Site Formation Works of the Kai Tak Cruise Terminal Project

Similar documents
Hong Kong International Airport (Chek-Lap Kok Airport)

Abstract. 1 Introduction

VERSION DATE OF ISSUE DESCRIPTION PREPARED CHECKED APPROVED Technical note HHP DKA OYBE

Revitalization of the previous Marine Police Headquarters in Tsim Sha Tsui

Recruitment Talk 7 March 2008

Building Connections to SUPPORT LIFE S JOURNEYS

Bonne Shipyard (Belgium) Pictures showing the application of Zinga by roller to the blasted hull of a typical fishing vessel.

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort

Port of Durban. Entrance Channel Widening & Deepening Project Completion Function. 31 March 2010

A Review on the Recent Large Scale Infrastructure Projects in Hong Kong

Consultation on Town Quay Mooring Redevelopment Proposals

SUMMARY OF THE MEETING OF THE WOODS HOLE, MARTHA S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY. September 25, 2018

Dredging, Exposure and Risk in China and South East Asia

APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY

North Cruise Berth Projects PortMiami

Background of the project

1. To provide an update on the Tauranga Marine Precinct project for the period to 30* June 2016.

COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT. Nassau Harbour Port Improvement Project

National Standard for Tonnage Measurement and Calculation of the Vessels Engaged on International Voyages General Definitions 2.

RIO VISTA MUNICIPAL AIRPORT

Click to edit Master title style. Job Opportunities at Architecture and Engineering Firms: You can work with us

Notice To Mariner No. 147 PORT OF FUJAIRAH & VHFL TERMINAL BERTH CONSTRUCTION & DESIGN CRITERIA

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

DOCKING AND ROUTING PLAN

American Institute of Marine Underwriters

BUSINESS CASE EXECUTIVE SUMMARY CHANNEL CAPACITY UPGRADE

Topic on A Technical and Project Review of the 10 Airport Core Projects and their Influence on Current Developments

Public Information Center August 12, 2010

Corroded pipe causing oil spill

Cover story PROJECT RUNWAY

MAPUTO PORT DEVELOPMENT COMPANY

OPEN CELL SHEET PILE TECHNOLOGY. Presentation to Alaska State Legislature, House Finance Committee

LATEST LOGISTICS AND FORWARDING NEWS

port of brisbane Information Guide

Ship traffic and the Roberts Bank Terminal 2 Project

Hundreds of Trees Planted at High Speed Rail Station to provide a Green Oasis in the community

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

SHEET PILE WALLS A SPACE-SAVING AVALANCHE DEFENCE STRUCTURE

the Port of Gothenburg

TERMINAL TARIFF Extracts

OWNER S MANUAL 10x10 SUN SHELTER WITH NETTING

DARWIN LUXURY HOTEL CONNECTIVITY AND PUBLIC REALM Our concept includes:

TNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects. 13 August

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Harbour-front Enhancement Committee Sub-committee on Harbour Plan Review

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance

WAIMAKARIRI DISTRICT COUNCIL REPORT. Craig Sargison, Manager Community and Recreation

Texas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge

Assessing key trends in the Australian maritime economy

F6. Coastal Ferry Terminal Zone

FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT. August 31, 2010

TARIFF OF HARBOUR DUES

Swagelok Thermoplastic Hose Hand Swager User s Manual

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

M/V. Tonnage Measurement (ITC-69) Tartous Naval Architect. Guardian Bureau of Shipping LLC Page 1 of 14 Form 5510/TM-69/GBS/DEL/01

Greenslade Pleasure Boats Stuart Rawlinson - Parkstone Bay Marina

Beyond Gateway Ports Navigating New Destinations

Project Update Utah Water Users Workshop March 14, 2012

Underwater hull repairs save time and money

Merchant Shipping (Tonnage) Regulations 2017

The Panama Canal: A Challenge to Efficiency in the 21st Century

Aerial view of the Express Rail Terminal at West Kowloon. The Express Rail Terminal Site at West Kowloon (early 2011)

PULAU SEBAROK - VOPAK TERMINAL (OSV) MAX DISPL. (tonnes) MAX LOA(m) 45, ,000 80, ,000 13,000 12, ,000 19,500 19,500

Dufferin Jog Elimination Project

Press Hong Kong, January 2015

Comparative Study of Design Berthing Energy on Fender as per Indian Standard IS4651 Part-3:1974 and British Standard BS6349 Part-4:1994

Port MacKenzie Rail Extension

GPD Australia Pty Ltd COMPANY PROFILE

Eclipse Hermetic Gas Boosters Series HB

CIVIL AVIATION AUTHORITY

Charles Cunningham Royal Motor Yacht Club. Colin Stewart was elected as Chairman for the meeting.

