CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: (extract from HS2 High Speed to Nowhere)

Similar documents
CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: (extract from HS2 High Speed to Nowhere)

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: MANCHESTER AIRPORT. (extract from HS2 High Speed to Nowhere)

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: and Merseyside conurbation. (extract from HS2 High Speed to Nowhere)

Census 2011: City snapshot

Delivering the High Speed Network the Nation Needs

Chapter 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes

Technical specification: BS 4449:2005 GRADE B500B BAR AND COIL

Doncaster Chamber of Commerce. Andy Taylor Head of Public Affairs, HS2 Ltd

City employment: An overview from the Business Register & Employment Survey (BRES)

Appendix 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes

Northern Powerhouse Rail

Christmas Engineering Works

75,402 sq ft. 88,866 sq ft NOTTINGHAM. panattoni park CONSTRUCTION UNDER. Two industrial/warehouse units TO LET AVAILABLE Q3 2018

CONSTRUCTION UNDER. Cross-docked warehouse/distribution unit 550,270 sq ft TO LET AVAILABLE Q M1/J26 PANATTONI PARK NOTTINGHAM NOTTINGHAM 550

550,270 sq ft TO LET AVAILABLE Q1 2019

550,270 sq ft TO LET AVAILABLE Q1 2019

Healthwatch is the independent champion for people who use health and social care services.

Department for Transport (DfT) Response to the Recommendations of Passenger Focus for the New Cross Country Rail Franchise.

UNITS 4 & 5 AVAILABLE TO LET CV35 9JY TWO NEW INDUSTRIAL / WAREHOUSE OPPORTUNITIES ON AN ESTABLISHED PARK

School improvement monitoring and brokering grant provisional allocations for illustrative purposes

THE LARGEST AVAILABLE WAREHOUSE IN THE UK 614,497 SQ FT (57, SQ M)

PQ Local Authorities with exceedances of NO 2 annual mean limit value (based on 2015

The Hybrid Bill and the journey to Royal Assent. Andy Taylor Head of Public Affairs, HS2 Ltd

Happiness is a town called Harrogate destination named happiest place to live for THIRD year running

Planned Expenditure by Local Authorities: Services for Young People

High Speed UK. Regional Mapping covering the East and West Midlands

This report, and information or advice which it contains, is prov ded by MVA Consultancy Ltd solely for internal use and reliance by ts Client in

Easter Improvement Works. London Euston Closed Friday 19 until Monday 22 April virgintrains.com/spanner nationalrail.co.

S31 Grant determination for a high needs strategic planning fund in : DCLG ref 31/2916

Jim Steer. Director Greengauge 21. HS2 and the North. Transport Times Conference. October October 2016 Transport Times, London 1

THE STOPS ARE JUST THE START

Introduction to European Commission Funding: ERDF and JESSICA

grade A space grade a location FOR SALE TO LET

1.6 million sq ft TO LET/FOR SALE AVAILABLE Q4 2019

YouGov PlaceIndex results

Oakley Hay, Corby RANGE OF AREAS BETWEEN 3.17 ACRES (1.28 HECTARES) ACRES (7.16 HECTARES) SAT NAV: NN18 8HS

Numbers achieving 3 A grades in specific A-Level combinations by school type and LEA

About your flights to Barcelona

Bigfoot s Back! Royal Oak Distribution Centre Daventry, East Midlands, NN11 8QL

PHASE 2 UNDER CONSTRUCTION

Department for Transport

LOGISTICS 175 TO LET M61/J4 BOLTON BL5 1BT. New build

Meeting the capacity challenge: The case for new lines

LOGISTICS 175 TO LET M61/J4 BOLTON BL5 1BT. New build

DC240 TO LET. 10,515 sq ft (980 sq m) high quality offices with exceptional car parking. high quality offices

Manchester Victoria 11 day blockade Easter 2016

Derby Commercial Park

40 ACRE HIGH PROFILE DEVELOPMENT SITE

Derby Commercial Park

IMPORTANT. Anyway, here is the list of the sections of routes on which passes may be used: 007 Deal Canterbury Bluewater Eltham Eltham VCS

