $9,538,801: sealed road maintenance ($1,618,403); unsealed road maintenance ($1,411,934); construction of drainage ($892,029); additional community roads ($537,176); vegetation maintenance, litter clean-up and environmental protection ($583,204); bus shelter maintenance ($100,000); signs, lines, rails and barriers ($781,614); maintenance of street/traffic lights ($290,000); FRA 16/91 maintenance of streetlights in Lami, Navua & Deuba ($62,000); FRA 16/90 maintenance of streetlights in Nasinu, Nausori & Levuka ($307,700); FRA 16/86 maintenance of streetlights in Suva ($189,000); FRA 16/87 maintenance of streetlights in Lautoka ($180,000); FRA 16/89 maintenance of streetlights in Labasa/Savusavu ($85,700); FRA 16/92 maintenance of streetlights in Nadi/Sigatoka ($122,000); FRA 16/88 maintenance of streetlights in Tavua/Ba/Rakiraki ($69,000); bridges ($456,468); crossings ($455,130); Jetties maintenance ($381,000); minor safety works ($90,000); Queens Road high priority sites (Navua Hospital - Town, Namelimeli, Taleanaua) ($138,836); and VAT ($787,607). Emergency Repairs - Storm Damages/Emergency Response $11,901,142 Contingency Funds This project provides contingency funds for restoration and rehabilitation works during and after natural disasters. Ongoing Projects from 2017-2018 ($11,901,142) o Repair works at Cicia Jetty - $600,000 o Repair works at Lakeba Jetty - $600,000 o Cyclone Kofi Package works - Package 2 FRA 16/69 ($127,783), Package 4 FRA 16/71 ($773,359) o Maintenance works at Lomaloma slip - $2,699,999 o Rehabilitation works at bridges/crossings/culverts Balenabelo Crossing ($1.5 million), Wailoku Road Culvert ($1.5 million), BS Chand Road Culvert ($900,000), Savu 2 Bridge ($1.6 million), and Savu 3 Bridge ($1.6 million) Renewals & Replacements - Roads and Services $74,183,771 This programme regularly renews and replaces existing road assets. Suva Sub-Division ($26.0 million) 3

o Resealing (up to 20km) - $1.5 million o Resealing (up to 20km) - $3.0 million o Mill & Fill City Center Streets - $4.0 million o Sealed Road Rehabilitation (up to 20km) - $8.0 million o Unsealed Road Rehabilitation (up to 30km) - $4.5 million o Unsealed Road Resheeting (up to 25km) - $2.5 million o Drainage (adjacent to all road renewals project works) - $2.5 million Northern Division ($14.0 million) o 2nd Coat Sealing (up to 30km) - $2.0 million o Resealing (up to 20km) - $2.5 million o Sealed Road Rehabilitation (up to 7km) - $3 million o Unsealed Road Rehabilitation (up to 20km) - $3.0 million o Unsealed Road Resheeting (up to 40km) - $2.5 million o Drainage (adjacent all road renewals project works) - $1.0 million Western Division ($20 million) o 2nd Coat Sealing (up to 30km) - $4.0 million o Resealing (up to 20km) - $3.0 million o Asphalt (Mill & Fill town/city center streets - Nadi and Lautoka) - $2.0 million o Sealed Road Rehabilitation (up to 5km) - $3.5 million o Unsealed Road Rehabilitation (up to 40km) - $4.5 million o Unsealed Road Resheeting (up to 25km) - $1.5 million o Drainage (adjacent all road renewals project works) - $1.5 million Rehabilitation of Vunimasei Access Road in Legalega, Nadi - $300,000 Rollover Projects from 2017-2018 - $13,883,771: sealed road rehabilitation programme ($3,451,397); SARUP 1 ($2,300,000); SARUP 2 ($50,000); reseals ($970,028); ADB Reseals ($400,000); asphalt ($19,000); unsealed road rehabilitation programme ($3,963,362); rural drainage renewal ($608,638); urban drainage renewal ($884,979); bus shelter renewal ($90,001); and VAT ($1,146,366). Upgrading and Replacement of Bridges - Bridge Renewals $67,649,903 This programme regularly renews and replaces existing bridges and crossings. New Projects ($7,666,667): Tamavua Bridge $5.0 million; and Vesidrua Bridge - $2.7 million 4

