TORONTO TRANSIT COMMISSION REPORT NO.

Similar documents
TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO.

York Region Rapid Transit Corporation Board of Directors. Mary-Frances Turner, President

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

Ossington Station Easier Access Project - Construction & Public Art Concept Update

9 VIVA DIRECT UNDERGROUND CONNECTION TO THE TORONTO-YORK SPADINA SUBWAY EXTENSION AT THE VAUGHAN METROPOLITAN CENTRE

TORONTO TRANSIT COMMISSION REPORT NO.

St. Clair West Station Easier Access Project Community Update Open House

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION STATION NAMES IN THE CITY OF VAUGHAN

TORONTO TRANSIT COMMISSION REPORT NO.

Dufferin Jog Elimination Project

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO.

COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.

STAFF REPORT ACTION REQUIRED

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Improving Directional Signage for TTC Services at Pearson Airport

TORONTO TRANSIT COMMISSION REPORT NO.

Marymount University Ballston Center Redevelopment

Woodbine Station Easier Access Project Public Open House January 27, :30 pm 8:30 pm Consultation Summary Report

First published December 2006 Copyright China Trend Building Press Limited

TORONTO TRANSIT COMMISSION REPORT NO.

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

Chairman and Members of the Planning and Development Committee. Edward R. Sajecki, Commissioner of Planning and Building

TORONTO TRANSIT COMMISSION REPORT NO.

1 SUBWAY EXTENSION TO VAUGHAN CORPORATE CENTRE - OPERATING AGREEMENT UPDATE

TORONTO TRANSIT COMMISSION REPORT NO.

COLLEGE STREET STUDY Community Consultation Meeting. December 2015

TREASURE ISLAND FERRY SHELTER & BUS SHELTERS. Arts Commission Civic Design Review APRIL 18, 2016

FORT YORK PEDESTRIAN & CYCLE BRIDGE

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

List of Our Ongoing Noise and Vibration Monitoring Projects

4 YORK REGION TRANSIT DON MILLS SUBWAY STATION ACCESS AGREEMENT

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier

Eglinton-Scarborough Crosstown LRT Update

MEETING DATE: February 17, 2010 SUBJECT: ACTION ITEM TORONTO TRANSIT COMMISSION REPORT NO. ACCESSIBLE TRANSIT SERVICES PLAN: 2009 STATUS REPORT

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

TORONTO TRANSIT COMMISSION REPORT NO.

Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager

York Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016

Director, Community Planning, Toronto and East York District

Dover Downs Hotel and Conference Center

CONSTRUCTION COMMITTEE MEETING AGENDA

During Construction. Full Resident and Non-Resident Services. Contract Administration and Construction Supervision of Groundside and Airside Projects

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

October 23, 2017 Council Workshop

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

AQUAFORMS INTRODUCING THE FUTURE OF INTERACTIVE WATER PLAY

Establishing a National Urban Park in the Rouge Valley

Kuria Hills Tented Camp. Tourvest East Africa

MOVING AHEAD 62% LINE TIME CROSSRAIL PROJECT AUGUST UPDATE 96% OF CONTRACTS AWARDED BY CROSSRAIL ARE TO COMPANIES WITHIN THE UK PROJECT

Memorandum. Committee of the Whole. Paul Jankowski Commissioner of Transportation Services. Date: September 4, 2018

York Region Rapid Transit Corporation Board of Directors

VAUGHAN METROPOLITAN CENTRE SUB-COMMITTEE OCTOBER 18, 2017 DEVELOPMENT ACTIVITY UPDATE: DOWNTOWN UNDER CONSTRUCTION VAUGHAN METROPOLITAN CENTRE

Terminal Reconstruction and Addition at the M.R. Štefánik Airport in Bratislava

STAFF REPORT FOR ACTION

Tweed City Fitout Guidelines. Issue date : July 2011 Rev : 2

Building the transportation network we need for the future in Niagara Region

INFORMATION ONLY. Subject: Metrolinx Presentation Date: June 22, 2015

First published December 2006 Copyright China Trend Building Press Limited

CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017

Survey Summary. 1. Overview. Pilot Implementation Survey Toronto Parks & Trails Wayfinding Strategy (Phase II) September 30 November 6, 2017

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

San Francisco International Terminal 3 /Boarding Area E San Francisco International Airport Civic Design Review Informational Package.

