SE-3, 11 OCT 2018 to 08 NOV SE-3, 11 OCT 2018 to 08 NOV 2018

Similar documents
SE-3, 01 FEB 2018 to 01 MAR SE-3, 01 FEB 2018 to 01 MAR 2018

VERO BEACH VRB Chan 120 N W L-23-24, H-8 PHORD N W

BAIRN FOUR ARRIVAL(RNAV) (BAIRN.BAIRN4) SE-3, 09 NOV 2017 to 07 DEC SE-3, 09 NOV 2017 to 07 DEC 2017 (BAIRN.BAIRN4)27APR17

MARCH Resources ZMA ATC Terminal Layout Passenger Feedback

NAME ALTERNATE MINIMUMS NAME ALTERNATE MINIMUMS INSTRUMENT APPROACH PROCEDURE CHARTS IFR ALTERNATE AIRPORT MINIMUMS

TAKE-OFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES

TABLE OF CONTENTS. Florida Department of Transportation Analysis of Scheduled Air Service in Florida

Revised Routes Between Miami ARTC Center and Havana Area Control Center

BAYPO SEVEN DEPARTURE (RNAV)

MIAMI ARTC CENTER AND JACKSONVILLE ARTC CENTER LETTER OF AGREEMENT

VFR FLIGHT P L A N N I N G C H A R T

SE-3, 06 DEC 2018 to 03 JAN SE-3, 06 DEC 2018 to 03 JAN 2019

NATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION

AL-469 (FAA) CARTERSVILLE BRTEN DOBBINS ARB FULTON COUNTY AIRPORT- BROWN FIELD. BOKRT Turbojets: Expect K Turboprops: Expect 9000 or 7000

MAR-A-LAGO TFR PROCEDURES

AirNav: KMCF - Mac Dill Air Force Base

NATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION

Chapter 6. Nonradar. Section 1. General DISTANCE

Naples Noise and FAA Updates

Virtual Jacksonville Air Route Traffic Control Center Orlando International ATCT Standard Operating Procedures

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations

NAVAL AIR STATION KEY WEST. ATC / TARPON Course Rules 24 TH PARALLEL DO NOT SPILL SOUTH OF 2418:32N 08232W 2400N 08335:57W 465B RHINO HORNET TIGER

Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC

Piedmont Triad International Airport

FLORIDA. Statewide Aviation Economic Impact Study Update EXEC UTI V E S UM M ARY

AERODROME CHART ATIS CLNC DEL

Following supplement is issued for information, guidance and necessary action. [EFFECTIVE DATE: 1 JULY 2010] RGI AIRPORT, SHAMSHABAD

Effective: GOLD COAST (YBCG) NEW PROCEDURES FOR INTRODUCTION OF ILS ON RWY 14

Project Update to Treasure Coast Regional Planning Council

Pi Aero Instrument Rating Syllabus

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

FLORIDA AIRSPACE OPTIMIZATION IFR HIGH ALTITUDE PREFERRED ROUTE SUPPLEMENT

Airservices Australia 2016

Flying an Approach with the Garmin GTN 750

Navigation at the. Federal Aviation Administration Crossroads

AIP MACAO GUANG ZHOU FIR HONG KONG FIR AD2-VMMC-65 A STAR MACAO RWY SEP 2013 (BIGRO 6 A, NLG 5 A, CON 6 A, POU 6 A) CAT A, B, C, D

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Jeppesen Mobile FliteDeck VFR

ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT. EFFECTIVE: July 10, SUBJECT: APPROACH CONTROL SERVICE

MODULE 4: SIDs and STARs. Slide <#> of

Learning Objectives. By the end of this presentation you should understand:

RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES

Introduction to Navigation

Stanfield VOR Procedures

SW-3, 11 OCT 2018 to 08 NOV SW-3, 11 OCT 2018 to 08 NOV 2018

IFR SEPARATION WITHOUT RADAR

MAR-A-LAGO POTUS TFR USER & STAKEHOLDER BRIEFING. Federal Aviation Administration. By: PBI Air Traffic Control Date: January 19, 2017

NE-2, 04 JAN 2018 to 01 FEB NE-2, 04 JAN 2018 to 01 FEB 2018

Providence ATCT Standard Operating Procedures

FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014

Eastern Caribbean PIARCO Virtual FIR. PIARCO Control Zone (CTR)

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

EXPLANATION OF TPP TERMS AND SYMBOLS

Standard Operational Procedures

Part 150 Update Status and Recommendation

April Ft. Lauderdale Airport Traffic Control Tower

JeppView for Windows. General Information. Runway Information. Communication Information. jep=jeppesen