Ongoing projects ($53,760,931): o Modular Bridges: Modular Bridges Package 1 (Central Division) - FRA 17-120 ($4,617,943), Modular Bridges Package 2 (Western Division) - FRA 17-122 ($5,041,138), Modular Bridges Package 3 (Northern Division) - FRA 17-124 ($5,733,578) o Crossing Renewals: Emuri Irish Crossing ($1,413,606), Low Level Crossing Package 2 (Western Division) FRA 17-123 ($2,802,500), Toga Culvert (Toga Road) ($3,863,839), Vorovoro Crossing ($1,154,103), Low Level Crossing Package 3 (Northern Division) FRA 17-125 ($5,576,574), Rewa-Vutia Road and Bridge ($2.2 million); Savusavu crossing in Ra ($2,749,513), Nausori Crossing in Ra ($3,484,531), Burelevu crossing in Ra ($3,050,000), Vakabuli Paipai No 2 Crossing ($1,293,606), Sawene Bridge/Crossing, Sigatoka ($3.5 million) o Repair of Critical Priority Bridge: Matainavuso Bridge (Kings Road) ($3,480,000) o Footbridge/Suspension Bridges: Gasele-Nauciwai Foot and Crossing ($800,000); Bua Lomanikoro Suspension Bridge ($1.5 million); Natua Village footbridge, Macuata ($0.6m); Lakeba Village, Saqani, Cakaudrove ($720,000); Nakaba Settlement, Savusavu, Cakaudrove ($180,000) Local Funding for the ADB/WB funded Transport Infrastructure Investment Sector Project ($2.2 million) Rollover projects (outstanding payments from 2017-2018 FY) ($4,022,305): Market bridge - defects notification period ($75,000); Naisogo bridge - defects notification period ($75,000); Nananau crossing ($100,000); Navaga crossing ($100,000); Emuri Irish crossing ($100,000); Toga road Culvert ($100,000); Vorovoro crossing ($100,000); Qawa Pipe crossing (Wainikoro Road) ($100,000); Naviavia crossing ($100,000); Naiyarabale Bridge ($100,000); Nayarabale crossing, Northern Division ($100,000); Nakodou crossing, Koro Circular Road ($50,000); Nasau crossing, Koro Circular Road ($50,000); Mudu crossing, Koro Coastal Road ($50,000); Waitabu crossing, Koro Coastal Road ($50,000); Rewa-Vutia road and Bridge ($300,000); Vatuwaqa Bridge ($107,034); Stinson Parade ($103,700); FSC Mill Penang Bridge repairs ($284,225); Tamavua Bridge 5

($400,000); Matainavuso Bridge, Kings Road ($150,000); Vesidrua Bridge, Vanua Levu ($275,229); Savusavu crossing in Ra ($200,000); Nausori crossing in Ra ($200,000); Burelevu crossing in Ra ($100,000); Vakabuli Paipai No. 2 in Ra ($120,000); Vutuni 3 crossing ($100,000); Waibula Crossing, Taveuni ($100,000); and VAT ($332,117) Jetties Maintenance and Renewals $18,221,185 This programme regularly renews and replaces existing jetty assets. Ongoing projects - $12,221,185: o Nabouwalu Jetty Stage 2 physical works ($3.0 million); o Savusavu Jetty Renewals ($525,270); o Vunisea 2 Jetty Renewals $2,470,000); o Waiyevo Jetty (Taveuni) ($1.6 million); o Natovi Jetty Waiting Shed ($600,000); o Makogai Jetty ($700,000); o Nabukeru Jetty ($2.0 million); o Moala Jetty ($600,000); o Investigation - Wainiyabia Jetty ($700,000); and o Ellington Wharf - Master Plan final payment ($25,915). New Projects ($6.0 million): Natovi Jetty ($1.0 million) and Korotari Crossing ($5.0 million) Fiji Decade of Action for Road Safety $2,196,000 The project improves traffic services by installing signs and traffic light installations in urban and peri-urban areas. Ongoing projects - $2,196,000: o Safety improvements at Matanikorovatu Road Junction (past Laqere Bridge), Omkaar Road Junction, Sonaisali Junction, Natabua (Lautoka) Junction ($600,000) o Navua Hospital Access safety Improvements - right turn bay and bus bays/ pedestrian crossing ($1,595,999) Upgrading of Rural Roads Programme $69,637,844 Central Division - $22,975,099 o Namata Village Access Road & Crossing ($1,599,501) o Kiuva-Kaba Peninsula Road ($3,535,500) o Sawanikula-Korovou-Nasauvere Road and Crossings ($1,151,200) o Nakorosule-Nawaisomo Road, Stage 1 & 2 ($3,481,000) o Natilla Access Road to Logani-Seba Road ($1,395,728) o Naqelewai - Nasoqo Road ($5,417,000) o Vuniduba Circular Road ($968,000) o Nausori Airport Road Diversion, Phase 1 ($410,171) o Wainivesi & Wainivilimi Road ($500,000) 6

