Developmental Cost Charge (DCC) Program Summary

Similar documents
2018 Development Cost Charges (DCCs) Update

2016 Development Cost Charges (DCC) UPDATE

South Westminster and Bridgeview

WASTEWATER ENGINEERING PROJECTS - FY19

HOPEWELL DISTRIBUTION CENTRE

Welcome. Share information on the new investments and funding proposed for the Phase Two Plan

ateway NOW UNDER CONSTRUCTION! 1777 Clearbrook Road Abbotsford, BC 65,000 SF in Building 1 Available Q ,229 SF in Building 2 Available Q2 2019

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

HOLDOM SKYTRAIN STATION

Federal Gas Tax Fund-Strategic Priorities Approved and Conditionally Approved Projects 2017 Intake

Annacis Island Wastewater Treatment Plant OUTFALL PROJECT

HOLDOM SKYTRAIN STATION

Roberts Bank Terminal 2 Project Project Definition Consultation Consultation Summary Report: Appendix 1 Invitation and Newspaper Advertisement

STADIUM- CHINATOWN SKYTRAIN STATION

Town of Cary Capital Listing

Thank you for joining us to learn about and provide input on the Highbury Interceptor Air Management Facility in Musqueam Park.

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

BETTER BUSINESS BUREAU 2015

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE PUBLIC WORKS AND UTILITIES DEPARTMENT

FOR LEASE 773 SF TO 2,500 SF UNITS AVAILABLE AT THE BREWERY DISTRICT NEW WESTMINSTER, BC BUILDING 9 THE BREWERY DISTRICT JOIN :

The District of North Vancouver FACT SHEET

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, ,

Welcome to the. EBC Breakfast Meeting. The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority

PASSENGER TRANSPORTATION BRANCH MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE LICENCE. Passenger Transportation Licence COPY

superseded by 2008 nhc report

Water & Wastewater Project Activity Report

Roberts Bank Terminal 2 Project

Roberts Bank Terminal 2 Project

DISTRICT BREWERY 1,000 SF - 17,000 SF AVAILABLE FOR LEASE AT. Join: Layla Vera

Mayo WRF ENR Upgrade and Expansion. Mayo-Glebe Heights Pump Station & Force Main Project Updates

APPENDIX A: SCREENLINE SURVEY STATION DETAILS

Building the transportation network we need for the future in Niagara Region

NEGOTIATING FOR SUCCESS IN THE COMPETITIVE PORT AND MARINE TERMINAL INDUSTRY

Plan for Water Recycling Centers

Application Summary. Taxi - Amendment to Licence

METRO VANCOUVER REGIONAL DISTRICT REGIONAL PARKS COMMITTEE

Building the transportation network we need for the future in Niagara Region

Bill Authorization Reference: BRCOTW ; Minute Item 5.1 THE REGIONAL MUNICIPALITY OF NIAGARA BY-LAW NO

TO: Mayor & Council DATE: November 22, It is recommended that the Finance Committee recommend that Council:

CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES

Client: BC Hydro Partnerships BC s Role: Procurement Manager. Client: Interior Health Authority

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

Building the transportation network we need for the future in Niagara Region

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS

Pattullo Bridge Replacement Project

Tenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204)

Building the transportation network we need for the future in Niagara Region

Decision (Applicant claims urgent public need )

CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017

Tenders. Manitoba Infrastructure

12. Capital Works Program Project Listing

2006 Residential Property Taxes and Utility Charges Survey

CAPITAL PROGRAM SUMMARY

CITY OF PEMBROKE 2004 BUDGET. July 6, 2004

Appendix E. System Issues

Vancouver Downtown & West

South of Fraser Transportation Priorities March 2017 Engagement

Creating Connections in Niagara Region

Transit Network Review translink.ca

METRO VANCOUVER REGIONAL DISTRICT (MVRD) - PARKS BOARD OF DIRECTORS

COUNTY SANITATION DISTRICT NO. 19 SERVICE CHARGE REPORT FOR FISCAL YEAR

COUNTY SANITATION DISTRICT NO. 21 SERVICE CHARGE REPORT FOR FISCAL YEAR

Port Metro Vancouver Facilitating our nation s trade

RETAIL SPACE AVAILABLE Corner of 12th Street and Imjin ± 8,213 (Divisible) to ± 10,710 SF