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

IVAO Switzerland Division

JANUARY 2018 BUSINESS AVIATION 2017 REVIEW

FEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC

Standard Operating Procedures (SOPs) for BAGHDAD (ORBI)

Honeywell.com PBN Concepts Krakow, Poland

BOSTON ARTCC (vzbw) TRAINING SYLLABUS LEVEL: Center Controller (C1)

RNAV - RNP. July 2010

SIMULATION USE ONLY. DO NOT USE FOR REAL WORLD NAVIGATION N IVAO HONG KONG

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

Airport and Airspace Operations in the US (Air Traffic Control)

EXAMPLE RADIO SCRIPTS. Fly Safe! Flight Following Wichita Approach, this is, checking in at,

LAS PILOT BRIEFING MCCARRAN INTERNATIONAL AIRPORT

PORTUGAL DIRECÇÃO DE SEGURANÇA E DESEMPENHO OPERACIONAL AERONAUTICAL INFORMATION SERVICE APARTADO LISBOA CODEX

Gleim Instrument Pilot FAA Knowledge Test 2012 Edition, 1st Printing Updates January 27, 2012

Standard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control

APPENDIX B DRO INSTRUMENT APPROACH CHARTS & DEPARTURE PROCEDURES

I3202 WORKSHEET / DD-175 / JET LOG

Analysis of AIRE Continuous Descent Arrival Operations at Atlanta and Miami

VATSIM MINNEAPOLIS ARTCC MINNEAPOLIS TRACON LETTER OF AGREEMENT

1996 BELL LONG RANGER 206L4

Procedure Design Concepts for Logan Airport Community Noise Reduction

9/23/2010 RDU B. Raleigh-Durham Air Traffic Control Tower. Standard Operating Procedures

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1

Cross the Pond Eastbound 2014 Departure Briefing John F. Kennedy International Airport (KJFK) October 25th, z

Pilot Briefing Document Cross The Pond 2013 Heathrow Airport EGLL/LHR

Quieter Skies Report. Partnership for. Broward County Aviation Department Partnership for Quieter Skies Quarterly Report

OMAKA OMAKA OMAKA/WOODBOURNE VICINITY ELEV 100 NZOM. Effective: 18 NOV 10 WOODBOURNE TOWER: WOODBOURNE ATIS: UNATTENDED: 122.

AVIA 3133 INSTRUMENT PROCEDURES UNIVERSITY OF OKLAHOMA

Instrument Proficiency Check Flight Record

Northern Regional Training Scheme. EGNT Newcastle Aerodrome Pilot s Guide. REVISION 2 (Wednesday, 03 August 2011 at 15:51)

Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW)

2018 Business Aviation Review

Standard Instrument Approach Procedures, and Takeoff Minimums. and Obstacle Departure Procedures; Miscellaneous Amendments

INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME

FLIGHT STRIP MANAGEMENT - APPROACH LEVEL

Single Engine Instrument Training Record I PREFLIGHT PREPARATION WEATHER INFORMATION weather reports and forecasts. pilot and radar reports.

AIP ENR JORDAN 01 MAY 2014

Quieter Skies Report. Partnership for. Broward County Aviation Department Partnership for Quieter Skies Quarterly Report

2009 CESSNA CITATION MUSTANG

2009 CESSNA CITATION MUSTANG

Transcription:

EADEN TRANSITION (EADEN.CURSO5) then on track 072 to MNNDY. (DVALL.CURSO5) CURSO FIVE ARRIVAL 124.85 322.3 INTLD-ATIS 119.15 -OPA LOCKA ATIS CURSO ATIS 124.0 072 249 069 18032 HOMESTEAD ARB ATIS 132.275 269.9 (5) ATIS /HOLLYW OOD INTLD-ATIS (6) (RNAV) Transition Routes TIGAR CARNU DVALL 10 NM 5 NM AL-257 (FAA) 043 043 043 223 STRAP 1400 (23) (9) (29) GUSHY (10) 011 1400 (38) 011 NOTE: RNAV 1. NOTE: DME/DME/IRU or GPS required. 223 10 NM 10 NM N Turbojets landing KMIA: Expect Landing East: and 250K Landing W est: 14000 and 280K Turbojets Landing KFLL, KFXE, KPMP: Expect 11000 and 250K Turbojets landing K07FA, KHST, KX51: Expect and 250K, al others: Expect Turbojets Landing KOPF: Expect MARATHON MTH See folowing page for continued arrival routes. MNNDY Landing KTMB, KHST, K07FA, KX51: Expect RADAR vectors after MNNDY. 191 (15) NOTE: MARATHON TRANSITION: ATC assigned only. 044 043 EADEN MARATHON TRANSITION (MTH.CURSO5).... From DVALLon track 069 to CURSO, ARRIVALROUTE DESCRIPTION CANOA MAXIM (CONTINUED ON FOLLOW ING PAGES) CURSO FIVE ARRIVAL (DVALL.CURSO5) 07DEC17 (RNAV) Transition Routes

