October 2016: Broke Ground October 2016 Excavated 6.2 Million Cubic Yards Excavated 100,000 Cubic Yards in one day at peak 36 30 Yard Scrappers 10 30 Yard Dump Trucks 85 Days to Complete
June 2017: 700 Piles 9 Weeks and 3 Days Pile Caps / Tie Beams Roof Foundations
End of 2017:
End of July 2018:
LA Stadium in 2020:
City of Champions INGLEWOOD
Population: 120,000 Demographics: 93% African American & Hispanic 38% of households earn $35K to $74K 37% ownership and growing 27% resident employment in education Size: Location: Position: Destinations: 9 Square Miles One of the 15 South Bay Cities 3.4 miles from LAX 12 miles south of Santa Monica 10 miles southwest of DTLA Confined within four major freeways Inglewood s Fabulous Forum, Roscoe s Chicken and Waffles, Hollywood Park Casino, Randy s Donuts About Inglewood
Economic Indicators Sales Tax Growth 2017 vs 2016 Inglewood +10.2% Source: State of California +3.1% Los Angeles County +3.1% Source: HdL +21% Median Home Sale Price Jan 2017 Jan 2018 Inglewood $417K $526K +21% LA Metro $572K $623K +8% California $435K $468K +7% Zillow As of May 2018 Workforce: 58,500 4.8% Unemployment Outpacing the Region 2017 vs. 2016 Inglewood L.A. CA Transportation/Rentals. +22.% +2.7% +3.9% Building and Construction +48% +6.0% +6.3% Family Apparel +10.7% +2.7% +1.9% Fast Casual Restaurants +20.6% +11.6% +9.3% Top Sales Tax Producers Advantage Rent A Car Arco AM PM Carmax Costco Dollar Rent-a-car Hirschfeld Steel Group LAX Firing Range Panda Express SchuffSteel Company The Forum Concessions United Oil 99 Cents Only Alamillo Rebar Burlington Carportland CVS Enterprise Rent A Car Home Depot Marshalls Ross Target T Mobile USA Gasoline Source: HdL Housing Stock +9% Existing Units: 38,840 Permits pulled: 3,644 Projected Households by 2020 42,484 Source: Inglewood Housing Department; Economic Development Department
New Inglewood Senior Center
Daniel Freeman Project: Grace Park Project unit count 226 Townhome units which feature a 100-yearold Moreton Bay Fig Tree Site grading is being done First Phase to be completed by the end of 2019, beginning of 2020 New Housing Downtown
Thomas Safran Associates Project: Six Agency-owned parcels set for development; the largest site: 4 acres 235 units; 95,000 square feet of retail Rooftop recreation and pool Grocery store component Breaks ground in 3 rd Quarter 2018 New Housing Downtown
Nutwood Proposal: 300 Market rate apartment homes Ground Floor retail New Housing Downtown
Los Angeles Philharmonic Youth Orchestra project: 17,000 sf former bank building Redesign by Frank Gehry Classrooms and rehearsal space Provides access to free instruments and intensive music training Youth Orchestra Los Angeles
Century Boulevard Reconstruction Completely resurfaced in the City Approximately 3 miles of beautification $30MM project Expected completion: October 2019 Street Improvements
Hilton TRU Hotel Hilton TRU concept 120 rooms Lush outdoor garden along Prairie Ave 118 parking spaces New Hotel
Status of the Negotiation o ENA approved August 2017 o 36-month negotiation period o Up to 18,000-seat venue o 40,000 sf of retail o Practice/sports medicine facility o $1,500,000 deposit to the City o Estimated completion date: 2024 Murphy s Bowl ENA/Clippers Arena
The Project $5 Billion development Broke ground February 2014; 6-7 years to develop 298 acres New NFL Stadium 300 hotel rooms 26 acres of open parks with lakes and a movie theater 40,000 construction-related jobs, 12,000 jobs after completion Los Angeles Stadium and Entertainment District
Project Features 3.9 Acre Civic Center 780,000 sf of Class A Office Space Los Angeles Stadium and Entertainment District
Entitlements: 890,000 sf of retail and fashion 300 room hotel A 6,000-seat performance venue A movie theater A grocery store 2,500 residences Entertainment District
Casino 120,000 sf casino Century Bar and Grill Raise Lounge Tableside service Hollywood Park Casino
