EON-NTM CR4 Export Cable Installation Update Update. Notice to Mariners

Similar documents
NOTICE TO MARINERS. Issue Date: 19 th Jan, Western Link Project. Out Of Service Cables ROUTE CLEARANCE

Dredging in Fowey Chapter 3 Post departure of the Lantic Bay

Madagascar. Ports description

Marine Notice No. 19 of 2014 This Marine Notice supersedes Marine Notice No. 12 of 2013.

ADVICE ON MOZAMBIQUE PORTS. P&I ASSOCIATES (PTY) LTD

Summary Report. Contact with Wharf General Villa. 5 March 2006

Suez Canal Transit. Characteristics of the current canal lengths

TRINIDAD OFFSHORE CALLING INSTRUCTIONS

FPMC INMARSAT number (Bridge), (Cabin) 1.16 Ship's address

ST. VINCENT AND THE GRENADINES

The collision between BLUE BIRD and HAGLAND BONA on 1st December 2008 in Randers Fjord.

SANTANDER PORT CONTROL PROCEDURE

Section 4 / Rev Page 1 of 5

M/V "Natalie" Antigua and Barbuda Flag

PORT INFORMATION AND GUIDE TO PORT ENTRY

Yorkshire s Offshore, Renewable Energy and Operations and Maintenance Centre. 7 th October 2014

REPORT OF INVESTIGATION INTO THE GROUNDING OF MV "PANTANAL" AT CASHLA BAY, ROSSAVEAL ON 31st MARCH 2011

STATUTORY INSTRUMENTS. S.I. No. 612 of 2016 CUSTOMS (REPORTS INWARDS AND OUTWARDS BY VESSELS) REGULATIONS 2016

SPECIFICATION OF TUG VISION 6 (3300 HP)

NEW ZEALAND TEMPORARY AND PRELIMINARY NOTICES IN FORCE (NZ NTM Edition No. 1 dated 11 January 2019)

LIFTing HEAVY CARGO FOR WORLDWIDE TRANSPORT

OCIMF Report Template OVID OVPQ

ANNEX. to the. Proposal for a Regulation of the European Parliament and of the Council

COLLISION INVESTIGATIONS The new technologies and other interesting bits

PORT PHILLIP SEA PILOTS PTY LTD PILOTAGE RATES EFFECTIVE 1st JULY 2015

MV Energy Scout Of UT 755L Design

Collision between the tug Arafura

Pearl String Service

Hellesylt. GEIRANGERFJORD CRUISE PORT

86' (26.21m) Cantiere delle Marche

The Procedures for Entry and Departure into and from, Taipei Harbor

HUMBER PASSAGE PLAN PREPARED BY ASSOCIATED BRITISH PORTS. 2 Version 1.1

FORM A 3 PORT STATE PARTICULARS 3 FORM B 4 DEFICIENCIES FOUND AND FOLLOW UP ACTIONS**) 4 NOTICE OF DETENTION FOR THE MASTER 5

Detail Information for Clearance Call Between Taiwan & China in Ishigaki, Japan

NOTICE 01/2012 NOTICE TO SHIPOWNERS, SHIPPING AGENTS, MASTERS, PORT PILOTS, BUNKER VESSEL OPERATORS, PORT TERMINAL OPERATORS AND PORT COMMUNITY

LIFTing HEAVY CARGO FOR WORLDWIDE TRANSPORT

162m Passenger Cruise Ship Listing ID:

CATCH ' (11.3 m) BERTRAM CATCH-22. Sport fisherman Convertible

DOCKING AND ROUTING PLAN

Republic of Turkey - Ministry of Economy,

Pearl String Service

Maritime Rules Part 46: Surveys, Certification and Maintenance

MARINE ACCIDENT INVESTIGATION REPORT

Port Handbook SANSOUCI PUERTO SANTO DOMINGO

Harbourmaster s Office

Navigation and operation 20. port procedures manual 22. communication 22. port security 23. Services

Commonwealth of Dominica. Office of the Maritime Administrator

TOGO OIL & MARINE (TOM) DEEP SEA TOWING & SALVAGE

Ports. Libya Port Contacts Commercial Ports Telephone Fax Marine Authorities (Tripoli Janzour)

Marine Incidents in Victoria

Port Dues in Hong Kong

Harlingen Port Authority

INFORMATION AND GUIDANCE TRAINING REQUIREMENTS FOR PERSONNEL ON SHIPS OPERATING IN POLAR WATERS

Report on shipping accidents in the Baltic Sea area during Introduction

TOGO OIL & MARINE (TOM) DEEP SEA TOWING & SALVAGE

Cantiere delle Marche Darwin Expedition Yacht STELLA DEL NORD. DEL NORD Yacht. Denison Yacht Sales

For Immediate Release September 3, CONSTRUCTION BEGINS ON NEW CABLE FERRY Special steel cutting ceremony held at shipyard

EcoBox Multi-Purpose Vessels

Dalian VTS Guide for Users

Port Feeder Barge: Floating Infrastructure for African Ports. 2 nd German-African Infrastructure Forum. Prof. Dr.-Ing.