Oriel 2018 (2019intake) Hospital and Health Board Employers

RUGBY GATEWAY RG-2 290,000 SQ FT SPECULATIVE UNIT TO LET JUNCTION 1 M6 CV23 0XF OCCUPATION FROM SEPTEMBER

PHASE 3 UNDER CONSTRUCTION

grade A space grade a location FOR SALE TO LET

Derby Commercial Park

High-Speed Rail Development Programme 2008/9

LOGISTICS 225 & LOGISTICS 175

Midlands Connect Strategy: Powering the Midlands Engine

NORTH GOWER STREET, LONDON NW1 A CENTRAL LONDON UNBROKEN RESIDENTIAL INVESTMENT OPPORTUNITY

#element of bullying / harassment South West 2gether NHS FT Mental Health Small

Midlands Connect Objectives for Improved Transport Connectivity

EMPIRE. Bromley Clydebank Newcastle Sunderland ODEON UK & IRELAND

SUFFOLK PARK BURY ST EDMUNDS IP32 7QB NEW INDUSTRIAL AND LOGISTICS PARK. BUILD-TO-SUIT OPTIONS FROM 50, ,000 sq ft suffolk-park.

PHASE 3 UNDER CONSTRUCTION

Phase II provides a further 45 acres for industrial and distribution space (B1/B2/B8); 25,000 sq ft 850,000 sq ft

BENTLEY MILL WAY WALSALL WS2 0LE. Prominent retail investment with annual fixed rental uplifts

Consented 4 million sq ft scheme over 250 acres Manufacturing/distribution opportunities

CELTIC BUSINESS PARK. 4hrs 3hrs 2hrs

Steve Carr. Homes & Communities Agency. Historic Towns Forum 9 November 2012

Manufacturing/distribution opportunities 20, ,000 sq ft

Liverpool ONE. Russian Council of International Shopping Centres 20 th June 2012

Dear Louise. I can confirm that the full list of approved sites for this study is:

Table 4.1 Organisation and management

Cris Tarrant CEO (BVA State of the Nation. Joe Stather Associate Director #2018HIF

NHS South Warwickshire CCG

DIDCOT DISTRIBUTION PARK DIDCOT OXFORDSHIRE OX14 4TA 62 ACRES

SUFFOLK PARK BURY ST EDMUNDS IP32 7QB NEW INDUSTRIAL AND LOGISTICS PARK. BUILD-TO-SUIT OPTIONS FROM 50, ,000 sq ft suffolk-park.

Regional Spread of Inbound Tourism

DIDCOT DISTRIBUTION PARK DIDCOT OXFORDSHIRE OX14 4TA 62 ACRES

Emerging Strategy. Executive Summary November Midlands Connect Powering the Midlands Engine

West Coast Main Line Track Access Applications Consultation:

City centres: past, present and future

DIDCOT DISTRIBUTION PARK DIDCOT OXFORDSHIRE OX14 4TA 62 ACRES ASDA BOOKPOINT DAILY MAIL

Manufacturing/distribution opportunities 20, ,000 sq ft

Workless households for areas across the UK in 2010

UK Airport Operators Association

National Training Awards 2011 Outshine the competition - enter today

WR Reporting Numbers Summer Compiled by Ed Chaplin

DC1 PRE-LET TO THE CO-OPERATIVE UP TO 471,000 SQ FT REMAINING

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

Leicester. Leicester. Commercial Park. 95,978 sq ft of warehouse / distribution space

NEW INDUSTRIAL AND LOGISTICS PARK SUFFOLK PARK BURY ST EDMUNDS IP32 7QB. 50, ,000 sq ft (4,745-69,667 sq m).