(DVALL.CURSO5) 17341 AL-257 (FAA) CURSO FIVE ARRIVAL(RNAV) Arrival Routes 124.85 322.3 INTL D-ATIS 119.15 -OPA LOCKA ATIS ATIS 124.0 HOMESTEAD ARB ATIS 132.275 269.9 ATIS /HOLLYWOOD INTL D-ATIS JAREM Landing KFLL: Expect RADAR vectors prior to JAREM. Landing KFXE, KPMP: Expect RADAR vectors after JAREM. 1400 JODPO KMIA Landing East: Expect RADAR vectors prior to JODPO. Landing KOPF, KHWO: Expect RADAR vectors prior to JODPO. 011 MNNDY Landing KTMB, KHST, K07FA, KX51: Expect RADAR vectors after MNNDY. (30) 053 (9) 098 (13) BEETR 053 (1) 080 (10) 4000 FRRDY HAXAM 3000 116 (15) 080 038 048 053 1400 (20) 1400 NOTE: RNAV 1. NOTE: DME/DME/IRU or GPS required. (22) 055 (17) 090 (28) HOLID EPENY 4000 1400 123 GRITT ENVER 092 116 ATONE 092 1400 093 088 (20) HOMESTEAD GENERAL AVIATION LECIT 076 085 INTL 124 HOMESTEAD ARB POMPANO BEACH AIRPARK - OPA LOCKA / HOLLYWOOD INTL IBISS VICLB (33) (20) 150 051 OCEAN REEF CLUB (Private) 123 GULPE (NARRATIVE ON FOLLOWING PAGE) CURSO FIVE ARRIVAL(RNAV) (DVALL.CURSO5) 07DEC17 Arrival Routes

(DVALL.CURSO5) 17341 CURSO FIVE ARRIVAL(RNAV) AL-257 (FAA) ARRIVALROUTEDESCRIPTION KMIA: From DVALontrack069 tocurso, thenontrack072 tomnndy. KMIALanding East Rwys08R/L, 09, 12: From MNNDYontrack053 to JODPO, thenontrack053 tobeetr, thenonheading 053. KMIALanding West Rwys26R/L, 27, 30: From MNNDYontrack053 to JODPO, thenontrack092 tolecit, thenonheading 124. Landing K07FA: From DVALontrack069 tocurso, thenontrack072 tomnndy, thenontrack123 tok07fa, thenonheading 123. Landing KFL: From DVALontrack069 tocurso, thenontrack072 tomnndy, thenontrack011 tojarem, thenontrack098 toholid, thenonheading 092. Landing KFXE: From DVALontrack069 tocurso, thenontrack072 tomnndy, thenontrack011 tojarem, thenontrack080 toenver, thenonheading 085. Landing KHST: From DVALontrack069 tocurso, thenontrack072 tomnndy, thenontrack150 togulpe, thenonheading 051. Landing KHWO: From DVALontrack069 tocurso, thenontrack072 tomnndy, thenontrack053 tojodpo, thenontrack038 tofrrdy, thenonheading 093. Landing KOPF: From DVALontrack069 tocurso, thenontrack072 tomnndy, thenontrack053 tojodpo, thenontrack048 toepeny, thenonheading 088. Landing KPMP: From DVALontrack069 tocurso, thenontrack072 tomnndy, thenontrack011 tojarem, thenontrack055 toatone, thenonheading 076. Landing KTMB: From DVALontrack069 tocurso, thenontrack072 tomnndy, thenontrack080 tohaxam, thenonheading 090. Landing KX51: From DVALontrack069 tocurso, thenontrack072 tomnndy, thenontrack116 tokx51, thenonheading 116. LOSTCOMMUNICATIONS KMIALanding East: TracktoJODPO, thenproceed direct togritt, intercept Rwy09 final approachcourse, conduct approach. KMIALanding West: TracktoLECIT, thenproceed direct VICLB, turnleft tointercept Rwy30 final approachcourse, conduct approach. Group 6 aircraft, tracktolecit, thenproceed direct IBISS, turnleft tointercept Rwy27 final approachcourse, conduct approach. CURSO FIVE ARRIVAL(RNAV) (DVALL.CURSO5) 07DEC17

