Central Park North (Nancy L. Moore Park) Lake Park North Expansion White Park Expansion #2 White Park Expansion #1 County East East Haslett East East TF87-212 Acquisition $90,000.00 Park. TF08-138 Acquisition $1,982,200.00 TF08-140 Acquisition $65,800.00 TF08-141 Acquisition $429,000.00 To acquire 40 acres contiguous to the existing 234 acre Central Acquisition of 75 acres of forest and 45 acres of wetland to expand Lake Park North. Acquisition of 1.75 acres adjacent to White Park to provide future pedestrian access to the park from the north. Acquisition of 2.93 acres adjacent to White Park to expand the park, eliminate a private property inholding, and provide a location for a trailhead/park entry plaza and additional connections to the pedestrian/bicycle system. 1987 Harris Nature Center (formerly Red Cedar Riverfront Park) TF1078 Acquisition $180,000.00 To acquire approximately 60.5 acres of land located along the south bank of the Red Cedar River that includes 2980 feet of river frontage. The property I between Legg Park and Riverfront Park. 1985 Red Cedar Natural Area TF110 Acquisition $138,000.00 Acquisition of land on the Red Cedar River. 1978 Recreation Corridor TF616 Acquisition $105,000.00 To acquire three acres, including a dam and mill pond, on the Red Cedar River. 1982 Eastgate Park (formerly Riverfront Recreation Area) TF628 Acquisition $125,000.00 To acquire approximately 70 acres of land with 4,650 feet of frontage along the Red Cedar River. 1982
Burchfield Park (formerly Grand River Park) Burchfield Park (formerly Grand River Park) Lake Park Expansion County County County TF630 Acquisition $120,000.00 To acquire land for a pedestrian connector between the two units of Grand River County Park. (Reauthorized-originally approved in PA 223 of 1982) To acquire 70 acres of land with about 1,400 feet of frontage on TF800 Acquisition $120,000.00 the Grand River. TF86-133 Acquisition $375,000.00 Park. River Trail TF88-139 Acquisition $80,250.00 Lake Beach Expansion Hawk Island County Park (formerly Solomon Pit) Williamstown Park Legg Park Extension Acquisition Environmental Corridors County County Williamstown East Williamstown East To acquire 166 acres adjacent to the existing County To acquire approximate 1/2 mile of abandoned railroad line with Grand River frontage in the northwest portion of for a major link in the River Trail system. Acquire 241 feet of Lake TF92-183 Acquisition $294,300.00 frontage adjacent to Lake Park South. TF93-165 Acquisition $900,000.00 TF93-337 Acquisition $383,600.00 TF94-193 Acquisition $71,900.00 TF95-010 Acquisition $765,400.00 Acquire a 100-acre parcel, including a 35-acre gravel pit located in the for future park. Parcel includes 3600' of frontage on Sycamore Creek. Acquisition of approximately 122 acres of land with 3,950 feet on the Red Cedar River for community park. Purchase 14+ acres of wooded upland with approximately 1,600 linear feet on the Red Cedar River. Acquisition of 91 acres to expand neighborhood and community recreation and to link City parklands and neighborhoods with a pedestrian and bike path system. 1982 1984 1986 1988 1992 1993 1993 1994 1995
Fenner Inholding Acquisition TF95-125 Acquisition $360,000.00 To acquire a ten-acre parcel which is presently a commercial inholding in Fenner Arboretum and return it to its natural setting. 1995 Ferguson Park Extension TF96-106 Acquisition $103,875.00 Purchase 30 acres of wooded floodplain and upland on the south side of the Red Cedar River, adjacent to Ferguson Park, including 1,460 linear feet of river frontage. 1996 Poyet Parcel Acquisition TF97-218 Acquisition $900,000.00 Acquire 31 acres of forested nature area in the Sycamore Creek corridor for preservation purposes and for the extension of the River Trail. 1997 Total Acquisition Hartrick Park Moores Park Improvements River Trail South Extension $7,589,325.00 TF01-024 Project will develop a new park including nature trails, paved pathways, barrier free boardwalk, wildlife lookout, $488,125.00 multipurpose ballfields, pavilion/restroom facility, entry drive and parking areas to provide active and passive recreation opportunities. 2001 Project will develop an extension to the Grand River TF02-127 Trail through Moores Park with $247,800.00 riverbank stabilization and 2002 improved fishing access and canoe launch. Southern extension of the River Trail from Shubel Park to Hawk Island County TF03-106 $226,500.00 Park. The ten-foot wide, paved 2003 trail will connect residential neighborhoods to existing park land.