o Veisa Farm Road ($500,000) o Nukusere - Namuamua Nakavu Access Road ($2,017,000) o Wainiyavu-Wainilotulevu Road ($2,000,000) Western Division $12,456,220 o Matokana Village Road, Stage 2 ($2,709,500) o Draubuta Access Road ($786,638) o Nasauvakarua Road ($580,000) o Lawaqa - Tilivalevu - Nadroumai Village Road ($849,913) o Veidrala Access Road ($1,903,211) o Naunuku - Nalotawa Access Road ($670,000) o Vagadra Access Road ($2,253,908) o Remaining payment for Veidrala Access Road Package 1 and Naunuku-Nalotawa Access Road Package 1 ($436,000) o Nalovo Road ($276,550) o Kavanagasau - Korua road ($163,500) o Nasatogo - Navitilevu Village Access Road ($1,827,000) Northern Division - $19,264,908 o Sevaci-Korotasere Road Stage 3 & Crossing ($216,663) o Koroinasolo Road - Kavula Banieka Road ($962,576) o Niurua-Raviravi Stage 2 & Crossings ($2,407,545) o Dreketilailai - Lekutulevu Road ($1,500,000) o Nasasa Lakeba, Viani Lea and Qelemumu Basoga ($109,000) o Naviqiri, Nasau Naivaka Road ($2,500,000) o Kedra-Sese Road ($498,624) o Nasealevu - Viriqali Road ($2,500,000) o Venia Lea Road ($2,827,000) o Nasasa - Nacula - Lakeba Road ($2,500,000) o Lagi - Duavata Village Access Road ($2,807,500) o Kilaka Road Stage 3 & Crossing ($436,000) Eastern Division - $8,862,500 o Eastern Islands Roads & Bridges ($2,000,000) o Rotuma Farm Roads ($1,163,500) o Remaining payment for Yawe District Road Stage 1 & 2, Nabukulevu-I-Ra Road and Kadavu contract ($545,000) o Yawe District Road. Stage 1 and 2 ($1,500,000) o Kadavu South (Vunisea, Vacalea, Daku, Jioma Road) ($654,000) o Naceva - Tikina Road (Vunisei - Vacalea) ($3,000,000) Periodic maintenance of rural roads - $6,079,117: Central Division ($1,000,000); Western Division ($1,557,732); Northern Division ($1,976,385); Eastern Division ($1,545,000) 7

Capital Community Programme $44,358,784 The project covers work to improve the safety of pedestrians and travellers in communities on the outskirts of developed areas. Construction of ongoing footpaths ($40,556,175) o Upgrading of existing footpaths - $89,617 o Northern Division (FRA contract 17/22) - $968,443 o Central Division (FRA contract 17/79 and 17/88) - $5,463,816 o Western Division (FRA contract 17/104) - $3,627,000 o Additional 14 sites for footpath in Western (35Km) - $19,407,300 o Additional 17 sites for footpath in Central (20Km) - $11.0 million Construction of ongoing bus shelters ($2,802,608) o Construction of 125 urban and rural (84 ongoing and 41 new) bus shelters - $2,538,876 o Payment for completed bus stops and bus shelters - $263,732 Small infrastructure works in Nasinu ($1.0 million) Streetlight Improvement Programme $20,541,296 The objective of the project is to create a safe and secure society by improving visibility for drivers and making streets safer to walk at night. Street lighting provides a feeling of warmth and security, it beautifies Fijian streets and communities, and allows business to operate during the evening hours. Defects notification period for the 2015/2016 Queens road villages/settlements Streetlighting programme - $488,320 Kings road Streetlighting programme from Tavarau (Ba) to Nausori - $3,118,595 Queens road Streetlighting programme from Suva to Sigatoka - $800,675 Vanua Levu Streetlighting programme from Labasa to Savusavu - $2,066,120 Nausori Areas (Wainibokasi, Vuci) - $537,586 8

