SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

Similar documents
STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Learning Objectives. By the end of this presentation you should understand:

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

MANAGING THE CHANGES AS A STATE CASE STUDY UAE Airspace Restructuring Project

PBN Operational Approval Overview

2012 Performance Framework AFI

PBN and airspace concept

TWELFTH AIR NAVIGATION CONFERENCE

PBN Implementation in the UK

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

RNP AR APCH Approvals: An Operator s Perspective

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Implementation of PBN in Armenian airspace

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

Performance Based Communication and Surveillance in the ICAO North Atlantic Region. PBCS in NAT HLA

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES


UK Implementation of PBN

Air Navigation Bureau ICAO Headquarters, Montreal

North Atlantic Initiatives

PBN Operational Approval The Process. ICAO PBN Operational Approval Course

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization

Russian Federation ATM modernization program

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

(RN R A N V A V & & RN R P N

FLIGHT OPERATIONS PANEL (FLTOPSP)

European Aviation Safety Agency

PBN Implementation Plan - Fiji Version 1 19 January 2010

Flight Operations Inspector Manual

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

ICAO Regional Seminar on Performance - Based Navigation (PBN) Nairobi, Developments and Benefits. 4 December 2008.

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

EUR/SAM corridor airspace concept

Presented by: Trinidad and Tobago

PBN Implementation Plan Tonga

NEW FPL Transition Phase & Implementation Stages

Towards a Global ATFM Manual. Brian Flynn Head Network Operations

RMT.0464 ATS Requirements The NPA

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

Flight Procedure Design and Cartography

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

TWELFTH AIR NAVIGATION CONFERENCE

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

The support of an European ANSP

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

European Joint Industry CDA Action Plan

Special Africa-Indian Ocean Regional Air Navigation Meeting (Durban, South Africa 24 to 29 November 2008) FOLLOW-UP ON ATM RECOMMENDATIONS

Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1

WEST ATLANTIC ROUTE SYSTEM (WATRS) PLUS AIRSPACE REDESIGN AND SEPARATION REDUCTION INITIATIVE. (Presented by United States of America) SUMMARY

APAC PBN UPDATE Slide 1 of xx

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

Performance Based Navigation Implementation Plan SINGAPORE. December Published by Civil Aviation Authority of Singapore

WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

CHAPTER 24 D APPROVAL OF SPECIAL OPERATIONS- PERFORMANCE BASED NAVIGATION OPERATION

NNF Work-shop on Navigation, Safety and Technology. Dato: 2. February Gunn Marit Hernes Luftfartstilsynet

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

ICAO Regional Seminar on CORSIA Session 1: Overview of CORSIA CORSIA Administrative Aspects and Timelines

Global ATM System ~Interoperability and Harmonization ~

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Civil/Military Cooperation ICAO Workshop. Civil/Military Cooperation in Ukraine

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016

INTERNATIONAL CIVIL AVIATION ORGANIZATION

PERFORMANCE BASED NAVIGATION (PBN)

CNS/ATM Systems Interoperability and Harmonization

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

AIC 02/ JUN 2014

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE. Thirteenth Meeting of the FANS I/A Interoperability Team (SAT/FIT/13)

Excerpts from ICAO PBCS Manual

Draft PBN Implementation Plan Papua New Guinea

AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP TWENTY FIRST MEETING (APIRG/21) (Nairobi, Kenya (9 to 11 October 2017)

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region

OPERATIONS CIRCULAR. Subject: Performance Based Communication and Surveillance (PBCS) OC NO 01 of 2018 Date: 23 rd March 2018

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

UK Performance-based Navigation (PBN) Implementation Status

SAMPLE TEMPLATE APPENDIX 3.5C-1

AERONAUTICAL INFORMATION CIRCULAR 33/17

Performance Based Navigation Implementation of Procedures

The Information Paper of the. Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation Roadmap

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place

34 th Airline/ATS Safety Forum

Transcription:

PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for the Project Manager and Team Coordinate planning and implementation needs with Air Navigation Service Providers, Regulators, Users, aircraft operators and military authorities Establish implementation target dates per each specific PBN implementation Establish implementation target date for Oceanic and Remote PBN implementation (if required) Establish implementation target date for Continental En-route PBN implementation (if required) Establish implementation target date for PBN Terminal implementation Establish implementation target date for PBN Approaches implementation Establish protocols for the sharing of resources and experiences between state stakeholders and intra-regionally Establish protocols for the attendance of Regional PBN Task Force Meetings ATNS/HO/C09/30/02/01 1 19 MARCH 2010

Establish a project site (if required) Establish a project site Establish the documentation format of PBN Implementation Website Determine State Infrastructure Status State WGS-84 implementation status State etod implementation status State implementation status of PBN components Air Operator equipage and approval status State Regulatory Status Conduct Process 1, Determine Requirements as per ICAO Doc 9613, PBN Manual Vol I, Part B, Chapter 2, including the following Gap Analyses ANSP CNS-ATM status Evaluate the PBN implementation in the ATC Automated Systems, considering the Amendment 1 to the PANS/ATM (FPLSG) Evaluate the PBN implementation in the CNS Systems Evaluate the PBN implementation in the ATM Systems ATNS/HO/C09/30/02/01 2 19 MARCH 2010

Evaluate State Training level status including pilots, ATCs, Flight Procedure Designers, etc. Evaluate State Flight Procedure Design status including competencies, capacities, tools and data Development of appropriate State Airspace Concepts Establish and prioritise Strategic Objectives (Safety, Capacity, Environment, etc.) Analyse aircraft fleet navigation capacity operating in the Airport/Airspace Analyse air traffic data to obtain airspace/airport traffic flows Analyse communication, ground navigation (VOR, DME) and surveillance for navigation specification and reversionary mode compliance. Notice needs to be taken of mixed mode operations Produce State Gap Analysis Report PLANNING PHASE Formulate a State PBN Implementation Plan/Roadmap Ensure harmonization within AFI region Devise methodologies for incorporating the effects of projected traffic growth and system changes on occupancy & collision risk in the future environment Establish/identify airspace categorization for en-route and areas ATNS/HO/C09/30/02/01 3 19 MARCH 2010

Identify transition areas and transition procedures Identify the restructuring of airspace as appropriate, if required Produce State PBN Implementation Plan/Roadmap Publish Intent of PBN Implementation in appropriate State publications Formulate State PBN Implementation Action Plan including: Develop Corrective Action Plans for Gap Analyses Produce Corrective Action Plan for WGS-84 and etod implementation Produce Corrective Action Plan for Air Operator equipage and approval implementation Produce Corrective Action Plan for ATC Automated Systems implementation Produce Corrective Action Plan for ATM and CNS Systems implementation Produce Timeline for Implementation per each specific PBN Implementation Develop PBN Performance Measurement Plan Produce Performance Measurement Plan, including gas emission, safety, efficiency and cost benefits ATNS/HO/C09/30/02/01 4 19 MARCH 2010

Develop Safety Assessment Plan Determine which methodology shall be used to evaluate procedure safety, depending on the navigation specification. Consider Airspace Modelling, ATC simulations (fast time and/or real time), Live Trials, etc. Prepare a data collection programme for airspace safety assessment Produce Safety Assessment Plan Development of Legislation and Regulation Amendment Plan including scope of amendments required publication alternatives, approval processes and timelines (if required) Development of Standards and Procedures Plan including ATS, Air Operator, airworthiness and certification processes Develop a PBN Training Needs Plan addressing ATS, Air Operator, airworthiness and certification requirements Develop a Progress Reporting Plan including reports to ICAO AFI regional office, state representatives, and all stakeholders as required Conduct a Cost-Benefit Analysis per each specific PBN Implementation Develop CBA per each specific PBN Implement Publish CBA per each specific PBN Implement ATNS/HO/C09/30/02/01 5 19 MARCH 2010

IMPLEMENTATION PHASE Execute Corrective Action Plans for Gap Analyses Execute Corrective Action Plans for WGS-84 implementation Execute Corrective Action Plans for etod implementation Execute Corrective Action Plans for Air Operator equipage and approval implementation Execute Corrective Action Plans for ATC Automated Systems implementation Execute Corrective Action Plans for CNS Systems implementation Execute Corrective Action Plans for ATM Systems implementation Execute State PBN Implementation Plan including: Conduct Process 2 Identifying an ICAO Specification for Implementation as per ICAO Doc 9613, PBN Manual Vol I, Part B, Chapter 3 for each specific PBN implementation (i.e. Oceanic and Remote, Continental En-route, Arrivals and Departures, and Approaches) Produce Report on ICAO Specifications to be used by State ATNS/HO/C09/30/02/01 6 19 MARCH 2010

