Section C75-FA-3. Baggage Compartment

Similar documents
80070 TOP MOUNT CAMPER SHELL and TRANSIT CONNECT RACK TMCS_3:1

FLEX KEY ASSEMBLY. ..._ o RAFTER ARM TUBE MAIN ARM TUBE CAP NUT CLAW HINGE

PR-429BF-600M. Bell 429 Blade Fold Kit Operations Manual

Shut off combine and remove key before installing the hopper extension. Make sure the combine is on a level surface. Engage parking brake.

An Improved Pedestal To A Version One Worksurface

INSTALLATION INSTRUCTIONS

Freon Hose Routing. My engine has not been installed yet, so the hoses for the compressor are not shown.

Assembly TOOLS REQUIRED: 17mm and 14mm or equivalent wrenches.

How to Build Your Own Flour Mill and Sifter

Gas Conversion Kits and Instructions

MANDATORY BULLETIN No. EV a (ZBEV a) SPORTSTAR 004 a (ZBSPORTSTAR-004a)

Otter Pro XT Cabin Installation and Set-Up Instructions

MANUAL REVISION TRANSMITTAL Manual 165A ( ) Illustrated Tool and Equipment Manual. REVISION 21 dated October 2017

Tuf-Lite and Tuf-Lite II Fans 6000M Series Hub

, & Series Nested Hardware

PRODUCT INFORMATION MANUAL SECTION: 17 METAL LOUVRE AWNINGS METAL LOUVRE AWNINGS

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V

Installation Instructions for the Rolltec Bravo Awning

Otter XT Cabin Installation and Set-Up Instructions

JOINING MULLION (DIRECT MULL) ASSEMBLY INSTRUCTIONS FOR 3-WAY OR 4-WAY JOINTS FOR IMPERVIA AWNING, CASEMENT AND LARGE AWNING

Otter Pro X-Over Lodge Installation and Set-Up Instructions

Y Camper Shell Tracks, 37 Cross Bars. Y Camper Shell Tracks, 44 Cross Bars.

Factory Style Bow Kit

ALPINE SLIDEOUT COVER

Tuf-Lite and Tuf-Lite II Fans 6000 Series Hub

COOPER FREESTANDING TUB FAUCET INSTALLATION

Advantage Plus TIM-3600 Series Reel

250 SERIES 1" STRUCTURAL TUBE MULLION ASSEMBLY INSTRUCTIONS

Assembly. Step 3. Attach the safety bracket (7) to the Pivot ARM (6).

Airworthiness Directive Schedule

Important! Read all of these instructions before assembling or riding the glider. For questions or help please call Glide Bikes at

Water Trailer Series. WT5HR Hose Reel Kit Installation REQUIRED TOOLS PARTS WORK SAFELY! PREPARATION

M129 SERVICE MANUAL- M129 MODEL #G-2 MANUAL CAN OPENER

RETRACTABLE AWNING w/ OPTIONAL HOOD ASSEMBLY INSTRUCTIONS

Installation Instructions for the Rolltec Physique XL Awning

HANDLE AND WHEEL KIT INSTALLATION

Urea/Adblue Hose Reel

Tuf-Lite III Fans 4000KW Series Hub

1946 READ AND SAVE THESE INSTRUCTIONS!

DO NOT USE WITH CROSSBAR SPREAD LESS THAN 24.

quick and easy installation guide

READ AND SAVE THESE INSTRUCTIONS! EasyAwn Dome Awning Installation

ASSEMBLY INSTRUCTIONS

SERVICE LETTER. This service letter applies to the models and serials that have 12,000 or more flight hours as follows

Baggage Door. 1. General

INSTALLATION INSTRUCTIONS AND OWNER'S MANUAL AWNINGS. For trailers & motor homes with straight sides TOOLS REQUIRED

TCWS54 SEE THRU LONG BEACH LOG INSTALLATION INSTRUCTIONS

W/ MAGNETIC TAPE ON FACE CENTER W/ MAGNETIC TAPE ON FACE CENTER W/ STEEL TAPE ON FACE BOTTOM L3-1 W/ STEEL TAPE ON FACE BOTTOM

SERVICE MANUAL- M126

TCWS54 SEE THRU DIAMOND BURNER INSTALLATION KIT INSTRUCTIONS

Standard Awning Installation Instructions

Wenger Corporation 2014 Printed in USA 05/14 Part #049B015-09

HermanMi ller Renew Single Stage Leg Disassembly for Recycling Instructions

AVIAT AIRCRAFT INC. P.O. Box South Washington Afton, WY USA Tel: Fax:

260 INSTALLATION OF OPTIONAL MARINE HEAD THRU-HULL, VENT, AND DECK PLATE

HL GUIDE-ON INSTRUCTIONS

Airworthiness Directive Schedule

Installation Instructions for the Rolltec Adalia X3M Extenda Awning

MYRIAD Banner Stand is a trademark of Skyline Exhibits. Patent Pending PN32294-B. MYRIAD Banner Stand

SERVICE LETTER. Conquest. WARNING: Further flight with a cracked carry through spar cap is prohibited. The carry

Installation Instructions Part # 2784 Awning

POP-UP OPTION USER HARDWARE MANUAL. EdgeTech 4 Little Brook Road West Wareham, MA _REV_B 8/29/2018

MS20663 and MS NAS1435E and NAS1435K

One Piece Low Torque Kelly Valve. Preventive Maintenance Service Video Disassembly and Assembly Procedures

LBH18BPK. Instruction Sheet

AND LOAD CANOPY RACK SPECIFICATIONS

READ AND SAVE THESE INSTRUCTIONS! EasyAwn Spear Awning Installation

EEZI - AWN series 1000 / 2000 Awning bracket

READ AND SAVE THESE INSTRUCTIONS! EasyAwn Standard Awning Installation

Two Piece Low Torque Kelly Valve

CONVEX Awning Instructions

Safety. BBA Compliance Kit Multi-Pro 5800 Turf Sprayer Model No Installation Instructions

Model. Oasis Automatic and Manual RV Door Awning System INSTALLATION & OPERATING INSTRUCTIONS

Clearly the Best FLEXIBLE PVC SOLUTION

KITFOX WING FOLDING INSTRUCTIONS

SEASONAL ANCHOR SYSTEM FOR PAIR OF PORTABLE SOCCER GOALS

Airworthiness Directive Schedule

Solera Classic Awning OEM INSTALLATION MANUAL

Solera Power Awning OEM INSTALLATION MANUAL

Special Three-Phase Motors with HSK-C Tool Holder for Manual Quick Tool Change

Parts Catalog 1/15/2013

Otter XT 650 Cabin Installation and Set-Up Instructions

SERVICE BULLETIN FLIGHT CONTROLS - CONTROL COLUMN HARDWARE REPLACEMENT

RUPHIS Blade Clamp. Instruction Manual

NEWMAR SERVICE SCHOOL

Solera Power Awning w/ LED Lights OEM INSTALLATION MANUAL

Airworthiness Directive Schedule

One Ton Truck Front Suspension Conversion

Utility Trailer Loadbar Kit Model: MPG493 TopTier - Assembly Instructions

FibreGuard Closure with SLIDE-N-LOCK Fiber Management

MODEL # 1 MANUAL CAN OPENER

Z-PURLIN MOUNTING WARNING:

Model INSTALLATION INSTRUCTIONS

INSTRUCTION MANUAL ALEKO RETRACTABLE AWNING

Otter Pro XT 1200 Cottage Installation and Set-Up Instructions

Swing-out Van Key Bench

Tuf-Lite II Fans 8000 Series Hub

Notes, Parts List & Drawings

OWNER S MANUAL. IMPORTANT: This instruction manual contains important information necessary for the proper assembly and safe use of the appliance.

AVIAT AIRCRAFT INC. P.O. Box South Washington Afton, WY USA Tel: Fax:

Transcription:

Section C75-FA-3 This manual has been prepared for assembly of the baggage compartment supplied with match drilled parts. This photo assembly manual is intended as a supplement to the drawings. If there is any discrepancy between this manual and the drawings, the drawings supersede this manual. For more information on building standards and allowable tolerances see Construction Standards for Zenair Light Aircraft available from Zenith Aircraft Co. Section C75-FA-3, Page 1 of 10

P/N: C75F5-2 Baggage Back Locate the position for the Baggage Back in the Rear Fuselage. See drawing page C75-FA-3. P/N: C75F6-5 Baggage Angle Cleco the Baggage Angle to the Baggage Back. Short clecos work great on the Baggage Angle. Section C75-FA-3, Page 2 of 10