(CYY.CYY9) 17341 CYPRESS NINE ARRIVAL IE P ST. PETERSBURG 116.4 PIE Chan 111 N27 54.47' - W82 41.06' L-21-24, H-8 AL-257 (FAA) 124.85 (LANDING EAST) 120.5 (LANDING WEST) INTL D-ATIS 119.15 DADE COUNTY ATIS 132.275 269.9 (116) 160 0 0 LEE COUNTY PAHOKEE 111.8 RSW RSW 115.4 PHK Chan 55 LA BELLE Chan 101 N26 31.79' 110.4 LBV W81 46.55' Chan L BV P HK 41 L-21-23, H-8 PALM BEACH 115.7 PBI Chan 104 PBI 155 (86) SARASOTA 117.0 SRQ Chan 117 SRQ N27 24.42' W82 33.82' L-21-23, H-8 CYPRESS 108.6 (T) CYY Chan 23 R-334 R-293 CY N26 09.21' - W81 46.69' R-338 2100 NOTE: Aircraft landing OPF: 182 CYPRESS EIGHT available to turbojet aircraft only. NOTE: RADAR required (23) R-140 113 (31) DEEDS N25 58.67' W81 13.99' R-157 (15) 46 WORPP R-211 N25 53.61' - W80 58.45' TURBOJET VERTICAL NAVIGATION PLANNING INFORMATION 113.9 DHP 104 (34) Miami Intl Landing East: Expect and 250K Miami Intl landing West: Expect 1 and 280K R-229 DOLPHIN Chan 86 DHP R-284 HOMESTEAD GENERAL AVIATION - OPA LOCKA ARB INTL HOMESTEAD OCEAN REEF CLUB (Private) LEE COUNTY TRANSITION (RSW.CYY9): From over RSW VORTAC on RSW R-182 to CYY VOR/DME. Thence.... ST. PETERSBURG TRANSITION (PIE.CYY9): From over PIE VORTAC on PIE R-160 and CYY R-338 to CYY VOR/DME. Thence.... SARASOTA TRANSITION (SRQ.CYY9): From over SRQ VOR/DME on SRQ R-155 and CYY R-334 to CYY VOR/DME. Thence........From over CYY VOR/DME via CYY R-113 to WORPP INT, then via DHP R-284 to DHP VORTAC. Expect RADAR vectors to final approach course. CYPRESS NINE ARRIVAL (CYY.CYY9) 07DEC17

17341 AL-257 (FAA) DVALL THREE ARRIVAL(DVALL.DVALL3) LBV 120.5 LA BELLE INTL D-ATIS 110.4 LBV 119.15 -HOLLYWOOD D-ATIS Chan 41 POMPANO BEACH AIR PARK N25 08.30' W81 19.54' 037 N25 33.14' - W80 54.82' (42) WEVER TURBOJET VERTICAL NAVIGATION PLANNING INFORMATION Miami Intl landing East: Expect clearance to cross at ' and 250K. Miami Intl landing West: Expect clearance to cross at 14000' and 250K. CARNU KEY WEST 113.5 EYW Chan 82 037 EYW DVALL N25 30.88' W80 59.94' N24 35.15' - W81 48.03' L-21-23, H-8 (29) 71 009 (48) 068 39 R-157 (5) (5) 34 L-23, H-8 FAMIN 068 N25 35.14' W80 50.30' MTH DHP N25 48.00' - W80 20.94' MARATHON 260 MTH DOLPHIN 113.9 DHP Chan 86 N24 42.71' - W81 05.72' (29) NOTE: MARATHON TRANSITION: ATC Assigned only. HOLLYWOOD INTL R-248 FORT LAUDERALE- - OPA LOCKA INTL HOMESTEAD ARB NOTE: DME required. KEY WEST TRANSITION (EYW.DVALL3): From over EYW VORTAC on EYW R-037 to DVALL INT. Thence.... MARATHON TRANSITION (MTH.DVALL3): From over MTH NDB on bearing 009 to DVALL INT. Thence........From over DVALL INT via DHP R-248 to DHP VORTAC. Expect RADAR vectors to final approach course after FAMIN INT. DVALL THREE ARRIVAL(DVALL.DVALL3) 07DEC17