FD S E R I E S ORDER BOOK

Development of Sochi transport node envisaged by items of Program of Olympic venues construction and Sochi development as an alpine resort

Port of Newcastle Schedule of Port Pricing

Ohio Freight Conference Great Lakes Commercial Navigation

Burner Plumbing on the Appalachian Center for Craft Crossdraft Soda Kiln

RESPONSIBLE SHIP RECYCLING IN PRACTICE

UK Port Infrastructure Project Pipeline Analysis Report

Erhama bin Jaber Al Jalahma Shipyard

Lamu Port and New Transport Corridor Development to Southern Sudan and Ethiopia (LAPSSET).

Reducing Vessel Emissions in Hong Kong & Pearl River Delta region: Stakeholder Action & Regional

Hong Kong Countdown Celebrations Fact Sheet. New Year New World. Organiser. Hong Kong Tourism Board (HKTB) Title Sponsor

Ronan Delaney. DELANEY_RONAN_AVIATION_JUN_2018.DOCX

Off-Site Solutions. CPM Headwalls. Concrete for Life

NEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA. Christopher Hamilton May

The History of the tug Polmear

DOVER WESTERN DOCKS REVIVAL (DWDR) NEWSLETTER. The single biggest investment ever undertaken in Dover

A Challenge to Large-Scale Projects

460 exp 460EXP - 115

Oil and Gas Capabilities

Item # BJ2PC With 8 Leg Frame, Cover, and Enclosure Kit with Windows Size: 10 8 Wide x 20 Long (Side Height 6 8 ) (Center Peak Height 9 9 )

Terms, conditions and prices

Hong Kong Convention and Exhibition Centre FAST FACTS

Abandoned Mine Sites Policy

Shun Tak Announces Interim Results for Year 2017

8th UNWTO Silk Road Ministers Meeting

DEPARTMENT OF TRANSPORT

LOA: 163' 9" (49.90m) Beam: 30' 2" (9.19m) Min Draft: 6' 7" (2.00m) Max Draft: 9' 3" (2.80m) Cruise Speed: 14 Kts. (16 MPH)

Port MacKenzie Rail Extension

EX USS SHADWELL Disposal Wreck in Place

Transcription:

Site Formation Works of the Kai Tak Cruise Terminal Project Presented by Ian Muir MIEAust, CPEng Maritime Business Unit Head Asia Pacific and Deputy Project Director for the Kai Tak Cruise Terminal Site Formation Project URS/Scott Wilson 26 th April 2012 The Australian Consulate General, Hong Kong, The Wombat Hole 24/F Harbour Centre, 25 Harbour Road, Wanchai, Hong Kong Following an introduction by President Scott Smith, Ian proceeded to entertain and inform the audience of 48 Members and Guests of the design and construction of the site formation works associated with the new international cruise terminal project being undertaken by the Hong Kong Government Civil Engineering Department as part of the re-development of the former Kai Tak International Airport site. The site formation works primarily comprise the construction of an 850m long two-berth piled quay deck to accommodate Mega-class cruise vessels to around 220,000 DWT. The quay deck adjoins the iconic cruise terminal building, being constructed concurrently under a separate works contract. Hong Kong has traditionally relied on Ocean Terminal at Tsim Sha Tsui for the bulk of ocean going cruise ships however it is limited to ships up to around 100,000 tonnes. It is unable to cope with larger vessels such as the Queen Mary 2 148,582 GT and 345m long. These vessels are required to berth at Kwai Chung Container Terminal not a very visitor friendly environment. Kwai Chung has been used eleven times in the five year period 2001 2005 and thirty three times in the three year period 2009-2011, indicating the more frequent visits of the larger cruise vessels. With the closure of Kai Tak airport in July 1998, new possibilities opened up.

