OCTOBER 2011 DGCA SAFETY BULLETIN. Informative Reading material

Similar documents
ILS APPROACH WITH B737/A320

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

Advisory Circular (AC)

Regulations & Obligations

NOISE ABATEMENT PROCEDURES

Regulation. 1. While flying you observe a green light ahead of you:

USE OF RADAR IN THE APPROACH CONTROL SERVICE

OPERATIONS CIRCULAR 01/2012. Subject: HEAD-UP DISPLAYS (HUD) AND ENHANCED VISION SYSTEMS (EVS)

CFIT-Procedure Design Considerations. Use of VNAV on Conventional. Non-Precision Approach Procedures

Consideration will be given to other methods of compliance which may be presented to the Authority.

FLIGHT OPERATIONS PANEL (FLTOPSP)

ECCAIRS Data Definition Standard. Event phases

Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding

Appendix B. Comparative Risk Assessment Form

CDA Continuous Descent Approach

ICAO Annex 14 Standards and Aerodrome Certification

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, NEW DELHI

AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION

AERODROME OPERATING MINIMA

Lecture Minimum safe flight altitude

LAPL(A)/PPL(A) question bank FCL.215, FCL.120 Rev OPERATIONAL PROCEDURES 070

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

GUERNSEY ADVISORY CIRCULARS. (GACs) UPSET PREVENTION AND RECOVERY TRAINING GAC 121/135-2

Consideration will be given to other methods of compliance which may be presented to the Authority.

AERODROME LIGHTING SYSTEM

GCAA ADVISORY CIRCULAR

LAPL(A)/PPL(A) question bank FCL.215, FCL.120 Rev OPERATIONAL PROCEDURES 070

Continuous Descent? And RNAV Arrivals

ACP / AQP Bulletin 01/14

CAUTION: WAKE TURBULENCE

Newcastle Airport. 36 years

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy

LFMN / Nice Côte-d Azur / NCE

The Legal Framework for RPAS/UAS Suitability of the Chicago Convention and its Annexes

Approach-and-Landing Briefing Note Response to GPWS Pull-Up Maneuver Training

II.B. Runway Incursion Avoidance

Introduction. Appendix D: Airspace Protection

IFR SEPARATION USING RADAR

A Pilot s perspective

AOP 11 Low Visibility Procedures (LVP s) (Aerodrome Operating Procedure)

General Information Applicant Name and Address: Tel./Fax/ Contact Person Name/Tel./Fax/

Striving for Excellence in Aviation Ground Safety

Runway Excursion 2018 projects ALTA 2018

AIR LAW AND ATC PROCEDURES

Cayman Islands Aviation Circular

Airport Obstruction Standards

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

USE OF TAKEOFF CHARTS [B737]

ATM 4 Airspace & Procedure Design

SECTION 6 - SEPARATION STANDARDS

APPENDIX D FEDERAL AVIATION REGULATIONS, PART 77

AIRWORTHINESS NOTICE

Operational Evaluation Board Report

Aerodrome Obstacle Survey Information Checks

IATA Air Carrier Self Audit Checklist Analysis Questionnaire

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

It is essential that planning take full account of air safety and efficiency of operations.

Use of technology to mitigate overrun aftermath

Learning Objectives 7.3 Flight Performance and Planning Flight Planning & Flight Monitoring

BUILDING LOCAL RUNWAY EXCURSION ACTION PLAN UNSTABILISED APPROACHES. Lisbon, 4 th Dec 2013

Approach-and-landing Risk Reduction Guide

Part 137. Agricultural Aircraft Operations. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand

AUTOMATION MANAGEMENT STANDARD OPERATING PROCEDURES

FALCON SERVICE ADVISORY

Runway Safety through Standardized Stop Bars Practices

Application for the inclusion of the A330 Aeroplane Type in Aircraft Rating (In Flight Cruise Relief Only) of a Pilot s Licence (Aeroplanes)

REGULATIONS OF THE CIVIL AVIATION BOARD NUMBER 75 ON PRIVILEGES OF HOLDERS OF PILOT, AIR TRAFFIC CONTROLLER

CHAPTER 5 AEROPLANE PERFORMANCE OPERATING LIMITATIONS

Source: Chippewa Valley Regional Airport ASOS, Period of Record

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1)

Advisory Circular CT

FLIGHT OPERATIONS PANEL

SAFETYSENSE LEAFLET AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE

NZQA registered unit standard version 2 Page 1 of 8. Demonstrate flying skills for a commercial pilot licence (aeroplane)

FAA Requirements for Engine-out Procedures and Obstacle Clearance

SECTION 4 - APPROACH CONTROL PROCEDURES

AERODROME ADVISORY CIRCULAR

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDURJUNG AIRPORT, NEW DELHI

8.4.9 Fatigue Management. Republic of Korea

The aim of any instrument approach is to allow the aircraft to safely descend to a low altitude in order to become visual.

July 2008 COMPANY INDOCTRINATION TRAINING 1.0 PURPOSE

Airlines are responsible for MagVar updates, which can be performed during scheduled maintenance.