(BAARY.SSCOT5) 18256 SSCOT FIVE ARRIVAL(RNAV) AL-257 (FAA) 120.5 350.20 INTLD-ATIS 119.15 ATIS 124.0 NORTHPERRYATIS -OPALOCKAATIS ARRIVAL ROUTE DESCRIPTION BAGGS TRANSITION (BAGGS.SSCOT5) JUULI TRANSITION (JUULI.SSCOT5) LANDING ALL AIRPORTS: From BAARY on track 141 to CYY VOR/DME, then on track 115 to DEEDS, then on track 115 to SSCOT, then on track 116 to RUBOE, then on track 091 to WALIP, then on track 126 to LECIT, then on heading 126 or as assigned by ATC. Expect RADAR vectors to final approach course. 11 NM 140 320 11 NM BAGGS (46) 11 NM 347 140 167 (86) 321 167 141 JUULI 115 BAARY LOST COMMUNICATIONS: MIA LANDING EAST: Continue track to LECIT, intercept the runway 8L final approach course, conduct approach. Group 6 aircraft, continue track to LECIT, intercept the runway 8R final approach course, conduct approach. MIA LANDING WEST: Continue track to LECIT, then proceed direct to JUNUR, then turn left to intercept the runway 30 final approach course, conduct approach. Group 6 aircraft, continue track to LECIT, then proceed direct to IBISS, then turn left to intercept the runway 27 final approach course, conduct approach. 18000 141 CYPRESS (36) CYY 11 NM 11000 115 (31) DEEDS (15) - OPA LOCKA 295 295 295 9 NM NOTE: RNAV 1. NOTE: DME/DME/IRU or GPS required. NOTE: Turbojet and turboprop aircraft only. SSCOT 8000 116 (7) NOTE: MIA landing east: expect to cross SSCOT at and 250K. RUBOE NOTE: MIA landing west: expect to cross SSCOT at 1 and 280K. NOTE: MIA landing runways 8L/R, 26L/R: expect RADAR vectors prior to WALIP. NOTE: MIA landing runways 9, 12 and landing all satellite airports: expect RADAR vectors prior to RUBOE. NOTE: MIA landing runway 27: expect RADAR vectors prior to LECIT. NOTE: Landing OPF-Turbojet aircraft only. NOTE: For non-gps equipped aircraft, PHK DME must be operational. WALIP 091 (13) 126 (18) HOMSTEAD GENERAL AVIATION 3000 OCEAN REEF CLUB (Private) LECIT IBISS INTL 126 HOMESTEAD ARB JUNUR SSCOT FIVE ARRIVAL(RNAV) (BAARY.SSCOT5) 13SEP18

(BLUFI.BLUFI4) 17341 BLUFI FOUR ARRIVAL TREASURE 117.3 TRV Chan 120 LEBUR R-150 1 135 (46) N27 37.83' W79 57.33' R-145 R-165 41 32 57 190 190 (5) (25) 010 TOPPR N27 07.58' W80 01.52' MELBOURNE 110.0 MLB Chan 37 N28 06.32' - W80 38.12' L-23-24, H-8 DALOO N27 12.65' W80 00.82' VERTICAL NAVIGATION PLANNING INFORMATION Expect 1 124.85 322.3 ATIS -OPA LOCKA ATIS /HOLLYWOOD INTL D-ATIS ATIS 124.0 INTL D-ATIS 119.15 HOMESTEAD ARB ATIS 132.275 269.9 PALM BEACH 115.7 PBI Chan 104 POMPANO BEACH AIRPARK / HOLLYWOOD INTL 27 R-010 198 150 (17) 46 71 59 198 (33) (25) BLUFI N26 53.63' W79 49.88' HEATT N26 29.46' R-270 W79 56.77' VERTICAL NAVIGATION PLANNING INFORMATION Expect 7000 NOTE: MELBOURNE TRANSITION available to MIA/HST/X51/ 07FA/TMB arrivals only when MIA is landing west. NOTE: Turboprops only. FREEPORT 113.2 ZFP Chan 79 -OPA LOCKA DOLPHIN 113.9 DHP Chan 86 HOMESTEAD GENERAL AVIATION R-059 13 R-018 INTL HOMESTEAD ARB KAINS N25 57.78' W80 05.71' VIRGINIA KEY 117.1 VKZ Chan 118 N25 45.11' - W80 09.27' OCEAN REEF CLUB (Private) MELBOURNE TRANSITION (MLB.BLUFI4): From over MLB VOR/DME on MLB R-135 to LEBUR INT/MLB 46 DME, then on PBI R-010 to TOPPR INT/PBI 30 DME, then on TRV R-150 to BLUFI INT. Thence...... from over BLUFI INT/VKZ 71 DME on VKZ R-018 to HEATT INT/VKZ 46 DME, then on VKZ R-018 to KAINS INT, then on VKZ R-018 to VKZ VOR/DME. Expect RADAR vectors to final approach course after KAINS INT. BLUFI FOUR ARRIVAL (BLUFI.BLUFI4) 22JUN17