Clackamas County Development Agency

FOR SALE. Opportunity to own a brand new, high quality industrial unit in the core of Metro Vancouver. DELTA LINK BUSINESS CENTRE PHASE II

PASSENGER TRANSPORTATION BRANCH MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE LICENCE. Passenger Transportation Licence COPY

Sales Associate Course

DESIGN, BUILD, FINANCE AND OPERATE OF THE WASTEWATER TREATMENT & SEWER SYSTEM FOR THE CITY OF BUDVA, MONTENEGRO

COUNTY SANITATION DISTRICT NO. 18 SERVICE CHARGE REPORT FOR FISCAL YEAR

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan

COUNTY SANITATION DISTRICT NO. 22 SERVICE CHARGE REPORT FOR FISCAL YEAR

CITY COUNCIL MEETING Council Chamber, Burnaby City Hall 4949 Canada Way, Burnaby, B. C. A G E N D A

REDEFINING THE NEW BUSINESS HUB OF GUILDFORD TOWN CENTRE

COUNTY SANITATION DISTRICT NO. 2 SERVICE CHARGE REPORT FOR FISCAL YEAR

Weymouth & Hingham (ARAWH) Draft Report: Weymouth Water Supply & Regulatory Review

Welcome! metrovancouver.org. Aldergrove Regional Park - Management Plan

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

COUNTY SANITATION DISTRICT NO. 15 SERVICE CHARGE REPORT FOR FISCAL YEAR

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

CITY OF COACHELLA CAPITAL IMPROVEMENT PROGRAM TOTAL PROJECTS REVENUE SUMMARY TABLE ES-1

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY


MSC/ACDF Approved Diagnostic Facilities DU - DIAGNOSTIC ULTRASOUND as of December 8, 2015

2015 PURDUE ROAD SCHOOL March 11, 2015

COUNTY SANITATION DISTRICT NO. 8 SERVICE CHARGE REPORT FOR FISCAL YEAR

Municipality of West Grey

COUNTY SANITATION DISTRICT NO. 14 SERVICE CHARGE REPORT FOR FISCAL YEAR

Pattullo Bridge Replacement Project

Where to buy Snappy Grains Barley in BRITISH COLUMBIA

Special Council Agenda

COUNTY SANITATION DISTRICT NO. 8 SERVICE CHARGE REPORT FOR FISCAL YEAR

JOINT SHARED SERVICES COMMITTEE THURSDAY, JANUARY 10, 2019, AT 9:00 A.M. ROOM th FLOOR - ABBOTSFORD CITY HALL AGENDA

Recommendations for Funding Water, Sewer and Drainage Systems. Presentation to the Citizens and Businesses of New Orleans January 2012

COUNTY SANITATION DISTRICT NO. 19 SERVICE CHARGE REPORT FOR FISCAL YEAR

City of Surrey PLANNING & DEVELOPMENT REPORT File:

Pattullo Bridge Replacement Project

Leaders in energy management

The Calgary Airport Authority. Parallel Runway Project. Public Consultation Meetings April 30 th, May 2 nd & May 4 th

BACKGROUNDER Office of the Premier Government of Canada

Transcription:

Developmental Cost Charge (DCC) Program Summary In 1997, Metro Vancouver implemented a Development Cost Charge (DCC) Program in the Liquid Waste function of the Greater Vancouver Sewerage and Drainage District (GVS&DD), the purpose of which was to ensure that new development in the region would fund the cost of the liquid waste infrastructure expansion required to service that development. The policy aspects of the program were developed to be consistent across liquid waste operations, with each sewer area assigned a separate and unique fee structure based on the requirements of that specific sewer area. The Issue At the introduction of the DCC program, rates were set based on the development plans of member municipalities and the necessary infrastructure expansion required to service that development. Since that time, DCC rates have not been updated, despite the significant growth in development throughout the Metro Vancouver region, the increasing need for system expansion, and the rising cost of liquid waste infrastructure. The Proposed Solution Metro Vancouver has recalculated the DCC rates taking into consideration growth, system and cost conditions, resulting in a required increase to help pay for expanded liquid waste infrastructure that will serve the growing population in the region, and is seeking public input on those proposed new rates prior to seeking provincial approval. Timeline Summer Fall December April 1997 2015 2017 2017 2017 2018 DCC DCC Review New DCC New DCC New DCC New DCC introduced Process Proposal Proposal Bylaw to Bylaw initiated brought to Consultation Metro implemented committee Dialogues Vancouver We are here Board

Population Growth Estimates 2016 2026 2036 2046 Vancouver Sewerage Area (VSA) North Shore Sewerage Area (NSSA) Lulu Island West Sewerage Area (LIWSA) (FSA) 687,083 756,600 810,500 850,000 184,417 199,500 215,500 230,000 201,250 230,500 254,000 273,000 1,328,417 1,622,000 1,873,000 2,078,000 TOTAL 2,401,167 2,808,500 3,153,000 3,431,000 INCREMENTAL POPULATION GROWTH (30 YEAR) VSA, 162,917 16% NSSA, 45,583 4% LIWSA, 71,750 7% FSA, 749,583 73%

2017-2026 Growth Projects by Sewerage Area PROJECT ESTIMATED COST Collingwood Trunk Sewer $ 5,090,000 Hastings Trunk Sewer 13,780,000 Hastings Tunnel 35,000,000 Iona Secondary Treatment Upgrade (Growth Component) 99,057,000 $ 152,927,000 North Shore Wastewater Treatment Plant (Growth Component) $ 52,321,500 Lulu Island West Sewerage Area Lulu Island Digester No. 3 $ 52,400,000 Albert Street Trunk Sewer 2,480,000 Burnaby Lake North Interceptor Cariboo to Piper Section 31,500,000 Burnaby Lake North Interceptor - Phillips to Sperling Section 28,140,000 Burnaby Lake North Interceptor - Piper to Philips Section 18,200,000 Burnaby South Slope Interceptor Main Branch 7,200,000 Burnaby South Slope Interceptor - West Branch Extension 8,330,000 Cloverdale PS Upgrade 31,100,000 Cloverdale Trunk Sewer Upgrade 28,975,000 East Fraser Flow Management Phase 1 57,500,000 Glenbrook Combined Trunk Kingsway Sanitary Section 1,100,000 Golden Ears Forcemain and River Crossing 114,000,000 Golden Ears Pump Station 35,100,000 Langley Pump Station Upgrade 35,450,000 Lozells Sanitary Trunk Golf Course Section 7,050,000 Marshend Pump Station Capacity Upgrade 9,425,378 North Road Trunk Sewer 7,200,000 North Road Trunk Sewer Phase 2 3,700,000 NSI 104th Ave Extension 500,000 Port Moody PS Upgrade 4,700,000 Port Moody South Slope Interceptor Upgrade 1,695,000 Queensborough Pump Station Replacement 16,000,000 Rosemary Heights Pressure Sewer Upgrade 8,625,000 Sapperton Forcemain Pump Station Connections 4,600,000 Sapperton Pump Station 75,527,606 South Surrey Interceptor Johnston Section 56,650,000 Sperling PS Increase Pump Capacity Construction & Property Acquisition 2,000,000 Stony Creek Trunk Upgrade 2,780,000 Surrey Central Valley Upgrade 45,750,000 Annacis Outfall System 196,750,000 NWL Options 3,500,000 Annacis Stage 5 Expansion Phase 1 & 2 466,900,000 NL Ground Improvements Phase A 24,000,000 NL Ground Improvements Phase B 18,000,000 NL Liquid Stream Phase A 306,000,000 NL Liquid Stream Phase B 306,000,000 NL Solids Handling 126,000,000 AI Effluent Pump Station 60,000,000 $ 2,152,427,984