Timeline: October 2008: The Government decides to implement a new Cruise Terminal using public funds April July 2009: Detailed design by URS/Scott Wilson August November 2009: Tendering December 2009: Commencement of Construction Mid 2013: Commissioning of Cruise Terminal Berth 1 2014: Commissioning of Cruise Terminal Berth II. Topics Covered by Ian The cruise industry is expected bring in some HK$1.5B - $2B in revenue and employ some 7,000 to 10,000 people by 2020 Longer cruise ships at Ocean terminal tend to extend out into the channel and this makes it difficult to moor them securely and also poses a hazard. One possible solution was to put a dolphin in the channel but this also creates a navigation problem. Kwai Chung was the only other alternative berth. The largest cruise ships can now reach up to in excess of 360 meters in length. More of the larger cruise ships have been coming to HK in recent years. The new Kai Tak terminal will have two berths, Berth I will be 450 meters and Berth II 400 meters. There are also two transition areas, north (viewing area) and south (helipad) which will blend the terminal into the rest of the Kai Tak development.

Three dredging zones A, B and C. A and B will be completed to conform to the cruise terminal opening dates. Zone C requires the decommissioning and removal of two submarine gas supply pipelines. Government initially intended this be privately funded but two earlier tenders failed and in 2008 the Government decided to use public funds. Contract Let 1 st December 2009 after URS/Scott Wison commencement detailed design in April 2009. Berth I Commissioning hard date June 2013 Site formation works handover in October 2012 for terminal construction. Berth II Commissioning later part of 2014. Gas main relocation beyond 2014 Main design was to provide Berths for mega cruise vessels up to 220,000 GT displacement 110,000 tonnes. Cruise ship design beam dimensions are showing a trend of increasing with time but are maintaining drafts of around 10+ meters so as to be able to visit a wider range of berths around the World. The design had to work to a zero reclamation regime due to Harbour Reclamation Ordinance as well as parallel construction of the terminal under a separate contract. Site boundary was defined as the high watermark at edge of the existing runway reclamation. No permanent construction for a piled deck could be taken beyond the boundary (waterline) so excavation was required to be made into the airport excavation area. The preliminary design arrangement comprised a piled deck with 4 rows of piles and gravity block retaining wall along the rear edge of the deck. This arrangement required temporary excavation into the cruise terminal building site. This arrangement was configured to separate the deck structure from the land works to suit maintenance responsibilities.

URS configured an arrangement incorporating a continuous pipe pile wall, which avoided the need for the gravity retaining structure and thereby avoided the encroachment into the cruise terminal building site. Various options considered and tubular steel piles decided on. Piles are 1200mm diameter for the front row and 1100mm in the three rows behind The piles incorporated in the pipe pile wall are clutched together using weld-on steel sections. Reinforced concrete inserts were constructed inside the tube piles allowing steel on the pile to be sacrificial (corrode away) leaving the reinforced concrete section as the support element. Further details on construction and construction sequence. Issues found and solved along the way. Pile toe levels varied from of -15mCD to -65mCD. Piles were manufactured in China, spiral wound and welded.. Guide frame used by contractor in setting the piles in the pipe pile wall to maintain the alignment of the clutches, as the piles tend to rotate when being driven. Piles driven in 12m long sections and butt welded together. Piling hammers from 12 to 25 tonne. Front row of piles were treated for appearance sake in a black protective coating. 700,000 cubic meters removed from dredging zones A and B. Maximum dredged depth of the order of 5 or 6 meters, mostly mud - some contaminated material which was disposed of accordingly. Enclosed boom hanging silk curtain down to sea floor protection applied around dredging areas. Long arm back hoe brought in to assist with sea wall removal to help profile temporary slope. Armour rock placed in reverse manner from which runway fill was removed. Silk curtains used around the site to limit migration of fines. Water quality monitoring around the Harbour and site works for the sea water intake protection as well as other work being done around the Harbour to ensure no pollution from those works coming to this site. Around 150 pieces of coral were found in the Harbour nearby and these were relocated to Tseung Kwan O and monitored for 12 months that it was OK. Reuse the old seawall materials, 200,000 cubic meters used on this site, sorting setup. Following Ian s presentation various audience questions were answered by Ian including: How do cruise ships compare to Panamax vessels? Existing Ocean Terminal will continue? Where does the dredging material end up? Any issues applying for Environmental Approval? How often would dredging need to be done to keep the appropriate Harbour depth? How much water is there above the three Cross Harbour Tunnels? Why the rigour with steel tube inspection and inspection issues?

In conclusion Scott presented Ian with a bottle of special EAust HK 10th Anniversary red wine. Many thanks to Ian for an enlightening presentation on a future HK landmark. Report by: John Meldrum Photos: URS Scott Wilson, Simon Fan and John Meldrum