1.1 We note that the following WCML access applications have been made:

An Introduction to HS2

HIGH SPEED RAIL: INVESTING IN BRITAIN S FUTURE

Agenda Item 5: Rail East Midlands Rail Franchise Consultation

Gateway. Leeds. A new national centre for logistics & manufacturing. TO LET Ready for immediate development M1/J45 LEEDS LS9 0PS

HS2 and Classic Service Plans

FAO: Sir Howard Davies, Chair, Airports Commission 21 Apr 2013

Area1 Area Code Cut-off Date In Bank Date Area North East Essex. 28th 14th Mid Essex South East Essex

Transcription:

APPNIX H2 CONNCTIVITY IMPROVMNTS ACHIV BY HS2 AN HIGH SP UK FOR: HURSFIL (extract from HS2 High Speed to Nowhere) Appendix H2 : Page 244 Introduction & key results Page 245 Timeline of comparative journey times from Page 246 HS2 routes from Page 247 HSUK routes from Page 248 Tabulated journey times from 243

Town/City References: City Region West Yorkshire Population of city/borough** 160,000 Ranking amongst UK cities N/A (part of W.Yorkshire) Number of cities directly linked by existing rail network (out of 31) 9 ** https://en.wikipedia.org/wiki/ : Intercity Connectivity with HSUK and HS2 Average journey time reduction Cities directly linked (out of 30) s made faster (out of 31) HSUK Yorkshire Rail Strategy HSUK Transpennine Rail Strategy HSUK Regional Maps 10 & 11 HSUK Network Map All available on HSUK website www.highspeeduk.co.uk s made worse (out of 31) Best performer (out of 31 journeys) High Speed UK 40% 17 26 0 26 HS2 8% 0 8 2 0 s location on the TransPennine Main Line between Leeds and gives the town good direct connectivity along a corridor extending to Liverpool in the west, and Hull and Newcastle in the east. Links to the wider intercity network are relatively easily available, at both Piccadilly and at Leeds. s most critical connectivity deficiency is its lack of high-quality direct links to other major UK cities, in particular Sheffield, and London. Although lies on the Leeds- TransPennine route for which major upgrades have been proposed, it is not yet clear whether the specified acceleration in Leeds- journey times from 49 to 30 minutes is compatible with a stop at. etailed modelling by HSUK indicates that around 25km of new tunnelled route will be necessary to achieve the required journey time reduction. One intervention is likely to be a tunnel completely bypassing station. has no place in HS2 plans; it is assumed that passengers will change onto HS2 services either at Piccadilly or at Leeds. Given the limited range of destinations, this will leave primarily reliant on the existing intercity network for its intercity connectivity. HSUK s new-build transpennine route via the abandoned Woodhead corridor will enable enhanced services from both Leeds and Sheffield to that easily beat the Northern Powerhouse specification of 30 minute journey times. HSUK s route will of necessity bypass ; however, full integration with the existing network will allow services on the existing route to be enhanced, with new direct journeys to, Airport, Crewe, Wolverhampton,, Coventry and Leicester. Restoration of the abandoned transpennine Woodhead route and Sheffield Victoria station will also enable for the first time direct high speed services from to London. 244

HIGH SP UK & HS2 LINKS TO H U R S F I L time (mins) Leeds Sheffield Stockport Warrington M ch r Airport Bradford York Crewe Leicester Liverpool oncaster Hull Preston Wolverhampton Stoke Nottingham erby London Northampton Walsall B'ham Airport Milton Keynes Luton Coventry Peterborough Heathrow Oxford Cheltenham $ $ Cheltenham services run onward to Bristol and Cardiff HURSFIL 40 80 120 160 200 240 280 Intercity journey time... with HSUK in place as existing with HS2 in place 245 # # # xisting journey made worse by HS2 Quickest journey... 26 5 0 via HSUK no change via HS2 20 minute increment applied to journey times (where relevant) to allow for deterrent effect of each change of trains Ave. journey time reduction HSUK HS2 40% 8% For journey times presented in tabulated format see p248