Conduct Process 3 Planning and Implementation as per ICAO Doc 9613, PBN Manual Vol I, Part B, Chapter 4 for each specific PBN Implementation (i.e. Oceanic and Remote, Continental En-route, Arrivals and Departures, and Approaches) Optimise the airspace structure, by reorganising the network or implementing new routes based on the strategic objectives of the airspace concept Optimise the airspace structure, by implementing new SIDs and STARs, based on the strategic objectives of the airspace concept Design Instrument Approach Procedures (RNP APCH/APV Baro-VNAV or RNP AR), based on the strategic objectives of the airspace concept Produce PBN Flight Procedures (En-Route, Terminal and Approach Procedures) Execute PBN Performance Measurement Plan Execute Performance Measurement Plan for gas emissions Execute Performance Measurement Plan for safety Execute Performance Measurement Plan for efficiencies Execute Performance Measurement Plan for cost benefits Undertake harmonisation of procedures with adjacent states ATNS/HO/C09/30/02/01 7 19 MARCH 2010

Execute Legislation and Regulation Amendment Plan (if required) Develop and publish regulations for PBN and GNSS use Develop and publish AIC notifying PBN implementation planning Publish AIP Supplement including applicable standards and procedures Execute Standards and Procedures Plan Develop, harmonise and obtain approval for ATS operational procedures Review and update the Procedural Manuals of the ATS units involved Update Letters of Agreement between ATS units, if necessary Develop and publish procedures to accommodate non-pbn approved aircraft, when applicable Develop and publish procedures for the suspension of PBN Develop and publish procedures for aircraft found to be non-compliant through monitoring Develop and publish standards for the charting of PBN Develop and publish weather and contingency procedures for applicability under PBN if required Develop and publish pilot certification requirements Develop and publish Air Operator approval requirements ATNS/HO/C09/30/02/01 8 19 MARCH 2010

Develop and publish Airworthiness approval requirements and Develop and publish aircraft certification approval requirements Execute Training Needs Plan Hold seminars for stakeholders indicating the plans and the operational and financial benefits expected Develop and implement a training programme and documentation for operators (pilots, dispatchers and maintenance) Develop and implement a training programme and documentation for Air Traffic Controllers and AIS Operators Develop and implement training programme and documentation for regulators (aviation safety inspectors) Execute ATS, Aircraft and Air Operators Approvals for each type of procedure and navigation specification Analyse ATS, aircraft and Air Operator approval requirements, i.e. approval requirements for the navigation specifications to be implemented, as contained in the ICAO PBN Manual Approval of ATS, aircraft and Air Operators for each type of procedure and navigation specification Establish and keep updated a record of approved ATS, aircraft and Air Operators Verify operations with a continuing monitoring programme Decision of State implementation for each specific PBN sub-category (i.e. Oceanic and Remote, Continental En-route, Arrivals and Departures, and Approaches) Evaluate operational documentation availability (ATS, OPS/AIR) ATNS/HO/C09/30/02/01 9 19 MARCH 2010

Evaluate the percentage of approved aircraft and operations (mixed equipage concerns) Review safety assessment results Publish Decision to Implement PBN in appropriate State documentation Execute Progress Reporting Plan Report planning and implementation progress to the corresponding Regional Office including lessons learnt Report planning and implementation progress to the state representative Report planning and implementation progress to stakeholders POST-IMPLEMENTATION PHASE System Performance Monitoring Develop post-implementation monitoring programme per each specific PBN implementation including safety, efficiency and environmental issues Execute post-implementation operations monitoring programme per each specific PBN implementation Perform periodically, other data collections (e.g. ASE stability) in order to ensure that the parameter values used remain current Perform periodical assessments of harmonisation with neighbouring states ATNS/HO/C09/30/02/01 10 19 MARCH 2010