(DEKAL.DEKAL5) 22JUN17 DEKAL FIVE ARRIVAL 133.775 285.6 /HOLLYW OOD INTLD-ATIS ATIS -OPA LOCKA ATIS /HOLLYW OOD INTL -OPA LOCKA to DEKAL. Thence.... POMPANO BEACH AIRPARK R-121 DEKAL 32 114.4 FLL 120 N25 51.03'-W 79 37.88' ARRIVALROUTE DESCRIPTION then on ZBV R-300 to DEKAL. Thence.... VERTICALNAVIGATION PLANNING INFORMATION Turbojets expect 250K ATC may assign 250K A l other aircraft expect 4000 Chan 91LF FREEPORT TRANSITION (ZFP.DEKAL5): From over ZFP VOR/DME on ZFP R-215 and ZBV R-036 to ZBV VORTAC, then on ZBV R-300 on ZQA R-315 to CAREY, then on ZBV R-100 to ZBV VORTAC, URSUS TRANSITION (URSUS.DEKAL5): From over URSUS on ZBV R-177 to ZBV VORTAC, then on ZBV R-300 to DEKAL. Thence.... NASSAU TRANSITION (ZQA.DEKAL5): From over ZQA VOR/DME 4000 300 (20)....from over DEKALexpect RADAR vectors to final approach course. R-177 (103) 357 R-036 300 215 (60) R-100 URSUS N24 00.00' 280 CAREY L-23, H-8 ZFP ZBV N25 42.25'-W 79 17.67' (58) W 79 04.19' 116.7 ZBV 113.2 ZFP N25 35.93' W 78 13.80' N26 33.32' W 78 41.87' BIMINI Chan 114 FREEPORT Chan 79 135 315 (55) NASSAU 112.7 ZQA Chan 74 L-23, H-8 N ZQA N25 01.53'-W 77 26.79' NOTE: RADAR and DME Required. DEKAL FIVE ARRIVAL (DEKAL.DEKAL5) 17173

(FISEL.FISEL7) 17173 FISEL SEVEN ARRIVAL (RNAV) ORMOND BEACH OMN NOTE: RNAV 1. NOTE: DME/DME/IRUor GPS required. NOTE: Turbojet aircraft only. 142 (52) DIINO (25) 143 QUASH MELBOURNE MLB 15 NM 323 (65) 1 133.775 285.6 /HOLLYWOOD INTL D-ATIS -OPA LOCKA ATIS ATIS 12 NM 1 018 198 (61) 198 CRANS NOTE: Treasure transition: ATC assigned only. 1 142 (66) ARRIVAL ROUTE DESCRIPTION CRANS TRANSITION (CRANS.FISEL7) FREEPORT TRANSITION (ZFP.FISEL7) MELBOURNE TRANSITION (MLB.FISEL7) ORMOND BEACH TRANSITION (OMN.FISEL7) TREASURE TRANSITION (TRV.FISEL7) From FISEL on track 227 to WAKED, then on track 258 to BEPAC, then on track 276 to AGOYA, then on 276 heading or as assigned by ATC. Expect RADAR vectors. AGOYA 4000 276 (33) POMPANO BEACH AIRPARK BEPAC 258 (6) /HOLLYWOOD INTL TREASURE TRV 227 (16) WAKED 148 (70) (4) MOSIE FISEL 171 (28) FATHR Expect FL240 8000 Expect 8000 and 250K 209 228 029 (7) (20) 171 351 8000 1 (6) 209 JALOP BALEW Expect 8000 and 250K to WAKED. after FISEL. TOOMR 8000 271 (58) NOTE: Landing FXE, HWO, OPF, PMP: Expect RADARvectorsprior NOTE: FLLanding West: Expect RADAR vectorstofinal approachcourse NOTE: FLLanding East: Expect RADAR vectorstofinal approach course prior toagoya. FREEPORT ZFP FISEL SEVEN ARRIVAL (RNAV) (FISEL.FISEL7) 22JUN17 -OPA LOCKA