Solar Streetlighting - $1.4 million Suva/Nausori Streetlighting programme - $1.2 million Upgrade of 36 traffic signals - $5.9 million New streetlights - $5.0 million Congestion and Capacity Improvements Programme $48,899,020 This programme contains projects aimed at easing congestion and increasing the capacity of current road systems. Ongoing Projects - $5,367,798 o Improvements along Nadi-Lautoka Corridor Detailed Engineering and Geotechnical studies of Four laning between Nadi Airport (where four laning completes) - Lautoka Corridor - $248,955 Formalise and improve 69 intersections Nadi Lautoka - $1,431,997 Gateway Treatments (marking a change in speed environment, including the transition from a high speed road to a lower speed environment) University of Fiji (Lautoka Campus) and Lauwaki including delineation improvements - $262,569 Two new pedestrian refuges (pedestrian refuge islands are not pedestrian crossings but are installed on busy or wide roads to help pedestrians cross in two stages) Lauwaki village and one new zebra crossing at University of Fiji (Lautoka Campus) - $234,016 Speed management at Wailoko Road to Dreketi Feeder Road Lautoka; right turn bays at Dreketi Feeder Road; Speed management at Navutu Road to Vitogo Parade, Lautoka - $129,565 Right turn Bays Wairabetia Road, Field 40 Road Lautoka - $299,973 Four lane and By-pass road from Lauwaki to Lautoka including University of Fiji - $796,655 Improvements along Ratu Dovi Road (Nadera-Laqere Junction) - $990,826 o Final payment for the Kings road/ Vitogo Parade signalisation - $130,800 o Final payment for the intersection capacity improvement - Vomo Street/Namoli Ave - $1,400 o Final payment for the speed management from Navutu road to Vitogo Parade Lautoka - $1,500 o Final payment for the improvements along Ratu Dovi road (Nadera - Laqere Junction) - $4,998 o Improve Naduna Road-Nasekula Road-Labasa River Bridge-Buileka Road (26 pedestrian crossings & improved delineation & Gateway improvement on Western approach to Labasa) - $697,077 9

o Right turn bays on 8 Intersections on Naduna Road to Bulileka Road - $298,746 New Projects - $32,869,945 o Queen Elizabeth Drive (Phase 2) - $15.0 million o Vorovoro road upgrading (Rups Nakasi side road sealing) $300,000 o Upgrading threshold signage for villages along Kings and Queens road - $430,000 o Vuci road drainage upgrade including footpath and bus bays - $4.0 million o Vuci road upgrade (1.7km from end of seal at Raralevu Police Post to Raralevu Village) - $1,011,500 o Queens road passing lanes - $1,555,556 o Kings road passing lanes - $1,555,556 o Nadi Back road footpath/bus bay/drainage/surface - $4,166,667 o School and health centre frontage sealing - $1,150,013 o Community/areas of worship frontage sealing - $825,689 o Traction sealing - $874,965 o Investigation and design for new Labasa bypass road and bridge - $2.0 million Local Funding for the ADB/WB funded Transport Infrastructure Investment Sector Project - $10.5 million NASRUP - Suva 3 (Nakasi to Nausori Bridge) $36,062,619 This budget is allocated for the relocation of services, including underground power line cables, construction projects and professional services, for the ongoing four laning works from Nakasi to Nausori Bridge. The project is expected to be completed by July 2019. NASRUP Nadi 2 (Votualevu Roundabout to Wailoaloa Road $7,070,082 Roundabout) This budget is allocated for the construction of additional service lanes, traffic signals, median works and outstanding land acquisition issues. The project is expected to be completed by November 2018. New Capital Tourism $519,500 This project covers works to improve road networks leading to tourism destinations. Enhancement of the existing pedestrian crossing at Ratu Navula School (ongoing project) - $219,500 New footpath from Narewa village to Denarau Bridge and construction of a bus shelter and turn bay before the Denarau Bridge - $300,000. Capital Resilience Programme $1,000,000 This programme aims to boost the resilience of road assets to adverse weather events such as floods and cyclones. The allocation is for the coastal protection along Kasavu junction, Moala, Cicia, Koro and Rotuma Island. Along with this, minor coastal protection works will be undertaken along parts of Coastal Viti Levu like Malevu Village and Volivoli Road, Ra. 10

Transport Infrastructure Investment Sector Project $61,650,000 The project aims to rehabilitate roads, bridges and rural jetties. The project has two outputs: (i) rehabilitated and climate-resilient land and maritime transport infrastructure, and (ii) efficient project management support and institutional strengthening. The project is financed through an Asian Development Bank loan of US$100 million and World Bank loan of US$50 million. Road Reseals Programme - $15.0 million Suva Arterial Road Upgrade Project (SARUP) 2 - $24.65 million Taveuni Bridge Replacement Programme - $6.0 million Ovalau Bridge Replacement Programme - $6.0 million Viti Levu - Rural Bridges Replacement Programme - $10.0 million 11