HURSFIL Isolated from HS2, poor links to London, Sheffield &, likely to be bypassed by HS3 HS2 Average journey time reductions: 8% No. of cities directly linked: 0 made faster: 8 made worse: 2 Blackpool Preston Wigan Liverpool Warrington Airport Large circle denotes centre considered in journey time assessment Cardiff Bristol Crewe Cheltenham Blackburn Stafford Wolverhampton New Street Curzon Street Bath Route of HS3 not defined Bolton Bristol Parkway KY Town/city/airport served by HS2 Centre served by HSUK but not HS2 HS2 new-build high speed line HS2 services on existing line No HS2 services from Stoke Leeds Bradford Stockport Walsall BHX Leamington Swindon Sheffield -field erby Reading York Nottingham Leicester Peterborough Coventry Northampton Oxford Milton Keynes Wakefield Hull oncaster Heathrow Newark ast Midlands Interchange/Toton Luton Interchange linked to BHX (B ham Airport) Old Oak Common Gatwick HIGH SP 2 ROUTS & CITIS SRV Stevenage London 246

HURSFIL Fully connected to national high speed network, enhanced links to London, Sheffield & HSUK Average journey time reductions: 40% Blackpool Preston Liverpool Wigan Blackburn Bolton Leeds Bradford York Wakefield Hull No. of cities directly linked: 17 made faster: 26 made worse: 0 served by: HSUK06 HSUK28 HSUK45 See Appendix A1 Warrington Airport Large circle denotes centre considered in journey time assessment Cardiff Bristol Crewe Stafford Wolverhampton Cheltenham Bath Stockport Stoke Walsall Airport Bristol Parkway Leamington Swindon KY Town/city/airport served by HSUK Centre not served by HSUK HSUK new-build high speed line HSUK services on existing line HSUK services from www.highspeeduk.co.uk Sheffield -field erby Coventry Oxford Milton Keynes Reading oncaster Newark Nottingham Leicester Peterborough Northampton Brent Cross Heathrow Luton Gatwick Stevenage London HIGH SP UK ROUTS & CITIS SRV 247

Quickest via: HSUK Comparative Times from time adjusted for HS2 number of changes HSUK xisting HS2 No change Origin estination HSUK xisting HS2 H U R S F I L time No of changes time No of changes time No of changes 98 156 102 98 0 136 1 82 1 B ham Airport 107 181 181 107 0 161 1 161 1 Bradford 43 43 43 43 0 43 0 43 0 Cheltenham 159 213 213 139 1 193 1 193 1 83 135 135 63 1 115 1 115 1 Coventry 116 191 155 116 0 171 1 105 2 B Crewe 55 100 100 55 0 80 1 80 1 erby 93 135 129 73 1 115 1 89 2 oncaster 75 87 87 55 1 67 1 67 1 # Heathrow 139 295 179 119 1 235 3 139 2 Hull 71 78 78 71 0 78 0 78 0 Leeds 19 19 19 19 0 19 0 19 0 Leicester 56 190 143 56 0 160 2 103 2 Liverpool 67 67 67 67 0 67 0 67 0 London 100 189 129 100 0 169 1 109 1 Luton 113 285 285 93 1 245 2 245 2 26 26 26 26 0 26 0 26 0 M ch r Airport 39 48 48 39 0 48 0 48 0 Milton Keynes 113 159 159 93 1 139 1 139 1 Northampton 101 204 201 81 1 164 2 151 2 B made worse by HS2 Nottingham 90 168 129 70 1 148 1 89 2 Oxford 144 240 240 124 1 220 1 220 1 Peterborough 124 150 150 104 1 130 1 130 1 Preston 71 106 106 71 0 86 1 86 1 Sheffield 26 80 80 26 0 80 0 60 1 Stockport 30 74 74 30 0 54 1 54 1 Stoke 84 101 101 64 1 81 1 81 1 # Walsall 105 227 227 85 1 187 2 187 2 Warrington 39 60 60 39 0 60 0 60 0 Wolverhampton 83 138 138 83 0 118 1 118 1 York 45 45 45 45 0 45 0 45 0 A = Change introduced by HS2 B = Change via shuttle between International and Interchange # = made worse by intervention of HS2 (no adjustment made to existing journey time) Generally, journey times adjusted by 20 minutes to allow for each change of trains. 30 minute adjustment applied for the special cases noted above ie A extra change introduced by HS2 and B shuttle connection between International and Interchange. 248