(FORTL.FORTL7) ST. PETERSBURG 116.4 PIE PIE Chan 111 N27 54.47' W82 41.06' L-21-24, H-8 R-077 R-179 17173 FORTL SEVEN ARRIVAL TEPEE N28 00.02' W82 21.99' H-8 TAYLOR 112.9 TAY Chan 76 133.775 285.6 /HOLLYWOOD INTL D-ATIS -OPA LOCKA ATIS ATIS POMPANO BEACH ATIS 154 0 NOTE: Aircraft Landing OPF: FORTL7 available to turboprop and prop aircraft only. SARASOTA 117.0 SRQ Chan 117 L-21-23, H-8 (96) N27 24.42' W82 33.82' (67) 0 146 LEE COUNTY 111.8 RSW Chan 55 (93) RSW 162 N26 31.79'-W81 46.55' J75 R-342 122 122 (26) KUBIC LA BELLE 110.4 LBV Chan 41 R-175 LBV (25) N26 05.86'-W80 56.97' TURBOJET VERTICAL NAVIGATION PLANNING INFORMATION Expect 8000 FORTL V7 J75-614 N26 18.56' W81 21.14' V7 52 R-199 113.9 DHP 115.4 PHK POMPANO BEACH AIRPARK / DOLPHIN HOLLYWOOD INTL 37 Chan 86 090 DHP PAHOKEE Chan 101 R-303 PHK - OPA LOCKA ARRIVAL ROUTE DESCRIPTION ST. PETERSBURG TRANSITION (PIE.FORTL7): From over PIE VORTAC on PIE R-154 to RSW VORTAC, then on RSW R-122 to FORTL INT. Thence.... SARASOTA TRANSITION (SRQ.FORTL7): From over SRQ VOR/DME on SRQ R-146 to RSW VORTAC, then on RSW R-122 to FORTL INT. Thence.... TEPEE TRANSITION (TEPEE.FORTL7): From over TEPEE INT on J75 and RSW R-342 to RSW VORTAC, then on RSW R-122 to FORTL INT. Thence........From over FORTL INT on RSW R-122 to KUBIC INT, then heading 090. Expect RADAR vectors to final approach course. FORTL SEVEN ARRIVAL (FORTL.FORTL7) 22JUN17

(GISSH.GISSH5) 17173 GISSH FIVE ARRIVAL FL280 136 (52) ORMOND BEACH 133.775 285.6 112.6 OMN /HOLLYWOOD INTL D-ATIS Chan 73 N29 18.20'-W81 06.76' ATIS L-21, 23, 24, H-8 DIINO N28 40.00' -OPA LOCKA ATIS W80 25.59' (25) 7 NM MELBOURNE 110.0 MLB Chan 37 N28 06.32'-W80 38.12' L-23, 24 78 (59) 316 169 165 FL240 NOTE: DME required. QUASH NOTE: Turbojets only. N28 21.50' NOTE: Treasure transition: W80 05.91' ATC assigned only. BOATR N27 24.48' W79 48.37' TREASURE 117.3 TRV Chan 120 N27 40.70'-W80 29.38' L-23, 24, H-8 GISSH N26 27.67' W79 49.27' (70) POMPANO BEACH AIRPARK 143 (66) 149 JALOP N26 45.03' W79 41.05' NAVIGATION PLANNING 114.4 FLL Chan 91 N26 04.44'-W80 09.99' L-23, H-8 / HOLLYWOOD INTL TURBOJET VERTICAL INFORMATION Expect 8000 -OPA LOCKA R-027 46 25 228 R-048 41 (19) (6) 65 (5) 71 106 (28) 8000 169 207 027 349 99 (6) FISEL N26 23.05' W79 51.46' VIRGINIA KEY 117.1 VKZ 7 NM Chan 118 71 R-349 TOOMR N26 51.00' W79 38.21' FATHR N27 18.43' W79 46.52' TURBOJET VERTICAL NAVIGATION PLANNING INFORMATION Expect FL240 268 (61) FREEPORT 113.2 ZFP Chan 79 N26 33.32'-W78 41.87' L-23, H-8 BIMINI 116.7 ZBV Chan 114 NOTE: Chart not to scale GISSH FIVE ARRIVAL (GISSH.GISSH5) 22JUN17 (NARRATIVE ON FOLLOWING PAGE)

(GISSH.GISSH5) 17173 GISSH FIVE ARRIVAL ARRIVAL ROUTE DESCRIPTION FREEPORT TRANSITION (ZFP.GISSH5): From over ZFP VOR/DME on ZFP R-268 to GISSH INT/ZFP 61 DME. Thence.... MELBOURNE TRANSITION (MLB.GISSH5): From over MLB VOR/DME on MLB R-143 to FATHR INT/MLB 66 DME, then on ZBV R-349 to TOOMR INT/ZBV 71 DME, then on VKZ R-027 to GISSH INT/VKZ 46 DME. Thence.... ORMOND BEACH TRANSITION (OMN.GISSH5): From over OMN VORTAC on OMN R-136 to QUASH INT/OMN 78 DME, then on ZBV R-349 to TOOMR INT/ZBV 71 DME, then on VKZ R-027 to GISSH INT/VKZ 46 DME. Thence.... TREASURE TRANSITION (TRV.GISSH5): From over TRV VORTAC on TRV R-149 to JALOP INT/TRV 70 DME, then on VKZ R-027 to GISSH INT/VKZ 46 DME. Thence........ from over GISSH INT/VKZ 46 DME on VKZ R-027 to FISEL INT/FLL 25 DME, then on FLL VOR/DME R-048 to FLL VOR/DME, expect RADAR vectors to final approach course. GISSH FIVE ARRIVAL (GISSH.GISSH5) 22JUN17