The 3 platforms are called Tchatamba-A (MOPU), Tchatamba South and the Tchatamba West and the FSO is called MADIELA and is owned by MODEC.

Dedicated to Electric & Hybrid Propulsion. A Future-Oriented Automation Platform. Scaldis Fully Self-Propelled Crane Vessel

NOTICE OF MARINE OPERATIONS

REGULATIONS FOR NY-ÅLESUND HARBOUR SVALBARD. 1. januar december 2017

Ministry of Social Affairs and Health, Finland N.B. Unofficial translation. Legally valid only in Finnish and Swedish

SHIPBUILDING INDUSTRY

112ft 1983 Benetti Custom Lloyds M.Y.

ICES form - Notification of proposed research cruise

Bahamas (BMA) Flag. Eagle Shipping Ltd

An Education In Offshore Pipeline Construction. By Allyn Stott

HATCH OPENINGS AND ALLOWABLE LOADS HATCH OPENINGS

ANNEX MARSEC FORM 02. ADOMS Department of Marine Services and Merchant Shipping Antigua and Barbuda MARITIME SECURITY

74' Sunseeker Manhattan 74

LIFTing HEAVY CARGO FOR WORLDWIDE TRANSPORT

Order on the discharge of oil from ships in the exclusive economic zone around Greenland

Port State Control Commencement of the New Inspection Regime on 1 st January 2011

The Swedish Transport Agency s Regulations and General Advice (TSFS 2010:70) on Maritime Traffic on Lake Vänern

Resolution A.1117(30) Adopted on 6 December 2017 (Agenda item 9) IMO SHIP IDENTIFICATION NUMBER SCHEME

102' (31.09m) Cantiere delle Marche

MINISTRY OF TRANSPORT OF THE RUSSIAN FEDERATION. ORDER dated Tuesday, August 12, 2014 No. 222 ON APPROVAL OF THE BY-LAWS OF THE SEAPORT OF MURMANSK

PROHIBITION AND RESTRICTION ON VESSELS TRANSITING, ANCHORING OR REMAINING IN THE DEMARCATED AREAS OF THE PORT WATERS

Terms, conditions and prices

Corporate Presentation 5 March 2003

Report on shipping accidents in the Baltic Sea area during 2010

Notice To Mariner No. 80/2004. SUBJECT : ISPS Code VESSELS CALLING AT PORT OF FUJAIRAH & FUJAIRAH OFFSHORE ANCHORAGE AREA

The History of the tug Polmear

The shaded blocks below indicate the areas of activity published within this Bulletin.

114 Encyclopedia of Ship Knowledge. Collar. Illustrations courtesy of Wärtsilä Corporation. Wärtsilä 9L46C 9450 kw. Pod 12,000 kw

Grounding of Maersk Garonne. Fremantle, Western Australia, 28 February 2015

ATLANTIC / ARNGAST Collision in the DW route east of Langeland, Denmark, 4 August 2005

2- Pilotage Cost Tonnage. 1- Pilotage Cost Tonnage. Currency

7. Services Navigation and Operation

460 exp 460EXP - 115

AIS data. Marco Puts

Port of Newcastle Schedule of Port Pricing

REPORT General Cargo Vessel MEG - UBFH - Grounding on October 15th, 2002

Serving the Tampa Bay Maritime Community Since Celebrating over 125 Years of Service

Port dues and charges Free port of Ventspils

Flagging-up. The UK Ship Register s quarterly newsletter. Issue # 26

MINISTRY OF INFRASTRUCTURES AND TRANSPORT HARBOUR MASTER S OFFICE OF RAVENNA ORDER NO. 97/2017

Transcription:

Dear Owners, Ships Agents, Masters, Pilots and Fishermen, Re: -.EON-NTM-00118-Installation of New Export Cable Update The layout drawing has been updated to reflect an additional 16 x 2.5-ton Delta Flipper anchors that will be deployed during the float in of the new cable at the inshore route. In addition, please be aware there is a spoil approx. 1m high running parallel to the West of the trench from KP 0.35 to KP 2.0. The Atalanti and associated Vessels started with preparatory operations for the cable installation on the 20/08/18 weather permitting and will last approximately 4 weeks. Installation of the new export will commence from around the 25/08/18 weather permitting and will last approximately 4 weeks. Vessel: CLB Atalanti Draught: 4.2m Length x Breadth: 96.99m x 31.46m Gross Tonnage: 5974 Speed recorded (Max / Average): 9.2/ 8.4knots Call Sign: 5BYY2 IMO: 8661616 MMSI: 212279000 Flag: Cyprus (CY) The vessel Artemis will assist the Atalanti during installation of the cable. Vessel: CLB Artemis Draught: 5.6m Length x Breadth: 67.83m x 15.6m Gross Tonnage: 1989 Speed recorded (Max / Average): 9.2/ 8.4knots Call Sign: 5BVJ3 IMO: 8321591 MMSI: 209618000 Flag: Cyprus (CY) Please be advised that the vessel MPSV Astrea will be conducting Trenching burial of the cable once laid by the cable lay vessel CLB Atlanti. The trenching of the cable is due to take 6 weeks and will be operating from KP2.0 to the offshore substation. Vessel: CLB Astrea Draught: 4.9m Length x Breadth: 71.3m x 15.6m Gross Tonnage: 3200 Speed recorded (Max / Average): 11.1/ 9.8knots Call Sign: SYBE IMO: 8520771 MMSI: 240691000 Flag: GREECE (GR)

The C59 (jack-up barge) and Capall Mara will be assisting inshore export cable landing operations. C59 Emotion Draught: 1.24 m Length x Breadth: 18.3 m X 18.3 m Gross Tonnage: 100 Speed recorded (Max / Average): 7.7/6.4 knots Call Sign: TBC MMSI: TBC Flag: (GB) Once pull-in operations are completed the Capall Mara will backfill the trench from KP0.35 to KP 2.0. This operation should take approx. 5 days weather permitting Capall Mara Draught: 2.4 m Length x Breadth: 39.6 m X 14 m Gross Tonnage: 992 Speed recorded (Max / Average): 7.7/6.4 knots Call Sign: MBSF3 MMSI: 232010652 Flag: (GB) Mariners are advised to give the vessels a wide berth as the vessels will be restricted in manoeuvrability whilst carrying out operations. All vessels are requested to remain a minimum safe distance of 500m from the vessels during operations and whilst they are on location. Vessels will be monitoring channel 16 VHF and the project P1 channel Please note there will be an additional 10 assorted Ribs of varying sizes to assist with the inshore float in of the cable from KP 2.2 to KP 0.2. The inshore pull-in is due to take 24hrs weather permitting There will be 4 x temp spud pontoons in position during the float in of the cable. See below illustration

Latitude Longitude KP 50 49.0347' N 0 20.1759' W 0.000 50 48.8174' N 0 20.0679' W 0.422 50 48.499' N 0 19.9179' W 1.038 50 47.5073' N 0 19.2754' W 3.026 50 46.9104' N 0 19.0408' W 4.167 50 46.8624' N 0 19.028' W 4.257 50 46.6346' N 0 18.9954' W 4.681 50 46.5865' N 0 18.9951' W 4.770 50 46.0698' N 0 19.0621' W 5.732 50 45.4367' N 0 19.1944' W 6.916 50 45.3316' N 0 19.2183' W 7.113 50 45.2744' N 0 19.2241' W 7.219 50 45.1798' N 0 19.222' W 7.394 50 45.0737' N 0 19.1969' W 7.593 50 44.4019' N 0 18.9836' W 8.864 50 44.2304' N 0 18.939' W 9.186 50 44.011' N 0 18.8819' W 9.598 50 43.7299' N 0 18.7794' W 10.133 50 43.441' N 0 18.6499' W 10.690 50 43.2979' N 0 18.5716' W 10.971 50 43.2454' N 0 18.5349' W 11.078 50 43.1797' N 0 18.4776' W 11.217 50 43.1319' N 0 18.4271' W 11.324 50 42.958' N 0 18.2059' W 11.738 50 42.7875' N 0 17.9298' W 12.191 50 42.3833' N 0 17.1555' W 13.372 50 42.2907' N 0 16.9781' W 13.642 50 41.9023' N 0 16.2441' W 14.767 50 41.796' N 0 16.0069' W 15.109 50 41.6474' N 0 15.666' W 15.596 50 41.6235' N 0 15.6358' W 15.653 50 41.5764' N 0 15.5982' W 15.751

Mark Brown Offshore Site Manager Tel: +44 (0) 7491 057 121 Email: mark.brown@eon.com Gordon Bain Lead Marine Coordinator Tel: +44 (0) 7816 648 082 Email: leadmc@rampionoffshore.com. Duty Marine Coordinator Tel: +44 (0) 7557 942 945 Email: traffic@rampionoffshore.com Alex Winrow-Giffin Brown & May Fisheries Liaison Tel: +44 (0) 7760 160 039 Email: alex@brownmay.com