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

STAFF REPORT INFORMATION ONLY

Director, Community Planning, Toronto and East York District

Transit System Performance Update

Case Study for Living Arts Brooklyn Museum Team 6

York Region Rapid Transit Corporation Board of Directors

York Region Rapid Transit Corporation Pg. 1. edocs: York-#

Capilano Substation Upgrade

Staff Report. Re: National Park Service Ferry Landing Facilities at Piers 31, 31½ and 33 Joint Meeting with BCDC Design Review Board

2017 Annual Service Plan

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

index Fabric Led Light Box 3-5 AE Frame Systems 6-7 Fabric Pop Up 8 Soho Fabric Walls 9-10 Stand Off, Counter, Accesories 11

THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE

The newest addition to iconic East Sydney.

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report)

SECTION 106 ACTIVITIES ANNUAL REPORT

THE CORPORATION OF DELTA COMMUNITY PLANNING ADVISORY COMMITTEE

UNION STATION ACCESS AND CAPACITY IMPROVEMENT STUDY PROJECT REPORT

Pedestrian Safety Review Spadina Avenue

Metrolinx Board of Directors. President, Union Pearson Express Date: September 22, 2015 UP Express Quarterly Board Report

Frameless All Glass Wall Systems (no stiles but with rails)

ENHANCE Onsite branding to give you Arab Health prominence

Welcome to the 2018 range of Delta Holiday Homes

2016 Annual Service Plan

IT S BACK TO SCHOOL WITH YRT

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5

MINUTES KNOXVILLE DOWNTOWN DESIGN REVIEW BOARD MEETING OF MAY 19, 2010 SMALL ASSEMBLY ROOM. Business Representative

F6. Coastal Ferry Terminal Zone

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

TECHNOLOGY QUALITY OF LIFE CAREER CHOICES INNOVATION GTA RAPID TRANSIT URBAN LIVING TOP RANKED SCHOOLS FUN HOUSING OPTIONS ARTS NATURE STYLE CULTURE

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

ATHLETICS High Jump & Pole Vault

Transcription:

Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: July 14, 2010 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT HIGHWAY 407 STATION APPROVAL OF FINISHES AND ARTWORK ACTION ITEM RECOMMENDATION It is recommended that the Commission approve the final design, finishes, and artwork for Highway 407 Station, which will be presented through the public consultation process. FUNDING Sufficient funds for this expenditure are included in the Toronto-York Spadina Subway Extension (TYSSE) project, as set out on pages 1439 to 1442 of the TTC 2010-2014 Capital Program (Category - Expansion) which was approved by City Council on December 8, 2009. BACKGROUND The TTC is planning the construction of a subway line from the existing Downsview Station on the Spadina Line located in the City of Toronto, to the proposed Vaughan Metropolitan Centre located in the City of Vaughan, Region of York as shown in Exhibit 1. The new 8.6 km long line will include both tunnelled and cut and cover sections. The Toronto-York Spadina Subway Extension (TYSSE) project is being funded by the Government of Canada, the Province of Ontario, the City of Toronto, and the Regional Municipality of York. The TTC is managing the design and construction of the TYSSE project and will own and operate the subway extension. At the Commission meeting of October 23, 2008, Contract A85-75D for the design of Highway 407 Station was awarded to the design team lead by Earth Tech Canada Inc. (now doing business as AECOM). The architectural firm for this team is Aedas. At its meeting of September 24, 2009, the Commission approved the TYSSE Design Philosophy with additional emphasis on achieving high quality architecture, urban design, streetscape, and landscape architecture as follows:

TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT HIGHWAY 407 STATION APPROVAL OF FINISHES AND ARTWORK Page 2 Integrated design of all elements with strong aesthetics, high-quality urban design, and public artwork; Column-free structures wherever possible with high ceilings and simple flow of space; Bright, open spaces with daylight penetrating deep into stations where possible; Barrier-free with at least one fully accessible entrance; Use of TTC standard elements; and Sustainable design to meet the Toronto Green Standard. At the Commission meeting of November 17, 2009, the Commission approved the concept design for this station. The project has been reviewed by the public and all stakeholders including York Region, GO Transit/Metrolinx, MTO, and the City of Vaughan. DISCUSSION OVERVIEW: Exhibit 1 TYSSE Map Exhibit 2 Site Plan Highway 407 Station is located west of Jane Street and south of Highway 407 on the west bank of Black Creek. A hydro corridor runs east/west just south of the station. The Highway 407 Station will be a multi-modal transportation hub with parking for 600 commuters, a 30 space Passenger Pick-Up and Drop-Off facility (PPUDO), and an 18 bay York Region Transit (YRT) and GO Transit bus terminal. The design also contains provisions for future connection to the proposed MTO Highway 407 Transitway. A new bridge structure over Black Creek provides access to the bus terminal and parking lot. The bus terminal and PPUDO will be owned and maintained entirely by GO Transit and York Region. The parking lot and below grade structures will be owned and operated by the Commission. PUBLIC REVIEW: The Highway 407 Station functional design concept has been reviewed as follows: Advisory Committee on Accessible Transportation (ACAT) Design Subcommittee on October 26, 2009; Public open house on March 10, 2010 (jointly with Steeles West and Vaughan Corporate Centre Stations); and ACAT Design Subcommittee on June 9, 2010. The March 10, 2010 open house was held specifically to exhibit functional design. There

TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT HIGHWAY 407 STATION APPROVAL OF FINISHES AND ARTWORK Page 3 were 51 attendees with seven written comment forms submitted one of which was specifically for Highway 407 Station. In general, the comments received were supportive of the station s functional design. The single written comment expressed concern that the parking lot is too far removed from the station entrance. General positive comments for the station design were heard in discussions. The concept design was reviewed with the Design Subcommittee of ACAT on October 26, 2009. Staff subsequently reviewed the completed design, finishes, and artwork with ACAT's Design Subcommittee on June 9, 2010. Comments included that consideration be given for a second elevator for each level to provide a secondary route when the primary elevator is not functioning. Staff are analyzing the feasibility and cost of providing provision for a second elevator. The station design, finishes, and artwork will be taken to a second public open house on July 13, 2010. If there are any major concerns, staff will include these in the presentation to the Commission. STATION DESIGN AND FINISHES: Exterior: Exhibit 3 Exterior View from Jane Street Exhibit 4 Exterior View from Parking Lot This station contains no TTC bus operations; YRT and GO Transit will operate accessible service to this terminal. In addition to the 600 parking spaces, 14 accessible parking spaces are provided adjacent to the PPUDO close to the TTC entrance facility. The barrier-free access route from the parking lot and PPUDO follows the hard landscaping, separated from vehicle traffic, to sliding doors at the entrance. The sloping bus terminal roof will be clad in a standing seam roof of clear anodized aluminum and have landscaped berms where the structure curves down toward ground level. The back of house elements are clad in white ceramic panels with painted metal doors to match. Glazing to the bus terminal is bird-friendly fritted glass in black aluminum curtain wall framing. Cornice and roof overhang soffits are clad in zinc coated aluminum panels while the roof is clad in sheet aluminum with standing seams. Hard landscaping will be coloured and textured concrete. Soft landscaping will be generally hardy and low maintenance for durability in the local environment. Street furniture will be integrated along with the provision of bicycle facilities to TTC standards alongside the PPUDO. Street Level: Exhibit 5 Section Exhibit 6 Bus Terminal Level

TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT HIGHWAY 407 STATION APPROVAL OF FINISHES AND ARTWORK Page 4 Exhibit 7 Entrance Level Exhibit 8 Interior View Bus Terminal Exhibit 9 Interior View Entrance Level Passengers enter the concourse level from the surface, from the bus terminal, from the parking/ppudo entrance, or from a level connecting to the future MTO Highway 407 Transitway. The east side of the station structure is next to Black Creek and contains sloped windows that allow daylight to penetrate into the concourse and down to platform level. Passengers arriving by GO Transit or YRT bus will move from the bus terminal level directly to the concourse by an elevator, centrally located escalators and stairs. All bus passengers enter the unpaid side of the concourse, as there are no TTC buses in the terminal. Passengers arriving at the station by car or bicycle will enter through the entrance level at the PPUDO and walk down a ramp to an elevator, escalators, and stairs to the concourse. The station will incorporate short-term bicycle parking in the form of post and rings located under roof overhangs. Consideration was given to long term bicycle storage facilities, but due to funding limitations, the City of Toronto reconsidered this initiative. The City is currently developing a standard for long term secure storage and may proceed with this at selected stations, depending on funding availability. In the mean time the standard TTC bicycle facilities will be provided, subject to possible enhancements currently under consideration. Interior walls and columns to the bus platforms and waiting area are clad with white ceramic panels, with doors painted to match. Bus platform floors are concrete, transitioning to polished concrete inside the bus terminal. Stairs are dark granite with nosings in a paler colour to provide contrast required to meet the TTC barrier-free design standards, with a field of TTC standard warning tiles at the top landing. Escalators are TTC standard high deck with stainless steel clad balustrades and a yellow art glass finish to the outer balustrades. The guardrails around the vertical circulation openings are stainless steel frames with tempered-laminated glass panels. Ceilings are clear anodised brushed aluminum perforated panels containing acoustic absorbing material, with accent downstands in a gloss black finish. Concourse: Exhibit 10 Concourse Level Exhibit 11 Interior View Concourse The concourse leads passengers from all entrance facilities to the fare line that contains an easier access low fare gate. The future Highway 407 Transitway will also connect into the concourse on the unpaid side of the fare line. Passing through the fare line leads to a landing that projects into a multi-storey space with a view out through a bank of sloped art glass windows east toward Jane Street. The landing, referred to as the lily pad, leads to an elevator and four escalators that connect 12m down to platform. A staircase also wraps around the glazed elevator shaft down to the platform to accommodate additional capacity.

TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT HIGHWAY 407 STATION APPROVAL OF FINISHES AND ARTWORK Page 5 The concourse level also contains TTC service spaces, and the north end includes a void for the future Highway 407 Transitway to run through the station box. Interior walls and columns are clad with white ceramic panels, some with perforations and backed with acoustic materials, with doors painted to match. Floors are terrazzo. Stairs are dark granite with nosings in a paler colour to provide contrast required to meet the TTC barrier-free design standards, with a field of TTC standard warning tiles at the top landing. Escalators are TTC standard high deck with stainless steel clad balustrades and a yellow art glass finish to the outer balustrades. The guardrails around the vertical circulation openings are stainless steel frames with tempered-laminated glass panels. Ceilings are exposed architectural finish concrete. Maintenance Level: Exhibit 12 Maintenance Level The maintenance level is not accessible to the public, who move through this level on the elevator, stair, or escalators. This level contains TTC service rooms including the emergency ventilation fans. Platform: Exhibit 13 Platform Level Exhibit 14 Interior View Platform The subway platform level is served by an elevator from the concourse level, by four escalators, and a stair. There are no columns on the platform, which allows an open view up to the sky through the maintenance level to the sloped windows and artwork above. Emergency exit stairs have been provided at both ends of the platform. Walls around service rooms and columns are clad with large white ceramic wall panels to match those at concourse and surface levels. Floors are in coloured terrazzo. Yellow platform edge tiles are used to distinguish both edges of the platform, and a TTC standard wayfinding route is located centred along the length of the platform. Stairs are dark granite with nosings in a paler colour to provide contrast required to meet the TTC barrier-free design standards, with a field of TTC standard warning tiles at the top landing. Escalators are TTC standard high deck with stainless steel clad balustrades. Ceilings are clear anodised aluminum perforated panels containing acoustic absorbing material. Composite metal panels cover the sloping shaft through the service level. TYSSE is currently reviewing options for mounting the platform edge sign bands. The optimal location for the platform edge sign band is to have it integrated into the header of the future PEDs. As an interim measure TYSSE are exploring options of suspending the platform edge sign band from the ceiling or smoke canopies above the platform edges or mounting the information contained on the signs on the train wall. Artwork: Exhibits 15 and 16 Artwork

TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT HIGHWAY 407 STATION APPROVAL OF FINISHES AND ARTWORK Page 6 A Public Art selection process resulted in the selection of David Pearl as the public artist for Highway 407 Station. The artwork has been approved by the Highway 407 Station Art Design Review Committee (ADRC). The artist identified two areas for the artwork in this station: the subway skylights and the western bus station glass façade at the top of the escalators. He describes this as: A simple palette of expressive coloured glass works with the dynamic of natural light and the movement of the observer to animate the space and interior surfaces. This is colour that is not coded to sign or direct just pure coloured natural light; responding to the cycles and rhythms of the sun; echoing the building s response to the greenbelt surroundings and its environmental sensitivity celebrated as art and architecture. Project Impacts: As this site and surrounding area is largely undeveloped, there is limited impact of the station on the surrounding community with the exception of during the construction period. The design team is working closely with the Toronto and Region Conservation Authority (TRCA) to address the impacts of the design and construction of the station components on Black Creek. Highway 407 Station will be the site of the tunnel boring machine (TBM) launch shafts for construction of the twin tunnels running north toward Vaughan Corporate Centre Station, and southeast toward Steeles West Station. To address the above impacts, the following steps have been undertaken during design development: Highway 407 Station and the adjoining will be constructed under one contract affording a single point of responsibility; Discussions with the TRCA; and An Environmental Management Plan (EMP) is included in the contract document to address the effects of dewatering, stormwater management, and erosion and sediment control; Instrumentation, inspection and response procedures will be in place to monitor and mitigate construction noise, vibration and dust control.

TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT HIGHWAY 407 STATION APPROVAL OF FINISHES AND ARTWORK Page 7 Cost and Schedule: The estimated final cost of construction costs for Highway 407 Station is $140 million, including costs recoverable from MTO and GO Transit. The proposed project schedule reflects completion of design development to 100% in early summer 2010. Highway 407 Station is scheduled for Substantial Completion by the end of 2014. Next Steps: This station is scheduled to be tendered as part of the North Tunnels Contract in August 2010. JUSTIFICATION Approval will allow the station design to be finalized. June 16, 2010 70-14-31 03-04-000006796 Attachments: Exhibits 1 to 16 - - - - - - - - - - - -

HIGHWAY 407 STATION Located South West of 407 ETR and Jane Street t intersection ti Five Level intermodal line station 600 Bay Commuter Parking Lot Passenger Pick-Up and Drop-Off (PPUDO) 18 bay Bus Terminal (GO, YRT & VIVA) Future Connection to MTO 407 Transitway Exhibit 1 TYSSE Map 03-04-000006798

Site Access Road Commuter Parking Lot Stormwater Management Pond Bicycle Storage PPUDO Highway 407 ETR Bus Layover Station Entrance Bus Terminal Black Creek Bridge Black Creek Subway Box Bus Only Entrance Exhibit 2 Site Plan Jane Street

Exhibit 3 Exterior View from Jane Street

Exhibit 4 Exterior View from Parking Lot

GO/YRT Bus Terminal Entrance Level Concourse Level Maintenance Level Platform Level TTC Fare line Exhibit 5 Section

BARRIER FREE ROUTE GO BUS BAY YRT / VIVA BUS BAY Bus Driver Accommodation Public Washrooms Ticket Office and GO Inspector Future Public Stair Escalators Public Stair Elevator Exhibit 6 Bus Terminal Level Future Retail YRT Inspector

Slope at 1:20 BARRIER FREE ROUTE GO BUS BAY YRT / VIVA BUS BAY Slope at 1:12 Public Stair to Bus Terminal Public Stair and escalator to Concourse Future Connection to Transitway Elevator to bus terminal and concourse level Exhibit 7 Entrance Level

Exhibit 8 Interior View Bus Terminal

Exhibit 9 Interior View Entrance Level

BARRIER FREE ROUTE GO BUS BAY YRT / VIVA BUS BAY Retail Escalators to bus terminal Elevator to bus terminal and entrance level Public stairs and escalator to entrance level Escalators to platform level Future Connection to Transitway Collectors Booth and Fare Line Exhibit 10 Concourse Level Elevator and stair to Subway Platform

Exhibit 11 Interior View Concourse

BARRIER FREE ROUTE GO BUS BAY YRT / VIVA BUS BAY Escalator Elevator & Public Stair Escalator Exhibit 12 Maintenance Level

BARRIER FREE ROUTE GO BUS BAY YRT / VIVA BUS BAY Escalator ato Public Stair Elevator eato DWA Escalator ato Exhibit 13 Platform Level

Exhibit 14 Interior View Platform

David Pearl has been working with the Highway 407 Station team to provide public art at the station. The art is integrated into the glazing at two locations: the subway box skylight and the bus terminal glazing. The locations have been chosen in order to anchor the connection between the terminal elements while providing a focal point for internal and external users of the station, visible from internally, the parking lot and Jane Street. The moving projections of colour will animate the entire subway station, but as you see the glazing plane, the surface has to be dynamic to the eye as well. The brush stroke/ palette knife texture of the colour application is an essential character of the work. It would be different if the light and colour was spilling in from somewhere above not seen, but here the colour needs a graphic language. David Pearl Exhibit 15 Artwork

I wanted to find a colour and form that harmonized with the spirit of the building: an extension of it into direct expression. I am reminded of Peter Cook s recent book Drawing the motive force of architecture : that drawing, the hand, lies at the heart of all our creativity. There is a narrative here, one of colour: and the delight of the gesture, but at a scale and simplicity that embrace an entire space in one move. And there is the narrative of the user also, in motion through the building. This is why I would like to make connections between spaces with the work, to participate in how the space is performed David Pearl Exhibit 16 Artwork