Project Map Region 2017-2026 Metro Vancouver Liquid Waste Growth Projects 2017-2026 Wastewater Treatment Plants LION'S GATE GVS&DD Sewer Pump Station Lulu Island Sewerage Area IONA ISLAND NORTHWEST LANGLEY Lulu Island Sewerage Area ANNACIS ISLAND LULU ISLAND 0 5 10 Kilometers

Project Map 2017-2026 Liquid Waste Growth Projects 2017-2026 Hastings Sanitary Trunk Sewer Hastings Tunnel Collingwood Trunk Sewer Iona Secondary Treatment Upgrade IONA ISLAND Wastewater Treatment Plant GVS&DD Sewer Pump Stations

Project Map 2017-2026 Liquid Waste Growth Projects 2017-2026 Wastewater Treatment Plant GVS&DD Sewer Pump Stations Lions Gate Secondary

Project Map Lulu Island West Sewerage Area 2017-2026 Lulu Island Sewerage Area Wastewater Treatment Plant GVS&DD Sewer Pump Stations Lulu Island Digester No 3 LULU ISLAND Lulu Island Sewerage Area

Project Map Fraser Shore Sewerage Area 2017-2026 Liquid Waste Growth Projects 2017-2026 Port Moody South Interceptor Upgrade Lozells Sanitary Trunk Golf Course Section Port Moody PS Upgrade Albert Street Trunk Sewer Burnaby Lake North Interceptor Stoney Creek Trunk Upgrade North Road Trunk Sewer Phase 1 and 2 Sperling PS Increase Pump Capacity Glenbrook Combined Trunk Kingsway Sanitary Section Sapperton Pump Station and Forcemain Pump Station Connections Burnaby South Slope Interceptor West Burnaby South Slope Branch Extension Interceptor Main Branch Golden Ears Pump Station Golden Ears Forcemain and River Crossing NSI 104th Ave Extension Marshend Pump Station Capacity Upgrade Queensborough Pump Station Replacement AI Effluent Pump Station Annacis Outfall System NORTHWEST LANGLEY NL Options ANNACIS ISLAND Wastewater Treatment Plant GVS&DD Sewer Pump Stations South Surrey Interceptor Surrey Central Valley Upgrade South Surrey Interceptor Johnston Section Cloverdale Trunk Sewer Upgrade Cloverdale PS Upgrade Langley Pump Station Upgrade Rosemary Heights Pressure Sewer Upgrade 0 5 10 Kilometers

Rate Changes EXISTING DEVELOPMENT COST CHARGE (DCC) RATES SEWER AREA SINGLE FAMILY TOWNHOUSE APARTMENT NON-RESIDENTIAL Vancouver $ 944 $ 826 $ 590 $0.443 sq ft Lulu Island $ 1,077 $ 942 $ 673 $0.505 sq ft North Shore $ 1,291 $ 1,129 $ 807 $0.605 sq ft Fraser $ 1,731 $ 1,515 $ 1,082 $0.811 sq ft PROPOSED DEVELOPMENT COST CHARGE (DCC) RATES SEWER AREA SINGLE FAMILY TOWNHOUSE APARTMENT NON-RESIDENTIAL Vancouver $ 1,811 (+92%) $ 1,618 (+96%) $ 1,072 (+82%) $0.93 sq ft (+109%) Lulu Island $ 2,214 (+106%) $ 1,915 (+ 103%) $ 1,388 (+106%) $1.05 sq ft (+109%) North Shore $ 2,300 (+78%) $ 2,076 (84%) $ 1,416 (75%) $1.20 sq ft (+99%) Fraser $ 5,428 (+214%) $ 4,695 (+210%) $ 3,530 (+226%) $2.67 sq ft (+229%)