(47) (RXXAN.JINGL6) 18256 JINGL SIX ARRIVAL(RNAV) 133.775 285.6 /HOLLYWOOD INTL D-ATIS ATIS -OPA LOCKA ATIS ARRIVAL ROUTE DESCRIPTION BAGGS TRANSITION (BAGGS.JINGL6) BALKE TRANSITION (BALKE.JINGL6) LANDING ALL AIRPORTS: From RXXAN on track 131 to FORTL, then on track 126 to SWAGS, then on track 127 to JINGL, then on track 100 to JAREM, then on track 090 to BEPAC, then on heading 093 or as assigned by ATC. Expect RADAR vectors to final approach course. LOST COMMUNICATIONS: FLL LANDING EAST: Continue track to JAREM, then proceed direct to HOLID, intercept Rwy 10L final approach course and conduct approach. 10 NM 11 NM BALKE 124 BAGGS 304 348 124 168 (75) 168 FLL LANDING WEST: Continue track to BEPAC, then proceed direct to CEDLU, turn right to intercept Rwy 28R final approach course and conduct approach. NOTE: NOTE: NOTE: NOTE: NOTE: NOTE: RADAR required. RNAV 1. DME/DME/IRUor GPSrequired. Turbojet and turboprop aircraft only. Landing OPFturboprops only. When FLis landing west, expect to cross JAREM at 7000. 10 NM 348 RXXAN 14000 131 (47) FORTL 311 POMPANO BEACH AIRPARK 126 SWAGS (16) 8000 (8) 127 7 NM 307 100 (12) (33) 4000 090 BEPAC 093 CEDLU HOLID / JAREM HOLLYWOOD INTL JINGL VERTICAL NAVIGATION PLANNING INFORMATION Expect 8000 -OPA LOCKA JINGL SIX ARRIVAL(RNAV) (RXXAN.JINGL6) 13SEP18

(WAVUN.WAVUN3) 22JUN17 WAVUN THREE ARRIVAL (RNAV) FRRDY FT. LAUDERDALE POMPANO BEACH AIRPARK FT. LAUDERDALE - HOLLYW OOD INTL 4000 278 (28) -OPA LOCKA KEVEY (13) W AVUN DEKAL TURBOJETS: ATC may assign 250K ALLOTHER AIRCRAFT: 4000 301 122 5 NM Expect Expect 4000 (11) NOTE: Landing Fort Lauderdale/Holywood Intl East: Expect RADAR (6) vectors to final approach course prior to FRRDY. NOTE: Landing Fort Lauderdale/Holywood Intl W est: Expect RADAR vectors to final approach course prior to KEVEY. NOTE: Landing Fort Lauderdale Executive, Pompano Beach Airpark: Expect RADAR vectors after DEKAL. NOTE: Landing Holywood North Perry, Miami-Opa Locka Executive: Expect RADAR vectors after W AVUN. W IERS 9000 302 (9) BIMINI ZBV (9) (37) 11000 11000 122 302 1 (17) SKIPS 1 FREEPORT ZFP BAHMA (19) 1 218 MAYKO 11000 282 (58) (25) 128.60 306.475 (4000 and below) 119.45 290.325 ( and above) /HOLLYW OOD INTLD-ATIS ATIS -OPA LOCKA ATIS CAREY 135 (26) MAJUR 315 (29) N FL220 WAVUN THREE ARRIVAL (RNAV) (WAVUN.WAVUN3) 17173 ARRIVALROUTE DESCRIPTION FREEPORT TRANSITION (ZFP.W AVUN3) NASSAU TRANSITION (ZQA.W AVUN3) URSUS TRANSITION (URSUS.W AVUN3) From ZBV VORTAC on track 302 to W IERS, then on 302 track to DEKAL, then on 301 track to W AVUN, then on 301 track to KEVEY, then on 278 track to FRRDY, then on 278 heading or as assigned by ATC. Expect radar vectors. FOW EE ZOLLA URSUS (42) (15) 359 FL200 NOTE: RNAV 1. NASSAU ZQA NOTE: DME/DME/IRU or GPS required.