Community Benefits $58MM in public infrastructure 35% local hiring 30% MBE/DBE $1 million in afterschool funding Use of stadium for charitable causes $150K per year for workforce outreach $250K for a minimum of 5 job fairs Community Benefits
Crenshaw/LAX Transit Project Southern Segment Update Four New Stations Three At-Grade One Aerial Five Aerial Structures One Underground Structure 1
Fairview Heights Station New station steel canopy placement Installation elevator frames: May 2018 2
Activity Near Fairview Heights Station Track and Ballast Retainer Walls Inspecting trackwork: May 2018 3
Downtown Inglewood Station Installation of glass canopy Installation of glass canopy: June 2018 4
Bridge Construction La Brea Av * Rail on bridge over La Brea Av facing eastbound 5
Activity Near Downtown Inglewood Station Westbound view of track, OCS and catenary lines 6
Electrical Trench Work Eucalyptus Av/Florence Av Northbound perspective from Eucalyptus Av AC compaction and placement for electrical trench line 7
Bridge Construction Under I-405 Bridge facing westbound Patching rock pockets under the 405 bridge 8
Westchester/Veterans Station Installation of glass canopy fittings Installation of glass canopy fittings 9
Westchester/Veterans Station Installation of glass canopy Installation of glass canopy 10
Bridge Construction Manchester Bridge: Manchester Bl/Aviation Bl Facing Southbound TPSS Site # 3 Laying base for a ramp adjacent to TPSS site 11
Aviation/Century Station Installation of Staircase and Escalators April: Stair No. 2 staircase formwork June: Completion of the activity 12
Aviation/Century Station Installation of Elevator Frames Installation elevator frames: June 2018 13
Aviation/Century Station Installation of the Glass Canopy Glass canopy install: June 2018 14
Century/Aviation Station Conceptual Rendering A conceptual rendering of the Century/Aviation Station 15
Underground Segment 1(UG1) Barrier rebar installation on the west U-wall: June 2018 16
Underground Segment 1 (UG1) A newly installed lighting fixture A newly installed lighting fixture: June 2018 17
Ongoing Bridge Construction Location/Activity Tentative Date: Century Station (Glass Canopy) July 2018 * Century Station (Ticket Pavilion Foundation Slab) August 2018 * Century Station (Elevator Install) October 2018 * 18
Southern Segment Ongoing At-Grade Station Construction Location/Activity Downtown Inglewood Station: Install Device/Lighting Canopy Westchester Veterans Station: Install Glass Canopy Westchester Veterans Station: HVAC and TC&C Room Fairview Heights Station: Erect Structural Steel Canopy Tentative Date: July 2018* July 2018* August 2018* August 2018* 19
Upcoming Inglewood/Westchester Lane Restrictions and Closures Location/Activity Tentative Date: Florence Av/Hindry Av (Full Depth Paving) Florence Av/Centinela(Full Depth Paving) TBD 2018* TBD 2018* 20
Southern Segment Southwestern Maintenance Yard Construction Activity Installation of Hand Rails(Stairs #3) Office Area (Restroom Finishes-Level 1) Communication Room (Contract Milestone) Anticipated Completion* July 2018* July 2018* July 2018 * * Schedule is subject to change 21
Southwestern Yard Project Current Southwestern Yard: May 2018
Southwestern Yard Project Current Placement of Precast Concrete Walls Southwestern Yard: May 2018
Southwestern Yard Project Overview Southwestern Yard Conceptual Rendering
AMC-Airport Metro Connector Project Rough grading Rough grading for the trans pad at the future 96 th St Station 25
AMC-Airport Metro Connector Project Conceptual Rendering Project located on Aviation Bl and Arbor Vitae St The proposed project includes a new multi-modal transportation center to connect LAX to the regional bus and rail transit system. 26
AMC-Station Naming Preliminary outreach in form of briefings and presentation are being hosted with key stakeholder to inform and educate about the station naming process and timeline. Outreach began in May 2018 and is scheduled through the end of Summer 2018. Email your name suggestions to: laxconnector@metro.net 27