Advisory Circular (AC)

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR SURVEILLANCE INSPECTION OF AERODROMES

CLEARANCE INSTRUCTION READ BACK

Electronic Terrain and Obstacle Data

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS)

AIRWORTHINESS ADVISORY CIRCULAR

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1

Instrument Proficiency Check Flight Record

CIVIL AVIATION REQUIREMENT SECTION 8 AIRCRAFT OPERATIONS SERIES F PART V ISSUE I, 29 TH JULY 2015 EFFECTIVE: 31 ST JULY 2015

ADVISORY CIRCULAR ON LAND USE AND ENVIRONMENTAL MANAGEMENT IN THE VICINITY OF AERODROMES

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

SITE ELEVATION AMSL...Ground Elevation in feet AMSL STRUCTURE HEIGHT...Height Above Ground Level OVERALL HEIGHT AMSL...Total Overall Height AMSL

6. Cross-Country Flight Limitations. The following criteria shall be applied to the conduct of cross-country flights.

AIRBUS FlyByWire How it really works

1.0 PURPOSE. a) Ensure safe movement with the objective of preventing collisions between aircraft, and between aircraft and obstacles;

ICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace

Transcription:

DGCA SAFETY BULLETIN OCTOBER 2011 DGCA is starting SAFETY BULLETINS from this month onward. The SAFETY BULLETIN will contain informative reading materials. Initially this will be published quarterly. However, efforts will be made to convert it into monthly safety journal of DGCA. The aim of the DGCA SAFETY BULLETIN is to provide a short synopsis on requirements of safety. Any suggestion to improve the SAFETY BULLETIN will be highly appreciated. Informative Reading material E.K. Bharat Bhushan Director General of Civil Aviation

DGCA SAFETY BULLETIN ATCOs THE INTEGRAL PART OF THE SAFETY CHAIN Working in aviation means teamwork. The pilots and the ATCOs are all part of this team, even though they are not physically in the same place. It is therefore important that we all have the same mental model of a situation all the time. A particular flight hazard one which an ATCO can help to prevent, thus making an important contribution to safety. Un-stabilized Approaches, which often lead to Approach and Landing Accidents (like CFIT or runway overruns or shortcomes). Possible clearances during the approach maintain 170/180kt to the outer marker, or maintain high speed during the approach. Every flight MUST be stabilized on approach not later than 1000 AGL. It is not meant as a goal it is a hard limit! With a jet like the common B737 it requires you to start further configuring the aircraft from the intermediate flap setting no later than 2000 AGL, which means around 7NM on finals and, depending on actual weather and the environmental situation, further speed reduction may be necessary. ATCO s are expected to keep such factors in mind when dealing with high-density air traffic. SEE ALSO OPERATIONS CIRCULAR On www.dgca.nic.in 2/2011 - Altitude and Speed Constraints in Area Navigation (RNAV) Procedures. 5/2011 - Pilot Controller Communication 8/2001 - ATCO Workload

FLYING A NON-PRECISION APPROACH Inspite of several ILS installations there are still non-precision approaches at many airfields. It has been researched that non-precision approaches increases the risk of an accident manifold. Of course it is quite true that every pilot should be able to fly such an approach. But a non-precision approach cannot be treated in the same way as a standard ILS approach. It should be treated as an abnormal procedure which requires a lot more situational awareness and working effort than a precision approach. Once again it is the human factor that makes flying a non-precision approach critical. On most modern aircraft a pilot can use the autopilot to help him with such things as tracking. But you must constantly readjust the heading to keep on the final approach track. But together with descending along the prescribed glide path it is much more demanding, especially if you do not start the approach in the final configuration and speed due to a requirement to maintain high speed as long as practicable. In this case, you will have to counteract for ballooning during flap extension and vertical speed adjustment due to speed change. All this, together with bad weather and may be manual flying, can turn an easy nonprecision approach into a flight hazard. SEE ALSO OPERATIONS CIRCULAR On www.dgca.nic.in

RAMP BRIEF As another winter season is approaching please ensure you are prepared. Now is the time to remove any equipment such as pallets, ballast, or carts used for storage, from around the gate areas. During the winter operations REMEMBER to: Adjust your stopping distances for wet conditions Use extra caution when standing water is present Use personal protective equipment Take care of the GROUND EQUIPMENT: Keep equipment protected from the elements when possible If equipment is damaged or will not start, contact your local GSE facility or vendor to have the equipment repaired Make sure lavatory and water trucks are winterized to prevent fluids from freezing In adverse weather, sloping ramp, chock the nose and both main gear tires forward & aft of the tire. Keep locations around the loading bridge, gates and terminal free from unnecessary equipment, FOD or anything else.

DISABLED AIRCRAFT REMOVAL Guidance on removal of a disabled aircraft, including recovery equipment, is given in the ICAO Airport Services Manual, Part 5. See also ICAO Annex 13 concerning protection of evidence, custody and removal of aircraft. 1. A plan for the removal of an aircraft disabled on, or adjacent to, the movement area shall be established for an aerodrome with a coordinator designated to implement the plan. 2. The disabled aircraft removal plan shall be based on the characteristics of the aircraft that may normally be expected to operate at the aerodrome, and include among other things: a) A list of equipment and personnel on, or in the vicinity of, the aerodrome which would be available for such purpose; and b) Arrangements for the rapid receipt of aircraft recovery equipment kits available from other aerodromes. CONTINUING AIRWORTHINESS REQUIREMENTS (a) The continuing airworthiness of aircraft and components shall be ensured in accordance with the provisions of CAR-M. (b) Organizations and personnel involved in the continuing airworthiness of aircraft and components, including maintenance, shall comply with the provisions of CAR-M, CAR145 and requirements for licensing of aircraft maintenance personnel, as appropriate. (c) By derogation from paragraph (a), the continuing airworthiness of aircraft holding a Ferry Flight Permit shall be ensured on the basis of the specific continuing airworthiness arrangements as defined in the Ferry Flight Permit issued in accordance with CAR Sec-2, Series F Part VII.