P/N: C75F6-7 Baggage Back Channel Cleco the Baggage Back Channel to the Fuselage Side Skin, the rivet line rear of the rear window. Once the Baggage Back is positioned in place, drill the Baggage Angle C75F6-5 thru the predrilled holes on the Top Skin. P/N: C75F5-3 Baggage Floor Cut three L angles 260mm long. Draw a center line on one flange and mark the first rivet location at 10mm from the end. With a #40 drill bit, predrill the first hole on the mark. Cleco the L angles to the Baggage Floor and rotate the L angles so the center line is visible through the predrilled holes in the Baggage Floor and clamp them in place. With a #40 drill bit, back drill through the holes in the Baggage Floor into the L angles and Cleco. With a #30 drill bit, expand the holes and Cleco. Section C75-FA-3, Page 3 of 10

Cleco the Baggage Floor to the Side Skins and the Baggage Back. P/N: C75F3-8 Shoulder Harness Attachment Locate the correct Shoulder Harness Attachment for each side. Section C75-FA-3, Page 4 of 10

Cleco the Shoulder Harness to the Longeron and Side Skin. P/N: C75F3-2 Flaperon Control Cover Cleco the Flaperon Control Covers to the Uprights and Side Skins. Section C75-FA-3, Page 5 of 10

P/N: C75F5-4 Right Baggage Upright P/N: C75F5-5 Left Baggage Upright Cleco the Right and Left Baggage Uprights to the Baggage Floor and the Side Skins. Note: Baggage Floor was removed for better clarity. The 55mm L angle is shown on the left and the 100mm L angle is centered in the photo above. Cut an L angle 55mm long. Position the L angle on the Upright under the Baggage Floor. With a #40 drill bit, back drill through the Upright into the L angle and Cleco. Cut an L angle 100mm long. Position the L angle on the Flaperon Control Cover under the Baggage Floor. With a #40 drill bit, back drill through the Flaperon Control Cover into the L angle. Back drill through the Baggage Floor into both L angles and Cleco. With a #30 drill bit, expand the holes and Cleco. Section C75-FA-3, Page 6 of 10

P/N: C75F4-5 Torque Tube Bearing Channel P/N: C75F5-1 Torque Tube Bearing Support Cleco the Torque Tube Bearing Channel to the Bottom Skin. Cleco the Torque Tube Bearing Support to the Torque Tube Bearing Channel. P/N: C75F6-2 Right Control Tunnel Side Cleco the Right Control Tunnel Side to the Right Baggage Upright. Note: The Control Tunnel Side fits best with the flange in front of the Baggage Upright. Section C75-FA-3, Page 7 of 10

P/N: C75F6-3 Left Control Tunnel Side Cleco the Left Control Tunnel Side to the Left Baggage Upright. Note: The Control Tunnel Side fits best with the flange infront of the Baggage Upright. P/N: C75F6-4 Control Tunnel Top Cleco the Control Tunnel Top to the Baggage Floor, the Control Tunnel Sides, and the Torque Tube Bearing Support. The rear flange should slide under the Baggage Floor and the side flanges overlap the Control Tunnel Sides. Section C75-FA-3, Page 8 of 10

P/N: C75F5-6 Right Lower Baggage Floor P/N: C75F6-1 Left Lower Baggage Floor Cut two L angles 270mm long and two L angles 240mm long. Draw a center line on one flange and mark the first rivet location at 10mm from the end. With a #40 drill bit, predrill the first hole on the mark. Cleco the L angles to the Lower Baggage Floor and rotate the L angles so the center line is visible through the predrilled holes in the Lower Baggage Floor and clamp them in place. With a #40 drill bit, back drill through the holes in the Lower Baggage Floor into the L angles and Cleco. With a #30 drill bit, expand the holes and Cleco. The rear L angle will overlap the Torque Tube Bearing Channel. Cleco the Right and Left Lower Baggage Floors in place. The Lower Baggage Floors rest on top of the Flange of the Baggage Uprights. The I/B flanges overlaps the Control Tunnel Sides inside the baggage compartment. Section C75-FA-3, Page 9 of 10

P/N: C75F4-7 Side Skin Gusset Position the Side Skin Gusset to the Fuselage side and Cleco to the Fuselage. See drawing C75-FA-7. P/N: C75F4-6 Gusset Cleco the Gusset to the Side Skin. With a #40 drill bit, back drill into the Torque Tube Bearing Channel and Cleco. With a #30 drill bit, expand the holes in the Gusset through the Torque Tube Bearing Channel and Cleco. With a #20 drill bit, back drill through the Gusset into the Side Skins. Note: It s best to have the Lower Baggage Floors in place to assure proper alignment. Section C75-FA-3, Page 10 of 10