River Trail South Extension TF04-078 $500,000.00 of a 10-foot wide asphalt trail to include a 14-foot wide boardwalk, and site amenities which will provide 8,100 linear feet of access to Sycamore Creek 2004 Northern Tier Trail East East TF04-121 $92,400.00 of a 5,000 linear foot, 10-foot wide asphalt trail. This project extends the 3.5 mile Northern Tier Trail system from the East Soccer Complex to State Road. 2004 River Trail South Extension Lake Trail County Hunter Pool Renovation TF05-071 $426,500.00 TF06-020 $358,300.00 TF06-050 $500,000.00 of a 4,100 linear foot hard-surface trail, boardwalk and bridge along the Sycamore Creek from Hawk Island Park to Maguire Park. of 2.5 mile pathway and accessible fishing pier providing access to Lake, Lake South County Park, parks, and natural areas. Improvements to Hunter Pool Park to include installation of splash park, and upgrades to existing pool to include zero depth entry, mechanical upgrades, drains, and pool deck, for water-based outdoor recreation in an urban setting. 2005 2006 2006
Multi-Use Shooting Sports and Education Facility DNR - Office of Communication s, Recruitment and Retention Alaiedon East TF06-133 $500,000.00 to include an indoor shooting range education facility in partnership with Michigan State University. The range will provide new, year-round recreation and education opportunities for archery, airguns and smallbore arms. 2006 White Park Improvements East East TF07-087 $225,000.00 Improvements to 48-acre Albert A. White Park, to include parking, trail, picnic shelter, wildlife viewing platform, pedestrian bridge, interpretive and park signage, softball field, and landscape restoration. 2007 Burchfield Park Fishing Dock County TF08-073 $60,000.00 will include a 10 foot wide, 55 foot long fishing dock and pathway. The dock will also serve as a boardwalk. McCormick Park Improvements Central Park Fishing Dock TF08-081 will include renovations of outdoor court, activity area, canoe/kayak $391,100.00 launch, fishing/observation structures, landscaping, and lighted pathway. to include fishing TF09-068 $30,000.00 dock, interpretive signage, and park amenities. 2009 Valhalla Park Restroom/Pavilion TF10-049 $283,100.00 Replacement of a 30-year old restroom building. 2010 Crego Park TF10-050 $500,000.00 to include utilities, entrance drive, parking lot, paved and boardwalk trail, fishing dock, accessible kayak launch and site amenities. 2010
North Trail Connector TF11-064 $300,000.00 to include approximately 2 miles of nonmotorized trail to connect to existing River Trail. 2011 Dansville State Game Area Shooting Range Dev. DNR - Office of Communication s, Recruitment and Retention TF11-135 $300,000.00 to include renovation of the Dansville shooting range to ADA stands, including rifle and pistol berms, shooting stations, rustic restroom facility, upgrading entrance walkway and service drive and parking lot. 2011 Frances Park Trail Improvement TF12-019 $300,000.00 to include shoreline restoration, fish habitat improvement and a regional non-motorized recreational network connection pathway linking Frances Park with Grand River Park. 2012 Wonch Park Parthway TF12-024 $45,000.00 to include adding approximately 2,055 linear feet of paved universally-accessible asphalt pathway. 2012 Patriarche Park Playground Replacement Urban Recreation Trail East East TF12-082 $300,000.00 TF86-229 $262,500.00 to include replacing existing wooden play structure at Patriarche Park with 2012 modern play structure and install a rain garden. This development project is for the construction of two contiguous links of the City's hiking/biking trail. The path is currently complete from the Brenke Fish Ladder to South Cedar Street. This project will commence at Elm, east of South Cedar, and pro 1986
Urban Recreation Trail TF87-244 $250,000.00 This segment of the Urban Recreation Trail will continue the trail east of Potter Park Zoo towards the Michigan State University campus. 1987 River Trail TF88-138 $375,000.00 This development project will be for the continued construction of a barrier-free walkway along the 1988 Grand River with oberservation decks, fishing and canoe access. River Trail '89 River Trail '90 Burchfield Park (formerly Grand River Park-North Bluff) Harris Nature Center TF89-187 $375,000.00 TF90-261 $316,500.00 County TF91-093 $300,000.00 TF94-194 $119,600.00 This development will continue the River Trail from the Turner Dodge Mansion to the Brenke Fish Ladder in north. Part 1 includes a boardwalk under Grand River Avenue, with stairs to street level. Part 2 includes the linkage along Grand R This project is for the construction of a asphalt pedestrian path with asphalt and wood decking, benches and landscaping along the Grand River from Grand River Avenue to the Dodge Mansion in north. 1989 1990 Develop roads, parking, youth group camp, 3 picnic shelters, picnic area, maintenance 1991 building, fishing/canoe dock and play area. Upgrade entry drive, develop overflow parking for 20 cars, develop accessible trail including rest stops, scenic overlook and interpretive signage. 1994
Red Cedar River Rapids River Trail West Frances Park Shoreline River Trail Moores Park - Elm Street Develop an artificial river rapids course in the Red Cedar River TF95-121 $342,700.00 to provide a regional 1995 recreational opportunity for boaters. Link existing River Trail from Spring Street to Riverpoint Park TF95-122 and from Riverpoint Park to $375,000.00 Washington Avenue, Scott 1995 Park, Cooley Gardens and Elm Street. Provide improved parking areas, fishing docks and TF96-102 riverbank stabilization to an $408,900.00 eroding and deteriorating 1996 shoreline along the Grand River. Construction of 1,600 feet of asphalt and boardwalk paths, TF97-027 $500,000.00 bridge over Grand River, and 1997 wooden stairs and walkway 0n adjacent property Northern Tier Bike/Hike Trail East East TF97-155 $375,000.00 Develop 10,200 linear feet of 10 foot wide bituminous pathway and construct three bridges to connect Abbott Road Park with 1997 the East Softball and Acquatics Center, the East Sccer Complex and the Abbott Parkside neighborhood. total Hawk Island County Park County TF99-111 $493,000.00 $10,567,025.00 Initial development of a water resource-oriented park including a restroom shelter, picnic area and shelter, maintenance building, boardwalk/fishing deck, landscaping, signage, roads and parking lots. 1999
Total $18,156,350.00